Permit Application Status

B0800674


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0800674
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
ADDITION COMMERCIAL
ADDITION FOR CATH LAB EXPANSION
05/19/2008
06/24/2008
09/29/2009
04/06/2009
Locations
Contacts
P1 GROUP INC, Address:16210 WEST 108TH ST  
J E DUNN CONSTRUCTION, Address:929 HOLMES RD  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
ACI BOLAND, Address:11229 NALL SUITE 140  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 12/20/2008 10/29/2010
Correction

Fire Department- 2006 IFC 703.1- Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

Fire Department- 2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Correction

Fire Department- 2006 IFC 901.5.1- Occupancy. It shall be unlawful to occupy any portion of a building or structure until the required fire detection, alarm and suppression systems have been tested and approved.
Correction

Codes Administration - 2006 IBC 1012.2 - Height. Handrail height, measured above the stair tread nosing, or finish surface of ramp slope shall be uniform, not less than 34 inches and not more than 38 inces.
Correction

Codes Administration - 2006 IBC 1012.5 - Handrail Extensions. Handrails shall return to a wall, guard or the walking surface or shall be continuous to the handrail of an adjacent stair flight or ramp run. At stairways where handrails are not continuous between flights, the handrails shall extend horizontally at least 12 inches beyond the top riser and continue to slope for the depth of one tread beyond the bottom riser. At ramps where handrails are not continuous between runs, the handrail shall extend horizontally above the landing 12 inches minimum beyond the top and bottom ramps.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Correction

Fire Department- 2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: appliances. 1.Alarm control and trouble signaling equipment. 2. Power connection. 3. Battery calculations. 4. Conductor type and sizes. 5. Voltage drop calculations. 6. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Fees
Paid Fees Amount Paid Owing Date Paid
Road and Bridge Escrow $1,114.79 $1,114.79 Paid 06/16/2008
0120 Building Permit Fee $3,987.72 $3,987.72 Paid 06/24/2008
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Plumbing Inspection - Commercial Passed 07/14/2008
Correction
Resolved
07/14/2008
ROOF DRAIN CONNECTION PER DRWG C2.0 CONNECT EXISTG TO ST BOX
Underground Plumbing Inspection - Commercial Request Complete 7/14/2008 7/14/2008 07/14/2008
Footing Inspection - Commercial Partial 07/21/2008
Correction
Partial Correction
07/21/2008
PREPARATION TO POUR ISOLATED COLUMN FOOTINGS L/6.3; M.3/6.3; M/7; OK TO POUR WHEN READY LOCATIONS DESCRIBED BELOW
Footing Inspection - Commercial Partial 07/22/2008
Correction
Partial Correction
07/22/2008
PREPARATION TO POUR ISOLATED COLUMN FOOTINGS L/6.3; M.3/6.3; M/7; L/5; L/7; OK TO POUR WHEN READY LOCATIONS DESCRIBED BELOW
Footing Inspection - Commercial Passed 07/24/2008
Correction
Resolved
07/24/2008
PREPARATION TO POUR GRADE BEAM + INTEGRAL COLUMN FOOTINGS OK TO POUR WHEN READY
Correction
Resolved
07/24/2008
PREPARATION TO POUR ISOLATED COLUMN FOOTINGS L/6.3; M.3/6.3; M/7; L/5; L/7 OK TO POUR WHEN READY LOCATIONS DESCRIBED BELOW
Concrete Walls and Columns Inspection Partial 07/25/2008
Correction
Partial Correction
07/25/2008
PREPARATION TO POUR C.I.P. CONCRETE COLUMNS L/5; L/6.3; L/7; LA/5.6; M.3/6.3; M.3/7; N/7.8; OK TO POUR WHEN READY COLUMNS @ LOCATIONS BELOW
Concrete Walls and Columns Inspection Partial 07/31/2008
Correction
Partial Correction
07/31/2008
PREPARATION TO POUR C.I.P. CONCRETE COLUMNS L/5; L/6.3; L/7; LA/5.6; M.3/6.3; M.3/7; N/7.8; LA/5; N/6.3; OK TO POUR WHEN READY COLUMNS @ LOCATIONS BELOW
Concrete Walls and Columns Inspection Partial 08/08/2008
Correction
Partial Correction
08/08/2008
PREPARATION TO POUR C.I.P. CONCRETE COLUMNS FIRST FLOOR LEVEL: L/5; L/6.3; L/7; LA/5.6; M.3/6.3; M.3/7; N/7.8; LA/5; N/6.3; K.1/5; K.1/6; K.1/7. OK TO POUR WHEN READY COLUMNS @ LOCATIONS BELOW
Underground Plumbing Inspection - Commercial Passed 08/13/2008
Correction
Resolved
08/13/2008
UNDER-SLAB WASTE, SOIL, VENT PIPING OK TO COVER WHEN READY
Underground Plumbing Inspection - Commercial Request Complete 8/13/2008 8/13/2008 08/13/2008
Underslab Electrical Inspection - Commercial Passed 08/18/2008
Correction
Resolved
08/18/2008
UNDER-FLOOR ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP OK TO COVER WHEN READY
Suspended Slab Inspection Not Ready 09/03/2008
Correction
Corrective Action Required
09/03/2008
READINESS FOR INSPECTION REQUEST CANCELED BY P.H.
Suspended Slab Inspection Not Ready 09/04/2008
Correction
Corrective Action Required
09/04/2008
READINESS FOR INSPECTION REQUEST CANCELED BY P.H.
Suspended Slab Inspection Passed 09/08/2008
Correction
Resolved
09/08/2008
PREPARATION TO POUR C.I.P. CONCRETE PAN SLAB ROOF DECK SUBJECT TO A/E INSPECTION OK TO POUR WHEN READY
Correction
Resolved
09/08/2008
READINESS FOR INSPECTION
Concrete Walls and Columns Inspection Passed 09/10/2008
Correction
Resolved
09/10/2008
PREPARATION TO POUR C.I.P. CONCRETE COLUMNS FIRST FLOOR LEVEL: L/5; L/6.3; L/7; LA/5.6; M.3/6.3; M.3/7; N/7.8; LA/5; N/6.3; K.1/5; K.1/6; K.1/7. SECOND FLOOR LEVEL STUB COLUMNS -- OK TO POUR WHEN READY OK TO POUR WHEN READY COLUMNS @ LOCATIONS BELOW
Rough Framing Inspection - Commercial Partial 10/01/2008
Correction
Partial Correction
10/01/2008
LIGHT-GUAGE STEEL FRAMING OF EXTERIOR WALLS SE/S/SW/W WALLS @ 1ST FLOOR & ROOF OK TO COVER WHEN READY AFTER ALL STUD FLANGES SCREWED TO TRACKS AND HEADERS EXCEPT AT A/E DESIGNATED SLIP-TRACK; OK TO COVER WHEN READY FOLLOWING PORTIONS:
Rough Framing Inspection - Commercial Request Complete 9/30/2008 10/1/2008 10/01/2008
Rough Framing Inspection - Commercial Passed 10/03/2008
Correction
Resolved
10/03/2008
LIGHT-GUAGE STEEL FRAMING OF EXTERIOR WALLS SE/S/SW/W WALLS @ 1ST FLOOR + ROOF PARAPET COMPLETE OK TO COVER WHEN READY FOLLOWING PORTIONS:
All Rough Inspection - Commercial Partial 10/21/2008
Correction
Partial Correction
10/21/2008
WALL FRAMING + IN-WALL SYSTEMS 220; 222; 222A; 226; 228; 236; CORR 00A N WALL (5) TO (6.3); OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 10/24/2008
Correction
Partial Correction
10/24/2008
WALL FRAMING + IN-WALL SYSTEMS 220; 222; 222A; 226; 228; 234; 236; 238; CORR 00A E-W & N-S; CORR 00C OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 10/27/2008
All Rough Inspection - Commercial Partial 10/30/2008
Underslab Electrical Inspection - Commercial Passed 10/30/2008
Correction
Resolved
10/30/2008
UNDER-FLOOR ELECTRICAL CONDUIT OK TO COVER WHEN READY PREP TO POUR FLOOR SLAB SPACE #229
Underground Electrical Inspection - Commercial Request Complete 10/30/2008 10/30/2008 10/30/2008
Rated Assembly Inspection Partial 11/03/2008
Correction
Partial Correction
11/03/2008
None 1 HR WALL-CORRIDOR, 20222/22A/26/28/38 (BATH RM NOT READY) APPROVED BELOW
Rated Assembly Inspection Passed 11/06/2008
Correction
Resolved
11/06/2008
None 1 HR WALL-CORRIDOR, 20222/22A/26/28/38; TLT 234 APPROVED BELOW
All Rough Inspection - Commercial Partial 11/06/2008
Correction
Partial Correction
11/06/2008
WALL FRAMING + IN-WALL SYSTEMS 220; 222; 222A; 226; 228; 234; 236; 238; CORR 00A E-W & N-S; CORR 00C OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 11/11/2008
Correction
Partial Correction
11/11/2008
WALL FRAMING + IN-WALL SYSTEMS 220; 222; 222A; 226; 228; 234; 236; 237 S&E WALLS; 238; CORR 00A E-W & N-S; CORR 00C OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 11/14/2008
Correction
Partial Correction
11/14/2008
WALL FRAMING + IN-WALL SYSTEMS 220; 222; 222A; 226; 228; 234; 236; 237 S&E WALLS; 238; CORR 00A E-W & N-S; CORR 00C; NW LEG OF CORR 00A N TO (K.1); OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 11/19/2008
Correction
Partial Correction
11/19/2008
WALL FRAMING + IN-WALL SYSTEMS 220; 222; 222A; 226; 228; 234; 236; 237 S&E WALLS; 238; CORR 00A E-W & N-S; CORR 00C; CORR 00B TO 15' N OF (K.1); OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 12/01/2008
Correction
Partial Correction
12/01/2008
WALL FRAMING + IN-WALL SYSTEMS 220; 222; 222A; 226; 227; 228; 234; 236; 237 S&E WALLS; 238; CORR 00A E-W & N-S; CORR 00C; CORR 00B TO 15' N OF (K.1); OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Not Ready 12/02/2008
Correction
Corrective Action Required
12/02/2008
READINESS FOR INSPECTION WORK REQUESTED FOR INSP NOT COMPLETED
All Rough Inspection - Commercial Partial 12/03/2008
Correction
Partial Correction
12/03/2008
WALL FRAMING + IN-WALL SYSTEMS 220; 222; 222A; 226; 227; 228; 234; 236; 237 S&E WALLS; 238; CORR 00A E-W & N-S; CORR 00C; CORR 00B TO 15' N OF (K.1); 229 WEST OF (7); 229A; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Correction
Resolved
12/03/2008
READINESS FOR INSPECTION
Rated Assembly Inspection Partial 01/06/2009
Correction
Resolved
01/06/2009
None 1 HR WALL-CORRIDOR 20222/22A/26/28/38; 234
Correction
Partial Correction
01/06/2009
TYPE YOUR OWN TEXT WEST FACE OF EAST WALL OF 231; 233; 235; OK TO TAPE/MUD/FIRE-SEAL TYPE "F" WALL ALONG (7.8)
Rated Assembly Inspection Partial 01/08/2009
Correction
Resolved
01/08/2009
TYPE YOUR OWN TEXT
Correction
Partial Correction
01/08/2009
TYPE "F" WALL ALONG (7.8) FROM (L) TO (N): GWB INCLUDING TAPE/MUD OK; WEST FACE OF WALL OK TO COVER FOLLOWING:
All Rough Inspection - Commercial Partial 01/13/2009
Correction
Corrective Action Required
01/13/2009
None - THREE (3) ROOMS - IN WALL ELECTRICAL Cath Lab
Correction
Resolved
01/13/2009
None - THREE (3) ROOMS - WALL STUDS OKAY TO ROCK BOTH SIDES Cath Lab
Rated Assembly Inspection Partial 01/29/2009
Correction
Partial Correction
01/29/2009
FIRE CLOSURE @ TOP OF WALL ALONG (7.8) FRAMING + LINER BOARD + EAST SIDE TWO LAYERS 5/8" TYPE X GWB IN PLACE -- OK TO COMPLETE REMAINING GWB ON (7.8) FROM M.3 TO K.1 PER SKETCH REF 4/A6.1
Underslab Electrical Inspection - Commercial Passed 02/03/2009
Correction
Resolved
02/03/2009
UNDER-FLOOR ELECTRICAL CONDUIT OK TO COVER WHEN READY PREP TO POUR FLOOR SLAB SPACE #229
All Rough Inspection - Commercial Passed 02/17/2009
Correction
Resolved
02/17/2009
WALL FRAMING + IN-WALL SYSTEMS 220; 222; 222A; 226; 227; 228; 234; 236; 237 S&E WALLS; 238; CORR 00A E-W & N-S; CORR 00C; CORR 00B TO 15' N OF (K.1); 229 WEST OF (7); 229A; 227; 229 AFTER EAST WALL RATED ASSEMBLY IS FIRE-CAULKED OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Correction
Resolved
02/17/2009
None
Correction
Resolved
02/17/2009
None
Correction
Resolved
02/17/2009
READINESS FOR INSPECTION
Above Ceiling Inspection Partial 02/19/2009
Correction
Partial Correction
02/19/2009
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS CORR 00A NORTHWEST TO DOOR 200A; CORR 00C; 220; 222; 222A; 226; 228; 231;233; 235; 237; 238; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Above Ceiling Inspection Passed 03/04/2009
Correction
Resolved
03/04/2009
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS EXISTING CORR NORTH OF DOOR 200B; CORR 00A NORTHWEST TO DOOR 200A; CORR 00C; 220; 222; 222A; 226; 227; 228; 229; 229A; 231;233; 235; 237; 238 OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Occupancy Inspection - Codes Commercial Failed 03/18/2009
Correction
Partial Correction
03/18/2009
Receive Fire Department approval OK PENDING COMPLETION OF EQUIPMENT & CURTAINS
Correction
Partial Correction
03/18/2009
CODES ADMINISTRATION INSPECTION NO ISSUES FOUND CATH EQPMT TOBE INSTALLED
Correction
Partial Correction
03/18/2009
USE / OCCUPANCY APPROVAL STATUS WHEN CATH EQUIPMENT AND CURTAINS ARE INSTALLED OK TO SET UP FOR BUSINESS REQUEST RE-INSPECTION
Rated Assembly Inspection Passed 03/18/2009
Correction
Resolved
03/18/2009
None
Correction
Resolved
03/18/2009
FIRE CLOSURE @ TOP OF WALL ALONG (7.8)
Correction
Resolved
03/18/2009
TYPE "F" WALL ALONG (7.8)
Occupancy Inspection - Codes Commercial Failed 03/18/2009
Correction
Corrective Action Required
03/18/2009
ROOFTOP INSPECTION SUBJECT TO APPROVAL
Correction
Resolved
03/18/2009
Receive Planning & Development Approval PER HECTOR SOTO 3/18/09
Occupancy Inspection - Codes Commercial Passed 04/03/2009
Correction
Resolved
04/03/2009
CODES ADMINISTRATION INSPECTION
Correction
Resolved
04/03/2009
USE / OCCUPANCY APPROVAL STATUS
Correction
Resolved
04/03/2009
ROOFTOP INSPECTION CHECK ELECTRICAL RECEPT ENSURE OPERABLE
Correction
Resolved
04/03/2009
Receive Fire Department approval PER CPT JOE DIR 4/3/09
Documents & Images
Date Uploaded File Type Document Name
07/31/2017 Saint Luke's Hospital - Cath Lab Addn
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home