Permit Application Status

B0700672


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0700672
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
NEW OTHER
PARKING LOT LIGHTS/RELEASE FOR WATER TOWE/REC CENT
04/05/2007
04/05/2007
10/02/2007
07/19/2007
Locations
Contacts
SUPERIOR ELECTRICAL CONSTRUCTION, Address:PO BOX 3137  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 10/02/2007 10/29/2010
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $293.02 $293.02 Paid 04/05/2007
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Electrical Inspection - Commercial Partial 04/23/2007
Correction
Corrective Action Required
04/23/2007
INSTALLATION OF BURIED CONDUIT FOR SITE ELECTRICAL
Correction
Partial Correction
04/23/2007
GROUNDING OF LIGHT POLE BASES #1; 2; 4-6; OK TO COVER WHEN READY GROUNDS AT FOLLOWING:
Correction
Partial Correction
04/23/2007
PREPARATION FOR POUR OF CONCRETE LIGHT POLE BASES #1; 2; 4-6; OK TO POUR WHEN READY BASES LISTED BELOW:
Underground Electrical Inspection - Commercial Request Complete 4/20/2007 4/23/2007 04/23/2007
Underground Electrical Inspection - Commercial Partial 04/24/2007
Correction
Partial Correction
04/24/2007
INSTALLATION OF BURIED CONDUIT FOR SITE ELECTRICAL 16 <PARTIAL> 17; 17 <> 18; 20 <> BLDG S.E. CORNER; THREE 1-1/2" FROM BLDG SE CRNR TO N OF BLDG NE CRNR; OK TO COVER WHEN READY BETWEEN L.P. LOCATIONS:
Underground Electrical Inspection - Commercial Request Complete 4/23/2007 4/24/2007 04/24/2007
Underground Electrical Inspection - Commercial Request Complete 4/24/2007 4/24/2007 04/24/2007
Underground Electrical Inspection - Commercial Request Complete 4/27/2007 4/27/2007 04/27/2007
Underground Electrical Inspection - Commercial Partial 05/01/2007
Correction
Partial Correction
05/01/2007
GROUNDING OF LIGHT POLE BASES #1; 2; 4-6; 3; 12; 14; 15; OK TO COVER WHEN READY GROUNDS AT FOLLOWING:
Correction
Partial Correction
05/01/2007
PREPARATION FOR POUR OF CONCRETE LIGHT POLE BASES #1; 2; 4-6; 3; 12; 14; 15; OK TO POUR WHEN READY BASES LISTED BELOW:
Underground Electrical Inspection - Commercial Partial 05/03/2007
Correction
Partial Correction
05/03/2007
INSTALLATION OF BURIED CONDUIT FOR SITE ELECTRICAL 16 <PARTIAL> 17; 17 <> 18; 20 <> BLDG S.E. CORNER; THREE 1-1/2" FROM BLDG SE CRNR TO N OF BLDG NE CRNR; 21; 22; 23; 24; 25; BLDG ENTRANCE TO 20' OUT; OK TO COVER WHEN READY BETWEEN L.P. LOCATIONS:
Underground Electrical Inspection - Commercial Partial 05/11/2007
Correction
Partial Correction
05/11/2007
GROUNDING OF LIGHT POLE BASES #1-6; 7; 8; 9; 10; 12; 13; 14-15; OK TO COVER WHEN READY GROUNDS AT FOLLOWING:
Correction
Partial Correction
05/11/2007
PREPARATION FOR POUR OF CONCRETE LIGHT POLE BASES #1-6; 7; 8; 9; 10; 12; 13; 14-15; OK TO POUR WHEN READY BASES LISTED BELOW:
Underground Electrical Inspection - Commercial Request Complete 5/10/2007 5/11/2007 05/11/2007
Underground Electrical Inspection - Commercial Partial 05/16/2007
Correction
Partial Correction
05/16/2007
None UNDERGROUND ELECTRICAL APPROVED FROM NORTH OF SOUTH ENTRY (OFF BLUE PKWY) - APPROVED 5' N + S OF POLE BASE #25, APPROVED 5' NW OF POLE BASE #11. UNDERGROUND ELECTRICAL STOPPED AT POLE BASE #11. SW CORNER OF SITE 2 POLE BASES
Underground Electrical Inspection - Commercial Request Complete 5/16/2007 5/16/2007 05/16/2007
Electrical Service Inspection Partial 05/18/2007
Correction
Partial Correction
05/18/2007
GROUND RODS AT POLE-MOUNTED SWITCH DRAWING ME200 NOTES 11&12 2 3/4"x10' RODS W/ #3 CU
Underground Electrical Inspection - Commercial Request Complete 5/18/2007 5/18/2007 05/18/2007
Electrical Service Inspection Passed 05/22/2007
Correction
Resolved
05/22/2007
GROUND RODS AT POLE-MOUNTED SWITCH DRAWING ME200 NOTES 11&12 2 3/4"x10' RODS W/ #3 CU
Correction
Resolved
05/22/2007
FUSED SWITCH AT AQUILA POLE #33492 + SE CONDUCTORS TERMINATED AT 600A FUSED SWITCH & AT MDP 2 SETS OF FOUR 350 MCM CU + 3/0 CU GROUND CONDUCTOR
Underground Electrical Inspection - Commercial Partial 06/06/2007
Correction
Partial Correction
06/06/2007
PREPARATION FOR POUR OF CONCRETE LIGHT POLE BASES #1-6; 7; 8; 9; 10; 11; 12; 13; 14-15; 21-25 OK TO POUR WHEN READY BASES LISTED BELOW:
Correction
Partial Correction
06/06/2007
GROUNDING OF LIGHT POLE BASES #1-6; 7; 8; 9; 10; 11; 12; 13; 14-15; 21-25 OK TO COVER WHEN READY GROUNDS AT FOLLOWING:
Underground Electrical Inspection - Commercial Request Complete 6/6/2007 6/6/2007 06/06/2007
Underground Electrical Inspection - Commercial Partial 06/13/2007
Correction
Resolved
06/13/2007
None (#16 - #20) LIGHT POLES ARE APPROVED SE CORNER 5 POLE BASES
Underground Electrical Inspection - Commercial Request Complete 6/13/2007 6/13/2007 06/13/2007
Underground Electrical Inspection - Commercial Passed 07/18/2007
Correction
Resolved
07/18/2007
PREPARATION FOR POUR OF CONCRETE LIGHT POLE BASES
Correction
Resolved
07/18/2007
GROUNDING OF LIGHT POLE BASES
Correction
Resolved
07/18/2007
INSTALLATION OF BURIED CONDUIT FOR SITE ELECTRICAL
Correction
Resolved
07/18/2007
None
Correction
Resolved
07/18/2007
None
Final Electrical Inspection - Commercial Passed 07/18/2007
Correction
Resolved
07/18/2007
CLOSE PERMIT
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home