Permit Application Status

B0702015


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0702015
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
ADDITION COMMERCIAL
SAINT LUKES DIAGNOSTIC CENTER - 2ND STORY ADDTION - CARDOVASCULAR CONSULTANTS
09/10/2007
10/04/2007
04/09/2008
07/30/2008
Locations
Contacts
SHAW ELECTRIC COMPANY, Address:3600 FULLER AVE  
A D JACOBSON CO INC, Address:16210 W 108TH ST  
A D JACOBSON CO INC, Address:16210 W 108TH ST  
A D JACOBSON CO INC, Address:16210 W 108TH ST  
A D JACOBSON CO INC, Address:16210 W 108TH ST  
JE DUNN CONSTRUCTION, Address:929 HOLMES  
ACI BOLAND, Address:11229 NALL SUITE 140  
STRUCTURAL ENGINEERING ASSOCIATES INC, Address:1000 WALNUT SUITE 1570  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 04/01/2008 10/29/2010
Correction

Codes Administration - 2006 IBC 1008.1.4 - Floor elevation. There shall be a floor or landing on each side of a door. Such floor or landing shall be at the same elevation on each side of the door. Landings shall be level except for exterior landings, which are permitted to have a slope not to exceed 0.25 unit vertical in 12 units horizontal (2-percent slope).
Correction

Codes Administration - 2006 IBC 1009.10 - Handrails. Stairways shall have handrails on each side and shall comply with Section 1012. Where glass is used to provide the handrail, the handrail shall also comply with Section 2047.
Correction

Codes Administration - 2006 IBC 1704.1.1 - Statement of special inspections. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with 106.1 as a condition for permit issuance. This statement shall be in accordance with Section 1705. Exceptions: 1. A statement of special inspections is not required for structures designed and constructed in accordance with the conventional construction provisions of Section 2308. 2. The statement of special inspections is permitted to be prepared by a qualified person approved by the building official for construction not designed by a registered design professional.
Correction

Codes Administration - 2006 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work.
Correction

Fire Department- 2006 IFC 408.11.2 Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background.
Correction

Fire Department- 2006 IFC 901.2 Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Correction

Fire Department- 2006 IFC 905.1 General. Standpipe systems shall be provided in new buildings and structures in accordance with this section and as required by the fire code official. Fire hose threads used in connection with standpipe systems shall be approved and shall be compatible with fire department hose threads. The location of fire department hose connections shall be approved. In buildings used for high-piled combustible storage, fire protection shall be in accordance with Chapter 23.
Correction

Fire Department- 2006 IFC 907.1.1 Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Fire Department- 2006 IFC Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-1300.
Correction

Fire Department- 2006 IFC 906.2 General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department- 2006 IFC 411.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress systems and facilities.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - Tenant finish plans shall be submitted to the Codes Administration Department prior to any interior alteration or improvments. Permits shall be obtained prior to any performing any work which requires permits.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $7,695.60 $7,695.60 Paid 10/04/2007
Road and Bridge Escrow $3,461.54 $3,461.54 Paid 02/12/2008
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Framing Inspection - Commercial Partial 10/09/2007
Correction
Partial Correction
10/09/2007
PREP TO POUR C.I.P. CONCRETE COLUMNS K/7; F/6; G/6; H/6; K/6; G/5; H/5; K/5; H/4; K/4; H/3; H/2; K/2; OK TO POUR WHEN READY COLUMNS @ LOCATIONS BELOW
Rough Framing Inspection - Commercial Passed 10/10/2007
Correction
Resolved
10/10/2007
PREP TO POUR C.I.P. CONCRETE COLUMNS K/7; F/6; G/6; H/6; K/6; G/5; H/5; K/5; F.6; H/4; K/4; G/3; H/3; K/3; G/2; H/2; K/2; G/1; H/1; J.8/1 OK TO POUR WHEN READY COLUMNS @ LOCATIONS BELOW
Rough Framing Inspection - Commercial Request Complete 10/9/2007 10/10/2007 10/10/2007
Footing Inspection - Commercial Passed 10/12/2007
Correction
Resolved
10/12/2007
PREP TO POUR GRADE BEAM @ NEW STAIRWELL OK TO POUR WHEN READY
All Rough Inspection - Commercial Partial 03/31/2008
Correction
Partial Correction
03/31/2008
WALL FRAMING + IN-WALL SYSTEMS OPENING AT NEW DOOR S01A; OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
All Rough Inspection - Commercial Partial 04/08/2008
Correction
Partial Correction
04/08/2008
WALL FRAMING + IN-WALL SYSTEMS OPENING AT NEW DOOR S01A; 203 E&S WALLS; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Final Inspection - Commercial Not Ready 06/03/2008
Correction
Partial Correction
06/03/2008
USE OF STAIRWELL S01 PERMIT HOLDER TO ENSURE CONSTRUCTION OPERATIONS ARE RESTRICTED FROM STAIRWELL AND DO NOT IMPINGE ON SAFE PASSAGE BY STAFF THROUGH GROUND LEVEL DOORS 1CS01 AND 1CS01A. OKFOR USE AS STAFF ACCESS CONTINGENT ON SAFETY
Final Inspection - Commercial Failed 07/17/2008
Correction
Resolved
07/17/2008
USE OF STAIRWELL S01
Correction
Corrective Action Required
07/17/2008
ROOFTOP INSPECTION
Correction
Resolved
07/17/2008
Receive Fire Department approval PER JOE DIR 7/17/08
Correction
Resolved
07/17/2008
Receive Planning & Development Approval PER T SCANNELL 7/17/08
Correction
Resolved
07/17/2008
Receive Water Utilities Approval NO ISSUES PRESENTED
All Rough Inspection - Commercial Passed 07/18/2008
Correction
Resolved
07/18/2008
WALL FRAMING + IN-WALL SYSTEMS
Final Inspection - Commercial Failed 07/18/2008
Correction
Corrective Action Required
07/18/2008
ROOFTOP INSPECTION 1) LADDER TO ROOF OBSTRUCTED BY JOIST BRIDGING 2) ELECT RECEPTS @ HIGH(NEW) ROOF NOT PROTECTED-TYPE 3) ELECT RECEPT @ LOW(EXSTG) ROOF WEST END LACKS COVER ISSUES STATED BELOW:
Final Inspection - Commercial Failed 07/24/2008
Correction
Corrective Action Required
07/24/2008
ROOFTOP INSPECTION ELECT RECEPT @ HIGH(NEW) ROOF NORTHEAST NOT GFCI PROTECTED ISSUES STATED BELOW:
Final Inspection - Commercial Passed 07/29/2008
Correction
Resolved
07/29/2008
CLOSE PERMIT
Correction
Resolved
07/29/2008
ROOFTOP INSPECTION
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home