Permit Application Status

B0700535


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0700535
Building Permit - Commercial
Final Completion
CML MO HAF LLC
NEW COMMERCIAL
PARKING GARAGE
03/21/2007
05/24/2007
09/21/2008
06/02/2015
Locations
Contacts
GUY GRONBERG ARCHITECTS, PC, Address:PO BOX 2024  
A&D HEATING AND COOLING, Address:2006 W MAIN  
FPC COMMERCIAL LLC, Address:301 SE DOUGLAS ST SUITE 201  
SHAKER ELECTRIC, Address:PO BOX 300795  
TRI-COUNTY PLUMBING, LLC, Address:100 W PACIFIC  
CML MO HAF LLC, Address:1010 WALNUT STE 500  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 11/18/2007 10/29/2010
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department;A site plan depicting proposed fire apparatus access, location of fire lanes and parking areas and for fire hydrant locations shall be submitted to the fire department for review and approval prior to construction.
Correction

1003.2.10.1 Fire Department- Where required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Exit sign placement shall be such that no point in an exit access corridor is more than 100 feet (30 480 mm) from the nearest visible exit sign.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

Codes Administration - A domestic water service is not shown.
Correction

Fire Department- Unable to find where the the sprinkler riser will be located and where the fire main will becoming from.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-7343.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $1,119.10 $1,119.10 Paid 05/24/2007
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Partial 11/05/2007
Correction
Partial Correction
11/05/2007
PREPARATION TO POUR DRILLED PIERS SUBJECT TO SOILS ENGR CERTIFICATION OF BEARING: X/6.9; A/6.9; B/6.9; X/5.3; A/5.3; B/5.0; C/5.0; X/4.3; A/4.3; C/4; B/3.4; X/3.3; A/3.3; C/3; B/2.4; OK TO POUR WHEN READY PIERS AT LOCATIONS BELOW:
Foundation Inspection - Commercial Passed 11/08/2007
Correction
Resolved
11/08/2007
LEVELING PADS ATOP DRILLED PIERS POUR ALL WHEN READY INSPECTIONS WAIVED
Foundation Inspection - Commercial Partial 11/15/2007
Correction
Partial Correction
11/15/2007
PREPARATION TO POUR 10" CONCRETE FOUNDATION WALL + 6" GUARD NORTH END COMPLETE; WEST SIDE S 62'; ON (5) FROM (B) TO (C); ON (C) FROM (5) TO (2.8); ENSURE 1-1/2" REBAR COVER OK TO POUR WHEN READY:
Piers/Caissons Inspection - Commercial Passed 02/12/2008
Correction
Resolved
02/12/2008
PREPARATION TO POUR DRILLED PIERS SUBJECT TO SOILS ENGR CERTIFICATION OF BEARING: X/6.9; A/6.9; B/6.9; X/5.3; A/5.3; B/5.0; C/5.0; X/4.3; A/4.3; C/4; B/3.4; X/3.3; A/3.3; C/3; B/2.4; ALL SOUTH OF (3) OK TO POUR WHEN READY PIERS AT LOCATIONS BELOW:
Sprinkler - Hydrostatic Test Passed 2/28/2008 at 12:00 AM 02/28/2008
Final Inspection - Commercial Not Ready 02/29/2008
Correction
Corrective Action Required
02/29/2008
Receive Public Works Approval 1) REPAIR OF DAMAGE TO ALLEY {CONC PUMPING 2/27/08} 2) REPAIR OF DAMAGE TO ARNOLD HALL PARKING LOT {CONC PUMPING 2/27/08}
Suspended Slab Inspection Partial 03/21/2008
Correction
Partial Correction
03/21/2008
None GARAGE SLAB FROM THE SOUTH END TO LINE 1.5 APPROVED PER PLANS. ENGINEER ON SIGHT.
Suspended Slab Inspection Partial 03/24/2008
Correction
Partial Correction
03/24/2008
PREP TO POUR TOPPING ON SUSPENDED PRE-CAST FLOOR SLAB FROM SOUTH END TO 64' NORTH; FROM NORTH END TO 28' SOUTH; OK TO POUR WHEN READY FOLLOWING SECTIONS:
Correction
Resolved
03/24/2008
None
Suspended Slab Inspection Passed 03/25/2008
Correction
Resolved
03/25/2008
PREP TO POUR TOPPING ON SUSPENDED PRE-CAST FLOOR SLAB FROM SOUTH END TO 64' NORTH; FROM NORTH END TO 28' SOUTH; CENTER SECTION TO COMPLETE FLOOR AREA OK TO POUR CONTINGENT ON STRUCTURAL ENGINEER APPROVAL AND COMPLETION OF RE-MESH PLACEMENT. OK TO POUR WHEN READY FOLLOWING SECTIONS:
Foundation Inspection - Commercial Partial 03/09/2010
Correction
Partial Correction
03/09/2010
PREPARATION TO POUR 10" CONCRETE FOUNDATION WALL + 6" GUARD NORTH END COMPLETE; WEST SIDE S 62'; ON (5) FROM (B) TO (C); ON (C) FROM (5) TO (2.8); ENSURE 1-1/2" REBAR COVER OK TO POUR WHEN READY:
Final Inspection - Commercial Not Ready 12/7/2012 at 12:00 AM 12/07/2012
Correction
Corrective Action Required
12/07/2012
Receive Public Works Approval 1) REPAIR OF DAMAGE TO ALLEY {CONC PUMPING 2/27/08} 2) REPAIR OF DAMAGE TO ARNOLD HALL PARKING LOT {CONC PUMPING 2/27/08}
Misc
Corrective Action Required
12/07/2012
PER DIRECTION BY LS ADMINISTRATION, ANY OUTSTANDING PUBLIC WORKS AND PLANNING & DEVELOPMENT ISSUES ON THE VOGUE/HARTLEY DEVLOPMENT PROPERTY ENCOMPASSING THREE BUILDINGS IN ADDITION TO PARKING GARAGE ARE TO BE RESOLVED AS PART OF FINAL INSPECTION AND APPROVAL OF THE PARKING GARAGE PERMIT.
Final Inspection - Commercial Partial 5/21/2015 at 12:00 AM 05/21/2015
Correction
Resolved
05/21/2015
Receive Public Works Approval 1) REPAIR OF DAMAGE TO ALLEY {CONC PUMPING 2/27/08} 2) REPAIR OF DAMAGE TO ARNOLD HALL PARKING LOT {CONC PUMPING 2/27/08}
Misc
Resolved
05/21/2015
PER DIRECTION BY LS ADMINISTRATION, ANY OUTSTANDING PUBLIC WORKS AND PLANNING & DEVELOPMENT ISSUES ON THE VOGUE/HARTLEY DEVLOPMENT PROPERTY ENCOMPASSING THREE BUILDINGS IN ADDITION TO PARKING GARAGE ARE TO BE RESOLVED AS PART OF FINAL INSPECTION AND APPROVAL OF THE PARKING GARAGE PERMIT.
Misc
Partial Correction
05/21/2015
SEE CURRENT STATUS ON PERMIT PRCOM20150134
Final Inspection - Commercial Passed 5/28/2015 at 12:00 AM 05/28/2015
Misc
Resolved
05/28/2015
SEE CURRENT STATUS ON PERMIT PRCOM20150134
Documents & Images
Date Uploaded File Type Document Name
05/28/2015 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home