Permit Application Status

B0701924


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0701924
Building Permit - Commercial
Certificate of Occupancy
PFIZER INC
NEW COMMERCIAL
UTILITY SEPARATION AND PUMP FACILITY
08/27/2007
11/30/2007
01/07/2009
10/09/2008
Locations
Contacts
MIDWEST MECHANICAL SERVICE INC, Address:14000 NORBY  
MIDWEST MECHANICAL SERVICE INC, Address:14000 NORBY  
MIDWEST MECHANICAL CONTRACTORS, Address:13800 WYANDOTTE ST  
MIDWEST MECHANICAL SERVICE INC, Address:14000 NORBY  
MIDWEST MECHANICAL SERVICE INC, Address:14000 NORBY  
ELECTRICAL CORP OF AMERICA, Address:7320 ARLINGTON  
PFIZER INC, Address:150 E 42ND ST FL 38TH  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 05/25/2008 10/29/2010
Correction

Codes Administration - All plans submitted for review on or after July 9, 2007 shall be designed to the requirements of the 2006 International Building Code, 2006 International Mechanical Code, 2006 International Plumbing Code, 2006 International Fuel Gas Code, 2006 International Fire Code, 2005 National Electric Code and the ANSI A117.1-2003 as amended and adopted by the City of Lee's Summit.
Correction

Fire Department- 2006 IFC - Provide a horn/strobe over the FDC to indicate water flow through the system.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

Fire Department- the storage of diesel fuel in above ground tanks shall be in accordance with 2006 IFC Chapters 27 and 34.
Correction

Fire Department- 2006 IFC 906.2 General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department- 2006 IFC Provide a plan for switch over of the old to the new pump with a minimum of system impairment.
Correction

Fire Department- The 600-gallons of diesel fuel exceeds the amount of a Class II combustible liquid for a fire area (240-gallons with 100% increase for a sprinklered building). The building is classified as an H3 occupancy.
Correction

Fire Department- The FDC shall be a 4" storz type connection. The number of connections needs to be calculated.
Correction

Fire Department- 2006 IFC- Provide a hydrant on the city side of the pump house within 100' of the FDC.
Correction

Fire Department- Incorporate the recommended changes to the fire protection system as indicated in the letter from Steve Dryden, PE with Poole Fire Protection.
Correction

Codes Administration - 2006 IPC 704.1 - Slope of horizontal drainage piping. Horizontal drainage piping shall be installed in uniform alignment at uniform slopes. The minimum slope of a horizontal drainage pipe shall be in accordance with Table 704.1.
Correction

Codes Administration - I am unable to locate door hardware information.
Correction

Codes Administration - A project cost has not been provided.
Correction

Codes Administration - A Code Analysis has not been provide.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $2,276.52 $2,276.52 Paid 11/30/2007
84 Water Meters $1,326.77 $1,326.77 Paid 12/06/2007
85 Water Taps $19,047.00 $19,047.00 Paid 12/06/2007
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Water Service Inspection Failed 11/30/2007
Correction
Partial Correction
11/30/2007
None 3" WATER MAIN FROM TIE IN POINT TO EXISTING PARKING LOT WEST - OK TO COVER
Sewer Service Inspection Passed 11/30/2007
Correction
Resolved
11/30/2007
2" FORCED MAIN EAST SIDE TIE IN POINT FOR NEW UTILITIES. 2" FORCED MAIN FROM MANHOLES TO TIE IN POINT. 3" WATER FROM TIE IN TO EXISTING PARKING LOT OK TO COVER
Sewer Service Inspection - Commercial Request Complete 11/30/2007 11/30/2007 11/30/2007
Water Service Inspection Failed 12/04/2007
Correction
Partial Correction
12/04/2007
None 3" WATER MAIN FROM TIE IN POINT TO EXISTING PARKING LOT WEST FROM PARKING LOT WESRT TO BACK FLOW LOCATION- APPROVED
Water Service Inspection - Commercial Request Complete 12/4/2007 12/4/2007 12/04/2007
Water Service Inspection Passed 01/07/2008
Correction
Resolved
01/07/2008
None 2" COPPER LINE FROM TAP TO METER>METER TO 14 FT. EAST OF METER. TRANSITION TO 3" PVC SERVICE LINE (APPROX. 700 FT)
Water Service Inspection - Commercial Request Complete 1/7/2008 1/7/2008 01/07/2008
Sewer Service Inspection Failed 01/08/2008
Correction
Partial Correction
01/08/2008
PUMP HOUSE FROM MANHOLE TO PUMP HOUSE. CITY MAIN TO MANHOLE INSPECTED BY J.H. PUBLIC W.
Sewer Service Inspection - Commercial Request Complete 1/8/2008 1/8/2008 01/08/2008
Underslab Plumbing Inspection - Commercial Passed 01/18/2008
Correction
Resolved
01/18/2008
None 3 FLOOR DRAIS AND 2 3" VENTS 2-4" CLEANOUTS
Sewer Service Inspection - Commercial Request Complete 1/18/2008 1/18/2008 01/18/2008
Footing Inspection - Commercial Passed 01/22/2008
Correction
Resolved
01/22/2008
None PUMP HOUSE APPROVED
Occupancy Inspection - Codes Commercial Failed 07/10/2008
Correction
Corrective Action Required
07/10/2008
Receive Public Works Approval
Correction
Corrective Action Required
07/10/2008
Receive Planning & Development Approval
Correction
Corrective Action Required
07/10/2008
Receive Water Utilities Approval approved per B.H. 7-10
Correction
Corrective Action Required
07/10/2008
Receive Fire Department approval
Correction
Corrective Action Required
07/10/2008
Unused Openings (IRC) 1. underground electrical: dig up 10' out side each structure and 1 area in the middle. 2. open knockouts in 2 ceiling junction boxes. 3. ground junction box right of main panel. 4. provide bubble covers per code on 2 exterior gfci outlets.
Occupancy Inspection - Codes Commercial Failed 07/11/2008
Correction
Resolved
07/11/2008
Receive Water Utilities Approval approved per B.H. 7-10
Correction
Resolved
07/11/2008
Unused Openings (IRC)
Occupancy Inspection - Codes Commercial Failed 08/12/2008
Correction
Resolved
08/12/2008
Receive Fire Department approval PER JOE DIR 7-16-08
Miscellaneous Inspection Failed 09/02/2008
Correction
Corrective Action Required
09/02/2008
None CALLED NIEL ANDREWS @ 223 0769 9-2-8
Occupancy Inspection - Codes Commercial Passed 10/06/2008
Correction
Resolved
10/06/2008
Receive Planning & Development Approval
Correction
Resolved
10/06/2008
Receive Public Works Approval
Sewer Service Inspection Passed 10/08/2008
Correction
Resolved
10/08/2008
PUMP HOUSE FROM MANHOLE TO PUMP HOUSE. CITY MAIN TO MANHOLE INSPECTED BY J.H. PUBLIC W.
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home