Permit Application Status

B0701750


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0701750
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
ADDITION COMMERCIAL
ADDITIONAL TWO O. R. RROMS AND ASSOCIATED RECOVERY SUPPORT AREA. REMODELED DOCTORS LOUNGE. NURSING AND PATIENT CARE FOR SURGERY PATIENTS.
08/03/2007
11/01/2007
04/29/2008
02/02/2009
Locations
Contacts
JE DUNN, Address:929 HOLMES  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
ACI BOLAND, Address:11229 NALL SUITE 140  
SHAW ELECTRIC COMPANY, Address:3600 FULLER AVE  
STRUCTURAL ENGINEERING ASSOCIATES INC, Address:1000 WALNUT SUITE 1570  
P1 GROUP INC, Address:16210 WEST 108TH ST  
P1 GROUP INC, Address:16210 WEST 108TH ST  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 04/29/2008 10/29/2010
Correction

Fire Department: Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators, and relief devices and valves, shall comply with NFPA 99 and the general provisions of this chapter. Documentation shall be provided of the pressure test of at least 150 psi for a minimum of 24 hours on installers letterhead.
Correction

Codes Administration - 2006 IBC 1704.1.1 - Statement of special inspections. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with 106.1 as a condition for permit issuance. This statement shall be in accordance with Section 1705. Exceptions: 1. A statement of special inspections is not required for structures designed and constructed in accordance with the conventional construction provisions of Section 2308. 2. The statement of special inspections is permitted to be prepared by a qualified person approved by the building official for construction not designed by a registered design professional.
Correction

Codes Administration - 2006 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work.
Correction

Fire Department- Door 1A200A is shown as a marked exit from the existing building side.The double doors need to both swing in the direction of travel or opposite diections.
Correction

Fire Department- 905.1 General. Standpipe systems shall be provided in new buildings and structures in accordance with this section and as required by the Code Offical. Fire hose threads used in connection with standpipe systems shall comply with NFPA 1963 or as otherwise approved and shall be compatible with fire department hose threads. The location of fire department hose connections shall be approved. In build-ings used for high-piled combustible storage, fire protection shall be in accordance with Chapter 23.
Correction

Codes Administration - The third party review of the electrical systems shall be completed and approved prior to issuance of the full building permit.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department; The required fire-resistance rating of fire-resistance-rated construction (including walls, fire stops, shaft enclosures, partitions and floors) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings, and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance rated assemblies shall be protected by self-closing or automatic- closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

Fire Department: Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required fire protection systems shall be extended, altered, or augmented as necessary to maintain and continue pro-tection whenever the building is altered, remodeled or added to.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Fire Department- 907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. 3. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Fees
Paid Fees Amount Paid Owing Date Paid
Road and Bridge Escrow $2,304.44 $2,304.44 Paid 09/04/2007
0120 Building Permit Fee $11,830.24 $11,830.24 Paid 11/01/2007
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 12/04/2007
Correction
Resolved
12/04/2007
UNDER-SLAB DWV PIPING INCLUDING CONCRETE ENCASEMENT OF TIE-IN TO EXISTING DRAIN LINE SPACE 1A078B OK TO COVER WHEN READY
Footing Inspection - Commercial Passed 12/19/2007
Correction
Resolved
12/19/2007
RETAINING WALL FOOTING SOUTH END OF ADDITION OK TO POUR WHEN READY
All Rough Inspection - Commercial Partial 12/28/2007
Correction
Partial Correction
12/28/2007
WALL FRAMING + IN-WALL SYSTEMS 1A078; 078A; 078B; 078C; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Foundation Inspection - Commercial Partial 01/02/2008
Correction
Partial Correction
01/02/2008
PREP TO POUR RETAINING WALL AT SOUTH END FULL LENGTH TO 16' ABOVE FOOTING; OK TO POUR WHEN READY PORTIONS DESCRIBED BELOW:
Foundation Inspection - Commercial Passed 01/14/2008
Correction
Resolved
01/14/2008
PREP TO POUR RETAINING WALL AT SOUTH END FULL LENGTH TO 16' ABOVE FOOTING; UPPER LIFT APPROVED FOR POUR 1/9/08 OK TO POUR WHEN READY PORTIONS DESCRIBED BELOW:
Above Ceiling Inspection Partial 01/28/2008
Correction
Partial Correction
01/28/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS 1A078; 1A078A; 1A078B; 1A078C; OK TO COVER WHEN READY SPACES LISTED BELOW:
All Rough Inspection - Commercial Partial 02/14/2008
Correction
Resolved
02/14/2008
None SHEET S2.1 COLUMNS AT LINE D X LINES 16, 17, 18, 19 Columns
All Rough Inspection - Commercial Partial 02/15/2008
Correction
Partial Correction
02/15/2008
None COLUMN @ D.1 LINE, 13.1/12.9 COLUMNS
Rough Framing Inspection - Commercial Partial 02/25/2008
Correction
Partial Correction
02/25/2008
PREP TO POUR C.I.P. CONCRETE COLUMNS ABOVE GRADE D.1'/19; D.1'/18; D.1'/17; D.1'/16; D.1'/15; D.1'/14; D.1'/13.1-D.1'/12.9; OK TO POUR WHEN READY COLUMNS @ LOCATIONS BELOW
All Rough Inspection - Commercial Partial 02/25/2008
Correction
Resolved
02/25/2008
None
Correction
Resolved
02/25/2008
None
Rough Framing Inspection - Commercial Request Complete 2/22/2008 2/25/2008 02/25/2008
Underground Electrical Inspection - Commercial Request Complete 2/25/2008 2/25/2008 02/25/2008
Rough Framing Inspection - Commercial Partial 02/27/2008
Correction
Partial Correction
02/27/2008
PREP TO POUR C.I.P. CONCRETE COLUMNS ABOVE GRADE D.1'/19; D.1'/18; D.1'/17; D.1'/16; D.1'/15; D.1'/14; D.1'/13.1-D.1'/12.9; D.1'/12; OK TO POUR WHEN READY COLUMNS @ LOCATIONS BELOW
Footing Inspection - Commercial Partial 02/28/2008
Correction
Partial Correction
02/28/2008
PREPARATION TO POUR GRADE BEAM FROM (12) NORTH TO (16.3); OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Rough Framing Inspection - Commercial Partial 02/29/2008
Correction
Partial Correction
02/29/2008
PREP TO POUR C.I.P. CONCRETE COLUMNS ABOVE GRADE D.1'/19; D.1'/18; D.1'/17; D.1'/16; D.1'/15; D.1'/14; D.1'/13.1-D.1'/12.9; D.1'/12; E'/12; E'/14; E'/15; OK TO POUR WHEN READY COLUMNS @ LOCATIONS BELOW
Occupancy Inspection - Codes Commercial Failed 03/03/2008
Correction
Partial Correction
03/03/2008
FINAL INSPECTION ON DOCTOR'S LOUNGE RESOLVE FIRE ALARM ISSUES WITH FIRE DEPARTMENT -- THEN REQUEST PARTIAL TEMPORARY OCCUPANCY BEFORE BEGINNING USE OF SPACE. OK TO SET UP FOR BUSINESS NO OTHER USE W/O APPROVAL
Rough Framing Inspection - Commercial Partial 03/03/2008
Correction
Partial Correction
03/03/2008
PREP TO POUR C.I.P. CONCRETE COLUMNS ABOVE GRADE D.1'/19; D.1'/18; D.1'/17; D.1'/16; D.1'/15; D.1'/14; D.1'/13.1-D.1'/12.9; D.1'/12; E'/12; E'/13.1; E'/14; E'/15; E'/16; OK TO POUR WHEN READY COLUMNS @ LOCATIONS BELOW
Rough Framing Inspection - Commercial Partial 03/04/2008
Correction
Partial Correction
03/04/2008
PREP TO POUR C.I.P. CONCRETE COLUMNS ABOVE GRADE D.1'/19; D.1'/18; D.1'/17; D.1'/16; D.1'/15; D.1'/14; D.1'/13.1-D.1'/12.9; D.1'/12; E'/12; E'/13.1; E'/14; E'/15; E'/16; E'/12.9; OK TO POUR WHEN READY COLUMNS @ LOCATIONS BELOW
Footing Inspection - Commercial Partial 03/06/2008
Correction
Partial Correction
03/06/2008
PREPARATION TO POUR GRADE BEAM FROM (12) NORTH TO (16.3); FROM (16.3) NORTH TO (19) OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Rough Framing Inspection - Commercial Partial 03/07/2008
Correction
Partial Correction
03/07/2008
PREP TO POUR C.I.P. CONCRETE COLUMNS ABOVE GRADE D.1'/19; D.1'/18; D.1'/17; D.1'/16; D.1'/15; D.1'/14; D.1'/13.1-D.1'/12.9; D.1'/12; E'/12; E'/13.1; E'/14; E'/15; E'/16; E'/12.9; E'/17; E'/18; E'/19; OK TO POUR WHEN READY COLUMNS @ LOCATIONS BELOW
Underslab Plumbing Inspection - Commercial Partial 03/07/2008
Correction
Partial Correction
03/07/2008
UNDER-SLAB STORM DRAIN PIPING FROM (12) TO (14.5); OK TO COVER WHEN READY FOLLOWING PORTIONS:
Correction
Partial Correction
03/07/2008
UNDER-SLAB SANITARY DRAINAGE/VENT PIPING FROM (12) TO (14.5); OK TO COVER WHEN READY FOLLOWING PORTIONS:
Rough Framing Inspection - Commercial Passed 03/10/2008
Correction
Resolved
03/10/2008
PREP TO POUR C.I.P. CONCRETE COLUMNS ABOVE GRADE D.1'/19; D.1'/18; D.1'/17; D.1'/16; D.1'/15; D.1'/14; D.1'/13.1-D.1'/12.9; D.1'/12; E'/12; E'/13.1; E'/14; E'/15; E'/16; E'/12.9; E'/17; E'/18; E'/19; F'/18.3; F'/19 OK TO POUR WHEN READY COLUMNS @ LOCATIONS BELOW
Underslab Plumbing Inspection - Commercial Partial 03/10/2008
Correction
Partial Correction
03/10/2008
UNDER-SLAB STORM DRAIN PIPING FROM (12) TO (14.5); FROM (14.5) TO (16) ; OK TO COVER WHEN READY FOLLOWING PORTIONS:
Correction
Partial Correction
03/10/2008
UNDER-SLAB SANITARY DRAINAGE/VENT PIPING FROM (12) TO (14.5); FROM (14.5) TO (15.1) ; OK TO COVER WHEN READY FOLLOWING PORTIONS:
Underslab Electrical Inspection - Commercial Partial 03/11/2008
Correction
Partial Correction
03/11/2008
UNDER-FLOOR ELECTRICAL CONDUIT FROM (12.8) N TO (13.8); UNDER GRADE BEAM @ (16); MATERIAL & WORKMANSHIP OK TO COVER WHEN READY
Underslab Plumbing Inspection - Commercial Partial 03/11/2008
Correction
Partial Correction
03/11/2008
UNDER-SLAB STORM DRAIN PIPING FROM (12) TO (14.5); FROM (14.5) TO (16); FROM (16) TO (16.6); OK TO COVER WHEN READY FOLLOWING PORTIONS:
Correction
Partial Correction
03/11/2008
UNDER-SLAB SANITARY DRAINAGE/VENT PIPING FROM (12) TO (14.5); FROM (14.5) TO (15.1); FROM (15.1) TO (16.6); OK TO COVER WHEN READY FOLLOWING PORTIONS:
Underslab Electrical Inspection - Commercial Partial 03/12/2008
Correction
Partial Correction
03/12/2008
UNDER-FLOOR ELECTRICAL CONDUIT FROM (12.8) N TO (16.4); MATERIAL & WORKMANSHIP OK TO COVER WHEN READY
Underslab Plumbing Inspection - Commercial Partial 03/13/2008
Correction
Partial Correction
03/13/2008
UNDER-SLAB STORM DRAIN PIPING FROM (12) TO (14.5); FROM (14.5) TO (16); FROM (16) TO (16.6); N TO (17.6); OK TO COVER WHEN READY FOLLOWING PORTIONS:
Correction
Partial Correction
03/13/2008
UNDER-SLAB SANITARY DRAINAGE/VENT PIPING FROM (12) TO (14.5); FROM (14.5) TO (15.1); FROM (15.1) TO (16.6); N TO (18); OK TO COVER WHEN READY FOLLOWING PORTIONS:
Underslab Electrical Inspection - Commercial Passed 03/13/2008
Correction
Resolved
03/13/2008
UNDER-FLOOR ELECTRICAL CONDUIT FROM (12.8) N TO (16.4); N TO (19) MATERIAL & WORKMANSHIP OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Request Complete 3/12/2008 3/13/2008 03/13/2008
Underslab Plumbing Inspection - Commercial Passed 03/14/2008
Correction
Resolved
03/14/2008
UNDER-SLAB STORM DRAIN PIPING FROM (12) TO (14.5); FROM (14.5) TO (16); FROM (16) TO (16.6); N TO (17.6); N TO (19) OK TO COVER WHEN READY FOLLOWING PORTIONS:
Correction
Resolved
03/14/2008
UNDER-SLAB SANITARY DRAINAGE/VENT PIPING FROM (12) TO (14.5); FROM (14.5) TO (15.1); FROM (15.1) TO (16.6); N TO (18); N TO (19) OK TO COVER WHEN READY FOLLOWING PORTIONS:
Occupancy Inspection - Codes Commercial Partial 03/24/2008
Correction
Partial Correction
03/24/2008
FINAL INSPECTION ON DOCTOR'S LOUNGE OK FOR OCCUPANCY IN ADVANCE OF FULL FINAL
Correction
Partial Correction
03/24/2008
Receive Fire Department approval DOCTORS' LOUNGE ONLY
Correction
Corrective Action Required
03/24/2008
Receive Planning & Development Approval SUBJECT TO APPROVAL WHEN ADDITION COMPLETED
Correction
Corrective Action Required
03/24/2008
Receive Public Works Approval SUBJECT TO APPROVAL WHEN ADDITION COMPLETED
Correction
Corrective Action Required
03/24/2008
Receive Water Utilities Approval SUBJECT TO APPROVAL WHEN ADDITION COMPLETED
Rough Framing Inspection - Commercial Partial 04/09/2008
Correction
Partial Correction
04/09/2008
LIGHT-GUAGE STEEL FRAMING OF EXTERIOR WALLS OK TO COVER WHEN READY ENSURE BOTH FLANGES SCREWED AT TOP TRACK
Suspended Slab Inspection Partial 04/14/2008
Correction
Partial Correction
04/14/2008
PREPARATION TO POUR C.I.P. CONCRETE PAN SLAB DECK FOLLOWING SECTIONS: 13.1 TO 16.5; OK TO POUR WHEN READY SUBJECT TO A/E APPROVAL
Footing Inspection - Commercial Partial 04/18/2008
Suspended Slab Inspection Partial 04/18/2008
Correction
Partial Correction
04/18/2008
PREPARATION TO POUR C.I.P. CONCRETE PAN SLAB DECK FOLLOWING SECTIONS: 13.1 TO 16.5; 16.5 TO 19 **12 TO 13.1: SOME MISSING REBARS @ SOUTH BEAM (B6) AND WRONG SIZE BOTTOM REBAR FOR J4 JOIST SITE. HAVE ENGINEER TO SEND LETTER OF APPROVAL OK TO POUR WHEN READY SUBJECT TO A/E APPROVAL
Rough Framing Inspection - Commercial Partial 04/23/2008
Correction
Partial Correction
04/23/2008
PREP TO POUR C.I.P. CONCRETE COLUMNS ABOVE GRADE 1ST FLOOR COMPLETE;; 2ND STORY STUB COLUMNS D.1'/14; E'/14; D.1'/15; E'/15; D.1'/16; E'/16; D.1'/17; E'/17; D.1'/18; E'/18; F'/18.3; D.1'/19; E'/19; F'/19 OK TO POUR WHEN READY COLUMNS @ LOCATIONS BELOW
Suspended Slab Inspection Passed 04/24/2008
Correction
Resolved
04/24/2008
PREPARATION TO POUR C.I.P. CONCRETE PAN SLAB DECK FOLLOWING SECTIONS: 12 TO 12.9; 13.1 TO 16.5; 16.5 TO 19 OK TO POUR WHEN READY SUBJECT TO A/E APPROVAL
Foundation Inspection - Commercial Passed 04/28/2008
Correction
Resolved
04/28/2008
PREP TO POUR RETAINING WALL AT SOUTH END
Suspended Slab Inspection Passed 04/28/2008
Correction
Resolved
04/28/2008
PREPARATION TO POUR C.I.P. CONCRETE PAN SLAB DECK
Footing Inspection - Commercial Passed 04/28/2008
Correction
Resolved
04/28/2008
RETAINING WALL FOOTING
Correction
Resolved
04/28/2008
PREPARATION TO POUR GRADE BEAM
Underslab Plumbing Inspection - Commercial Passed 04/28/2008
Correction
Resolved
04/28/2008
UNDER-SLAB DWV PIPING
Correction
Resolved
04/28/2008
UNDER-SLAB STORM DRAIN PIPING
Correction
Resolved
04/28/2008
UNDER-SLAB SANITARY DRAINAGE/VENT PIPING
Underslab Electrical Inspection - Commercial Passed 04/28/2008
Correction
Resolved
04/28/2008
UNDER-FLOOR ELECTRICAL CONDUIT
Rough Framing Inspection - Commercial Partial 04/28/2008
Correction
Partial Correction
04/28/2008
PREP TO POUR C.I.P. CONCRETE COLUMNS ABOVE GRADE 1ST FLOOR COMPLETE;; 2ND STORY STUB COLUMNS D.1'/14; E'/14; D.1'/15; E'/15; D.1'/16; E'/16; D.1'/17; E'/17; D.1'/18; E'/18; F'/18.3; D.1'/19; E'/19; F'/19; D.1'/12; D.1'/12.9; D.1'/13.1; E'/12; E'/12.9; E'/13.1 OK TO POUR WHEN READY COLUMNS @ LOCATIONS BELOW
All Rough Inspection - Commercial Partial 05/05/2008
Correction
Partial Correction
05/05/2008
TWO-LAYER STC-60 GWB WALL COVERING @ SPACE 230 SOUTH WALL 1ST LAYER 5/8" TYPE XP GWB; OK TO COVER WHEN READY FOLLOWING ELEMENTS:
Rough Framing Inspection - Commercial Partial 05/13/2008
Correction
Resolved
05/13/2008
PREP TO POUR C.I.P. CONCRETE COLUMNS ABOVE GRADE
Correction
Partial Correction
05/13/2008
LIGHT-GUAGE STEEL FRAMING OF EXTERIOR WALLS SOUTH WALL FULL HEIGHT; PARAPET SECTIONS ON (E') FROM (12) TO (14) + ON (E') FROM (16) TO (18); OK TO COVER WHEN READY AREAS DESCRIBED BELOW:
Rough Framing Inspection - Commercial Passed 05/15/2008
Correction
Resolved
05/15/2008
LIGHT-GUAGE STEEL FRAMING OF EXTERIOR WALLS OK TO APPLY EXTERIOR SHEATHING OK TO COVER WHEN READY ALL EXTERIOR WALL AREAS
Suspended Slab Inspection Passed 05/27/2008
Correction
Resolved
05/27/2008
PREP TO POUR IN-FILL OF C.I.P. ROOF DECK ALONG (D') FRM (12)TO(19) OK TO POUR WHEN READY
All Rough Inspection - Commercial Failed 07/01/2008
Correction
Corrective Action Required
07/01/2008
WALL FRAMING + IN-WALL SYSTEMS 1) SCREW ALL L.G. FRAMING CONNECTIONS AT EXTERIOR WALLS 2) SCREW ALL L.G. FRAMING CONNECTIONS WITHIN WIDTH OF OPENINGS @ INTERIOR WALLS -- EXCEPT @ SLIP TRACK 3) ISOLATE COPPER PIPING FROM CONTACT W/ STEEL
Rated Assembly Inspection Partial 07/01/2008
Correction
Partial Correction
07/01/2008
RATED WALL ALONG (D') FRAMING + 1" LINER BOARD: FROM (16.3) TO (17.1); FROM (17.3) TO (19); OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
All Rough Inspection - Commercial Partial 07/03/2008
Correction
Resolved
07/03/2008
WALL FRAMING + IN-WALL SYSTEMS
Correction
Partial Correction
07/03/2008
WALL FRAMING + IN-WALL SYSTEMS 1A078; 078A; 078B; 078C; EXTERIOR WALLS AT SOUTH, WEST, NORTH; ALL INTERIOR PARTITIONS HIGH-LIGHTED IN GREEN ON WORKING PRINT SET ON JOB; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Rated Assembly Inspection Partial 07/03/2008
Correction
Partial Correction
07/03/2008
RATED WALL ALONG (D') FRAMING + 1" LINER BOARD + 1ST LAYER 5/8" TYPE X GWB: FROM (16.3) TO (17.1); FROM (17.3) TO (19); OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Rated Assembly Inspection Partial 07/08/2008
Correction
Partial Correction
07/08/2008
RATED WALL ALONG (D') FRAMING + 1" LINER BOARD + 1ST LAYER 5/8" TYPE X GWB + 2ND LAYER 5/8" TYPE X GWB: FROM (16.3) TO (17.1); FROM (17.3) TO (19); OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
All Rough Inspection - Commercial Partial 07/15/2008
Correction
Partial Correction
07/15/2008
WALL FRAMING + IN-WALL SYSTEMS 1A078; 078A; 078B; 078C; EXTERIOR WALLS AT SOUTH, WEST, NORTH; ALL INTERIOR PARTITIONS HIGH-LIGHTED IN GREEN ON WORKING PRINT SET ON JOB; INT WALLS OF OR's; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Rated Assembly Inspection Partial 07/15/2008
Correction
Partial Correction
07/15/2008
RATED WALL ALONG (D') FRAMING + 1" LINER BOARD + 1ST LAYER 5/8" TYPE X GWB + 2ND LAYER 5/8" TYPE X GWB + TAPE & SEAL 2ND LAYER -- OK TO CONSTRUCT FALSE WALL IN FRONT: FROM (16.3) TO (17.1); FROM (17.3) TO (19); OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Correction
Partial Correction
07/15/2008
2 HR RATED BARRIER @ CORRIDOR 209 NORTH WALL 1ST LAYER 5/8" TYPE X GWB -- EXCLUDING 8' TIE-IN SEGMENT NEAR (D'); OK TO COVER WHEN READY FOLLOWING COMPONENTS:
Rated Assembly Inspection Partial 07/22/2008
Correction
Partial Correction
07/22/2008
2 HR RATED BARRIER @ CORRIDOR 209 NORTH WALL 1ST + 2ND LAYER 5/8" TYPE X GWB -- EXCLUDING 8' TIE-IN SEGMENT NEAR (D'); OK TO COVER WHEN READY FOLLOWING COMPONENTS:
All Rough Inspection - Commercial Partial 07/22/2008
Correction
Partial Correction
07/22/2008
WALL FRAMING + IN-WALL SYSTEMS 1A078; 078A; 078B; 078C; EXTERIOR WALLS AT SOUTH, WEST, NORTH; WALLS OF OR's; 220 N WALL; 220A S WALL; 220A-220C W WALL; 220D-220G E WALL; COLUMN E'/16; ALL REMAINING INTERIOR WALLS EXCEPT @ BREAK-THROUGH TO EXISTING; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Passed 08/05/2008
Correction
Resolved
08/05/2008
TWO-LAYER STC-60 GWB WALL COVERING @ SPACE 230 SOUTH WALL 1ST LAYER 5/8" TYPE XP GWB; OK TO COVER WHEN READY FOLLOWING ELEMENTS:
Correction
Resolved
08/05/2008
WALL FRAMING + IN-WALL SYSTEMS 1A078; 078A; 078B; 078C; EXTERIOR WALLS AT SOUTH, WEST, NORTH; WALLS OF OR's; 220 N WALL; 220A S WALL; 220A-220C W WALL; 220D-220G E WALL; COLUMN E'/16; 061 S WALL; 211 S WALL; INTERIOR WALLS COMPLETE OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Rated Assembly Inspection Partial 08/05/2008
Correction
Partial Correction
08/05/2008
RATED WALL ALONG (D') FRAMING + 1" LINER BOARD + 1ST LAYER 5/8" TYPE X GWB + 2ND LAYER 5/8" TYPE X GWB + TAPE & SEAL 2ND LAYER -- OK TO CONSTRUCT FALSE WALL IN FRONT: FROM (16.3) TO (17.1); FROM (17.3) TO (19); FRAMING + LINER BOARD FROM (16.2) TO (17.5) OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
All Rough Inspection - Commercial Passed 08/06/2008
Correction
Resolved
08/06/2008
WALL FRAMING + IN-WALL SYSTEMS 1A078; 078A; 078B; 078C; EXTERIOR WALLS AT SOUTH, WEST, NORTH; WALLS OF OR's; 220 N WALL; 220A S WALL; 220A-220C W WALL; 220D-220G E WALL; COLUMN E'/16; 061 S WALL; 211 S WALL; 207 S WALL; INTERIOR WALLS COMPLETE OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Rated Assembly Inspection Partial 08/06/2008
Correction
Partial Correction
08/06/2008
RATED WALL ALONG (D') FRAMING + 1" LINER BOARD + TWO LAYERS 5/8" TYPE X GWB + TAPE/SEAL 2ND LAYER -- OK TO CONSTRUCT FALSE WALL IN FRONT: FROM (16.3) TO (17.1); FROM (17.3) TO (19); FRAMING + LINER BOARD + 1ST LAYER 5/8" TYPE X GWB FROM (16.2) TO (17.5) OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Rated Assembly Inspection Partial 08/07/2008
Correction
Partial Correction
08/07/2008
RATED WALL ALONG (D') FRAMING + 1" LINER BOARD + TWO LAYERS 5/8" TYPE X GWB + TAPE/SEAL 2ND LAYER -- OK TO CONSTRUCT FALSE WALL IN FRONT: FROM (16.3) TO (17.1); FROM (17.3) TO (19); FROM (16) TO (17.6); FRAMING + LINER BOARD + 1ST LAYER 5/8" TYPE X GWB FROM (16.2) TO (17.5); OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Correction
Partial Correction
08/07/2008
2 HR RATED BARRIER @ CORRIDOR 209 NORTH WALL 1ST + 2ND LAYER 5/8" TYPE X GWB -- ALL EXCEPT S FACE @ 211 S WALL OK TO COVER WHEN READY FOLLOWING COMPONENTS:
All Rough Inspection - Commercial Passed 08/07/2008
Correction
Resolved
08/07/2008
WALL FRAMING + IN-WALL SYSTEMS 1A078; 078A; 078B; 078C; EXTERIOR WALLS AT SOUTH, WEST, NORTH; WALLS OF OR's; 220 N WALL; 220A S WALL; 220A-220C W WALL; 220D-220G E WALL; COLUMN E'/16; 061 S WALL; 211 S WALL; 207 S WALL; 211 N WALL; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Underslab Plumbing Inspection - Commercial Passed 08/07/2008
Correction
Resolved
08/07/2008
UNDER-SLAB SANITARY DRAINAGE/VENT PIPING ROOM 056 SOUTH WALL
All Rough Inspection - Commercial Partial 08/12/2008
Correction
Partial Correction
08/12/2008
WALL FRAMING + IN-WALL SYSTEMS 1A078; 078A; 078B; 078C; EXTERIOR WALLS AT SOUTH, WEST, NORTH; WALLS OF OR's; 220 N WALL; 220A S WALL; 220A-220C W WALL; 220D-220G E WALL; COLUMN E'/16; 061 S WALL; 211 S WALL; 207 S WALL; 211 N WALL; 056 S/W/N WALLS; 210 E/S/W WALLS OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Rated Assembly Inspection Partial 08/13/2008
Correction
Partial Correction
08/13/2008
2 HR RATED BARRIER @ CORRIDOR 209 NORTH WALL 1ST + 2ND LAYER 5/8" TYPE X GWB -- ALL, INCLUDING N&S FACES @ 211 S WALL OK TO COVER WHEN READY FOLLOWING COMPONENTS:
Above Ceiling Inspection Partial 08/21/2008
Correction
Partial Correction
08/21/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS 1A078; 1A078A; 1A078B; 1A078C; OK TO COVER WHEN READY SPACES LISTED BELOW:
Correction
Partial Correction
08/21/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS OR's 204 & 206 OUTER PERIMETER; SUBSTERILE 205; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Above Ceiling Inspection Partial 09/12/2008
Correction
Partial Correction
09/12/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS ALL EXCEPT 046; 061; 202; 210 OK TO COVER WHEN READY SPACES LISTED BELOW:
Correction
Resolved
09/12/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS
Above Ceiling Inspection Partial 09/15/2008
Correction
Resolved
09/15/2008
None inspection completed on 12 Sept 08 by John Borns.
Above Ceiling Inspection Passed 10/07/2008
Correction
Resolved
10/07/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS ALL INCLUDING 061; 202; 207; 210 OK TO COVER WHEN READY SPACES LISTED BELOW:
Correction
Resolved
10/07/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS
Occupancy Inspection - Codes Commercial Not Ready 10/29/2008
Correction
Resolved
10/29/2008
Receive Planning & Development Approval PER TOM SCANNELL 10/29/08
Occupancy Inspection - Codes Commercial Failed 10/30/2008
Correction
Resolved
10/30/2008
FINAL INSPECTION ON DOCTOR'S LOUNGE
Correction
Resolved
10/30/2008
Receive Fire Department approval PER JOE DIR 10/30/08
Correction
Resolved
10/30/2008
Receive Public Works Approval NO ISSUES PRESENTED
Correction
Resolved
10/30/2008
Receive Water Utilities Approval NO ISSUES PRESENTED
Correction
Corrective Action Required
10/30/2008
LABELING OF RATED DOOR FRAMES COVERED WITH PAINT MUST BE CLEARLY READABLE
Occupancy Inspection - Codes Commercial Passed 10/31/2008
Correction
Resolved
10/31/2008
LABELING OF RATED DOOR FRAMES
Rated Assembly Inspection Passed 11/06/2008
Correction
Resolved
11/06/2008
RATED WALL ALONG (D')
Correction
Resolved
11/06/2008
2 HR RATED BARRIER @ CORRIDOR 209 NORTH WALL
All Rough Inspection - Commercial Passed 11/06/2008
Correction
Resolved
11/06/2008
WALL FRAMING + IN-WALL SYSTEMS
Underslab Plumbing Inspection - Commercial Partial 11/21/2008
Correction
Partial Correction
11/21/2008
UNDER-SLAB SANITARY DRAINAGE/VENT PIPING ALL WEST OF (D'); ROOM 056 SOUTH WALL; SPACES 071, 072, 073, 074 OK TO COVER WHEN READY SEGMENTS @ AREAS BELOW:
All Rough Inspection - Commercial Passed 12/02/2008
Correction
Resolved
12/02/2008
WALL FRAMING + IN-WALL SYSTEMS ALL INCLUDING 071; 072; 073; 074 AREAS DESCRIBED BELOW:
Above Ceiling Inspection Passed 12/19/2008
Correction
Resolved
12/19/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS ALL INCLUDING 061; 071; 072; 073; 074; 202; 207; 210 OK TO COVER WHEN READY SPACES LISTED BELOW:
All Rough Inspection - Commercial Passed 12/19/2008
Correction
Resolved
12/19/2008
WALL MODIFICATIONS @ 052 OK TO COVER WHEN READY
Occupancy Inspection - Codes Commercial Partial 01/08/2009
Correction
Partial Correction
01/08/2009
FINAL INSPECTION OF FOLLOW-ON PHASES SPACES 071; 072; 073; 074; OK FOR USE/OCCUPANCY AREAS DESCRIBED BELOW:
Underslab Plumbing Inspection - Commercial Passed 01/08/2009
Correction
Resolved
01/08/2009
UNDER-SLAB SANITARY DRAINAGE/VENT PIPING
Occupancy Inspection - Codes Commercial Passed 01/14/2009
Correction
Resolved
01/14/2009
FINAL INSPECTION OF FOLLOW-ON PHASES SPACES 071; 072; 073; 074; PHASE 5 AREA OK FOR USE/OCCUPANCY AREAS DESCRIBED BELOW:
Documents & Images

No documents are currently available for viewing.

Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home