Permit Application Status

B0800105


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0800105
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
NEW TENANT FINISH
CARDIOVASCULAR CONSULTANTS TENANT FINISH
02/14/2008
04/03/2008
01/24/2009
07/30/2008
Locations
Contacts
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
ACI BOLAND, Address:11229 NALL SUITE 140  
JE DUNN CONSTRUCTION, Address:929 HOLMES RD  
P1 GROUP INC, Address:16210 WEST 108TH ST  
SHAW ELECTRIC COMPANY, Address:3600 FULLER AVE  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 09/24/2008 10/29/2010
Correction

Fire Department- 2006 IFC 703.1- Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

Fire Department- 2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Correction

Fire Department- 2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Codes Administration - ICC/ANSI A117.1 2003 604.5.1 - Fixed sidewall grab bars. Fixed sidewall grab bars shall be 42 inches minimum in length, located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. In addition, a vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located between 39 inches and 41 inches above the floor, and with the center line of the bar located between 39 inches and 41 inches from the rear wall.
Correction

Codes Administration - ICC/ANSI A117.1 2003 804.6.6 - Refrigerator/Freezer. Combination refrigerators and freezers shall have at least 50 percent of the freezer compartment shelves, including the bottom of the freezer, 54 inches maximum above the floor when the shelves are installed at the maximum heights possible in the compartment. A clear floor space, positioned for a parallel approach to the space dedicated to a refrigerator/freezer, shall be provided. The centerline of the clear floor space shall be offset 24 inches maximum from the centerline of the dedicated space.
Correction

Codes Administration - 2005 NEC 517.13 - Grounding of receptacles and fixed electric equipment in patient care areas. Wiring in patient care areas shall comply with 517.13(A) and 517.13(B).
Correction

Codes Administration - 2006 IBC 1210.1 - Floors. In other than dwelling units, toilet and bathing room floors shall have a smooth, hard, nonabsorbant surface that extends upward onto the walls at least 6 inches.
Correction

Planning and Development - Commercial buisnesses located along existing public streets shall be subject to the following design standards: a. buildings shall be designed with four (4) sided architecture, the same level of finish on all sides (no "back"); b. rooftop or ground-level mechanical equipment shall be totally screened from view by using either parapet walls at the same height of the mechanical units for rooftop mounts or by providing screening for ground mounted units acceptable to the Director; c. wherever possible, parking areas and pedestrian walks shall connect internally to parking areas and pedestrian walks of existing adjoining businesses. Provisions shall be make for future connections to adjoining property not yet developed or redeveloped.
Correction

Codes Administration - 2006 IPC 403.1 - Minimum number of fixtures. Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 403.1. Types of occupancies not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Occupancy classification shall be determined in accordance with the International Building Code.
Correction

Codes Administration - 2006 IPC 403.2 - Separate facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (See code for possible exceptions.)
Correction

CA - A Certificate of Occupancy will not be issued for a tenant finish until a minimum of a Temporary Occupancy has been issued for the shell building.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

Fire Department- 2006 IFC 1411.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress systems and facilities.
Correction

Fire Department- Remove the exit sign in the corridor above door 20240.
Correction

Fire Department- The location of the two exit lights in corridor 20264 that are next to the exit lights in corridors 20263 and 20265 seem confusing. Remove the lights.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $4,577.20 $4,577.20 Paid 04/03/2008
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Partial 04/08/2008
Correction
Partial Correction
04/08/2008
WALL FRAMING + IN-WALL SYSTEMS 203 N&W WALLS; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 04/14/2008
Correction
Partial Correction
04/14/2008
WALL FRAMING + IN-WALL SYSTEMS 200 EXCL W END WALL @ DOORWAY; 203 N&W WALLS; 242-256; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 04/16/2008
Correction
Partial Correction
04/16/2008
WALL FRAMING + IN-WALL SYSTEMS 200 EXCL W END WALL @ DOORWAY; 203 N&W WALLS; 228; 230; 232; 234; 236; 238; 242-256; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 04/21/2008
Correction
Partial Correction
04/21/2008
WALL FRAMING + IN-WALL SYSTEMS 200 EXCL W END WALL @ DOORWAY; 203 N&W WALLS; 204; 207; 215; 219; 221; 223; 225; 228; 230; 232; 234; 236; 238; 241; 243; 245; 247; 242-256; 258; 260; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 04/24/2008
Correction
Partial Correction
04/24/2008
WALL FRAMING + IN-WALL SYSTEMS 200 EXCL W END WALL @ DOORWAY; 203 N&W WALLS; 204; 207; 210; 211; 212; 214; 216; 218; 220; 215; 219; 221; 223; 225; 228; 230; 232; 234; 236; 238; 241; 243; 245; 247; 255; 242-256; 258; 260; 263; 264; 265; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 04/30/2008
Correction
Partial Correction
04/30/2008
WALL FRAMING + IN-WALL SYSTEMS 200; 201A; 203 N&W WALLS; 204; 207; 210-212; 214-216; 218-221; 223; 225; 226; 228; 230; 232; 234; 236; 238; 241-256; 258; 260; 262-264; 265; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 05/08/2008
Correction
Partial Correction
05/08/2008
WALL FRAMING + IN-WALL SYSTEMS 200; 201A COMPLETE; 203; 204; 207; 210-212; 214-216; 218-221; 223; 225; 226; 228; 230; 232; 234; 236; 238; 241-256; 258; 260; 262-264; 265; TWO ROOMS ADDED WITHIN 215 PER RFI PR#6; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Above Ceiling Inspection Passed 05/13/2008
Correction
Resolved
05/13/2008
SYSTEM TIE-IN'S / EXTENSIONS ABOVE 1ST FLOOR CEILING NO ISSUES FOUND SPOT-CHECKED TO EXENT ACCESSIBLE
Above Ceiling Inspection Partial 05/16/2008
Correction
Partial Correction
05/16/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS TOP OF STAIRWELL S01; OK TO COVER WHEN READY FOLLOWING AREAS:
All Rough Inspection - Commercial Passed 05/22/2008
Correction
Resolved
05/22/2008
WALL FRAMING + IN-WALL SYSTEMS 200; 201A; 203-204; 207; 210-212; 214-216; 218-221; 222; 223; 224; 225-226; 228; 230; 232; 234; 236; 238; 241-256; 258; 260; 262-265; TWO ROOMS ADDED WITHIN 215 PER RFI PR#6 OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Above Ceiling Inspection Partial 06/13/2008
Correction
Partial Correction
06/13/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS TOP OF STAIRWELL S01; 200 EXCL @ (4.5); 206; 207; 209; 211; 213; 215; 219; 221;223; 225; 241; 242; 243; 244; 245; 246; 247; 248; 250; 252; 254; 255; 256; 258; 260; 262; 263; 264; 265; OK TO COVER WHEN READY FOLLOWING AREAS:
Above Ceiling Inspection Passed 06/18/2008
Correction
Resolved
06/18/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS S01; 200; 206; 207; 209; 211; 213; 215; 219; 221;223; 225; 241; 242; 243; 244; 245; 246; 247; 248; 250; 252; 254; 255; 256; 258; 260; 262; 263; 264; 265; 210; 212; 214; 216; 218; 220; 222; 224; 226; 228; 230; 232; 234; 236; 238; 201A; 202 OK TO COVER WHEN READY FOLLOWING AREAS:
Occupancy Inspection - Codes Commercial Not Ready 07/14/2008
Correction
Partial Correction
07/14/2008
EXPOSED SYSTEMS @ MECHANICAL ROOM NO ISSUES FOUND 7/14/08
Occupancy Inspection - Codes Commercial Failed 07/17/2008
Correction
Corrective Action Required
07/17/2008
GLAZING OF PASS WINDOWS NOT ETCHED "TEMPERED"
Correction
Resolved
07/17/2008
EXPOSED SYSTEMS @ MECHANICAL ROOM
Occupancy Inspection - Codes Commercial Failed 07/18/2008
Correction
Corrective Action Required
07/18/2008
GLAZING OF PASS WINDOWS NOT ETCHED "TEMPERED" PER DRWG DETAIL (29)/A5.0
Correction
Partial Correction
07/18/2008
USE/OCCUPANCY AUTHORIZATION STATUS RECOMMEND REMOVAL OF NON-TEMPERED PASS WINDOW GLAZING PENDING REPLACEMENT. OK TO SET UP FOR BUSINESS NO PUBLIC UNTIL APPROVED
Correction
Corrective Action Required
07/18/2008
BUILDING SHELL PERMIT ISSUES TO BE RESOLVED
Correction
Resolved
07/18/2008
Receive Fire Department approval PER JOE DIR 7/17/08
Occupancy Inspection - Codes Commercial Failed 07/24/2008
Correction
Corrective Action Required
07/24/2008
GLAZING OF PASS WINDOWS NON-TEMPERED GLASS UNITS HAVE BEEN REMOVED PENDING REPLACEMENT WITH CONFORMING GLAZING. NOT ETCHED "TEMPERED" PER DRWG DETAIL (29)/A5.0
Correction
Partial Correction
07/24/2008
USE/OCCUPANCY AUTHORIZATION STATUS SEE TEMPORARY OCCUPANCY
Correction
Corrective Action Required
07/24/2008
BUILDING SHELL PERMIT ISSUES TO BE RESOLVED
Occupancy Inspection - Codes Commercial Passed 07/29/2008
Correction
Resolved
07/29/2008
GLAZING OF PASS WINDOWS
Correction
Resolved
07/29/2008
USE/OCCUPANCY AUTHORIZATION STATUS
Correction
Resolved
07/29/2008
BUILDING SHELL PERMIT ISSUES
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home