Permit Application Status

B0800249


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0800249
Building Permit - Commercial
Final Completion
PARTIAL COMMERCIAL
PARTIAL PERMIT FOR THE FOUNDATION ONLY.
03/14/2008
03/14/2008
12/13/2008
09/25/2008
Locations
Contacts
MILLER STAUCH CONSTRUCTION, Address:1300 W 87TH ST PARKWAY  
ACI BOLAND - KANSAS CITY, Address:1421 E 104TH STREET  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 09/10/2008 10/29/2010
Correction

CA - This is an "at risk permit". Construction shall be in accordance with plans submitted for permit approval. The applicant understands that issuance of this permit does not guaranty issuance of a full permit.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $177.68 $177.68 Paid 03/14/2008
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Passed 04/07/2008
Footing Inspection - Commercial Partial 04/07/2008
Correction
Partial Correction
04/07/2008
SEE TEXT LINE A, 2 THRU 18 (AND APPROX. 4' TO WEST ON SOUTH SIDE) APPROVED TO POUR AS FOLLOWS:
Footing Inspection - Commercial Partial 04/09/2008
Correction
Partial Correction
04/09/2008
SEE TEXT LINE A, 2 THRU 18 (AND APPROX. 4' TO WEST ON SOUTH SIDE) 4/9/08 - NOT READY (PLEASE CANCEL INSPECTIONS WHEN NOT READY) APPROVED TO POUR AS FOLLOWS:
Footing Inspection - Commercial Partial 04/14/2008
Correction
Partial Correction
04/14/2008
SEE TEXT LINE A, 2 THRU 18 (AND APPROX. 4' TO WEST ON SOUTH SIDE); LINE 0.5, A-F; NE CORNER MINUS DOUBLE PIER; APPROVED TO POUR AS FOLLOWS:
Footing Inspection - Commercial Partial 04/15/2008
Correction
Partial Correction
04/15/2008
SEE TEXT LINE A, ALL; LINE 0.5, ALL; NE CORNER MINUS DOUBLE PIER; LINE K, 1-3.5; LINE 17, ALL; LINE E, ALL; LINE 19, A-H; NOTE: UFER GROUND PRESENT IN SE CORNER APPROVED TO POUR AS FOLLOWS:
Footing Inspection - Commercial Failed 04/16/2008
Correction
Partial Correction
04/16/2008
SEE TEXT LINE A, ALL; LINE 0.5, ALL; NE CORNER MINUS DOUBLE PIER; LINE K, 1-3.5; LINE 17, ALL; LINE E, ALL; LINE 19, A-H; PADS - NORTHEAST CORNER. NOTE: UFER GROUND PRESENT IN SE CORNER APPROVED TO POUR AS FOLLOWS:
Correction
Corrective Action Required
04/16/2008
STEEL PROXIMITY TO EARTH DO NOT POUR: REMAINDER OF LINES K & 17; INTERIOR PADS STEEL MAY NOT BE WITHIN 3" OF EARTH
Footing Inspection - Commercial Failed 04/17/2008
Correction
Partial Correction
04/17/2008
SEE TEXT LINE A, ALL; LINE 0.5, ALL; NE CORNER MINUS DOUBLE PIER; LINE K, 0.5-11; LINE 17, ALL; LINE E, ALL; LINE 19, A-H; PADS - NORTHEAST CORNER, WEST INTERIOR NOTE: UFER GROUND PRESENT IN SE CORNER APPROVED TO POUR AS FOLLOWS:
Correction
Corrective Action Required
04/17/2008
STEEL PROXIMITY TO EARTH STEEL MAY NOT BE WITHIN 3" OF EARTH. SOME PORTIONS POURED W/O APPROVAL. PROVIDE LETTER OF AFFIDAVIT TO VERIFY THAT CORRECTIONS WERE MADE ON: - LINE K, 3.5-11 - EAST INTERIOR PADS
Footing Inspection - Commercial Partial 04/21/2008
Correction
Partial Correction
04/21/2008
SEE TEXT FOOTINGS APPROVED EXCEPT 6' E/W IN SW CORNER. PADS - APPROVED. (ONLY AT BASES OF NE CORNER & CANOPY) NOTE: SOME FOOTING & PAD APPROVALS CONTINGENT UPON AFFIDAVIT LETTER AS LISTED AT OTHER INSPECTION NOTE: UFER GROUND PRESENT IN SE CORNER APPROVED TO POUR AS FOLLOWS:
Correction
Corrective Action Required
04/21/2008
STEEL PROXIMITY TO EARTH STEEL MAY NOT BE WITHIN 3" OF EARTH. SOME PORTIONS POURED W/O APPROVAL. PROVIDE LETTER OF AFFIDAVIT TO VERIFY THAT CORRECTIONS WERE MADE ON: - LINE K, 3.5-11 - EAST INTERIOR PADS
Footing Inspection - Commercial Partial 04/22/2008
Correction
Partial Correction
04/22/2008
SEE TEXT FOOTINGS APPROVED EXCEPT 6' N/E IN SW CORNER. PADS - APPROVED. (ONLY AT BASES OF NE CORNER & 2 CANOPY) NOTE: UFER GROUND PRESENT IN SE CORNER APPROVED TO POUR AS FOLLOWS:
Correction
Resolved
04/22/2008
STEEL PROXIMITY TO EARTH OK PER LETTER DATED 4/22/08
Footing Inspection - Commercial Partial 04/23/2008
Correction
Resolved
04/23/2008
TRASH ENCLOSURE
Erosion Control Inspection Residential Failed 06/16/2008
Correction
Corrective Action Required
06/16/2008
Erosion Control INSUFFICIENT EROSION CONTROL 2 DAYS TO COMPLY
Correction
Corrective Action Required
06/16/2008
Tracking Mud, Debris STREET CLEANUP REQUIRED. 2 DAYS TO COMPLY
Footing Inspection - Commercial Passed 06/16/2008
Correction
Resolved
06/16/2008
SEE TEXT ALL NOTE: UFER GROUND PRESENT IN SE CORNER
Final Inspection - Commercial Passed 09/24/2008
Erosion Control Inspection Residential Passed 09/24/2008
Correction
Resolved
09/24/2008
Erosion Control
Correction
Resolved
09/24/2008
Tracking Mud, Debris
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home