Permit Application Status

B0700533


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0700533
Building Permit - Commercial
Final Completion
24 LLC
PARTIAL COMMERCIAL
FOUNDATION, SLAB, WATER & SEWE, TEMP ELEC
03/21/2007
03/27/2007
09/23/2007
11/29/2007
Locations
Contacts
DARLAND CONSTRUCTION CO, Address:4115 S 133RD ST  
PEAK INC, Address:533 N LINDENWOOD DR STE B  
SALADINO PLUMBING & HEATING CO, Address:2210 TELEVISION PL  
CENTRAL SYSTEMS HEATING AND AIR CONDITIONING, INC., Address:2857 WESTBOUND 40 HWY  
PROFESSIONAL SERVICES INDUSTRIES, Address:1211 W CAMBRIDGE CIRCLE DRIVE  
24 LLC, Address:427 POTLOCK RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 09/23/2007 10/29/2010
Correction

CA - This is an "at risk permit". Construction shall be in accordance with plans submitted for permit approval. The applicant understands that issuance of this permit does not guaranty issuance of a full permit.
Correction

Codes Administration - 2003 IBC 1704.1.1 - Building permit requirements. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with Section 106.1 as a condition for permit issuance. This statement shall include a complete list of materials and work requiring special inspections by this section, the inspections to be performed and a list of the individuals, approved agencies or firms intended to be retained for conducting such inspections.
Correction

Codes Administration - 2003 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work.
Correction

Codes Administration - Prior to the issuance of any certificate of occupancy for any structure in the development, the developer shall design and construct, in accordance with City's ordinances and the Design and Construction Manual, a 200-foot southbound left-turn lane along M-291 at Deerbrook Street.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $671.16 $671.16 Paid 03/27/2007
84 Water Meters $625.00 $625.00 Paid 03/27/2007
85 Water Taps $13,670.00 $13,670.00 Paid 03/27/2007
Right of Way Permit $35.00 $35.00 Paid 03/27/2007
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Passed 04/20/2007
Correction
Resolved
04/20/2007
None LINE C, LINE D X 3, 4, LINE E X 3, 4, LINE E X 3, 4, 4.5, LINE E.5 X 3, 3.5, 4, 4.5
Piers/Caissons Inspection - Commercial Failed 04/23/2007
Correction
Partial Correction
04/23/2007
See Comment LINE 2 X D.5, E & E.5 - PIERS MODIFIED - CHANGE MUST BE APPROVED BY ENGINEER & PLANS EXAMINER BASE OF PIER AS PER PLANS POUR AT OWN RISK
Correction
Corrective Action Required
04/23/2007
See Comment A REVIEW OF PLANS WITH LANCE BLISS HAS REVEALED A NUMBER OF CHANGES TO APPROVED PLANS. PLANS MUST BE RESUBMITTED TO PLANS EXAMINER FOR APPROVAL.
Footing Inspection - Commercial Passed 04/24/2007
Correction
Resolved
04/24/2007
None LINE 1 FROM D.7 TO F
Footing Inspection - Commercial Passed 04/25/2007
Correction
Resolved
04/25/2007
None LINE 1 FROM D.7 TO F LINE 1 FROM C.4 TO D.7 Sheet S1
Piers/Caissons Inspection - Commercial Passed 05/01/2007
Correction
Resolved
05/01/2007
See Comment LINE 2 X D.5, E & E.5 - PIERS MODIFIED - CHANGE MUST BE APPROVED BY ENGINEER & PLANS EXAMINER BASE OF PIER AS PER PLANS POUR AT OWN RISK
Correction
Resolved
05/01/2007
See Comment A REVIEW OF PLANS WITH LANCE BLISS HAS REVEALED A NUMBER OF CHANGES TO APPROVED PLANS. PLANS MUST BE RESUBMITTED TO PLANS EXAMINER FOR APPROVAL.
Correction
Resolved
05/01/2007
None LINE 2 X C.5 & D
Footing Inspection - Commercial Passed 05/01/2007
Correction
Resolved
05/01/2007
None LINE 1 FROM D.7 TO F LINE 1 FROM C.4 TO D.7 LINE 1 FROM C TO C.4 Line 1
Correction
Resolved
05/01/2007
None SHEET F FROM LINE 1 20' NORTH Line F
Footing Inspection - Commercial Partial 05/10/2007
Correction
Partial Correction
05/10/2007
None LINE 1 FROM D.7 TO F LINE 1 FROM C.4 TO D.7 LINE 1 FROM C TO C.4 Line 1
Correction
Resolved
05/10/2007
None LINE F FROM LINE 1 20' NORTH LINE F, G & H Lines F, G & H
Correction
Partial Correction
05/10/2007
None FROM E.7 TO H Line 5
Footing Inspection - Commercial Partial 05/11/2007
Correction
Partial Correction
05/11/2007
None LINE 1 FROM D.7 TO F LINE 1 FROM C.4 TO D.7 LINE 1 FROM C TO C.4 Line 1
Correction
Resolved
05/11/2007
None FROM E.7 TO H FROM E TO E.7 FROM A TO E.7 Line 5
Footing Inspection - Commercial Partial 05/14/2007
Correction
Resolved
05/14/2007
None FROM E.7 TO H FROM E TO E.7 FROM A TO E.7 Line 5
Correction
Resolved
05/14/2007
None FROM LINE 2.8 TO 5 Line A
Correction
Resolved
05/14/2007
None FROM LINE 2.2 TO 2.8 Line B
Piers/Caissons Inspection - Commercial Passed 05/14/2007
Correction
Resolved
05/14/2007
None LINE C, LINE D X 3, 4, LINE E X 3, 4, LINE E X 3, 4, 4.5, LINE E.5 X 3, 3.5, 4, 4.5
Correction
Resolved
05/14/2007
See Comment LINE 2 X D.5, E & E.5 - PIERS MODIFIED - CHANGE MUST BE APPROVED BY ENGINEER & PLANS EXAMINER BASE OF PIER AS PER PLANS POUR AT OWN RISK
Correction
Resolved
05/14/2007
See Comment A REVIEW OF PLANS WITH LANCE BLISS HAS REVEALED A NUMBER OF CHANGES TO APPROVED PLANS. PLANS MUST BE RESUBMITTED TO PLANS EXAMINER FOR APPROVAL.
Correction
Resolved
05/14/2007
None LINE 2 X C.5 & D LINE 2 X C.5, D, D.5, E, E.5
Footing Inspection - Commercial Partial 05/16/2007
Correction
Resolved
05/16/2007
None FROM B TO C Line 1.2
Correction
Resolved
05/16/2007
None FROM 1 TO 1.2 Line C
Correction
Resolved
05/16/2007
None Elevator Site
Footing Inspection - Commercial Passed 05/17/2007
Correction
Resolved
05/17/2007
None LINE 1 FROM D.7 TO F LINE 1 FROM C.4 TO D.7 LINE 1 FROM C TO C.4 Line 1
Correction
Resolved
05/17/2007
None FROM LINE 2.8 TO 5 Line A
Correction
Resolved
05/17/2007
None Elevator Site
Underslab Electrical Inspection - Commercial Partial 05/17/2007
Correction
Partial Correction
05/17/2007
None NW Corner
Correction
Partial Correction
05/17/2007
None 2 1/2" CONDUIT RUNNING FROM NW CORNER TO SE CORNER OF BUILDING - APPROX 2/3 COMPLETED
Underslab Electrical Inspection - Commercial Failed 05/18/2007
Correction
Corrective Action Required
05/18/2007
See Comment 1 1/2" & 1 1/4" RUNNING EAST-WEST SOUTH SIDE OF ELEVATOR PIT BURIED - UNCOVER FOR INSPECTION
Water Service Inspection Failed 05/22/2007
Correction
Corrective Action Required
05/22/2007
See Comment 1. THE WATER METER TO BE SET AT A DEPTH OF 14 TO 18 INCHES BELOW THE WATER METER LID. 2. 2" PIPE CONNECTED - BY-PASSING METER - OBTAIN WATER UTILITIES APPROVAL
Underslab Electrical Inspection - Commercial Partial 05/22/2007
Correction
Resolved
05/22/2007
See Comment 1 1/2" & 1 1/4" RUNNING EAST-WEST SOUTH SIDE OF ELEVATOR PIT BURIED - UNCOVER FOR INSPECTION
Underslab Plumbing Inspection - Commercial Passed 05/22/2007
Correction
Resolved
05/22/2007
None 4" LINE AT LINE 2.5 FROM LINE B TO LINE E.5 4" LINE AT LINE C.2 FROM LINE 2.5 TO LINE 4.5 4" LINE AT LINE E.4 FROM LINE 2.5 TO LINE 4.3
Water Service Inspection - Commercial Request Complete 5/22/2007 5/22/2007 05/22/2007
Water Service Inspection Partial 05/23/2007
Correction
Partial Correction
05/23/2007
See Comment 1. THE WATER METER TO BE SET AT A DEPTH OF 14 TO 18 INCHES BELOW THE WATER METER LID. 2. 2" PIPE CONNECTED - BY-PASSING METER - OBTAIN WATER UTILITIES APPROVAL see e-mail from Rich Thomas dated 05-23-07
Miscellaneous Inspection Passed 05/23/2007
Correction
Resolved
05/23/2007
None FLOOR SLAB Basketball Court
Underslab Plumbing Inspection - Commercial Passed 05/23/2007
Correction
Resolved
05/23/2007
None 4" LINE - LINE 2.5 FROM LINE B TO LINE E.5 4" LINE - LINE C.2 FROM LINE 2.5 TO LINE 4.5 4" LINE - LINE E.4 FROM LINE 2.5 TO LINE 4. 4" LINE - LINE B.5 FROM LINE 1.2 TO LINE 2.5
Correction
Resolved
05/23/2007
None 3" LINE - LINE 1.3 FROM LINE B.5 TO LINE C.1 3" LINE - LINE 2.3 FROM LINE C.1 TO LINE E.4 3" LINE - LINE C.1 FROM LINE 1.3 TO LINE 2.4
Miscellaneous Inspection Passed 05/25/2007
Correction
Resolved
05/25/2007
None FLOOR SLAB FOR BUILDING
Foundation Inspection - Commercial Partial 06/05/2007
Correction
Partial Correction
06/05/2007
Precast Walls PANEL #'S - P10, P13, P15, P17, P19, P20, P23, P24, P25, P21, P22A, OPENINGS REINFORCED BEYOND PLANS - P26, P28, P29 Okay to pour following
Miscellaneous Inspection Passed 06/06/2007
Correction
Resolved
06/06/2007
None #'S APPROVED = P01, P02, P07, P09, P04, P20, P32, P34, P35, P03, DP02, P11, P12, P30 PRECAST WALL PANELS
Miscellaneous Inspection Failed 06/12/2007
Correction
Resolved
06/12/2007
None #'S APPROVED = P01, P02, P07, P09, P04, P20, P32, P34, P35, P03, DP02, P11, P12, P30 Precast Wall Panels
Correction
Resolved
06/12/2007
None PO 5, 6,8, 14, 16, 18, 27, 31, 36, 37 DP 01, 03 Preast Wall Panel
Correction
Corrective Action Required
06/12/2007
See Comment P 22 - PLANS CALL FOR 8" PANEL - AS BUILT PANEL IS 12" THICK. SUBMIT ENGEERING CHANGE Precast Wall Panel
Piers/Caissons Inspection - Commercial Passed 07/10/2007
Correction
Resolved
07/10/2007
None LINE 7 X LINE D.9 LINE 7 X LINE E.2 LINE H X LINE 3
Underground Electrical Inspection - Commercial Request Complete 7/16/2007 7/16/2007 07/16/2007
Footing Inspection - Commercial Passed 07/27/2007
Correction
Resolved
07/27/2007
GRADE BEAMS AT NORTH ENTRANCE (D)-(E) x (5)-(6) OK TO POUR WHEN READY
Footing Inspection - Commercial Failed 07/27/2007
Correction
Corrective Action Required
07/27/2007
No Ready Entryway North
Underslab Plumbing Inspection - Commercial Passed 08/15/2007
Correction
Resolved
08/15/2007
None 4" LINE - LINE 2.5 FROM LINE B TO LINE E.5 4" LINE - LINE C.2 FROM LINE 2.5 TO LINE 4.5 4" LINE - LINE E.4 FROM LINE 2.5 TO LINE 4. 4" LINE - LINE B.5 FROM LINE 1.2 TO LINE 2.5 Underslab
Correction
Resolved
08/15/2007
None 3" LINE - LINE 1.3 FROM LINE B.5 TO LINE C.1 3" LINE - LINE 2.3 FROM LINE C.1 TO LINE E.4 3" LINE - LINE C.1 FROM LINE 1.3 TO LINE 2.4 Underslab\
Correction
Resolved
08/15/2007
Not Ready Locker/Shower Rooms
Correction
Resolved
08/15/2007
None 1. PRIOR TO BACKFILLING - REMOVE PRESSURE TEST CAPS & MAKE FINAL CONNECTIONS. 2. BACKFILL AT OWN RISK - FERNCO FITTINGS MUST BE APPROVED FOR GROUND CONTACT - PROVIDE DOCUMENTATION OF APPROVAL Men's Locker Room
Underslab Electrical Inspection - Commercial Partial 08/15/2007
Correction
Partial Correction
08/15/2007
None CONDUIT FROM EXTERIOR & PANEL TO PANEL CONDUIT APPROVED. CONDUIT TO OTHER AREAS NOT COMPLETED Mechanical Room
Underslab Plumbing Inspection - Commercial Passed 08/27/2007
Correction
Resolved
08/27/2007
None Women's Locker Room
Electrical Service Inspection Passed 09/18/2007
Correction
Resolved
09/18/2007
None Main Disconnect
Underslab Plumbing Inspection - Commercial Passed 10/08/2007
Correction
Resolved
10/08/2007
None 3" LINE - LINE 1.3 FROM LINE B.5 TO LINE C.1 3" LINE - LINE 2.3 FROM LINE C.1 TO LINE E.4 3" LINE - LINE C.1 FROM LINE 1.3 TO LINE 2.4 3" LINE - DRAIN LIN AROUND POOL Underslab
Underslab Electrical Inspection - Commercial Passed 11/13/2007
Correction
Resolved
11/13/2007
None NW Corner
Correction
Resolved
11/13/2007
None 2 1/2" CONDUIT RUNNING FROM NW CORNER TO SE CORNER OF BUILDING - APPROX 2/3 COMPLETED
Correction
Resolved
11/13/2007
None CONDUIT FROM EXTERIOR & PANEL TO PANEL CONDUIT APPROVED. CONDUIT TO OTHER AREAS NOT COMPLETED Mechanical Room
Miscellaneous Inspection Passed 11/21/2007
Correction
Resolved
11/21/2007
See Comment P 22 - PLANS CALL FOR 8" PANEL - AS BUILT PANEL IS 12" THICK. SUBMIT ENGEERING CHANGE see letter dated 19 Nov 07 from McHale Engineering Precast Wall Panel
Foundation Inspection - Commercial Passed 11/26/2007
Correction
Resolved
11/26/2007
Precast Walls PANEL #'S - P10, P13, P15, P17, P19, P20, P23, P24, P25, P21, P22A, OPENINGS REINFORCED BEYOND PLANS - P26, P28, P29 Okay to pour following
Water Service Inspection Passed 11/26/2007
Correction
Resolved
11/26/2007
See Comment 1. WATER METER TO BE SET AT A DEPTH OF 14 TO 18 INCHES BELOW LID. 2. 2" PIPE CONNECTED - BY-PASSING METER - OBTAIN WATER UTILITIES APPROVAL see e-mil fromKathy Brown dated 11-15-07 see e-mail from Rich Thomas dated 05-23-07
Occupancy Inspection - Codes Commercial Failed 11/26/2007
Correction
Corrective Action Required
11/26/2007
Receive Planning & Development Approval RECEIVE UNDER SEPARATE COVER
Correction
Corrective Action Required
11/26/2007
Receive Public Works Approval RECEIVE UNDER SEPARATE COVER
Correction
Corrective Action Required
11/26/2007
Sewer NO RECORD OF INSPECTION
Occupancy Inspection - Codes Commercial Passed 11/28/2007
Correction
Resolved
11/28/2007
Receive Planning & Development Approval see permit for shell building
Correction
Resolved
11/28/2007
Receive Public Works Approval see permit for shell building
Correction
Resolved
11/28/2007
Sewer NO RECORD OF INSPECTION
Final Inspection - Commercial Passed 11/28/2007
Correction
Resolved
11/28/2007
None
Sewer Service Inspection Passed 11/28/2007
Correction
Resolved
11/28/2007
None see e-mail dated 27 Nov 07 from Jon Haley
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home