Summary
B0701638
Building Permit - Commercial
Certificate of Occupancy
JOHN KNOX VILLAGE
ADD/ALTER MULTI-FAMILY
RENOVATIONS ON BUILDINGS A
07/20/2007
08/08/2007
02/04/2008
09/24/2008
Locations
Contacts
ALL STATE MECHANICAL INC, Address:12604 N 6TH ST  
METRO AIR CONDITIONING COMPANY, Address:10035 LACKMAN RD  
TEAGUE ELECTRIC CONSTRUCTION, INC., Address:11325 STRANG LINE RD.  
GASTINGER WALKER HARDEN ARCHITECTS, Address:817 WYANDOTTE  
THE WEITZ COMPANY, Address:8900 INDIAN CREEK PKWY SUITE 100  
JOHN KNOX VILLAGE, Address:400 NW MURRAY RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/29/2008 10/29/2010
Correction

Codes Administration - The value provided for this project was for both buildings. As separate permits are being issued for each building separate values are necessary.
Correction

Fire Department: Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required fire protection systems shall be extended, altered, or augmented as necessary to maintain and continue pro-tection whenever the building is altered, remodeled or added to.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-1300.
Correction

Fire Department- 905.1 General. Standpipe systems shall be provided in new buildings and structures in accordance with this section and as required by the Code Offical. Fire hose threads used in connection with standpipe systems shall comply with NFPA 1963 or as otherwise approved and shall be compatible with fire department hose threads. The location of fire department hose connections shall be approved. In build-ings used for high-piled combustible storage, fire protection shall be in accordance with Chapter 23.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department; Required means of egress components shall be maintained during construction and demolition.
Correction

Fire Department: Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the code official is authorized to require a key box to be installed in an accessible location. The key box shall be of an approved type and shall contain keys to gain access as required by the code official.
Correction

Fire Department; The required fire-resistance rating of fire-resistance-rated construction (including walls, fire stops, shaft enclosures, partitions and floors) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings, and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance rated assemblies shall be protected by self-closing or automatic- closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - All exterior mechanical equipment, whether roof mounted or ground mounted, shall be screened from view from off the property. The appearance of screens shall be coordinated with the building to maintain a unified appearance.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $11,073.00 $11,073.00 Paid 08/08/2007
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 10/12/2007
Correction
Partial Correction
10/12/2007
UNDER-SLAB DWV PIPING MAIN DRAIN FULL LENGTH OF CORRIDOR 110; OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Underslab Plumbing Inspection - Commercial Partial 10/18/2007
Rough Plumbing Inspection - Commercial Partial 11/30/2007
Correction
Partial Correction
11/30/2007
None AIR TEST APPROVED 5 PSI. ON DWV PIPE ROOM #s C 201, C 202, C 203, C 204, C 205, C 206, C 301, C 302, C 303, C 304, C 305 AND C 306.
Underslab Plumbing Inspection - Commercial Partial 01/07/2008
Correction
Partial Correction
01/07/2008
UNDER-SLAB DWV PIPING MAIN DRAIN FULL LENGTH OF CORRIDOR 110; UNITS 102; 104; 106; OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Underslab Plumbing Inspection - Commercial Partial 01/09/2008
Correction
Partial Correction
01/09/2008
UNDER-SLAB DWV PIPING MAIN DRAIN FULL LENGTH OF CORRIDOR 110; UNITS 102; 104; 106; 101; 103; 105; OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Rough Plumbing Inspection - Commercial Partial 01/25/2008
Correction
Resolved
01/25/2008
None
Correction
Partial Correction
01/25/2008
PRESSURE TEST ON TOP-ROUGH PLUMBING AIR TEST APPROVED 5 PSI. ON DWV PIPE ROOM #s C 201, C 202, C 203, C 204, C 205, C 206, C 301, C 302, C 303, C 304, C 305 AND C 306. {210; 211; 213} TO FLOOR LINE ABOVE; [212 FAILED TEST] TESTS BY SPACE NUMBERS SHOWN BELOW:
Above Ceiling Inspection Failed 01/29/2008
Correction
Corrective Action Required
01/29/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 3RD FLOOR UPPER CEILING: REQUESTING ENTIRE FLOOR EXCEPT CORRIDOR + 307 >>> NOT APPROVED >> RESOLVE EXISTING ROOF OPENINGS OK TO COVER WHEN READY SPACES LISTED BELOW:
Rough Plumbing Inspection - Commercial Partial 01/29/2008
Correction
Partial Correction
01/29/2008
PRESSURE TEST ON TOP-ROUGH PLUMBING AIR TEST APPROVED 5 PSI. ON DWV PIPE ROOM #s C 201, C 202, C 203, C 204, C 205, C 206, C 301, C 302, C 303, C 304, C 305 AND C 306. {201; 202; 204; 205; 210; 211; 212; 213} TO FLOOR LINE ABOVE TESTS BY SPACE NUMBERS SHOWN BELOW:
Rough Plumbing Inspection - Commercial Partial 02/01/2008
Correction
Partial Correction
02/01/2008
PRESSURE TEST ON TOP-ROUGH PLUMBING AIR TEST APPROVED 5 PSI. ON DWV PIPE ROOM #s C 201, C 202, C 203, C 204, C 205, C 206, C 301, C 302, C 303, C 304, C 305 AND C 306. {301; 302; 303; 304; 305; 306N; 306S; 310; 311; 312; 313; 317 AT FLOOR LINE FROM FLOOR BELOW TESTS BY SPACE NUMBERS SHOWN BELOW:
All Rough Inspection - Commercial Partial 02/01/2008
Correction
Partial Correction
02/01/2008
WALL FRAMING + IN-WALL SYSTEMS 3RD FLOOR EXCLUDING 306; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Above Ceiling Inspection Partial 02/21/2008
Correction
Partial Correction
02/21/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 2ND FLOOR UPPER CEILINGS THROUGHOUT EXCEPT CORR 216/222 AND UNIT 207 OK TO COVER WHEN READY SPACES LISTED BELOW:
All Rough Inspection - Commercial Partial 02/26/2008
Correction
Partial Correction
02/26/2008
WALL FRAMING + IN-WALL SYSTEMS 3RD FLOOR EXCLUDING 306; 2ND FLOOR EXCLUDING CORRIDOR 201/222 AND 207; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Above Ceiling Inspection Partial 03/06/2008
Correction
Resolved
03/06/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 3RD FLOOR OK TO INSTALL UPPER CEILING; 7' CEILINGS AT ALL EXCEPT 307 OK TO COVER WHEN READY AFTER CORRECTION OF THREE AREAS POINTED OUT OK TO COVER WHEN READY SPACES LISTED BELOW:
Above Ceiling Inspection Partial 03/21/2008
Correction
Partial Correction
03/21/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 2ND FLOOR UPPER CEILINGS THROUGHOUT EXCEPT CORR 216/222 AND UNIT 207 OK TO COVER WHEN READY SPACES LISTED BELOW:
Correction
Corrective Action Required
03/21/2008
CEILING PENETRATIONS 1 ST FLOOR FIRE CAULK ALL PVC PENETRATIONS OF 1 ST FLOOR CEILING. BLDG. A 1 ST FLOOR
All Rough Inspection - Commercial Partial 03/21/2008
Correction
Partial Correction
03/21/2008
WALL FRAMING + IN-WALL SYSTEMS 3RD FLOOR EXCLUDING 306; 2ND FLOOR EXCLUDING CORRIDOR 201/222 AND 207; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Correction
Partial Correction
03/21/2008
None BLDG. A 1 ST FLOOR WALLS APPROVED EXCEPT FOR CORRIDOR BLDG A 1 ST. FLOOR WALLS ONLY
Correction
Partial Correction
03/21/2008
None PLUMBING APPROVED 1 ST. FLOOR WALLS ONLY BLDG. A WALLS ONLY
Correction
Partial Correction
03/21/2008
None ELECTRICAL WALLS ONLY APPROVED 1 ST. FLOOR BLDG A 1 ST FLOOR
Correction
Partial Correction
03/21/2008
None 2 - FLUE PIPES FOR NEW BOILERS INSTALLED 1 ST. FLOOR AND THROUGH CEILING OF 2 ND. FLOOR MECHANICAL ROOM - BLDG A ROOM 207
Electrical Service Inspection Partial 03/21/2008
Correction
Partial Correction
03/21/2008
None ELECTRIC SERVICE APPROVED FOR ALL ROOMS 1 ST. FLOOR PNLY 1 ST. FLOOR BLDG A
Above Ceiling Inspection Partial 03/25/2008
Correction
Partial Correction
03/25/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 2ND FLOOR UPPER CEILINGS THROUGHOUT EXCEPT CORR 216/222 AND UNIT 207; 7' CEILINGS AT KITCHENS (SHOWERS NOT APPROVED: OK TO COVER WHEN READY SPACES LISTED BELOW:
Correction
Resolved
03/25/2008
CEILING PENETRATIONS 1 ST FLOOR OK TO COVER WHEN READY BLDG. A 1 ST FLOOR
Footing Inspection - Commercial Partial 03/26/2008
Correction
Partial Correction
03/26/2008
UNDERPINNING FOR EXISTING WEST WALL SIX ALTERNATING SECTIONS OF UNDERPINNING PER DRAWING OK TO POUR WHEN READY CONTINGENT ON A/E INSPECTION; PER A7 & A13 @ SHT 73.01 FOLLOWING PORTIONS:
Correction
Resolved
03/26/2008
LEVELING PAD FOR PATIO WING WALLS PER SECT A13/73.01 OK TO POUR WHEN READY
Rated Assembly Inspection Partial 03/31/2008
Correction
Partial Correction
03/31/2008
MECHANICAL CHASES(2) @ RMS 207/307 CHASE @ RM 207: FRAMING + LINER BOARD OK; OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Above Ceiling Inspection Not Ready 03/31/2008
Correction
Corrective Action Required
03/31/2008
READINESS FOR INSPECTION REQUEST CANCELED BY P.H.
Footing Inspection - Commercial Passed 04/01/2008
Correction
Resolved
04/01/2008
UNDERPINNING FOR EXISTING WEST WALL SIX ALTERNATING SECTIONS; FOUR REMINING SECTIONS OF UNDERPINNING PER DRAWING OK TO POUR WHEN READY CONTINGENT ON A/E INSPECTION PER A7 & A13 @ SHT 73.01 FOLLOWING PORTIONS:
Above Ceiling Inspection Partial 04/02/2008
Correction
Partial Correction
04/02/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 2ND FLOOR UPPER CEILINGS THROUGHOUT INCLUDING CORR 216/222 BUT EXCLUDING UNIT 207; 7' CEILINGS AT KITCHENS OK TO INSTALL (SHOWERS NOT APPROVED); OK TO COVER WHEN READY SPACES LISTED BELOW:
Correction
Resolved
04/02/2008
READINESS FOR INSPECTION
Rough Mechanical Inspection - Commercial Partial 04/04/2008
Correction
Partial Correction
04/04/2008
BOILER FLUE FROM MECH ROOM TO ROOF @ 3RD FLOOR OK TO COVER READY FOR FRAME+LINER BD
Rated Assembly Inspection Partial 04/04/2008
Correction
Partial Correction
04/04/2008
MECHANICAL CHASES(2) @ RMS 207/307 CHASE @ RM 207: FRAMING + LINER BOARD OK; CHASE @ RM 307: FRAMING + LINER BOARD OK @ N CHASE EXCEPT CLOSE HOLE @ JOIST PENETRATION; OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Above Ceiling Inspection Partial 04/18/2008
Correction
Resolved
04/18/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 2ND FLOOR OK TO COVER WHEN READY SPACES LISTED BELOW:
Correction
Resolved
04/18/2008
None
Correction
Partial Correction
04/18/2008
None
Correction
Partial Correction
04/18/2008
None ABOVE CEILING APPROVED IN ALL 1 ST. FLOOR KITCHEN AND SHOWER AREAS. ALSO ABOVE CEILING APPROVED MIDDLE STAIRWELL SOFFIT 1 ST. FLOOR AND 2 SOFFITS IN 1 ST FLOOR CORRIDOR. 1 ST FLOOR
All Rough Inspection - Commercial Partial 05/02/2008
Correction
Partial Correction
05/02/2008
WALL FRAMING + IN-WALL SYSTEMS 3RD FLOOR EXCLUDING 306; 2ND FLOOR EXCLUDING CORRIDOR 201/222 AND 207; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Correction
Partial Correction
05/02/2008
None 2 - FLUE PIPES FOR NEW BOILERS INSTALLED 1 ST. FLOOR AND THROUGH CEILING OF 2 ND. FLOOR MECHANICAL ROOM - BLDG A ROOM 207
Correction
Partial Correction
05/02/2008
None ALLROUGH APPROVED ROOM #s 207 AND 307.
Above Ceiling Inspection Partial 05/02/2008
Correction
Partial Correction
05/02/2008
None ABOVE CEILING APPROVED FOR HARD CEILING ROOM 207 AND 307.. ROOM 207 AND 307
Electrical Service Inspection Partial 05/02/2008
Correction
Partial Correction
05/02/2008
None ELECT SERVICE APPROVED ROOM 207 AND 307. ROOM 207 AND 307
Above Ceiling Inspection Partial 05/16/2008
Correction
Resolved
05/16/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 3RD FLOOR UPPER CEILING; ALL 7' CEILINGS INCLUDING 307 OK TO COVER WHEN READY SPACES LISTED BELOW:
Correction
Resolved
05/16/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 2ND FLOOR 7' CEILINGS @ 207; OK TO COVER WHEN READY SPACES LISTED BELOW:
Correction
Resolved
05/16/2008
None
Above Ceiling Inspection Not Ready 06/23/2008
Correction
Corrective Action Required
06/23/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 3RD FLOOR 1) SECURE MC CABLE W/I 12" OF BOXES 2) SECURE OR REMOVE L.V. TEMP CONTROL CABLES 3) CLOSE ALL LINE CURRENT ELECT BOXES 4) COMPLETE F.A. WIRING/BOXES PRELIM INSP 6/23/08
Above Ceiling Inspection Partial 07/01/2008
Correction
Resolved
07/01/2008
None
Correction
Partial Correction
07/01/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 3RD FLOOR CORRIDOR + ALL UNITS EXCEPT 307; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Correction
Resolved
07/01/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 2ND FLOOR ALL SPACES OK TO COVER WHEN READY
Miscellaneous Inspection Partial 07/08/2008
Correction
Partial Correction
07/08/2008
READINESS FOR INSPECTION
Above Ceiling Inspection Partial 07/31/2008
Correction
Partial Correction
07/31/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 3RD FLOOR CORRIDOR + ALL UNITS OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Correction
Partial Correction
07/31/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 1ST FLOOR ALL EXCEPT RESTROOMS IN UNITS 101 & 105 (CAN LIGHT WIRING INCOMPLETE) OK TO COVER WHEN READY CEILINGS @ SPACES BELOW
Above Ceiling Inspection Passed 08/13/2008
Correction
Resolved
08/13/2008
None
Correction
Resolved
08/13/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 3RD FLOOR
Correction
Resolved
08/13/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS -- 1ST FLOOR ALL -- INCLUDING RESTROOMS IN UNITS 101 & 105 OK TO COVER WHEN READY CEILINGS @ SPACES BELOW
Electrical Service Inspection Passed 08/25/2008
Correction
Resolved
08/25/2008
None
Correction
Resolved
08/25/2008
None
Rated Assembly Inspection Passed 08/25/2008
Correction
Resolved
08/25/2008
MECHANICAL CHASES(2) @ RMS 207/307
All Rough Inspection - Commercial Passed 08/25/2008
Correction
Resolved
08/25/2008
WALL FRAMING + IN-WALL SYSTEMS
Correction
Resolved
08/25/2008
None
Correction
Resolved
08/25/2008
None
Correction
Resolved
08/25/2008
None
Correction
Resolved
08/25/2008
None
Correction
Resolved
08/25/2008
None
Occupancy Inspection - Codes Commercial Not Ready 08/25/2008
Correction
Corrective Action Required
08/25/2008
Receive Fire Department approval
Correction
Corrective Action Required
08/25/2008
Receive Water Utilities Approval
Underslab Plumbing Inspection - Commercial Passed 08/25/2008
Correction
Resolved
08/25/2008
UNDER-SLAB DWV PIPING
Rough Plumbing Inspection - Commercial Passed 08/25/2008
Correction
Resolved
08/25/2008
None
Correction
Resolved
08/25/2008
PRESSURE TEST ON TOP-ROUGH PLUMBING
Rough Mechanical Inspection - Commercial Passed 08/25/2008
Correction
Resolved
08/25/2008
BOILER FLUE FROM MECH ROOM TO ROOF
Occupancy Inspection - Codes Commercial Failed 08/26/2008
Correction
Resolved
08/26/2008
Receive Fire Department approval PER JOE DIR 8/26/08
Correction
Resolved
08/26/2008
Receive Water Utilities Approval PER BEN HASKAMP 8/26/08
Correction
Resolved
08/26/2008
ELECTRICAL RECEPTACLE(S) AT WET LOCATIONS WEATHERPROOF COVERS NOW INSTALLED
Correction
Resolved
08/26/2008
VARIOUS ELECTRICAL ISSUES CORRECTED IN PROGRESS OF INSPECTION
Correction
Corrective Action Required
08/26/2008
LABELING OF FIRE-RATED CORRIDOR DOORS LABELS NOT VISIBLE CONCEALED IN TOP CAP
Occupancy Inspection - Codes Commercial Failed 08/29/2008
Occupancy Inspection - Codes Commercial Passed 09/22/2008
Correction
Resolved
09/22/2008
LABELING OF FIRE-RATED CORRIDOR DOORS
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home