Permit Application Status

B0701917


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0701917
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
TENANT CARDIO CONSULTANTS PET/CT REMODEL - REMODEL OF EXISTING SPACE TO ADD IMAGING SCAN EQUIPMENT AND CARIAC ECHO EQUIPMENT. PATIENTS WILL BE PREPPED FOR NON-INVASIVE SCANS. STORAGE OF ISOTOPES IN HOT LAB.
08/24/2007
09/19/2007
03/17/2008
12/17/2007
Locations
Contacts
CATES SHEET METAL IND INC, Address:15555 W 108TH ST  
J E DUNN CONSTRUCTION, Address:929 HOLMES  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
SHAW ELECTRIC COMPANY, Address:3600 FULLER AVE  
ACI BOLAND, Address:11229 NALL SUITE 140  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 03/17/2008 10/29/2010
Correction

Fire Department- 2006 IFC, 407.2 Material Safety Data Sheets. Material Safety Data Sheets (MSDS) for all hazardous materials shall be readily available on the premises.
Correction

Fire Department-2006 IFC 407.5 Hazardous Materials Inventory Statement. Where required by the fire code official, each application for a permit shall include a Hazardous Materials Inventory Statement(HMIS) in accordance with Section 2701.5.2.
Correction

Fire Department- 2006 IFC 407.3 Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-1300.
Correction

Fire Department- Clarify why shielding is not provided on the ceiling of the hot lab.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

Fire Department; The required fire-resistance rating of fire-resistance-rated construction (including walls, fire stops, shaft enclosures, partitions and floors) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings, and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance rated assemblies shall be protected by self-closing or automatic- closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Correction

Fire Department: Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required fire protection systems shall be extended, altered, or augmented as necessary to maintain and continue pro-tection whenever the building is altered, remodeled or added to.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $1,154.65 $1,154.65 Paid 09/19/2007
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 09/21/2007
Correction
Resolved
09/21/2007
UNDER-SLAB DWV PIPING OK TO COVER WHEN READY
Underslab Electrical Inspection - Commercial Passed 09/25/2007
Correction
Resolved
09/25/2007
SEE TEXT PRE-FAB DATA CABLE FOR MEDICAL EQUIPMENT AND THREE CUSTOM PULL BOXES APPROVED. CONDUIT FOR
All Rough Inspection - Commercial Failed 10/23/2007
Correction
Partial Correction
10/23/2007
None OKAY TO ROCK - EXCEPT: 1. ROOM 108 ROCK AT OWN RISK. 2. ROCK FIRST LAYER ONLY OF RATED WALLS.
Correction
Resolved
10/23/2007
None Plumbing
Correction
Partial Correction
10/23/2007
None WEST WALL ROOM 104 NOT READY Electrical
Correction
Resolved
10/23/2007
None Framing
Correction
Corrective Action Required
10/23/2007
Approved Plans ROOM 108 - NOT INSTALLD AS PLANS INDICATED. SUBMIT CHANGE TO PLANS EXAMINER
All Rough Inspection - Commercial Partial 11/01/2007
Correction
Resolved
11/01/2007
WALL FRAMING + IN-WALL SYSTEMS 1) AT LEAST FOUR SCREWS AT ALL STUD LAP SPLICES 2) CONNECT ONE UPPER STUD TO HEADER MEMBER 3) SCREW ALL STUD FLANGES NEXT TO BOTTOM OF HM DOOR JAMBS WEST EXTERIOR WALL COVER WHEN READY AFTER:
Correction
Resolved
11/01/2007
Approved Plans
Above Ceiling Inspection Partial 11/14/2007
Correction
Partial Correction
11/14/2007
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS REMOVE ALL TEMPORARY WIRING -- THEN COVER AT: 101-103; 104 AFTER 1 ELECT J.B. CLOSED; 105 AFTER SMOKE DETECTOR SWUNG OVER TO 104; 107; 154; OK TO COVER WHEN READY SPACES LISTED BELOW:
Above Ceiling Inspection Passed 11/16/2007
Correction
Resolved
11/16/2007
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS 101-107; 154 OK TO COVER WHEN READY SPACES LISTED BELOW:
Occupancy Inspection - Codes Commercial Failed 11/28/2007
Correction
Partial Correction
11/28/2007
USE / OCCUPANCY APPROVAL STATUS NO PUBLIC ACCESS PRIOR TO APPROVAL OK TO INSTALL EQUIPMENT AND SET UP FOR BUSINESS
Occupancy Inspection - Codes Commercial Passed 12/14/2007
Correction
Resolved
12/14/2007
USE / OCCUPANCY APPROVAL STATUS
All Rough Inspection - Commercial Passed 12/14/2007
Correction
Resolved
12/14/2007
WALL FRAMING + IN-WALL SYSTEMS
Correction
Resolved
12/14/2007
None
Correction
Resolved
12/14/2007
None
Correction
Resolved
12/14/2007
None
Correction
Resolved
12/14/2007
None
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home