B0700463
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW COMMERCIAL
WATER PARK POOL AND ASSOCIATED STRUCTURES.
03/13/2007
08/31/2007
02/27/2008
10/20/2008
Locations
Contacts
BALES ELECTRIC, Address:17505 E 163RD ST  
DIMAGGIO MECHANICAL INC., Address:1 SE 4TH ST  
JAKES REFRIGERATION HTG/COOLING, Address:1101 SW 1ST ST  
KRAUS-ANDERSON CONSTRUCTION CO, Address:15612 COLLEGE BLVD  
SCHICK PLUMBING & HEATING COMPANY, Address:11200 BILYOU RD  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/13/2008 10/29/2010
Correction

Codes Administration - We have had applications and permits for this project with both a Blue Pkwy address and a Jefferson St address.
Correction

Codes Administration - This permit covers the water park and associated structures and facilities. The rec center addition is covered under a separate permit.
Correction

Codes Administration - I am unable to locate details on the wall construction.
Correction

Codes Administration - I am unable to locat the listings on the fire-resistive wall assemblies.
Correction

Codes Administration - The required clear floor space outside of the transfer type showers is not being provided.
Correction

Codes Administration - Section 803.4 of ANSI A117.1-1998 requires a bench be installed per Section 903 be installed in locker rooms.
Correction

Codes Administration - I am unable to locate information on the shade structures to be installed.
Correction

Codes Administration - Note 7 on Sheet M210 indicates that the water is to be installed 36 inches below grade. The City of Lee's Summit requires water lines to be installed 42 inches below grade.
Correction

Codes Administration - 2002 NEC 210.8(B) - Other than dwelling units. All 125-volt, single phase, 15- and 20-ampere receptacles installed in the locations specified in (1), (2) and (3) shall have ground-fault circuit-interrupter protection for personnel: (1) Bathrooms (2) Rooftops (3) Kitchens
Correction

Codes Administration - The design of the slide tower and slides has not been provided.
Correction

Codes Administration - The civil plans refer to the structural plans for the the design of several retaining walls but I am unable to locate the information.
Correction

Codes Administration - I am unable to locate details on the sewage ejection pit.
Correction

Codes Administration - The project cost provided was for the entire project but the project is being broken into two permits.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

Codes Administration - 2003 IPC 403.1 - Minimum number of fixtures. Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 403.1. Types of occupancies not shown in Tale 403.1 shall be considered individually by the code official. The number of occupants shall be deetermined by the International Building Code. Occupancy classification shall be determined in accordance with the International Building Code.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department; The required fire-resistance rating of fire-resistance-rated construction (including walls, fire stops, shaft enclosures, partitions and floors) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings, and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance rated assemblies shall be protected by self-closing or automatic- closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Correction

Fire Department; Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the code official.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Codes Administration - For the Health Department permit approval contact Chris Saxton with the Jackson County Public Works Department, Environmental Services Division at 816-881-4455. Plan approval is required by the City of Lee's Summit prior to issuance of any type of permit.
Correction

Codes Administration - For the Health Department inspection contact Chris Saxton with the Jackson County Public Works Department, Environmental Services Division at 816-881-4455. Occupancy approval is required by the City of Lee's Summit prior to issuance of any type of occupancy.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

Codes Administration - The plans do not indicate the rise and run of the stairs.
Correction

Fire Department- 2703.5 Hazard identification signs. Unless otherwise exempted by the fire code official, visible hazard identification signs as specified in NFPA 704 for the specific material contained shall be placed on stationary containers and above-ground tanks and at entrances to locations where hazardous materials are stored, dispensed, used or handled in quantities requiring a permit and at specific entrances and locations designated by the fire code official. 2703.5.1 Markings. Individual containers, cartons or packages shall be conspicuously marked or labeled in an approved manner. Rooms or cabinets containing compressed gases shall be conspicuously labeled: COMPRESSED GAS.
Correction

Fire Department- 2703.2.2.1 Design and construction. Piping, tubing, valves, fittings and related components used for hazardous materials shall be in accordance with the following: 1. Piping, tubing, valves, fittings and related components shall be designed and fabricated from materials compatible with the material to be contained and shall be of adequate strength and durability to withstand the pressure, structural and seismic stress, and exposure to which they are subject. 2. Piping and tubing shall be identified in accordance with ANSI A13.1 to indicate the material conveyed. 3. Readily accessible manual valves, or automatic remotely activated fail-safe emergency shutoff valves shall be installed on supply piping and tubing at the following locations: 3.1. The point of use. 3.2. The tank, cylinder or bulk source. 4. Emergency shutoff valves shall be identified and the location shall be clearly visible and accessible and indicated by means of a sign. 5. Backflow prevention or check valves shall be provided when the backflow of hazardous materials could create a hazardous condition or cause the unauthorized discharge of hazardous materials. 6. Where gases or liquids having a hazard ranking of: Health hazard Class 3 or 4 Flammability Class 4 Reactivity Class 3 or 4 in accordance with NFPA 704 are carried in pressurized piping above 15 pounds per square inch gauge (psig) (103 kPa), an approved means of leak detection and emergency shutoff or excess flow control shall be provided. Where the piping originates from within a hazardous material storage room or area, the excess flow control shall be located within the storage room or area. Where the piping originates from a bulk source, the excess flow control shall be located as close to the bulk source as practical. Exceptions: 1. Piping for inlet connections designed to prevent backflow. 2. Piping for pressure relief devices.
Correction

Fire Department- IFC 2701.5.1 Hazardous Materials Management Plan.Where required by the fire code official, each application for a permit shall include a Hazardous Materials Management Plan (HMMP). The HMMP shall include a facility site plan designating the following: 1. Storage and use areas. 2. Maximum amount of each material stored or used in each area. 3. Range of container sizes. 4. Locations of emergency isolation and mitigation valves and devices. 5. Product conveying piping containing liquids or gases, other than utility-owned fuel gas lines and low-pressure fuel gas lines. 6. On and off positions of valves for valves that are of the self-indicating type. 7. Storage plan showing the intended storage arrangement, including the location and dimensions of aisles. 8. The location and type of emergency equipment.The plans shall be legible and drawn approximately to scale. Separate distribution systems are allowed to be shown on separate pages.
Correction

Fire Department - 2701.5.2 Hazardous Materials Inventory Statement (HMIS). Where required by the fire code official, an application for a permit shall include an HMIS, such as SARA (Superfund Amendments and Reauthorization Act of 1986) Title III, Tier II Report, or other approved statement. The HMIS shall include the following information: 1. Manufacturer’s name. 2. Chemical name, trade names, hazardous ingredients. 3. Hazard classification. 4. MSDS or equivalent. 5. United Nations (UN), North America (NA) or the Chemical Abstract Service (CAS) identification number. 6. Maximum quantity stored or used on-site at one time. 7. Storage conditions related to the storage type, temperature and pressure.
Correction

Codes Administration - 2003 IBC 1704.1.1 - Building permit requirements. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with Section 106.1 as a condition for permit issuance. This statement shall include a complete list of materials and work requiring special inspections by this section, the inspections to be performed and a list of the individuals, approved agencies or firms intended to be retained for conducting such inspections.
Correction

Codes Administration - 2003 IBC 1014.1 - Exit or exit access doorways required. Two exits or exit access doorways from any space shall be provided where one of the following conditions exists: 1. The occupant load of the space exceeds the value in Table 1014.1. 2. The common path of egress travel exceeds the limitations of Section 1013.3. 3. Where required by Sections 1014.3, 1014.4 and 1014.5.
Correction

Codes Administration - 2003 IPC 1009.3.2 - Profile. The radius of curvature at the leading edge of the tread shall be not greater than 0.5 inch. Beveling of nosing shall not exceed 0.5 inch. Risers shall be solid and vertical or sloped from the underside of the leading edge of the tread above at an angle not more than 30 degrees from the vertical. The leading edge (nosings) of treads shall project not more than 1.25 inches beyond the tread below and all projections of the leading edges shall be of uniform size, including the leading edge of the floor at the top of a flight.
Correction

Codes Administration - 2003 IBC 1009.3 - Stair treads and risers. Stair riser heights shall be 7 inches (178 mm) maximum and 4 inches (102 mm) minimum. Stair tread depths shall be 11 inches (279 mm) minimum. The riser height shall be measured vertically between the leading edges of adjacent treads. The greatest riser height within any flight of stairs shall not exceed the smallest by more than 0.375 inch 99.5 mm). The tread depth shall be measured horizontally between the vertical planes of the foremost projection of adjacent treads and at right angle to the tread's leading edge. The greatest tread depth within any flight of stairs shall not exceed the smallest by more than 0.375 inch (9.5 mm). Winder treads shall have a minimum tread depth of 11 inches (279 mm) measured at a right angle to the tread's leading edge at a point 12 inches (305 mm) fron the side where the treads are narrower and a minimum tread depth of 10 inches (254 mm). The greatest winder tread depth at the 12 inch (305 mm) walk line within any flight of stairs shall not exceed the smallest by more than 0.375 inch (9.5 mm).
Correction

Codes Administration - 2003 IPC 608.3 - Devices, appurtenances, appliances and apparatus. All devices, appurtenances, appliances and apparatus intended to serve some special function, such as sterilization, distillation, processing, cooling, or storage of ice or foods, and that connect to the water supply system, shall be provided with protection against backflow and contamination of the water supply system. Water pumps, filters, softners, tanks and all other appliances and devices that handle or treat potable water shall be protected against contamination.
Correction

Codes Administration - 2003 IPC 608.16.1 - Beverage dispensers. The water supply connection to carbonated beverage dispensers shall be protected against backflow by a backflow preventer conforming to ASSE 1022 or by an air gap. The backflow preventer device and the piping downstream therefrom shall not be affected by carbon dioxide gas.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

P & D - All exterior lighting, whether on poles or buildings, shall be of such types and so arranged that no light source is visible from adjacent properties and public right-of-way.
Correction

All proposed hose bibb connections must have an approved (vacuum breaker) backflow preventer.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $18,772.00 $18,772.00 Paid 08/31/2007
89 Sewer Tap Fees $1,590.00 $1,590.00 Paid 08/31/2007
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 09/28/2007
Correction
Partial Correction
09/28/2007
None -EXTERIOR WALL FOOTING OF STORAGE ROOMS B117-B120; FOOTING BETWEEN B117-B120; INTERIOR FOOTING BETWEEN ROOMS B117-B120 AND B115 OK TO POUR AT FOLLOWING
Footing Inspection - Commercial Partial 10/01/2007
Correction
Partial Correction
10/01/2007
None -EXT WALL FOOTING RMS B117-B120; FOOTING BETWEEN B117-B120; INT FTG BETWEEN RMS B117-B120 AND B115 OK TO POUR AT FOLLOWING
Correction
Partial Correction
10/01/2007
PREPARATION TO POUR GRADE BEAM B112 & B113 E WALL; B112 N&S WALLS; B111 & B113 S WALL; B115 E 30' OF S WALL; B115 S 8' OF E WALL; OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Rough Electrical Inspection - Commercial Partial 10/01/2007
Correction
Partial Correction
10/01/2007
BONDING OF CONDUCTIVE BUILDING ELEMENTS GRADE BEAM RE-BAR AT: B112 & B113 E WALL; B112 N&S WALLS; B111 & B113 S WALL; B115 E 30' OF S WALL; B115 S 8' OF E WALL; OK TO COVER WHEN READY FOLLOWING BONDED ELEMENTS
Footing Inspection - Commercial Partial 10/02/2007
Correction
Partial Correction
10/02/2007
PREPARATION TO POUR GRADE BEAM B112 & B113 E WALL; B112 N&S WALLS; B111 & B113 S WALL; B115 E 30' OF S WALL; B115 S 8' OF E WALL; B109 N&W WALLS; B110A E&W&N&S WALLS; B111 E&W&N&S WALLS; OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Rough Electrical Inspection - Commercial Partial 10/02/2007
Correction
Partial Correction
10/02/2007
BONDING OF CONDUCTIVE BUILDING ELEMENTS GRADE BEAM RE-BAR AT: B112 & B113 E WALL; B112 N&S WALLS; B111 & B113 S WALL; B115 E 30' OF S WALL; B115 S 8' OF E WALL; B109 N&W WALLS; B110A E&W&N&S WALLS; B111 E&W&N&S WALLS; OK TO COVER WHEN READY FOLLOWING BONDED ELEMENTS
Underground Electrical Inspection - Commercial Request Complete 10/1/2007 10/2/2007 10/02/2007
Underground Plumbing Inspection - Commercial Passed 10/04/2007
Footing Inspection - Commercial Partial 10/04/2007
Correction
Partial Correction
10/04/2007
PREPARATION TO POUR GRADE BEAM B112 & B113 E WALL; B112 N&S WALLS; B111 & B113 S WALL; B115 E 30' OF S WALL; B115 S 8' OF E WALL; B109 N&W WALLS; B110A E&W&N&S WALLS; B111 E&W&N&S WALLS; B115 SE CRNR COMPLETE OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Underslab Plumbing Inspection - Commercial Partial 10/04/2007
Correction
Resolved
10/04/2007
MAIN DRAIN SUCTION LINES @ RECEIVING POOL OK TO COVER WHEN READY 16" PVC RUN TRANSVERSE LAYOUT REVISED FROM DRWG
Correction
Partial Correction
10/04/2007
INLET PIPING @ RECEIVING POOL OK TO COVER WHEN READY PRESSURE TEST IN PROGRESS NO ISSUES FOUND
Foundation Inspection - Commercial Passed 10/04/2007
Correction
Resolved
10/04/2007
WALLS AT BACKWASH PIT AT MECHANICAL BUILDING OK TO POUR WHEN READY
Pool Steel/Bonding - Commercial Partial 10/04/2007
Correction
Partial Correction
10/04/2007
BONDING OF CONDUCTIVE BUILDING ELEMENTS WALLS OF BACKWASH PIT @ MECH BLDG; GRADE BEAM RE-BAR AT: B112 & B113 E WALL; B112 N&S WALLS; B111 & B113 S WALL; B115 E 30' OF S WALL; B115 S 8' OF E WALL; B109 N&W WALLS; B110A E&W&N&S WALLS; B111 E&W&N&S WALLS; B115 SE CRNR COMPLETE OK TO COVER WHEN READY BONDED ITEMS LISTED BELOW
Rough Electrical Inspection - Commercial Passed 10/04/2007
Correction
Resolved
10/04/2007
BONDING OF CONDUCTIVE BUILDING ELEMENTS SEE POOL STEEL BONDING
Footing Inspection - Commercial Partial 10/05/2007
Correction
Partial Correction
10/05/2007
PREPARATION TO POUR GRADE BEAM B112 & B113 E WALL; B112 N&S WALLS; B111 & B113 S WALL; B115 E 30' OF S WALL; B115 S 8' OF E WALL; B109 N&W WALLS; B110A E&W&N&S WALLS; B111 E&W&N&S WALLS; B115 SE CRNR COMPLETE; PUMP PIT PERIMETER; OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Pool Steel/Bonding - Commercial Partial 10/05/2007
Correction
Partial Correction
10/05/2007
BONDING OF CONDUCTIVE BUILDING ELEMENTS WALLS OF BACKWASH PIT @ MECH BLDG; GRADE BEAM RE-BAR AT: B112 & B113 E WALL; B112 N&S WALLS; B111 & B113 S WALL; B115 E 30' OF S WALL; B115 S 8' OF E WALL; B109 N&W WALLS; B110A E&W&N&S WALLS; B111 E&W&N&S WALLS; B115 SE CRNR COMPLETE; PUMP PIT PERIMETER OK TO COVER WHEN READY BONDED ITEMS LISTED BELOW
Underslab Plumbing Inspection - Commercial Partial 10/10/2007
Correction
Partial Correction
10/10/2007
STORM DRAIN PIPING 8" DRAIN FOR TWO SOUTH AREA DRAINS @ ACTIVITY POOL: WEST 28' INSIDE POOL; EAST 24' OF POOL BREADTH OK TO COVER WHEN READY COMPONENTS DESCRIBED:
Foundation Inspection - Commercial Passed 10/11/2007
Correction
Resolved
10/11/2007
WALLS AT BACKWASH PIT AT MECHANICAL BUILDING OK TO POUR WHEN READY
Correction
Resolved
10/11/2007
PUMP PIT WALLS REINFORCE AT SLEEVES OK TO POUR WHEN READY
Pool Steel/Bonding - Commercial Partial 10/11/2007
Correction
Partial Correction
10/11/2007
BONDING OF CONDUCTIVE BUILDING ELEMENTS FOOTING + WALLS @ MECH BLDG / BACKWASH PIT / PUMP PIT COMPLETE; GRADE BEAM RE-BAR AT: B112 & B113 E WALL; B112 N&S WALLS; B111 & B113 S WALL; B109 N&W WALLS; B110A E&W&N&S WALLS; B111 E&W&N&S WALLS; OK TO COVER WHEN READY BONDED ITEMS LISTED BELOW
Footing Inspection - Commercial Partial 10/11/2007
Correction
Partial Correction
10/11/2007
PREPARATION TO POUR GRADE BEAM B112 & B113 E WALL; B112 N&S WALLS; B111 & B113 S WALL; B115 E 30' OF S WALL; B115 S 8' OF E WALL; B109 N&W WALLS; B110A E&W&N&S WALLS; B111 E&W&N&S WALLS; B115 SE CRNR COMPLETE; PUMP PIT PERIMETER; REMAINDER OF STEP FOOTINGS ADJACENT TO PUMP PIT. OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Underslab Plumbing Inspection - Commercial Partial 10/12/2007
Correction
Partial Correction
10/12/2007
FILL, SUCTION, MAIN DRAIN PIPING @ ACTIVITY POOL VISUALINSPECTION APPROVED PRESSURE TEST TO FOLLOW
Underslab Plumbing Inspection - Commercial Partial 10/15/2007
Correction
Partial Correction
10/15/2007
FILL, SUCTION, MAIN DRAIN PIPING @ ACTIVITY POOL VISUAL INSPECTION + PRESSURE TEST OF FEEDER/FILL PIPING; VISUAL INSPECTION OF SUCTION & MAIN DRAIN PIPING; OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Underslab Plumbing Inspection - Commercial Partial 10/24/2007
Correction
Partial Correction
10/24/2007
FILL, SUCTION, MAIN DRAIN PIPING @ ACTIVITY POOL VISUAL INSPECTION + PRESSURE TEST OF FEEDER/FILL PIPING; VISUAL INSPECTION + PRESSURE TEST OF SUCTION & MAIN DRAIN PIPING OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Pool Steel/Bonding - Commercial Partial 10/26/2007
Correction
Partial Correction
10/26/2007
BONDING OF CONDUCTIVE BUILDING ELEMENTS MECHANICAL BLDG COMPLETE; CONCESSION/OFFICE BLDG COMPLETE; LOCKER/RESTROOM BLDG PERIMETER OK TO COVER WHEN READY BONDED ITEMS LISTED BELOW
Underslab Plumbing Inspection - Commercial Partial 10/26/2007
Correction
Partial Correction
10/26/2007
UNDER-SLAB DWV PIPING @ MECHANICAL BLDG SPACE 115 N 16'; 8' MAIN DRAIN FROM S WALL SPACE 115 SOUTH TO CONCESSION/OFFICE BLDG OK TO COVER WHEN READY @ AREAS DESCRIBED BELOW:
Correction
Partial Correction
10/26/2007
UNDER-SLAB DWV PIPING AT CONCESSION/OFFICE BLDG 8' MAIN DRAIN FROM N WALL TO 10' SOUTH; OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Footing Inspection - Commercial Partial 10/26/2007
Correction
Resolved
10/26/2007
None
Correction
Partial Correction
10/26/2007
PREPARATION TO POUR GRADE BEAM MECHANICAL BLDG COMPLETE; CONCESSION/OFFICE BLDG COMPLETE; LOCKER/RESTROOM BLDG PERIMETER OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Underslab Plumbing Inspection - Commercial Partial 10/30/2007
Correction
Partial Correction
10/30/2007
UNDER-SLAB DWV PIPING @ MECHANICAL BLDG SPACE 115 N 16'; 8' MAIN DRAIN FROM S WALL SPACE 115 SOUTH TO CONCESSION/OFFICE BLDG; TWO FD'S AT PUMP PIT; OK TO COVER WHEN READY @ AREAS DESCRIBED BELOW:
Correction
Partial Correction
10/30/2007
UNDER-SLAB DWV PIPING AT CONCESSION/OFFICE BLDG 8' MAIN DRAIN FROM N WALL TO 10' SOUTH; COMPLETION OF 8" MAIN DRAIN LINE TO OUTSIDE WEST WALL; OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Underground Plumbing Inspection - Commercial Partial 11/02/2007
Correction
Partial Correction
11/02/2007
None 3 MAIN DRAINS FOR THE BIG POOL -- 2 SECTIONS 16 INCH DRAIN PIPE OUT 40 FT. NORTH END OF POOL.
Pool Steel/Bonding - Commercial Partial 11/06/2007
Correction
Partial Correction
11/06/2007
BONDING OF CONDUCTIVE BUILDING ELEMENTS MECHANICAL BLDG COMPLETE; CONCESSION/OFFICE BLDG COMPLETE; LOCKER/RESTROOM BLDG PERIMETER; ACTIVITY POOL SLAB; RECEIVING POOL SLAB; OK TO COVER WHEN READY BONDED ITEMS LISTED BELOW
Underslab Plumbing Inspection - Commercial Partial 11/07/2007
Correction
Partial Correction
11/07/2007
INLET & DRAIN PIPING AT SWIMMING POOL OK TO COVER WHEN READY VISUAL INSPECTION + PRESSURE TEST IN PROGRESS
Underslab Plumbing Inspection - Commercial Partial 11/09/2007
Correction
Resolved
11/09/2007
UNDER-SLAB DWV PIPING @ MECHANICAL BLDG OK TO COVER WHEN READY BUILDING COMPLETE
Correction
Resolved
11/09/2007
UNDER-SLAB DWV PIPING AT CONCESSION/OFFICE BLDG
Correction
Resolved
11/09/2007
UNDER-SLAB DWV PIPING AT LOCKER / RESTROOM BUILDING OK TO COVER WHEN READY BUILDING COMPLETE
Underground Plumbing Inspection - Commercial Partial 11/09/2007
Correction
Partial Correction
11/09/2007
WATER LINE TO ALL-SEASONS RESTROOMS @ POOL HOUSE FROM B117 SOUTH TO 27' S OF S WALL OF MECH + ALONG OUTSIDE OF SW WALL OF LOCKERS/RESTROOMS TO RESTROOMS B101/102; OK TO COVER WHEN READY FOLLOWING PORTIONS:
Underground Plumbing Inspection - Commercial Request Complete 11/9/2007 11/9/2007 11/09/2007
Underground Plumbing Inspection - Commercial Request Complete 11/9/2007 11/9/2007 11/09/2007
Underground Plumbing Inspection - Commercial Partial 11/12/2007
Correction
Resolved
11/12/2007
3" COPPER WATER SERVICE LINE TO MECH BLDG PER DRWG SHEETS C401 & M210 FROM EXSTG METER PIT TO ENTRY @ ROOM B121
Underground Plumbing Inspection - Commercial Request Complete 11/12/2007 11/12/2007 11/12/2007
Footing Inspection - Commercial Partial 11/13/2007
Correction
Resolved
11/13/2007
PREP TO POUR FOOTINGS @ LOCKER/SHOWER/RESTROOM BLDG OK TO POUR WHEN READY
Underground Plumbing Inspection - Commercial Partial 11/13/2007
Correction
Resolved
11/13/2007
None 3 MAIN DRAINS FOR THE BIG POOL -- 2 SECTIONS 16 INCH DRAIN PIPE OUT 40 FT. NORTH END OF POOL.
Correction
Partial Correction
11/13/2007
ROOF DRAIN PIPING @ POOL HOUSE FROM B112 & B115 TO STORM LINE NORTH TO EXSTG
Correction
Resolved
11/13/2007
WATER LINE TO ALL-SEASONS RESTROOMS @ POOL HOUSE FROM B117 SOUTH TO 27' S OF S WALL OF MECH + ALONG OUTSIDE OF SW WALL OF LOCKERS/RESTROOMS TO RESTROOMS B101/102; OK TO COVER WHEN READY FOLLOWING PORTIONS:
Footing Inspection - Commercial Partial 11/14/2007
Miscellaneous Inspection Partial 11/15/2007
Correction
Partial Correction
11/15/2007
PREPARATION TO POUR SWIMMING POOL SLAB NO ISSUES FOUND OK TO PLACE WHEN READY
Underground Plumbing Inspection - Commercial Partial 11/15/2007
Correction
Resolved
11/15/2007
TWO 16" PVC MAIN DRAIN LINES 10 PSI PRESSURE TEST IN PLACE. OK TO COVER WHEN READY. FROM BOOSTER PUMP STATION TO RECEIVING POOL SLIDE
Underground Plumbing Inspection - Commercial Request Complete 11/14/2007 11/15/2007 11/15/2007
Underslab Plumbing Inspection - Commercial Partial 11/20/2007
Correction
Resolved
11/20/2007
UNDER-SLAB DWV PIPING AT CONCESSION/OFFICE BLDG INCLUDING KITCHEN
Underground Plumbing Inspection - Commercial Partial 11/20/2007
Correction
Resolved
11/20/2007
SANITARY EJECTION PIT PER DRWG M210 OK TO COVER WHEN READY
Underground Plumbing Inspection - Commercial Partial 11/26/2007
Correction
Resolved
11/26/2007
WATER LINE TO ALL-SEASONS RESTROOMS @ POOL HOUSE FROM B117 SOUTH TO 27' S OF S WALL OF MECH + ALONG OUTSIDE OF SW WALL OF LOCKERS/RESTROOMS TO RESTROOMS B101/102; COMPLETE ALONG N SIDE OF BLDG OK TO COVER WHEN READY COMPLETE
Underground Plumbing Inspection - Commercial Request Complete 11/26/2007 11/26/2007 11/26/2007
Pool Steel/Bonding - Commercial Partial 11/27/2007
Correction
Partial Correction
11/27/2007
BONDING OF CONDUCTIVE BUILDING ELEMENTS MECHANICAL BLDG; CONCESSION/OFFICE BLDG; LOCKER/RESTROOM BLDG PERIM; ACTIVITY POOL SLAB; RECEIVING POOL SLAB; NICHE LIGHT SHELLS @ RECEIVING POOL; INLET BOX @ ACTIVITY POOL OK TO COVER WHEN READY BONDED ITEMS LISTED BELOW
Pool Steel/Bonding - Commercial Partial 11/28/2007
Foundation Inspection - Commercial Partial 11/28/2007
Correction
Partial Correction
11/28/2007
PREP TO POUR WALLS AT SLIDE BOOSTER PUMP STATION OK TO POUR WHEN READY
Foundation Inspection - Commercial Not Ready 11/28/2007
Correction
Corrective Action Required
11/28/2007
PREP TO POUR WALLS AT SLIDE BOOSTER PUMP STATION NOT READY FOR INSPECTION
Footing Inspection - Commercial Partial 11/29/2007
Correction
Resolved
11/29/2007
TRENCH DRAIN TRENCH DRAIN - PAGE C503 - SECTION 4 C503- SECTION 4
Underground Plumbing Inspection - Commercial Partial 11/29/2007
Correction
Resolved
11/29/2007
ACTIVITY POOL PVC LINES FROM ACTIVITY POOL EAST ACROSS RIVER- OK TO COVER SEE BELOW
Underground Plumbing Inspection - Commercial Request Complete 11/29/2007 11/29/2007 11/29/2007
Footing Inspection - Commercial Partial 11/30/2007
Correction
Partial Correction
11/30/2007
None P1 DRAINAGE BOTTOM
Erosion Control Inspection Residential Passed 11/30/2007
Underslab Electrical Inspection - Commercial Partial 12/04/2007
Correction
Partial Correction
12/04/2007
UNDER-FLOOR ELECTRICAL CONDUIT FOLLOWING LOCATIONS: MECHANICAL BUILDING; MATERIAL & WORKMANSHIP OK TO COVER WHEN READY
Footing Inspection - Commercial Partial 12/04/2007
Correction
Resolved
12/04/2007
PREP TO POUR BASE SLAB FOR SURGE TANK @ SWIMMING POOL OK TO POUR WHEN READY
Underslab Electrical Inspection - Commercial Not Ready 12/13/2007
Correction
Corrective Action Required
12/13/2007
READINESS FOR INSPECTION WORK REQUESTED FOR INSP COVERED W/ WEATHER PROT
Electrical Service Inspection Partial 12/14/2007
Correction
Partial Correction
12/14/2007
TEMPORARY ELECTRICAL SERVICE INSTALLATION RELEASE TEMPORARY SERVICE
Underslab Electrical Inspection - Commercial Partial 12/20/2007
Correction
Partial Correction
12/20/2007
UNDER-FLOOR ELECTRICAL CONDUIT FOLLOWING LOCATIONS: MECHANICAL BUILDING (SIX CONDUITS TO BE ADDED SUBJECT TO APPROVAL); POOL HOUSE CONCESSION/OFFICE SECTION; MATERIAL & WORKMANSHIP OK TO COVER WHEN READY
Correction
Resolved
12/20/2007
READINESS FOR INSPECTION
Erosion Control Inspection Residential Passed 12/21/2007
Underslab Electrical Inspection - Commercial Partial 12/21/2007
Correction
Partial Correction
12/21/2007
None UNDER SLAB ELECT APPROVED - BATH HOUSE AND MECHANICAL BLDG.
Miscellaneous Inspection Partial 12/27/2007
Correction
Partial Correction
12/27/2007
PREPARATION TO POUR SWIMMING POOL SLAB
Underslab Plumbing Inspection - Commercial Partial 12/28/2007
Correction
Resolved
12/28/2007
MAIN DRAIN PIPING AT RIVER FROM TEE'S OFF MAIN LINES NORTH OF PUMP STATION #5 STUBBED ~12' TO EAST -- HOLDING STEADY 10 PSI PRESSURE TEST. OK TO COVER WHEN READY TWO 10" PVC PIPES VISUAL + PRESSURE TEST
Pool Steel/Bonding - Commercial Partial 01/07/2008
Footing Inspection - Commercial Partial 01/07/2008
Correction
Resolved
01/07/2008
None
Correction
Resolved
01/07/2008
PREPARATION TO POUR GRADE BEAM
Correction
Resolved
01/07/2008
PREP TO POUR FOOTINGS @ LOCKER/SHOWER/RESTROOM BLDG
Correction
Resolved
01/07/2008
None P1 DRAINAGE BOTTOM
Correction
Resolved
01/07/2008
PREP TO POUR BASE SLAB FOR SURGE TANK @ SWIMMING POOL
Correction
Partial Correction
01/07/2008
PREP TO POUR BASE SLABS FOR RIVER BOOSTER PUMP STATIONS BASE SLAB AT: BPS #1; 5; OK TO POUR WHEN READY AT FOLLOWING LOCATIONS:
Foundation Inspection - Commercial Partial 01/15/2008
Correction
Partial Correction
01/15/2008
PREP TO POUR WALLS AT RIVER BOOSTER PUMP STATIONS WALLS AT P.S. #1; #2; OK TO POUR WHEN READY FOLOWING PORTIONS:
Foundation Inspection - Commercial Partial 01/16/2008
Correction
Resolved
01/16/2008
PREP TO POUR WALLS @ SWIMMING POOL SURGE CHAMBER OK TO POUR WHEN READY APPROVED 1/15/08
Footing Inspection - Commercial Partial 02/12/2008
Correction
Partial Correction
02/12/2008
PREP TO POUR BASE SLABS FOR RIVER BOOSTER PUMP STATIONS BASE SLAB AT: BPS #1; 5; 2; 3 ENSURE COLD-WEATHER CONCRETE PLACEMENT IS PROTECTED PER ACI/PCA. OK TO POUR WHEN READY AT FOLLOWING LOCATIONS:
Footing Inspection - Commercial Partial 02/13/2008
Correction
Partial Correction
02/13/2008
PREP TO POUR WATER SLIDE ISOLATED FOOTINGS C7; C8; C9; C10; OK TO POUR WHEN READY FOOTINGS LISTED BELOW:
Foundation Inspection - Commercial Partial 02/14/2008
Correction
Partial Correction
02/14/2008
None WALLS ONLY STATION 3 - APPROVED PER DETAIL 1/ CR8 # 4s 6'' ON CENTER.
Underslab Plumbing Inspection - Commercial Partial 02/14/2008
Correction
Partial Correction
02/14/2008
None UNDER SLAB GROUNDING APPROVED - SURGE TANK - LAP POOL FROM PUMP PIT.
Footing Inspection - Commercial Partial 02/15/2008
Correction
Resolved
02/15/2008
None REBAR FOR PUMP HOUSING WALLS Booster Pump #2
Footing Inspection - Commercial Partial 02/19/2008
Correction
Partial Correction
02/19/2008
PREP TO POUR WATER SLIDE ISOLATED FOOTINGS C7*; C8*; C9*; C10; * FOOTINGS POURED; THEN REMOVED AND RE-CONSTRUCTED IN CORRECT LOCATIONS OK TO POUR WHEN READY FOOTINGS LISTED BELOW:
Rough Plumbing Inspection - Commercial Partial 02/19/2008
Correction
Partial Correction
02/19/2008
IN-WALL PLUMBING AT POOL HOUSE LOCKER/TOILET BUILDING COMPLETE WATER PIPE INSULATION BEFORE BEGINNING WALL CONSTRUCTION WATER + DWV PIPING + FIXTURE CARRIERS
Footing Inspection - Commercial Partial 02/27/2008
Correction
Partial Correction
02/27/2008
PREP TO POUR WATER SLIDE ISOLATED FOOTINGS C6; C7*; C8*; C9*; C10; T1; T2-T3-T4-T5; T6; * FOOTINGS POURED; THEN REMOVED AND RE-CONSTRUCTED IN CORRECT LOCATIONS OK TO POUR WHEN READY FOOTINGS LISTED BELOW:
Correction
Partial Correction
02/27/2008
FOOTING-SUPPORTED PIERS AT WATER SLIDE C7; C8; C9; C10; OK TO POUR WHEN READY PIERS @ LOCATIONS BELOW:
Footing Inspection - Commercial Partial 02/28/2008
Correction
Partial Correction
02/28/2008
PREP TO POUR BASE SLABS FOR RIVER BOOSTER PUMP STATIONS BASE SLAB AT: BPS #1; 5; 2; 3; 4 ENSURE COLD-WEATHER CONCRETE PLACEMENT IS PROTECTED PER ACI/PCA. OK TO POUR WHEN READY AT FOLLOWING LOCATIONS:
Foundation Inspection - Commercial Passed 02/29/2008
Correction
Resolved
02/29/2008
WALLS AT BACKWASH PIT AT MECHANICAL BUILDING
Correction
Resolved
02/29/2008
PUMP PIT WALLS
Correction
Resolved
02/29/2008
PREP TO POUR WALLS AT SLIDE BOOSTER PUMP STATION
Correction
Resolved
02/29/2008
PREP TO POUR WALLS AT RIVER BOOSTER PUMP STATIONS WALLS AT P.S. #1; #2; #3; #4 OK TO POUR WHEN READY FOLOWING PORTIONS:
Correction
Resolved
02/29/2008
PREP TO POUR WALLS @ SWIMMING POOL SURGE CHAMBER
Correction
Resolved
02/29/2008
None
Pool Steel/Bonding - Commercial Partial 03/04/2008
Correction
Partial Correction
03/04/2008
BONDING OF CONDUCTIVE BUILDING ELEMENTS MECHANICAL BLDG; CONCESSION/OFFICE BLDG; LOCKER/RESTROOM BLDG PERIM; ACTIVITY POOL SLAB; RECEIVING POOL SLAB; NICHE LIGHT SHELLS @ RECEIVING POOL; INLET BOX @ ACTIVITY POOL; 6 NICHE LIGHT SHELLS @ LAP POOL EAST HALF; OK TO COVER WHEN READY BONDED ITEMS LISTED BELOW
Footing Inspection - Commercial Partial 03/06/2008
Correction
Partial Correction
03/06/2008
FOOTING-SUPPORTED PIERS AT WATER SLIDE C7; C8; C9; C10; 3-6-8-- PIERS C1,C3,C4 APPROVED C2- PENDING APPROVAL FROM PSI OK TO POUR WHEN READY PIERS @ LOCATIONS BELOW:
Pool Steel/Bonding - Commercial Partial 03/06/2008
Correction
Partial Correction
03/06/2008
BONDING OF CONDUCTIVE BUILDING ELEMENTS MECHANICAL BLDG; CONCESSION/OFFICE BLDG; LOCKER/RESTROOM BLDG PERIM; ACTIVITY POOL SLAB; RECEIVING POOL SLAB; NICHE LIGHT SHELLS @ RECEIVING POOL; INLET BOX @ ACTIVITY POOL; 6 NICHE LIGHT SHELLS @ LAP POOL EAST HALF; OK TO COVER WHEN READY BONDED ITEMS LISTED BELOW
Correction
Partial Correction
03/06/2008
See Comment POOL LIGHTS - 4 LIGHTS ON WEST SIDE, 1 LIGHT AT NORTH SIDE WEST END, POOL LIGHT ON SOUTH SIDE WEST END ALREADY COVERED, ABLE TO SEE BOND WIRE AT FITTING ON FIXTURE & ON OUTSIDE OF POOL
Footing Inspection - Commercial Partial 03/07/2008
Correction
Partial Correction
03/07/2008
FOOTING-SUPPORTED PIERS AT WATER SLIDE C1; C2; C3; C7; C8; C9; C10; T2; T3; T4; T5; OK TO POUR WHEN READY PIERS @ LOCATIONS BELOW:
Correction
Partial Correction
03/07/2008
PREP TO POUR ISOLATED COLUMN FOOTINGS @ CONCESSION SEATING AREA 11 OF 12 TOTAL, EXCLUDING FTG NEXT TO ENTRANCE STOOP TO MECH BLDG OK TO POUR WHEN READY FOOTINGS @LOCATIONS BELOW
Footing Inspection - Commercial Partial 03/10/2008
Correction
Partial Correction
03/10/2008
PREP TO POUR ISOLATED COLUMN FOOTINGS @ CONCESSION SEATING AREA 12 OF 12 TOTAL, NOW INCLUDING FTG NEXT TO ENTRANCE STOOP TO MECH BLDG OK TO POUR WHEN READY FOOTINGS @LOCATIONS BELOW
Underslab Plumbing Inspection - Commercial Partial 03/10/2008
Correction
Resolved
03/10/2008
MAIN DRAIN SUCTION LINES @ RECEIVING POOL
Correction
Resolved
03/10/2008
INLET PIPING @ RECEIVING POOL
Correction
Resolved
03/10/2008
STORM DRAIN PIPING ACTIVITY POOL
Correction
Resolved
03/10/2008
FILL, SUCTION, MAIN DRAIN PIPING @ ACTIVITY POOL
Correction
Resolved
03/10/2008
UNDER-SLAB DWV PIPING @ MECHANICAL BLDG
Correction
Resolved
03/10/2008
UNDER-SLAB DWV PIPING AT CONCESSION/OFFICE BLDG
Correction
Resolved
03/10/2008
INLET & DRAIN PIPING AT SWIMMING POOL
Correction
Resolved
03/10/2008
UNDER-SLAB DWV PIPING AT LOCKER / RESTROOM BUILDING
Correction
Resolved
03/10/2008
MAIN DRAIN PIPING AT RIVER
Correction
Resolved
03/10/2008
None SURGE TANK - LAP POOL FROM PUMP PIT
Correction
Partial Correction
03/10/2008
DRAIN & DISCHARGE PIPING @ PUMP STATIONS PIPING FROM PIT ACROSS WIDTH OF RIVER @ PS #2; OK TO COVER WHEN READY FOLLOWING LOCATIONS:
Pool Steel/Bonding - Commercial Partial 03/12/2008
Correction
Resolved
03/12/2008
BONDING OF CONDUCTIVE BUILDING ELEMENTS MECHANICAL BLDG; CONCESSION/OFFICE BLDG; LOCKER/RESTROOM BLDG PERIM; ACTIVITY POOL SLAB; RECEIVING POOL SLAB; NICHE LIGHT SHELLS @ RECEIVING POOL; INLET BOX @ ACTIVITY POOL; 12 NICHE LIGHT SHELLS @ LAP POOL OK TO COVER WHEN READY BONDED ITEMS LISTED BELOW
Correction
Resolved
03/12/2008
See Comment
Correction
Partial Correction
03/12/2008
BONDING OF RE-BAR & OTHER METAL ELEMENTS IN RIVER WALLS EJ #1 (@SW) COUNTERCLOCKWISE TO EJ #2 OUTER & INNER WALLS; TO EJ #3 OUTER & INNER WALLS; OK TO COVER WHEN READY FOLLOWING PORTIONS:
Sewer Service Inspection Passed 03/12/2008
Correction
Resolved
03/12/2008
CONNECTION OF SEWAGE EJECTION PIT TO SANITARY SEWER EXCEPT SITE SANITARY LINE IS ACTUALLY 6" RATHER THAN 4" SHOWN ON DRAWINGS OK TO COVER WHEN READY PER DRWGS M210 & C401
Sewer Service Inspection - Commercial Request Complete 3/11/2008 3/12/2008 03/12/2008
Footing Inspection - Commercial Partial 03/13/2008
Correction
Resolved
03/13/2008
PREP TO POUR BASE SLABS FOR RIVER BOOSTER PUMP STATIONS
Correction
Partial Correction
03/13/2008
PREP TO POUR WATER SLIDE ISOLATED FOOTINGS C6; C7*; C8*; C9*; C10; T1; T2-T3-T4-T5; T6; C5; * FOOTINGS POURED; THEN REMOVED AND RE-CONSTRUCTED IN CORRECT LOCATIONS OK TO POUR WHEN READY FOOTINGS LISTED BELOW:
Correction
Partial Correction
03/13/2008
FOOTING-SUPPORTED PIERS AT WATER SLIDE C1; C2; C3; C7; C8; C9; C10; T2; T3; T4; T5; C4; C6; T6; OK TO POUR WHEN READY PIERS @ LOCATIONS BELOW:
Correction
Resolved
03/13/2008
PREP TO POUR ISOLATED COLUMN FOOTINGS @ CONCESSION SEATING AREA
Correction
Resolved
03/13/2008
PREP TO POUR PIERS ON ISOLATED COLUMN FOOTINGS @ CONCESSION SEATING AREA OK TO POUR WHEN READY
Underground Plumbing Inspection - Commercial Partial 03/14/2008
Correction
Partial Correction
03/14/2008
6" FROM RECEIVING POOL 6" FROM RECEIVING POOL -2" CLOLD WATER TO RECEIVING POOL BOOSTER PUMP STATION TO CORNER OF LAP POOL. 6" WHERE MEETS 2"
Underslab Plumbing Inspection - Commercial Partial 03/14/2008
Correction
Partial Correction
03/14/2008
RIVER POOL 2-2 1/2", 1-10"- APPROVED IN SECTION 6. ( M.H.) SECTION #6
Footing Inspection - Commercial Not Ready 03/17/2008
Correction
Corrective Action Required
03/17/2008
READINESS FOR INSPECTION REQUEST CANCELED BY P.H.
Footing Inspection - Commercial Failed 03/21/2008
Correction
Partial Correction
03/21/2008
FOOTING-SUPPORTED PIERS AT WATER SLIDE C1; C2; C3; C7; C8; C9; C10; T2; T3; T4; T5; C4; C6; T6; 7 PIERS APPROVED FOR WATER SLIDE. OK TO POUR WHEN READY PIERS @ LOCATIONS BELOW:
Underground Plumbing Inspection - Commercial Partial 03/21/2008
Correction
Partial Correction
03/21/2008
6" FROM RECEIVING POOL 6" FROM RECEIVING POOL -2" CLOLD WATER TO RECEIVING POOL BOOSTER PUMP STATION TO CORNER OF LAP POOL. PUMP STATION 2: 6" LINE TO MIAN DRAIN BOX 6" WHERE MEETS 2"
Underground Plumbing Inspection - Commercial Partial 03/24/2008
Correction
Partial Correction
03/24/2008
CIRCULATION & OVER-FLOW PIPING OUTSIDE WALLS OF LAP POOL OK TO COVER WHEN READY AFTER PRESSURE TEST OK
Footing Inspection - Commercial Partial 03/25/2008
Correction
Resolved
03/25/2008
READINESS FOR INSPECTION
Correction
Resolved
03/25/2008
PREP TO POUR FOOTING FOR CURB WALL FROM CONCESSION OK TO POUR WHEN READY PER K-A SKETCH DATED 3/24/08 APP'D BY A/E. TO MECH BLDG INSTALL WALL DOWELS
Pool Steel/Bonding - Commercial Partial 03/25/2008
Correction
Partial Correction
03/25/2008
BONDING OF RE-BAR & OTHER METAL ELEMENTS IN RIVER WALLS EJ #1 (@SW) COUNTERCLOCKWISE TO EJ #2 OUTER & INNER WALLS; TO EJ #3 OUTER & INNER WALLS; TO EJ #4 OUTER & INNER WALLS; OK TO COVER WHEN READY FOLLOWING PORTIONS:
Underground Plumbing Inspection - Commercial Partial 03/26/2008
Correction
Partial Correction
03/26/2008
PIPING FROM CONT RIVER TO MECHANICAL BLDG PER CR-2 FROM NW TWO 10" + ONE 8" + ONE 2" SE TO 45's INTO MAIN TRENCH; OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Underground Plumbing Inspection - Commercial Request Complete 3/26/2008 3/26/2008 03/26/2008
Foundation Inspection - Commercial Passed 03/27/2008
Correction
Resolved
03/27/2008
PREP TO POUR CURB WALL FROM CONCESSION TO MECH BLDG PER K-A SKETCH DATED 3/24/08 APP'D BY A/E OK TO POUR WHEN READY
Underground Plumbing Inspection - Commercial Partial 03/27/2008
Correction
Resolved
03/27/2008
CIRCULATION & OVER-FLOW PIPING OUTSIDE WALLS OF LAP POOL OK TO COVER WHEN READY PER DRWG SP-2: GUTTER OUTLET SUCTION LINES (ONE 8" + ONE 6") + ONE 8" MAIN DRAIN LINE FROM LAP POOL ENTRIES TO SURGE CHAMBER
Footing Inspection - Commercial Partial 03/27/2008
Underground Plumbing Inspection - Commercial Request Complete 3/27/2008 3/27/2008 03/27/2008
Foundation Inspection - Commercial Partial 03/28/2008
Correction
Corrective Action Required
03/28/2008
PREP TO POUR RETAINING WALL AT LAP POOL NOT YET READY
Footing Inspection - Commercial Partial 03/28/2008
Correction
Partial Correction
03/28/2008
PREP TO POUR WATER SLIDE ISOLATED FOOTINGS C6; C7*; C8*; C9*; C10; T1; T2-T3-T4-T5; T6; C5; * FOOTINGS POURED; THEN REMOVED AND RE-CONSTRUCTED IN CORRECT LOCATIONS OK TO POUR WHEN READY FOOTINGS LISTED BELOW:
Correction
Partial Correction
03/28/2008
FOOTING-SUPPORTED PIERS AT WATER SLIDE C1; C2; C3; C7; C8; C9; C10; T2; T3; T4; T5; C4; C6; T6; A1; A2; A3; B1; B2; B3; C5; OK TO POUR WHEN READY PIERS @ LOCATIONS BELOW:
Correction
Partial Correction
03/28/2008
PREP TO POUR FOOTING FOR RETAINING WALL AT LAP POOL FROM MECH BLDG NE CORNER NORTH 100'; OK TO POUR WHEN READY FOLLOWING SECTIONS:
Underground Plumbing Inspection - Commercial Partial 03/28/2008
Correction
Resolved
03/28/2008
CIRCULATION & OVER-FLOW PIPING OUTSIDE WALLS OF LAP POOL FROM LAP POOL ENTRIES TO SURGE CHAMBER: GUTTER OUTLET SUCTION LINES (ONE 8" + ONE 6") + ONE 8" FLR INLET RETURN; 8" MAIN DRAIN SUCTION FRM POOL TO SURGE CHAMBER + 6" FLR INLET RETURN FRM RP TO MAIN TRENCH; 2" CW FROM RP BOOSTER PUMP STN TO MAIN TRENCH OK TO COVER WHEN READY PER DRWGS SP-2 & CR-2
Footing Inspection - Commercial Partial 03/29/2008
Correction
Resolved
03/29/2008
PREP TO POUR FOOTING FOR RETAINING WALL AT LAP POOL FROM MECH BLDG NE CORNER NORTH 100'; TO NE CORNER + 20' WEST; TO NW CORNER; WEST SIDE TO COMPLETE OK TO POUR WHEN READY FOLLOWING SECTIONS:
Underground Plumbing Inspection - Commercial Partial 03/31/2008
Correction
Resolved
03/31/2008
None OUT 40 FT. NORTH END OF POOL. 3 MAINDRAINS FOR BIG POOL 2 SECTIONS 16" DRAIN PIPE
Correction
Resolved
03/31/2008
WATER LINE TO ALL-SEASONS RESTROOMS @ POOL HOUSE
Correction
Resolved
03/31/2008
3" COPPER WATER SERVICE LINE TO MECH BLDG PER DRWG SHTS C401 & M210
Correction
Resolved
03/31/2008
ROOF DRAIN PIPING @ POOL HOUSE
Correction
Resolved
03/31/2008
TWO 16" PVC MAIN DRAIN LINES FROM BOOSTER PUMP STATION TO RECEIVING POOL SLIDE
Correction
Resolved
03/31/2008
SANITARY EJECTION PIT PER DRWG M210
Correction
Resolved
03/31/2008
ACTIVITY POOL PVC LINES FROM A.P. EAST ACROSS RIVER
Correction
Resolved
03/31/2008
6" FROM RECEIVING POOL 6" FROM RECEIVING POOL -2" COLD WATER TO RECEIVING POOL BOOSTER PUMP STATION TO CORNER OF LAP POOL. PUMP STATION 2: 6" LINE TO MAIN DRAIN BOX 6" WHERE MEETS 2"
Correction
Resolved
03/31/2008
CIRCULATION & OVER-FLOW PIPING OUTSIDE WALLS OF LAP POOL FROM LAP POOL ENTRIES TO SURGE CHAMBER: GUTTER OUTLET SUCTION LINES (ONE 8" + ONE 6") + ONE 8" FLR INLET RETURN; 8" MAIN DRAIN SUCTION FRM POOL TO SURGE CHAMBER + 6" FLR INLET RETURN FRM RP TO MAIN TRENCH; 2" CW FROM RP BOOSTER PUMP STN TO MAIN TRENCH PER DRWGS SP-2 & CR-2
Correction
Partial Correction
03/31/2008
PIPING FROM CONT RIVER TO MECHANICAL BLDG PER CR-2 FROM NW TWO 10" + ONE 8" + ONE 2" SE TO 45's INTO MAIN TRENCH; ALL LINES PER CR-2 FROM S/SW/NW EAST IN MAIN TRENCH TO WITHIN 60' OF MECH BLDG WEST WALL; OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Underground Plumbing Inspection - Commercial Request Complete 3/28/2008 3/31/2008 03/31/2008
Underground Plumbing Inspection - Commercial Not Ready 04/01/2008
Correction
Corrective Action Required
04/01/2008
READINESS FOR INSPECTION REQUEST CANCELED BY P.H.
Underground Plumbing Inspection - Commercial Request Complete 3/31/2008 4/1/2008 04/01/2008
Footing Inspection - Commercial Partial 04/02/2008
Correction
Resolved
04/02/2008
PREP TO POUR FOOTINGS FOR RETAINING WALLS BETWEEN REC CTR & POOL HOUSE WALL DOWELS TO BE "STABBED" DURING POUR. OK TO POUR WHEN READY ENSURE 3" COVERAGE
Underground Plumbing Inspection - Commercial Partial 04/03/2008
Correction
Partial Correction
04/03/2008
PIPING FROM CONT RIVER TO MECHANICAL BLDG PER CR-2 FROM NW TWO 10" + ONE 8" + ONE 2" SE TO 45's INTO MAIN TRENCH; ALL LINES PER CR-2 FROM S/SW/NW EAST IN MAIN TRENCH TO WITHIN 60' OF MECH BLDG WEST WALL; TO WITHIN 10' OF MECH BLDG WEST WALL (FIANL PRESSURE TEST NOT COMPLETED; OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Correction
Partial Correction
04/03/2008
READINESS FOR INSPECTION
Pool Steel/Bonding - Commercial Not Ready 04/03/2008
Correction
Corrective Action Required
04/03/2008
READINESS FOR INSPECTION CALL FOR INSPECTION AFTER PREPARATION IS COMPLETE WORK REQUESTED FOR INSP NOT COMPLETED
Underground Plumbing Inspection - Commercial Request Complete 4/2/2008 4/3/2008 04/03/2008
Underground Plumbing Inspection - Commercial Partial 04/04/2008
Correction
Partial Correction
04/04/2008
PIPING FROM CONT RIVER TO MECHANICAL BLDG PER CR-2 FROM NW TWO 10" + ONE 8" + ONE 2" SE TO 45's INTO MAIN TRENCH; ALL LINES PER CR-2 FROM S/SW/NW EAST IN MAIN TRENCH TO WITHIN 60' OF MECH BLDG WEST WALL; TO MECH BLDG WEST WALL (LINK-SEAL INSTALLATION + FINAL PRESSURE TESTS IN PROGRESS) OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Pool Steel/Bonding - Commercial Partial 04/04/2008
Correction
Partial Correction
04/04/2008
BONDING OF RE-BAR & OTHER METAL ELEMENTS IN RIVER WALLS EJ #1 (@SW) COUNTERCLOCKWISE TO EJ #2 OUTER & INNER WALLS; FROM EJ #2 TO EJ #3; FROM EJ #3 TO EJ #4; FROM EJ #6 TO EJ #1; OK TO COVER WHEN READY FOLLOWING PORTIONS:
Correction
Resolved
04/04/2008
READINESS FOR INSPECTION
Underground Electrical Inspection - Commercial Passed 04/04/2008
Correction
Resolved
04/04/2008
BURIED SECONDARY ELECTRICAL SERVICE CONDUIT FRM XFMR PAD TO MECH BLDG OK TO COVER WHEN READY
Pool Steel/Bonding - Commercial Partial 04/04/2008
Correction
Partial Correction
04/04/2008
BONDING OF RE-BAR & OTHER METAL ELEMENTS IN RIVER WALLS WALLS FROM EJ #1 (@SW) COUNTERCLOCKWISE TO EJ #2 OUTER & INNER WALLS; FROM EJ #2 TO EJ #3; WALLS FROM EJ #3 TO EJ #4; HANDRAIL INSERTS @ STAIR @ SOUTH END; WALLS FROM EJ #6 TO EJ #1; OK TO COVER WHEN READY FOLLOWING PORTIONS:
Underground Plumbing Inspection - Commercial Request Complete 4/3/2008 4/4/2008 04/04/2008
Underground Plumbing Inspection - Commercial Partial 04/07/2008
Correction
Resolved
04/07/2008
PIPING FROM CONT RIVER TO MECHANICAL BLDG PER CR-2
Correction
Partial Correction
04/07/2008
DISCHARGE LINES FROM RIVER BOOSTER STATIONS TO MANFOLDS AT BOOSTER STATIONS # 3; #4; 10" PVC UNDER RIVER BED OK TO COVER WHEN READY
Correction
Resolved
04/07/2008
SUPPLY PIPING FROM SLIDE BOOSTER STATION STUBBED UP ABOVE GRADE OK TO COVER WHEN READY
Foundation Inspection - Commercial Partial 04/07/2008
Correction
Partial Correction
04/07/2008
PREP TO POUR RETAINING WALL AT LAP POOL OK TO POUR WHEN READY
Pool Steel/Bonding - Commercial Partial 04/07/2008
Correction
Resolved
04/07/2008
BONDING OF CONDUCTIVE BUILDING ELEMENTS MECHANICAL BLDG; CONCESSION/OFFICE BLDG; LOCKER/RESTROOM BLDG PERIM; ACTIVITY POOL SLAB; RECEIVING POOL SLAB; NICHE LIGHT SHELLS @ RECEIVING POOL; INLET BOX @ ACTIVITY POOL; 12 NICHE LIGHT SHELLS + STAIR HANDRAIL INSERTS @ LAP POOL OK TO COVER WHEN READY BONDED ITEMS LISTED BELOW
Correction
Partial Correction
04/07/2008
BONDING OF RE-BAR & OTHER METAL ELEMENTS IN RIVER WALLS WALLS FROM EJ #1 (@SW) COUNTERCLOCKWISE TO EJ #2 OUTER & INNER WALLS; FROM EJ #2 TO EJ #3; WALLS FROM EJ #3 TO EJ #4; HANDRAIL INSERTS AT STAIRS @ SO END & NORTHEAST; WALLS FROM EJ #6 TO EJ #1; OK TO COVER WHEN READY FOLLOWING PORTIONS:
Suspended Slab Inspection Partial 04/07/2008
Correction
Partial Correction
04/07/2008
PREP TO POUR CONCRETE LIDS ON BOOSTER STATIONS CR BOOSTER PUMP STN #1; #5; OK TO POUR WHEN READY AT FOLLOWING LOCATIONS:
Underground Electrical Inspection - Commercial Passed 04/07/2008
Correction
Resolved
04/07/2008
BURIED SECONDARY ELECTRICAL SERVICE CONDUIT FRM XFMR PAD TO MECH BLDG
Correction
Resolved
04/07/2008
CONDUIT BANK FROM MECH BLDG TO GROUND BOX SW OF BLDG 42 SCH 40 PVC OK TO COVER WHEN READY
Underground Plumbing Inspection - Commercial Request Complete 4/7/2008 4/7/2008 04/07/2008
Underground Electrical Inspection - Commercial Not Ready 04/09/2008
Correction
Corrective Action Required
04/09/2008
READINESS FOR INSPECTION WORK REQUESTED FOR INSP ALREADY COVERED
Underground Electrical Inspection - Commercial Request Complete 4/9/2008 4/9/2008 04/09/2008
Foundation Inspection - Commercial Partial 04/11/2008
Correction
Resolved
04/11/2008
2 RETAINING WALLS 2 RETAINING WALLS AT SOUTHEAST CORNER OF PROJECT, BETWEEN REC. CENTER AND POOL HOUSES. OK TO POUR SOUTHEAST SIDE
Underground Plumbing Inspection - Commercial Partial 04/14/2008
Correction
Partial Correction
04/14/2008
STORM DRAIN PIPING @ PERIMETER OF LAP POOL SOUTH/WEST/NORTH OF POOL OK TO COVER WHEN READY
Suspended Slab Inspection Partial 04/14/2008
Correction
Partial Correction
04/14/2008
PREP TO POUR CONCRETE LIDS ON BOOSTER STATIONS CR BOOSTER PUMP STN #1; #5; SLIDE BOOSTER PUMP STATION; OK TO POUR WHEN READY AT FOLLOWING LOCATIONS:
Underground Electrical Inspection - Commercial Partial 04/14/2008
Correction
Resolved
04/14/2008
READINESS FOR INSPECTION
Correction
Partial Correction
04/14/2008
BURIED CONDUIT FROM GROUND BOX SW OF MECH BLDG 17 CONDUITS (3/4" & 1") FROM GROUND BOX NW TO CONTINUOUS RIVER; TWO 1-1/2" + THREE 1" CONDUITS FROM BOX NORTH 132' TOWARD RECEIVING POOL & SLIDE; OK TO COVER WHEN READY FOLLOWING SECTIONS:
Correction
Resolved
04/14/2008
CONDUIT BANK FROM MECH BLDG TO GROUND BOX SW OF BLDG
Underground Plumbing Inspection - Commercial Request Complete 4/14/2008 4/14/2008 04/14/2008
Underground Electrical Inspection - Commercial Request Complete 4/14/2008 4/14/2008 04/14/2008
Footing Inspection - Commercial Partial 04/15/2008
Correction
Resolved
04/15/2008
PREP TO POUR CONCRETE BASES FOR GEYSER MOUNDS @ C.R. 6"+ SLABS, REINFORCED W/ #4 REBAR EPOXIED INTO RIVER WALL OK TO POUR WHEN READY TWO LOCATIONS
Underground Electrical Inspection - Commercial Partial 04/15/2008
Correction
Partial Correction
04/15/2008
BURIED CONDUIT FROM GROUND BOX SW OF MECH BLDG 17 CONDUITS (3/4" & 1") FROM GROUND BOX NW TO CONTINUOUS RIVER; TWO 1-1/2" + THREE 1" CONDUITS FROM BOX NORTH 258' TOWARD RECEIVING POOL & SLIDE BOOSTER PUMP; OK TO COVER WHEN READY FOLLOWING SECTIONS:
Underslab Electrical Inspection - Commercial Partial 04/15/2008
Correction
Partial Correction
04/15/2008
UNDER-FLOOR ELECTRICAL CONDUIT FOLLOWING LOCATIONS: MECHANICAL BUILDING (SIX CONDUITS TO BE ADDED SUBJECT TO APPROVAL); POOL HOUSE CONCESSION/OFFICE SECTION; CONTROL 108 @ POOL HOUSE; MATERIAL & WORKMANSHIP OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Request Complete 4/14/2008 4/15/2008 04/15/2008
Underground Electrical Inspection - Commercial Request Complete 4/15/2008 4/15/2008 04/15/2008
Underground Electrical Inspection - Commercial Passed 04/16/2008
Correction
Resolved
04/16/2008
BURIED CONDUIT FROM GROUND BOX SW OF MECH BLDG 17 CONDUITS (3/4" & 1") FROM GROUND BOX NW TO CONTINUOUS RIVER; TWO 1-1/2" + THREE 1" FROM BOX NORTH 258' TOWARD RECEIVING POOL & SLIDE BOOSTER PUMP; TWO 1-1/2" + ONE 1" CONDUITS TO WITHIN 12' OF SLIDE BOOSTER PUMP; ONE 1" CONDUIT TO NW CORNER OF R.P. OK TO COVER WHEN READY FOLLOWING SECTIONS:
Underground Electrical Inspection - Commercial Request Complete 4/16/2008 4/16/2008 04/16/2008
Underslab Plumbing Inspection - Commercial Partial 04/17/2008
Correction
Corrective Action Required
04/17/2008
INTERIOR RIVER POOL NORTH SIDE INTERIOR OF RIVER ,2- 4" SOUTH TO 6"-APPROVED
Underground Plumbing Inspection - Commercial Partial 04/18/2008
Correction
Partial Correction
04/18/2008
2 OUTDOOR SHOWERS UNDERGROUND PLUMBING OK TO BACKFILL WHEN READY
Pool Steel/Bonding - Commercial Partial 04/18/2008
Correction
Partial Correction
04/18/2008
BONDING OF RE-BAR & OTHER METAL ELEMENTS IN RIVER WALLS WALLS FROM EJ #1 (@SW) COUNTERCLOCKWISE TO EJ #2 OUTER & INNER WALLS; FROM EJ #2 TO EJ #3; WALLS FROM EJ #3 TO EJ #4; HANDRAIL INSERTS AT STAIRS @ SO END & NORTHEAST; WALLS FROM EJ #6 TO EJ #1; -REMAINING WALLS WITH 11 WET-NICHE FIXTURES OK TO COVER WHEN READY FOLLOWING PORTIONS:
Underground Plumbing Inspection - Commercial Request Complete 4/18/2008 4/18/2008 04/18/2008
Underground Electrical Inspection - Commercial Partial 04/21/2008
Correction
Resolved
04/21/2008
BURIED CONDUIT FROM GROUND BOX SW OF MECH BLDG SEVENTEEN (3/4" & 1") FROM GRD BOX NW TO C.R.; TWO 1-1/2" + THREE 1" FROM BOX N 258' TOWARD R.P. & SLIDE BOOSTER PUMP; TWO 1-1/2" + ONE 1" TO WITHIN 12' OF SLIDE BOOSTER PUMP; ONE 1" TO NW CRNR OF R.P.; FOUR 1" TO J.B.'s ACROSS C.R. FROM B.S.#1; OK TO COVER WHEN READY FOLLOWING SECTIONS:
Correction
Corrective Action Required
04/21/2008
PREPARATION FOR POUR OF CONCRETE LIGHT POLE BASES NOT READY FOR INSPECTION
Underground Electrical Inspection - Commercial Request Complete 4/21/2008 4/21/2008 04/21/2008
Underground Electrical Inspection - Commercial Partial 04/23/2008
Correction
Partial Correction
04/23/2008
PREPARATION FOR POUR OF CONCRETE LIGHT POLE BASES OK TO POUR WHEN READY 11 BASES + GROUND RODS
Underground Plumbing Inspection - Commercial Partial 04/23/2008
Correction
Partial Correction
04/23/2008
BURIED PIPING W/SW OF BPS#3 4" INLET RETURN; 1"(3/4") + 1/2" FOG NOZZLE SUPPLY; OK TO COVER WHEN READY FOLLOWING PIPING:
Underground Electrical Inspection - Commercial Request Complete 4/23/2008 4/23/2008 04/23/2008
Pool Steel/Bonding - Commercial Partial 05/01/2008
Correction
Corrective Action Required
05/01/2008
READINESS FOR INSPECTION NOT READY THIS DATE
Underground Plumbing Inspection - Commercial Partial 05/01/2008
Correction
Resolved
05/01/2008
READINESS FOR INSPECTION
Correction
Partial Correction
05/01/2008
POOL CIRCULATION PIPING AROUND OUTSIDE OF ACTIVITY POOL BETWEEN A.P. & C.R. OK TO COVER WHEN READY
Underground Plumbing Inspection - Commercial Request Complete 4/30/2008 5/1/2008 05/01/2008
Suspended Slab Inspection Partial 05/05/2008
Correction
Partial Correction
05/05/2008
PREP TO POUR CONCRETE LIDS ON BOOSTER STATIONS SLIDE BOOSTER PUMP STATION; CR BOOSTER PUMP STNS #1; #5; #2; #3; #4 OK TO POUR WHEN READY AT FOLLOWING LOCATIONS:
Pool Steel/Bonding - Commercial Partial 05/05/2008
Correction
Resolved
05/05/2008
BONDING OF CONDUCTIVE BUILDING ELEMENTS MECHANICAL BLDG; CONCESSION/OFFICE BLDG; LOCKER/RESTROOM BLDG PERIM; ACTIVITY POOL SLAB; RECEIVING POOL SLAB; NICHE LIGHT SHELLS @ RECEIVING POOL; INLET BOX @ ACTIVITY POOL; SLAB MESH E OF SLIDE; OK TO COVER WHEN READY BONDED ITEMS LISTED BELOW
Correction
Partial Correction
05/05/2008
READINESS FOR INSPECTION
Correction
Partial Correction
05/05/2008
BONDING OF CONDUCTIVE ELEMENTS @ LAP POOL NICHE LIGHT SHELLS; STAIR HANDRAIL INSERTS; DIVING BOARD & LADDER CAST-IN'S + DECK MAT @ NORTH END; OK TO COVER WHEN READY ELEMENTS DESCRIBED BELOW:
Underslab Electrical Inspection - Commercial Partial 05/06/2008
Correction
Partial Correction
05/06/2008
UNDER-FLOOR ELECTRICAL CONDUIT FOLLOWING LOCATIONS: MECHANICAL BUILDING; POOL HOUSE CONCESSION/OFFICE SECTION; CONTROL 108 @ POOL HOUSE; WITHIN INTERIOR OF CONTINUOUS RIVER; MATERIAL & WORKMANSHIP OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Request Complete 5/5/2008 5/6/2008 05/06/2008
Electrical Service Inspection Passed 05/08/2008
Correction
Resolved
05/08/2008
TEMPORARY ELECTRICAL SERVICE INSTALLATION
Correction
Resolved
05/08/2008
ELECTRICAL SERVICE INSTALLATION 600A/3P RELEASE SERVICE
Pool Steel/Bonding - Commercial Partial 05/09/2008
Correction
Partial Correction
05/09/2008
BONDING OF CONDUCTIVE BUILDING ELEMENTS MECHANICAL BLDG; CONCESSION/OFFICE BLDG; LOCKER/RESTROOM BLDG PERIM; ACTIVITY POOL SLAB; RECEIVING POOL SLAB; NICHE LIGHT SHELLS @ RECEIVING POOL; INLET BOX @ ACTIVITY POOL; SLAB MESH E OF SLIDE; OK TO COVER WHEN READY BONDED ITEMS LISTED BELOW
Correction
Resolved
05/09/2008
See Comment
Correction
Resolved
05/09/2008
BONDING OF RE-BAR & OTHER METAL ELEMENTS IN RIVER WALLS
Correction
Resolved
05/09/2008
READINESS FOR INSPECTION
Correction
Resolved
05/09/2008
BONDING OF CONDUCTIVE ELEMENTS @ LAP POOL NICHE LIGHT SHELLS; STAIR HANDRAIL INSERTS; DIVING BOARD & LADDER CAST-IN'S + DECK MAT @ NORTH END; DECK MAT + FENCE @ SOUTH END OK TO COVER WHEN READY ELEMENTS DESCRIBED BELOW:
Pool Steel/Bonding - Commercial Partial 05/12/2008
Correction
Partial Correction
05/12/2008
BONDING OF CONDUCTIVE BUILDING ELEMENTS MECHANICAL BLDG; CONCESSION/OFFICE BLDG; LOCKER/RESTROOM BLDG PERIM; ACTIVITY POOL SLAB; RECEIVING POOL SLAB; NICHE LIGHT SHELLS @ RECEIVING POOL; INLET BOX @ ACTIVITY POOL; SLAB MESH E OF SLIDE; RAMP BY RIVER & ADJACENT LOWER PAD WITHIN EXP. JOINTS; OK TO COVER WHEN READY BONDED ITEMS LISTED BELOW
Pool Steel/Bonding - Commercial Partial 05/13/2008
Underslab Electrical Inspection - Commercial Partial 05/13/2008
Correction
Partial Correction
05/13/2008
UNDER-FLOOR ELECTRICAL CONDUIT FOLLOWING LOCATIONS: MECHANICAL BUILDING; POOL HOUSE CONCESSION/OFFICE SECTION; CONTROL 108 @ POOL HOUSE; WITHIN INTERIOR OF CONTINUOUS RIVER; AROUND O/S OF ACTIVITY POOL MATERIAL & WORKMANSHIP OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Request Complete 5/12/2008 5/13/2008 05/13/2008
Pool Steel/Bonding - Commercial Partial 05/14/2008
Correction
Partial Correction
05/14/2008
BONDING OF RE-MESH IN CONC SLABS / WALKS BEYOND POOL DECKS W/SW OF MECH BLDG & POOL HOUSE; OK TO COVER WHEN READY AREAS DESCRIBED BELOW:
Pool Steel/Bonding - Commercial Partial 05/15/2008
Correction
Partial Correction
05/15/2008
BONDING OF RE-MESH IN CONC SLABS / WALKS BEYOND POOL DECKS W/SW OF MECH BLDG & POOL HOUSE; SE OF CR; OK TO COVER WHEN READY AREAS DESCRIBED BELOW:
Pool Steel/Bonding - Commercial Partial 05/16/2008
Correction
Partial Correction
05/16/2008
BONDING OF CONDUCTIVE BUILDING ELEMENTS MECHANICAL BLDG; CONCESSION/OFFICE BLDG; LOCKER/RESTROOM BLDG PERIM; OK TO COVER WHEN READY BONDED ITEMS LISTED BELOW
Correction
Partial Correction
05/16/2008
BONDING OF CONTINUOUS RIVER ELEMENTS EAST RAMP BY RIVER & ADJACENT LOWER PAD WITHIN EXP. JOINTS; EAST STAIR @ WEST BRIDGE; WEST RAMP;
Correction
Resolved
05/16/2008
BONDING OF POOL ELEMENTS ACTIVITY POOL SLAB; RECEIVING POOL SLAB; NICHE LIGHT SHELLS @ RECEIVING POOL; INLET BOX @ ACTIVITY POOL; OK TO COVER WHEN READY POOL ELEMENTS BELOW:
Correction
Partial Correction
05/16/2008
BONDING OF RE-MESH IN CONC SLABS / WALKS BEYOND POOL DECKS SLAB E OF SLIDE; SIDEWALK UNDER SLIDE; W/SW OF MECH BLDG & POOL HOUSE; SE OF CR; S OF CR; NW OF CR; OK TO COVER WHEN READY AREAS DESCRIBED BELOW:
Rough Electrical Inspection - Commercial Passed 05/16/2008
Correction
Resolved
05/16/2008
PREP TO POUR UNDERWATER LIGHT JUNCTION BOX TOMBSTONES PER (1) @DRWG SHEET SP-11 OK TO POUR 9 WHEN READY
Pool Steel/Bonding - Commercial Partial 05/19/2008
Correction
Partial Correction
05/19/2008
BONDING OF RE-MESH IN CONC SLABS / WALKS BEYOND POOL DECKS SLAB E OF SLIDE; SIDEWALK UNDER SLIDE; W/SW OF MECH BLDG & POOL HOUSE; SE OF CR; S OF CR; NW-W OF CR; INTERIOR OF CR FROM NE END TO SW EXTREMITY; OK TO COVER WHEN READY AREAS DESCRIBED BELOW:
Pool Steel/Bonding - Commercial Partial 05/20/2008
Correction
Partial Correction
05/20/2008
BONDING OF RE-MESH IN CONC SLABS / WALKS BEYOND POOL DECKS SLAB E OF SLIDE; SIDEWALK UNDER SLIDE; W/SW OF MECH BLDG & POOL HOUSE; SE OF CR; S OF CR; NW-W OF OUTSIDE OF CR; INTERIOR OF CR FROM NE END TO SW EXTREMITY; W/SW/S OF OUTSIDE OF CR OK TO COVER WHEN READY AREAS DESCRIBED BELOW:
Above Ceiling Inspection Not Ready 05/23/2008
Correction
Corrective Action Required
05/23/2008
READINESS FOR INSPECTION REQUEST CANCELED BY P.H.
Pool Steel/Bonding - Commercial Partial 05/27/2008
Correction
Resolved
05/27/2008
BONDING OF CONDUCTIVE ELEMENTS @ LAP POOL NICHE LIGHT SHELLS; STAIR HANDRAIL INSERTS; DIVING BOARD & LADDER CAST-IN'S + DECK MAT @ NORTH END; DECK MAT + FENCE @ SOUTH END; EXAMPLE OF NICHE LIGHT POTTING COMPOUND PLACEMENT DEMONSTRATED OK TO COVER WHEN READY ELEMENTS DESCRIBED BELOW:
Above Ceiling Inspection Partial 06/04/2008
Correction
Resolved
06/04/2008
READINESS FOR INSPECTION
Correction
Partial Correction
06/04/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS 109 EXCEPT AT ELECT J.B. @ NW CORNER; 112 AFTER TEMPORARY ELECTRICAL WIRING REMOVED; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Correction
Partial Correction
06/04/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS 102; 105; 106; AFTER ACCESS PANEL INSTALLED}101 & 107 OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Above Ceiling Inspection Partial 06/05/2008
Correction
Partial Correction
06/05/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS 109 EXCEPT AT ELECT J.B. @ NW CORNER; 112 AFTER TEMPORARY ELECTRICAL WIRING REMOVED; OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Correction
Resolved
06/05/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS SEE BELOW
Above Ceiling Inspection Partial 06/06/2008
Above Ceiling Inspection Passed 06/11/2008
Correction
Resolved
06/11/2008
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS 102; 105; 106; AFTER ACCESS PANEL INSTALLED}101 & 107 OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Correction
Resolved
06/11/2008
ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS B109; 110; 110A; 111; 112; 113 OK TO COVER WHEN READY CEILINGS @ SPACES BELOW:
Miscellaneous Inspection Passed 06/20/2008
Correction
Resolved
06/20/2008
PREPARATION TO POUR SWIMMING POOL SLAB
Foundation Inspection - Commercial Passed 06/20/2008
Correction
Resolved
06/20/2008
PREP TO POUR RETAINING WALL AT LAP POOL
Suspended Slab Inspection Passed 06/20/2008
Correction
Resolved
06/20/2008
PREP TO POUR CONCRETE LIDS ON BOOSTER STATIONS SLIDE BOOSTER PUMP STATION; CR BOOSTER PUMP STNS #1; #5; #2; #3; #4 OK TO POUR WHEN READY AT FOLLOWING LOCATIONS:
Underground Electrical Inspection - Commercial Passed 06/20/2008
Correction
Resolved
06/20/2008
PREPARATION FOR POUR OF CONCRETE LIGHT POLE BASES OK TO POUR WHEN READY 11 BASES + GROUND RODS
Pool Steel/Bonding - Commercial Passed 06/20/2008
Correction
Resolved
06/20/2008
BONDING OF CONDUCTIVE BUILDING ELEMENTS MECHANICAL BLDG; CONCESSION/OFFICE BLDG; LOCKER/RESTROOM BLDG PERIM; OK TO COVER WHEN READY BONDED ITEMS LISTED BELOW
Correction
Resolved
06/20/2008
BONDING OF CONTINUOUS RIVER ELEMENTS EAST RAMP BY RIVER & ADJACENT LOWER PAD WITHIN EXP. JOINTS; EAST STAIR @ WEST BRIDGE; WEST RAMP;
Correction
Resolved
06/20/2008
BONDING OF RE-MESH IN CONC SLABS / WALKS BEYOND POOL DECKS SLAB E OF SLIDE; SIDEWALK UNDER SLIDE; W/SW OF MECH BLDG & POOL HOUSE; SE OF CR; S OF CR; NW-W OF OUTSIDE OF CR; INTERIOR OF CR FROM NE END TO SW EXTREMITY; W/SW/S OF OUTSIDE OF CR OK TO COVER WHEN READY AREAS DESCRIBED BELOW:
Occupancy Inspection - Codes Commercial Not Ready 06/20/2008
Correction
Corrective Action Required
06/20/2008
Receive Water Utilities Approval
Correction
Corrective Action Required
06/20/2008
Receive Planning & Development Approval
Correction
Corrective Action Required
06/20/2008
Receive Public Works Approval
Correction
Corrective Action Required
06/20/2008
Receive Water Utilities Approval
Correction
Corrective Action Required
06/20/2008
Receive Fire Department approval
Footing Inspection - Commercial Passed 06/20/2008
Correction
Resolved
06/20/2008
PREP TO POUR WATER SLIDE ISOLATED FOOTINGS C6; C7*; C8*; C9*; C10; T1; T2-T3-T4-T5; T6; C5; * FOOTINGS POURED; THEN REMOVED AND RE-CONSTRUCTED IN CORRECT LOCATIONS OK TO POUR WHEN READY FOOTINGS LISTED BELOW:
Correction
Resolved
06/20/2008
FOOTING-SUPPORTED PIERS AT WATER SLIDE C1; C2; C3; C7; C8; C9; C10; T2; T3; T4; T5; C4; C6; T6; A1; A2; A3; B1; B2; B3; C5; OK TO POUR WHEN READY PIERS @ LOCATIONS BELOW:
Underslab Plumbing Inspection - Commercial Passed 06/20/2008
Correction
Resolved
06/20/2008
DRAIN & DISCHARGE PIPING @ PUMP STATIONS PIPING FROM PIT ACROSS WIDTH OF RIVER @ PS #2; OK TO COVER WHEN READY FOLLOWING LOCATIONS:
Correction
Resolved
06/20/2008
RIVER POOL 2-2 1/2", 1-10"- APPROVED IN SECTION 6. ( M.H.) SECTION #6
Correction
Resolved
06/20/2008
INTERIOR RIVER POOL NORTH SIDE INTERIOR OF RIVER ,2- 4" SOUTH TO 6"-APPROVED
Underslab Electrical Inspection - Commercial Passed 06/20/2008
Correction
Resolved
06/20/2008
UNDER-FLOOR ELECTRICAL CONDUIT FOLLOWING LOCATIONS: MECHANICAL BUILDING; POOL HOUSE CONCESSION/OFFICE SECTION; CONTROL 108 @ POOL HOUSE; WITHIN INTERIOR OF CONTINUOUS RIVER; AROUND O/S OF ACTIVITY POOL MATERIAL & WORKMANSHIP OK TO COVER WHEN READY
Correction
Resolved
06/20/2008
None UNDER SLAB ELECT APPROVED - BATH HOUSE AND MECHANICAL BLDG.
Underground Plumbing Inspection - Commercial Passed 06/20/2008
Correction
Resolved
06/20/2008
DISCHARGE LINES FROM RIVER BOOSTER STATIONS TO MANFOLDS AT BOOSTER STATIONS # 3; #4; 10" PVC UNDER RIVER BED OK TO COVER WHEN READY
Correction
Resolved
06/20/2008
STORM DRAIN PIPING @ PERIMETER OF LAP POOL SOUTH/WEST/NORTH OF POOL OK TO COVER WHEN READY
Correction
Resolved
06/20/2008
2 OUTDOOR SHOWERS UNDERGROUND PLUMBING OK TO BACKFILL WHEN READY
Correction
Resolved
06/20/2008
BURIED PIPING W/SW OF BPS#3 4" INLET RETURN; 1"(3/4") + 1/2" FOG NOZZLE SUPPLY; OK TO COVER WHEN READY FOLLOWING PIPING:
Correction
Resolved
06/20/2008
POOL CIRCULATION PIPING AROUND OUTSIDE OF ACTIVITY POOL BETWEEN A.P. & C.R. OK TO COVER WHEN READY
Rough Plumbing Inspection - Commercial Passed 06/20/2008
Correction
Resolved
06/20/2008
IN-WALL PLUMBING AT POOL HOUSE LOCKER/TOILET BUILDING COMPLETE WATER PIPE INSULATION BEFORE BEGINNING WALL CONSTRUCTION WATER + DWV PIPING + FIXTURE CARRIERS
Occupancy Inspection - Codes Commercial Not Ready 06/23/2008
Correction
Partial Correction
06/23/2008
Receive Fire Department approval OK FOR STAFF CONCESSION STAND + MECH BLDG + LOCKER BLDG
Correction
Resolved
06/23/2008
Receive Public Works Approval NO ISSUES PRESENTED
Correction
Partial Correction
06/23/2008
USE / OCCUPANCY APPROVAL STATUS OF CONCESSION BUILDING 1) SEAL EXTERIOR ELECT RECEPTS TO SPLIT FACE BLOCK WALL 2) ELIMINATE GAPS AROUND ELECT BOXES -- INTERIOR & EXTERIOR 3) NO BACKFLOW PREVENTION FOUND AT ICE MAKER 4) ROOF INSP: CLEAN/CLEAR; LABEL DISCONNECTS; RECEPT INOP OK FOR STAFF SET-UP NO PUBLIC UNTIL APPROVED
Occupancy Inspection - Codes Commercial Not Ready 06/27/2008
Correction
Partial Correction
06/27/2008
USE / OCCUPANCY APPROVAL STATUS OF CONCESSION BUILDING OK FOR STAFF SET-UP NO PUBLIC UNTIL APPROVED
Occupancy Inspection - Codes Commercial Not Ready 07/01/2008
Correction
Resolved
07/01/2008
Receive Fire Department approval PER JOE DIR 7/1/08
Occupancy Inspection - Codes Commercial Not Ready 07/02/2008
Correction
Resolved
07/02/2008
Receive Water Utilities Approval PER BEN HASKAMP 7/2/08
Occupancy Inspection - Codes Commercial Failed 07/03/2008
Correction
Resolved
07/03/2008
Receive Water Utilities Approval PER BEN HASKAMP 7/3/08
Correction
Partial Correction
07/03/2008
USE / OCCUPANCY APPROVAL STATUS OF CONCESSION BUILDING SEE TEMPORARY OCCUPANCY
Correction
Corrective Action Required
07/03/2008
HANDICAPPED ACCESSIBLE RESTROOM SIGNS @ ACCESSIBLE RR'S ENSURE ALL IN PLACE
Correction
Corrective Action Required
07/03/2008
STAIR AT LAP POOL DECK NW CORNER IBC 1009.10 HANDRAIL REQUIRED BOTH SIDES OF STAIR
Correction
Corrective Action Required
07/03/2008
LIGHT SWITCHES @ SHOWER ROOMS 105, 106, 107 FROM SHOWER SPRAY SOURCE OF MOISTURE IF INSTALLED MUST BE PROTECTED
Correction
Corrective Action Required
07/03/2008
WATER SLIDE STAIR STRUCTURE ENSURE ALL BOLTS IN PLACE AND DRAWN TIGHT
Correction
Corrective Action Required
07/03/2008
LADDER IN POOL WATER SURGE TANK OBSTRUCTED BY PIPING
Correction
Corrective Action Required
07/03/2008
"BUBBLE" COVERS ON EXTERIOR ELECTRICAL RECEPTACLES NEC 406.8; E3902.8 DO NOT ALLOW CORD ENTRY WHEN CLOSED
Occupancy Inspection - Codes Commercial Failed 07/09/2008
Correction
Corrective Action Required
07/09/2008
Receive Planning & Development Approval PHONE 816-969-1606 COORDINATE WITH P&D JENNIFER THOMPSON
Correction
Resolved
07/09/2008
LADDER IN POOL WATER SURGE TANK PIPING BEING RE-ROUTED
Occupancy Inspection - Codes Commercial Failed 07/18/2008
Correction
Resolved
07/18/2008
STAIR AT LAP POOL DECK NW CORNER
Correction
Resolved
07/18/2008
LIGHT SWITCHES @ SHOWER ROOMS 105, 106, 107 FROM SHOWER SPRAY SOURCE OF MOISTURE IF INSTALLED MUST BE PROTECTED
Correction
Resolved
07/18/2008
LADDER IN POOL WATER SURGE TANK
Correction
Resolved
07/18/2008
"BUBBLE" COVERS ON EXTERIOR ELECTRICAL RECEPTACLES
Occupancy Inspection - Codes Commercial Failed 07/21/2008
Correction
Resolved
07/21/2008
USE / OCCUPANCY APPROVAL STATUS OF CONCESSION BUILDING SEE TEMPORARY OCCUPANCY
Correction
Resolved
07/21/2008
WATER SLIDE STAIR STRUCTURE SEE REPORT OF INSPECTION BY PSI DATED 7/11/08
Occupancy Inspection - Codes Commercial Passed 10/17/2008
Correction
Resolved
10/17/2008
Receive Planning & Development Approval PER JENNIFER THOMPSON REPORT DATED 10/14/08
Correction
Resolved
10/17/2008
HANDICAPPED ACCESSIBLE RESTROOM SIGNS @ ACCESSIBLE RR'S
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home