Permit Application Status

B0702504


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0702504
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
ADDITION COMMERCIAL
SAINT LUKES ER ADDITION
11/28/2007
02/07/2008
03/04/2009
09/10/2008
Locations
Contacts
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
ACI BOLAND, Address:11229 NALL SUITE 140  
JE DUNN CONSTRUCTION, Address:1570 NE DOUGLAS ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
SHAW ELECTRIC COMPANY, Address:3600 FULLER AVE  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 07/27/2008 10/29/2010
Correction

Fire Department- 2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

Codes Administration - All plans submitted for review on or after July 9, 2007 shall be designed to the requirements of the 2006 International Building Code, 2006 International Mechanical Code, 2006 International Plumbing Code, 2006 International Fuel Gas Code, 2006 International Fire Code, 2005 National Electric Code and the ANSI A117.1-2003 as amended and adopted by the City of Lee's Summit.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

Codes Administration - A Code Modification Request has been submitted for the installation of the roofing materials.
Correction

Codes Administration - A third party review of the electrical systems is required for this project. This review shall be based on the requirements of the 2005 National Electical Code.
Correction

Fire Department- 2006 IFC 3006.4 Medical gas systems. Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators and relief devices and valves, shall comply with NFPA 99 and the general provisions of this chapter.
Correction

Fire Department-2006 IFC 1411.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress systems and facilities.
Correction

Fire Department- 2006 IFC 703.1 Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $4,197.60 $4,197.60 Paid 02/07/2008
89 Sewer Tap Fees $270.00 $270.00 Paid 02/07/2008
Road and Bridge Escrow $1,098.22 $1,098.22 Paid 02/12/2008
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Not Ready 02/08/2008
Correction
Corrective Action Required
02/08/2008
READINESS FOR INSPECTION REQUEST CANCELED BY P.H.
Footing Inspection - Commercial Not Ready 02/11/2008
Correction
Corrective Action Required
02/11/2008
READINESS FOR INSPECTION REQUEST CANCELED BY P.H.
Footing Inspection - Commercial Not Ready 02/12/2008
Correction
Corrective Action Required
02/12/2008
READINESS FOR INSPECTION REQUEST CANCELED BY P.H.
Footing Inspection - Commercial Partial 02/13/2008
Correction
Partial Correction
02/13/2008
PREPARATION TO POUR ISOLATED COLUMN FOOTINGS F4; F6; OK TO POUR WHEN READY LOCATIONS DESCRIBED BELOW
Correction
Resolved
02/13/2008
READINESS FOR INSPECTION
Footing Inspection - Commercial Partial 02/15/2008
Correction
Partial Correction
02/15/2008
PREPARATION TO POUR ISOLATED COLUMN FOOTINGS F4; F6; OK TO POUR WHEN READY LOCATIONS DESCRIBED BELOW
All Rough Inspection - Commercial Partial 02/15/2008
Correction
Corrective Action Required
02/15/2008
None @ F4&F6 PROVIDE PICTURE VERIFICATION OF INSTALLATION OF EMBEDDED HOOKS FOR BOTH COLUMNS TO TUNNEL LID OK TO POUR WHEN READY ISOLATED COLUMNS
Rough Framing Inspection - Commercial Partial 03/04/2008
Correction
Partial Correction
03/04/2008
PREP TO POUR C.I.P. CONCRETE COLUMNS APPROVED 2/15/08 OK TO POUR WHEN READY COLUMNS LISTED BELOW
Footing Inspection - Commercial Passed 03/04/2008
Correction
Resolved
03/04/2008
PREPARATION TO POUR ISOLATED COLUMN FOOTINGS F4; F6; E/0.3; E/0.7 OK TO POUR WHEN READY LOCATIONS DESCRIBED BELOW
Correction
Resolved
03/04/2008
PREPARATION TO POUR GRADE BEAM + INTEGRAL COLUMN FOOTINGS OK TO POUR WHEN READY
Miscellaneous Inspection Partial 03/04/2008
Correction
Partial Correction
03/04/2008
READINESS FOR INSPECTION
All Rough Inspection - Commercial Partial 03/04/2008
Correction
Partial Correction
03/04/2008
None
Underslab Plumbing Inspection - Commercial Passed 03/06/2008
Correction
Resolved
03/06/2008
UNDER-SLAB DWV PIPING OK TO COVER WHEN READY
Underslab Electrical Inspection - Commercial Partial 03/07/2008
Correction
Partial Correction
03/07/2008
FLOOR BOX + CONDUIT SPACE B155 NO ISSUES FOUND
Rough Framing Inspection - Commercial Request Complete 4/9/2008 4/9/2008 04/09/2008
All Rough Inspection - Commercial Partial 05/16/2008
Correction
Resolved
05/16/2008
None
Correction
Partial Correction
05/16/2008
WALL FRAMING + IN-WALL SYSTEMS PHASE 1 WALLS AFTER COPPER PIPING IS PROTECTED FROM STEEL FRAMING AT PENETRATIONS; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Rated Assembly Inspection Partial 06/03/2008
Correction
Partial Correction
06/03/2008
GWB INSTALLATION AT 1 HR FIRE-RATED WALLS 153; OK TO COVER WHEN READY WALLS AT SPACES LISTED:
Rated Assembly Inspection Partial 06/05/2008
Correction
Partial Correction
06/05/2008
GWB INSTALLATION AT 1 HR FIRE-RATED WALLS 153; 157; OK TO COVER WHEN READY WALLS AT SPACES LISTED:
Rated Assembly Inspection Partial 06/10/2008
Correction
Partial Correction
06/10/2008
GWB INSTALLATION AT 1 HR FIRE-RATED WALLS 153; 157 INCLUDING BOTH FACES S&W WALLS OK TO COVER WHEN READY WALLS AT SPACES LISTED:
Above Ceiling Inspection Passed 07/18/2008
Correction
Resolved
07/18/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS ENSURE ALL TEMPORARY ELECTRICAL WIRING IS REMOVED BEFORE PLACING TILE. OK TO COVER WHEN READY AFTER TEMP ELECT REMOVED
Underslab Electrical Inspection - Commercial Passed 08/15/2008
Correction
Resolved
08/15/2008
FLOOR BOX + CONDUIT
Rough Framing Inspection - Commercial Passed 08/15/2008
Correction
Resolved
08/15/2008
PREP TO POUR C.I.P. CONCRETE COLUMNS
All Rough Inspection - Commercial Not Ready 08/15/2008
Correction
Corrective Action Required
08/15/2008
READINESS FOR INSPECTION WORK REQUESTED FOR INSP APPARENTLY COVERED
Rated Assembly Inspection Passed 08/15/2008
Correction
Resolved
08/15/2008
GWB INSTALLATION AT 1 HR FIRE-RATED WALLS
All Rough Inspection - Commercial Passed 08/18/2008
Correction
Resolved
08/18/2008
WALL FRAMING + IN-WALL SYSTEMS ALL INCLUDING 140 W WALL; 141 WALL & SE CORNER CHASE OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Correction
Resolved
08/18/2008
READINESS FOR INSPECTION
Occupancy Inspection - Codes Commercial Not Ready 09/02/2008
Correction
Partial Correction
09/02/2008
USE / OCCUPANCY APPROVAL STATUS RMS 158; 159; 161; 162 OK FULL FINAL TO FOLLOW
Correction
Partial Correction
09/02/2008
Receive Fire Department approval RMS 158; 159; 161; 162 OK FULL FINAL TO FOLLOW
Above Ceiling Inspection Passed 09/03/2008
Correction
Resolved
09/03/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS 166 AFTER UNUSED ELECT OPENING IS PLUGGED OK TO COVER WHEN READY INCLUDING 167 SOUTH END +
Occupancy Inspection - Codes Commercial Not Ready 09/06/2008
Correction
Resolved
09/06/2008
Receive Planning & Development Approval PER TOM SCANNELL 9/5/08
Occupancy Inspection - Codes Commercial Failed 09/08/2008
Correction
Partial Correction
09/08/2008
USE / OCCUPANCY APPROVAL STATUS UNTIL APPROVED OK TO SET UP FOR BUSINESS NO PUBLIC ENTRY
Correction
Partial Correction
09/08/2008
Receive Fire Department approval RMS 158; 159; 161; 162 OK REMAINING INSP PENDING
Occupancy Inspection - Codes Commercial Passed 09/09/2008
Correction
Resolved
09/09/2008
CODES ADMINISTRATION INSPECTION NO REMAINING ISSUES
Correction
Resolved
09/09/2008
USE / OCCUPANCY APPROVAL STATUS
Correction
Resolved
09/09/2008
Receive Fire Department approval PER JOE DIR 9/9/08
Miscellaneous Inspection Passed 09/09/2008
Correction
Resolved
09/09/2008
READINESS FOR INSPECTION
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home