Summary
B0701367
Building Permit - Commercial
Final Completion
TRD REAL ESTATE LLC
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB
06/19/2007
07/17/2007
01/13/2008
04/22/2008
Locations
Contacts
HERITAGE ELECTRIC, LLC., Address:1802 E 123RD STREET  
KLEINFELDER, Address:7802 BARTON  
ROSE CONSTRUCTION COMPANY INC, Address:863 N MARTWAY DR  
HEARTLAND PLUMBING INC, Address:800 S CREEKSIDE DR  
METRO AIR CONDITIONING COMPANY, Address:10035 LACKMAN RD  
TRD REAL ESTATE LLC, Address:607 NW BLUE PARKWAY  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/02/2008 10/29/2010
Correction

CA - This is an "at risk permit". Construction shall be in accordance with plans submitted for permit approval. The applicant understands that issuance of this permit does not guaranty issuance of a full permit.
Correction

Codes Administration - 2003 IBC 1104.4 - Multilevel buildings and facilities. At least one accessible route shall connect each accessible level, including mezzanines, in multilevel building and facilities.
Correction

Fire Department- 903.3.7 Fire department connections. The FDC shall be within 100' of a fire hydrant.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

Fire Department; An approved lock shall be installed on gates or similar barriers when required by the code official.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

Codes Administration - 2003 IPC 403.1 - Minimum number of fixtures. Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 403.1. Types of occupancies not shown in Tale 403.1 shall be considered individually by the code official. The number of occupants shall be deetermined by the International Building Code. Occupancy classification shall be determined in accordance with the International Building Code.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Correction

Codes Administration - 2003 IBC 1004.1 - Design occupant load. In determining means of egress requirements, the number of occupants for whom meansof egress facilities shall be provided shall be established by the largest number computed in accordance with Sections 1004.1.1 through 1004.1.3.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department; Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the code official.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $799.00 $799.00 Paid 07/17/2007
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 08/28/2007
Correction
Partial Correction
08/28/2007
WALL SPREAD FOOTING PER 7/S7 EAST WALL FROM 44' N OF S END TO 106' N; OK TO POUR WHEN READY PORTIONS DESCRIBED BELOW:
Footing Inspection - Commercial Partial 08/29/2007
Correction
Partial Correction
08/29/2007
WALL SPREAD FOOTING PER 7/S7 E WALL: FROM 44' N OF S END TO 106' N; S 44' OF E WALL TO SE CRNR / S WALL TO WITHIN 10' OF SW CRNR; OK TO POUR WHEN READY PORTIONS DESCRIBED BELOW:
Footing Inspection - Commercial Not Ready 08/30/2007
Correction
Corrective Action Required
08/30/2007
READINESS FOR INSPECTION CALL FOR INSPECTION AFTER PREPARATION IS COMPLETE WORK REQUESTED FOR INSP NOT COMPLETED
Footing Inspection - Commercial Partial 08/31/2007
Correction
Resolved
08/31/2007
READINESS FOR INSPECTION
Correction
Partial Correction
08/31/2007
WALL SPREAD FOOTING PER 7/S7 E WALL: FROM 44' N OF S END TO 106' N; S 44' OF E WALL TO SE CRNR / S WALL TO WITHIN 10' OF SW CRNR; REMAINDER OF S WALL; W WALL FROM SW CRNR TO 80' N INCL COMPRESSOR RM; OK TO POUR WHEN READY PORTIONS DESCRIBED BELOW:
Footing Inspection - Commercial Partial 08/31/2007
Footing Inspection - Commercial Partial 09/05/2007
Correction
Partial Correction
09/05/2007
WALL SPREAD FOOTING PER 7/S7 E WALL: FROM 44' N OF S END TO 106' N; S 44' OF E WALL TO SE CRNR / S WALL TO WITHIN 10' OF SW CRNR; REMAINDER OF S WALL; W WALL FROM SW CRNR TO 110' N INCL COMPRESSOR RM; OK TO POUR WHEN READY PORTIONS DESCRIBED BELOW:
Foundation Inspection - Commercial Partial 09/05/2007
Correction
Partial Correction
09/05/2007
PREP TO POUR FOUNDATION WALL E 72' OF S WALL + S 82' OF E WALL -- PER SECT 6/S7; OK TO POUR WHEN READY
Foundation Inspection - Commercial Partial 09/06/2007
Correction
Partial Correction
09/06/2007
PREP TO POUR FOUNDATION WALL E 72' OF S WALL + S 82' OF E WALL -- PER SECT 6/S7; E WALL FROM 82' N OF SE CRNR TO 136' N; OK TO POUR WHEN READY
Foundation Inspection - Commercial Partial 09/12/2007
Correction
Partial Correction
09/12/2007
PREP TO POUR FOUNDATION WALL E 72' OF S WALL + S 82' OF E WALL -- PER SECT 6/S7; E WALL FROM 82' N OF SE CRNR TO 136' N; W 8' OF S WALL + S 61' OF W WALL; OK TO POUR WHEN READY SEGMENTS OF WALL BELOW:
Footing Inspection - Commercial Partial 09/13/2007
Correction
Partial Correction
09/13/2007
WALL SPREAD FOOTING PER 7/S7 E WALL: FROM 44' N OF S END TO 106' N; S 44' OF E WALL TO SE CRNR / S WALL TO WITHIN 10' OF SW CRNR; REMAINDER OF S WALL; W WALL FROM SW CRNR TO 110' N INCL COMPRESSOR RM; W WALL N TO D.4; OK TO POUR WHEN READY PORTIONS DESCRIBED BELOW:
Foundation Inspection - Commercial Partial 09/18/2007
Correction
Partial Correction
09/18/2007
PREP TO POUR FOUNDATION WALL S WALL COMPLETE; S 136' OF E WALL; S 61' OF W WALL; WALLS @ COMP/STOR/TRASH S 65' @ OUTER + S 12' @ INNER; OK TO POUR WHEN READY SEGMENTS OF WALL BELOW:
Footing Inspection - Commercial Partial 09/18/2007
Correction
Partial Correction
09/18/2007
FOOTING PER DESIGN CHANGE DTD 8/30/07 WALL FOOTING, BUT EXCLUDING [5.00] FOOTING; OK TO POUR WHEN READY PORTIONS DESCRIBED BELOW:
Foundation Inspection - Commercial Partial 09/20/2007
Correction
Partial Correction
09/20/2007
PREP TO POUR FOUNDATION WALL S WALL COMPLETE; S 136' OF E WALL; S 61' OF W WALL; REMAINDER OF WALLS @ COMP/STOR/TRASH + W WALL N TO D.4; OK TO POUR WHEN READY SEGMENTS OF WALL BELOW:
Foundation Inspection - Commercial Partial 09/21/2007
Correction
Partial Correction
09/21/2007
PREP TO POUR FOUNDATION WALL S WALL COMPLETE; S 136' OF E WALL; S 61' OF W WALL; WALLS @ COMP/STOR/TRASH + W WALL N TO D.4; REMAINDER OF C.I.P. WALL AT LUNCH RM S & E; OK TO POUR WHEN READY SEGMENTS OF WALL BELOW:
Footing Inspection - Commercial Partial 10/12/2007
Correction
Partial Correction
10/12/2007
PREP TO POUR GRADE BEAM ON (12) FROM BREAK ROOM NORTH TO (G); OK TO POUR WHEN READY PORTIONS DESCRIBED BELOW:
Correction
Resolved
10/12/2007
FOOTING PER DESIGN CHANGE DTD 8/30/07
Correction
Resolved
10/12/2007
WALL SPREAD FOOTING PER 7/S7
Footing Inspection - Commercial Partial 10/25/2007
Correction
Partial Correction
10/25/2007
PREP TO POUR GRADE BEAM ON (12) FROM BREAK ROOM NORTH TO (G);(G) NORTH ON 13 TO (BB) OK TO POUR WHEN READY PORTIONS DESCRIBED BELOW:
Footing Inspection - Commercial Partial 10/30/2007
Correction
Partial Correction
10/30/2007
PREPARATION TO POUR ISOLATED COLUMN FOOTINGS L/1; P/1; J/2; L/2; U/3; L/4; N/4; J/5; L/5; N/5; T/5; V/5; Z/5; D/2; D/5; OK TO POUR WHEN READY LOCATIONS DESCRIBED BELOW
Correction
Partial Correction
10/30/2007
PREP TO POUR GRADE BEAM ON (12) FROM BREAK ROOM NORTH TO (G);(G) NORTH ON 13 TO (BB); WEST WALL FROM (L) TO (BB); PERIM OF CAR WASH; (BB) COMPLETE FROM W WALL TO (13); OK TO POUR WHEN READY PORTIONS DESCRIBED BELOW:
Footing Inspection - Commercial Passed 11/01/2007
Correction
Resolved
11/01/2007
PREPARATION TO POUR ISOLATED COLUMN FOOTINGS L/1; P/1; J/2; L/2; U/3; L/4; N/4; J/5; L/5; N/5; T/5; V/5; Z/5; D/2; D/5; E/14; H/14; AA/14; CC/7; DD/14; 5/RM143; N/4; T/4; V/4; Z/4; P/3; L/8&9; P/9; U/9; Z/11 OK TO POUR WHEN READY LOCATIONS DESCRIBED BELOW
Correction
Resolved
11/01/2007
PREP TO POUR GRADE BEAM ON (12) FROM BREAK ROOM NORTH TO (G);(G) NORTH ON 13 TO (BB); WEST WALL FROM (L) TO (BB); PERIM OF CAR WASH; (BB) COMPLETE FROM W WALL TO (13); ISOLATED GB @ DD/13 OK TO POUR WHEN READY PORTIONS DESCRIBED BELOW:
Underslab Plumbing Inspection - Commercial Not Ready 03/05/2008
Correction
Corrective Action Required
03/05/2008
DESIGNATION OF PLUMBING CONTRACTOR ON PERMIT NOT COMPLETED
Underslab Plumbing Inspection - Commercial Partial 03/06/2008
Correction
Partial Correction
03/06/2008
DESIGNATION OF PLUMBING CONTRACTOR ON PERMIT GR ROUGH - NORTH END - EAST SIDE - COMPLETED
Underslab Plumbing Inspection - Commercial Partial 03/11/2008
Correction
Partial Correction
03/11/2008
UNDER-SLAB WASTE, SOIL, VENT PIPING NORTH END/EAST SIDE; 4" PVC S&O FROM 5' N OF (BB) S TO TERMINATION @ (C.2); 4" PVC S&O BRANCH FROM C.2/1.7 TO 20' E; OK TO COVER WHEN READY FOLLOWING PORTIONS:
Correction
Resolved
03/11/2008
DESIGNATION OF PLUMBING CONTRACTOR ON PERMIT
Underslab Plumbing Inspection - Commercial Partial 03/25/2008
Correction
Partial Correction
03/25/2008
UNDER-SLAB WASTE, SOIL, VENT PIPING NORTH END/EAST SIDE; 4" PVC S&O FROM 5' N OF (BB) S TO TERMINATION @ (C.2); FROM (C.2) TO 66' S; 4" PVC S&O BRANCH FROM C.2/1.7 TO 20' E; OK TO COVER WHEN READY FOLLOWING PORTIONS:
Underslab Plumbing Inspection - Commercial Partial 03/27/2008
Correction
Partial Correction
03/27/2008
UNDER-SLAB WASTE, SOIL, VENT PIPING NORTH END/EAST SIDE; 4" PVC S&O FROM 5' N OF (BB) S TO TERMINATION @ (C.2); FROM (C.2) TO 66' S; S TO WITHIN 60' OF S WALL & TERMINATING WITH RISERS FOR C.O. AND F.D. CONNECTION; 4" PVC S&O BRANCH FROM C.2/1.7 TO 20' E; OK TO COVER WHEN READY FOLLOWING PORTIONS:
All Rough Inspection - Commercial Failed 04/14/2008
Correction
Corrective Action Required
04/14/2008
INSTALLATION OF MC ELECTRICAL CABLE NEC 300-11 & 334-10 NOT SECURELY FASTENED WITHIN 12" OF BOXES
Correction
Corrective Action Required
04/14/2008
FASTENING OF LIGHT-GUAGE STEEL FRAMING EXCEPT @ TOP DEEP/SLIP TRACK SCREW BOTH STUD FLANGES T&B TRACKS + HEADERS
All Rough Inspection - Commercial Partial 04/16/2008
Correction
Resolved
04/16/2008
FASTENING OF LIGHT-GUAGE STEEL FRAMING EXCEPT @ TOP DEEP/SLIP TRACK SCREW BOTH STUD FLANGES T&B TRACKS + HEADERS
Correction
Resolved
04/16/2008
INSTALLATION OF MC ELECTRICAL CABLE
Correction
Partial Correction
04/16/2008
WALL FRAMING + IN-WALL SYSTEMS WALLS @ MEZZANINE; OK TO COVER WHEN READY WALLS @ FOLLOWING SPACES:
All Rough Inspection - Commercial Passed 04/21/2008
Correction
Resolved
04/21/2008
INSTALLATION OF MC ELECTRICAL CABLE
Correction
Resolved
04/21/2008
FASTENING OF LIGHT-GUAGE STEEL FRAMING
Correction
Resolved
04/21/2008
WALL FRAMING + IN-WALL SYSTEMS SEE SUPERSTRUCTURE PERMIT
Foundation Inspection - Commercial Passed 04/21/2008
Correction
Resolved
04/21/2008
PREP TO POUR FOUNDATION WALL
Final Inspection - Commercial Passed 04/21/2008
Correction
Resolved
04/21/2008
CLOSE PERMIT
Underslab Plumbing Inspection - Commercial Passed 04/21/2008
Correction
Resolved
04/21/2008
DESIGNATION OF PLUMBING CONTRACTOR ON PERMIT
Correction
Resolved
04/21/2008
UNDER-SLAB WASTE, SOIL, VENT PIPING
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home