Permit Application Status

B0701609


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0701609
Building Permit - Commercial
Certificate of Occupancy
NEW TENANT FINISH
TENANT FINISH
07/18/2007
08/06/2007
02/02/2008
12/07/2007
Locations
Property
60420990900000000

Address
2000 SE BLUE PKWY, LEES SUMMIT, MO 64063

2100 SE BLUE PKWY, UNIT 100
Contacts
HMN ARCHITECTS INC, Address:7400 W 110TH ST  
LYTLE CONSTRUCTION INC, Address:1051 SE BROADWAY DR  
PRO ELECTRIC, INC., Address:5320 SPEAKER RD  
METRO AIR CONDITIONING COMPANY, Address:10035 LACKMAN RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/30/2008 10/29/2010
Correction

Codes Administration - 2003 IBC 2406.1 - Human impact loads. Individual glazed areas, including glass mirrors, in hazardous locations as defined in Section 2406.3 shall comply with Sections 2406.1 through 2406.1.4.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-1300.
Correction

Fire Department- Plans reviewed under the 2006 International Fire Code.
Correction

Codes Administration - The application has an address of 2200 SE Blue Pkwy. The actual address of this facility is 2100 SE Blue Pkwy.
Correction

Codes Administration - A suite number must be assigned to this each tenant space in this building. The suite number must indicate the floor that the tenant space is located on. Examples would be 2A or 201 for tenant spaces on the second floor.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - A Certificate of Occupancy will not be issued for a tenant finish until a minimum of a Temporary Occupancy has been issued for the shell building.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Codes Administration - All plans submitted for review on or after July 9, 2007 shall be designed to the requirements of the 2006 International Building Code, 2006 International Mechanical Code, 2006 International Plumbing Code, 2006 International Fuel Gas Code, 2006 International Fire Code, 2005 National Electric Code and the ANSI A117.1-2003 as amended and adopted by the City of Lee's Summit.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

Fire Department: Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required fire protection systems shall be extended, altered, or augmented as necessary to maintain and continue pro-tection whenever the building is altered, remodeled or added to.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $276.07 $276.07 Paid 08/06/2007
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Miscellaneous Inspection Passed 09/19/2007
All Rough Inspection - Commercial Failed 09/19/2007
Correction
Corrective Action Required
09/19/2007
Outlet MISSING OUTLET ON WEST WALL Room 105
Correction
Corrective Action Required
09/19/2007
Incomplete Walls ROOM 101 - SOUTH WALL NOT FINISHED ROOM 102 & 105 - COMPLETE FUR IN OF COLUMNS OKAY TO ROCK EXCEPT AS LISTED ABOVE
Rough Framing Inspection - Commercial Request Complete 9/18/2007 9/19/2007 09/19/2007
All Rough Inspection - Commercial Failed 09/28/2007
Correction
Resolved
09/28/2007
Incomplete Walls
Above Ceiling Inspection Passed 10/17/2007
Correction
Resolved
10/17/2007
None
All Rough Inspection - Commercial Passed 10/23/2007
Correction
Resolved
10/23/2007
Outlet MISSING OUTLET ON WEST WALL
Occupancy Inspection - Codes Commercial Failed 10/23/2007
Correction
Corrective Action Required
10/23/2007
Receive Fire Department approval RECEIVE UNDER SEPARATE COVER
Occupancy Inspection - Codes Commercial Passed 12/06/2007
Correction
Resolved
12/06/2007
Receive Fire Department approval see e-mail from Joe Dir dated 29 Nov 07
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home