Summary
B0700400
Building Permit - Commercial
Certificate of Occupancy
CML MO HAF LLC
NEW MULTI-FAMILY
NEW COMMERCIAL
03/06/2007
05/24/2007
12/11/2012
11/21/2012
Locations
Contacts
SHAKER ELECTRIC, Address:PO BOX 300795  
A&D HEATING AND COOLING, Address:2006 W MAIN  
TRI-COUNTY PLUMBING, LLC, Address:100 W PACIFIC  
FROEHLICH PYCIOR COMPANIES, Address:301 SE DOUGLAS ST SUITE 201  
CML MO HAF LLC, Address:1010 WALNUT STE 500  
DILL ENTERPRISES INC, Address:816 SE BROWNING AVE , Phone:(816) 554-3455  
HATHEWAY ELECTRIC LLC, Address:3125 SW PRYOR RD, Phone:(660) 232-2419  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
AL-HAM HEATING & COOLING, Address:15810 E 24 HWY, Phone:(816) 461-6556  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 11/18/2007 10/29/2010
Correction

Codes Administration - 2003 IBC 1704.1.1 - Building permit requirements. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with Section 106.1 as a condition for permit issuance. This statement shall include a complete list of materials and work requiring special inspections by this section, the inspections to be performed and a list of the individuals, approved agencies or firms intended to be retained for conducting such inspections.
Correction

Codes Administration - 2003 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work.
Correction

Codes Administration - I am unable to locate information on the plans regarding the requirments for accessible dwelling units.
Correction

Codes Administration - The requirements for wood carpentry are found under the metals section of the specs.
Correction

Codes Administration - The floor plan notes indicate that the requirements for the design of the guards and handrails are in the specifications but I am unable to locate them.
Correction

Codes Administration - The cost of this portion of the project needs to be provided for fee calculation.
Correction

Fire Department- IFC 308.3.1 Open flame, and open flame cooking devices. Charcoal burners, open flame devices and open flame cooking devices shall not be operated on combustible balconies or within 10 feet (3048 mm) of combustible construction. Exceptions: 1.One-and two-family dwellings. 2.Where buildings and decks are protected by an automatic sprinkler system. IFC 308.3.1.1 Liquefied-petroleum-gas-fueled cooking devices. LP-gas burners having a LP-gas container with a water capacity greater than 2.5 pounds (1.14 kg) [nominal 1 pound (0.454 kg) LP-gas capacity] shall not be located on combustible balconies or within 10 feet (3048 mm) of combustible construction. Exception: One- and two-family dwellings.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department; Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the code official.
Correction

Fire Department; The required fire-resistance rating of fire-resistance-rated construction (including walls, fire stops, shaft enclosures, partitions and floors) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings, and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance rated assemblies shall be protected by self-closing or automatic- closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-7343.
Correction

Fire Department; Valve supervision and water flow alarm and trouble signals shall be distinctly different and shall be automatically transmitted to an approved central station, remote supervising station or proprietary supervising station as defined in NFPA72 or, when approved by the code official, shall sound an audible signal at a constantly attended location.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $2,238.20 $2,238.20 Paid 05/24/2007
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Failed 6/21/2012 6/21/2012 at 12:00 AM 08/03/2007
Correction
Corrective Action Required
08/03/2007
RE-BAR COVERAGE / CLEARANCE PER DRAWING & ACI 7.7.1 3" MINIMUM REQUIRED TO BOTTOMS / BANKS
Footing Inspection - Commercial Passed 08/30/2007
Correction
Resolved
08/30/2007
RE-BAR COVERAGE / CLEARANCE
Correction
Resolved
08/30/2007
PREPARATION TO POUR PERIMETER GRADE BEAM THIS RE-INSPECTION PERFORMED 8/28/07 RE-POUR OF GRADE BEAM POURED EARLIER & REMOVED
Electrical Service Inspection Partial 09/25/2007
Correction
Resolved
09/25/2007
None 1200 AMP PANEL. RELEASE SERVICE. MDP
Correction
Partial Correction
09/25/2007
None 200 AMP PANELS. RELEASE METERS 101, 102, 103, 104
Underslab Plumbing Inspection - Commercial Passed 10/01/2007
Correction
Resolved
10/01/2007
UNDER-SLAB DWV PIPING OK TO COVER WHEN READY
Electrical Service Inspection Partial 10/03/2007
Footing Inspection - Commercial Partial 10/11/2007
Correction
Resolved
10/11/2007
PREPARATION TO POUR PERIMETER GRADE BEAM THIS RE-INSPECTION PERFORMED 8/28/07 RE-POUR OF GRADE BEAM POURED EARLIER & REMOVED
Correction
Partial Correction
10/11/2007
SLAB-ON-GRADE THICKENED EDGES & BEARING WALL LINES NORTH 1/2 OF BUILDING; OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Footing Inspection - Commercial Passed 10/19/2007
Correction
Resolved
10/19/2007
SLAB-ON-GRADE THICKENED EDGES & BEARING WALL LINES NORTH 1/2 OF BUILDING; SOUTH 1/2 OF BUILDING OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Rough Plumbing Inspection - Commercial Not Ready 11/09/2007
Correction
Corrective Action Required
11/09/2007
READINESS FOR INSPECTION
All Rough Inspection - Commercial Failed 03/26/2008
Correction
Corrective Action Required
03/26/2008
BATH VENT FAN DISCHARGE CHECK ALL TO ENSURE DUCT HOSE CONNECTED
Correction
Corrective Action Required
03/26/2008
CONTINUITY OF BRANCH CIRCUIT GROUND CONDUCTORS CHECK ALL BOXES TO ENSURE ALL GROUNDS TIED THROUGH
Correction
Corrective Action Required
03/26/2008
ROUGH-IN FOR SMOKE ALARMS TO BE VERIED COMPLIANT
Correction
Corrective Action Required
03/26/2008
ANCHORAGE OF EXTERIOR WALL SILL PLATE
Correction
Corrective Action Required
03/26/2008
VERTICAL SUPPORT OF STAIR STRUCTURES & LANDINGS OBTAIN ENGINEER APPROVAL
All Rough Inspection - Commercial Failed 03/27/2008
Correction
Corrective Action Required
03/27/2008
CONTINUITY OF BRANCH CIRCUIT GROUND CONDUCTORS NEC 250.148 USE LISTED WIRE NUTS OR CRIMP CONNECTORS CHECK ALL BOXES TO ENSURE GROUND PROPERLY CONNECTED
Correction
Corrective Action Required
03/27/2008
ROUGH-IN FOR SMOKE ALARMS VERIFY ROUGH-IN LOCATIONS COMPLIANT WITH IRC 317
Correction
Corrective Action Required
03/27/2008
ANCHORAGE OF EXTERIOR WALL SILL PLATE R403.1.6: MINIMUM 1/2" DIAMETER BOLTS CENTERED IN PLATE; EMBEDDED MIN 7" IN CONCRETE FOUNDATION; MIN TWO BOLTS PER PLATE SECTION; ONE WITHIN 12" OF ENDS OF EACH PLATE SECTION; 6` MAX SPACING BETWEEN BOLTS; WASHER + NUT WRENCH-TIGHTENED CHECK ALL FOR SUBSTANTIAL COMPLIANCE
Correction
Corrective Action Required
03/27/2008
VERTICAL SUPPORT OF STAIR STRUCTURES & LANDINGS PROVIDE ENGINEER LETTER CONFIRMING ADAQUACY
Correction
Corrective Action Required
03/27/2008
HEADER BEARING ON JACK STUDS ENSURE ALL BEARING SHIM AS REQUIRED
Correction
Corrective Action Required
03/27/2008
PLUMBING STACK AT 101 2ND LEVEL TEE NOT PLUGGED
All Rough Inspection - Commercial Failed 03/28/2008
Sewer Service Inspection Passed 03/28/2008
Correction
Resolved
03/28/2008
BUILDING SEWER LINE 5' EAST OF EAST END OF BUILDING TO BE COVERED W/ SIDEWALK 4" PVC - OK TO COVER
Sewer Service Inspection Passed 04/01/2008
Correction
Resolved
04/01/2008
BUILDING SEWER LINE 5' EAST OF EAST END OF BUILDING
Correction
Resolved
04/01/2008
BUILDING SANITARY SEWER BUILDING SE CORNER TO CONNECTION TO MAIN @ALLEY
Sewer Service Inspection - Commercial Request Complete 4/1/2008 4/1/2008 04/01/2008
Electrical Service Inspection Partial 03/09/2010
All Rough Inspection - Commercial Failed 03/09/2010
Electrical Service Inspection Not Ready 6/21/2012 6/21/2012 at 12:00 AM 06/21/2012
Misc
Corrective Action Required
06/21/2012
REQUESTED SERVICE PANELS AND DISCONNECT ENCLOSURES BE OPENED FOR INSPECTION AND PERMIT PRINTS BE AVAILABLE ON JOBSITE. DILL SUBSEQUENTLY RE-SCHEDULED INSPECTION TO 6/25.
Electrical Service Inspection Passed 7/10/2012 at 12:00 AM 07/10/2012
Misc
Resolved
07/10/2012
REQUESTED SERVICE PANELS AND DISCONNECT ENCLOSURES BE OPENED FOR INSPECTION AND PERMIT PRINTS BE AVAILABLE ON JOBSITE. DILL SUBSEQUENTLY RE-SCHEDULED INSPECTION TO 6/25.
Occupancy Inspection - Codes Commercial Failed 10/31/2012 10/31/2012 at 12:00 AM 10/31/2012
Misc
Corrective Action Required
10/31/2012
ANY REMAINING ISSUES OUTSIDE OF BUILDING LINES ON THE THREE VOGUE/HARTLEY RESIDENSE / COMMERCIAL BUILDINGS ARE TO BE RESOLVED AS PART OF FINAL INSPECTION OF VOGUE/HARTLEY PARKING GARAGE BUILDING PERMIT.
Misc
Corrective Action Required
10/31/2012
RESOLVE ANY PLANNING AND DEVELOPMENT ISSUES INTEGRAL TO THIS BUILDING. CONSULT WITH CHRIS HUGHEY.
Misc
Corrective Action Required
10/31/2012
BOTTOM RAIL OF BALCONY GUARDS MUST NOT ALLOW PASSAGE OF 4" SPHERE. PLANNED INSTALLATION OF PAVER TILE WILL RESOLVE.
Misc
Corrective Action Required
10/31/2012
1) GARAGE / RESIDENCE SEPARATION: CLOSE WALL GWB TIGHT TO FLOOR OR STEM WALL. 2) SEAL ALL PENETRATIONS 3) COVER PVC PLUMBING STACK CLEANOUTS WITH NON-COMBUSTIBLE MATERIAL; BUT MUST REMAIN USABLE
Misc
Corrective Action Required
10/31/2012
MODIFY OR SUPPORT HOSE BIB IN 101 GARAGE -- PROJECTS EXCESSIVELY FROM WALL
Misc
Corrective Action Required
10/31/2012
ELIMINATE EXPOSED PAPRE-FACED INSULATION AT FURNACE ROOMS
Misc
Corrective Action Required
10/31/2012
ENSURE WATER HEATER TPR DISCHARGES ARE PIPED TO WITHIN 6" OF FLOOR OR RECEPTACLE. EXAMPLE: 101
Misc
Corrective Action Required
10/31/2012
GFCI RECEPTACLE @ 104 2ND FLR BALCONY NOT TRIPPING ON TEST.
Misc
Corrective Action Required
10/31/2012
NEC 370-20; IRC E3806.5-6 SET-BACK OF ELECTRICAL RECEPTACLE / SWITCH BOXES: 1/4" MAXIMUM SET-BACK @ NON-COMBUSTIBLE SURFACES. SEE AT KITCHEN BACKSPLASHES.
Misc
Corrective Action Required
10/31/2012
NEC 380-10; 410-56(f) / IRC E3901.10; E3902.6 SECURING OF ELECTRICAL RECEPTACLES / SWITCHES: SOME NOT TIGHT TO BOX; CHECK ALL AND ENSURE NONE ARE "SOFT" OR LOOSE SIDE-TO-SIDE.
Misc
Corrective Action Required
10/31/2012
CHECK MANUFACTURER'S INSTRUCTIONS AND WARRANTY TO DETERMINE WHETHER ROOFTOP HVAC UNIT REQUIRE SLIP SHEETS UNDER PADS.
Occupancy Inspection - Codes Commercial Temporary C of O 11/8/2012 11/8/2012 at 12:00 AM 11/08/2012
Misc
Partial Correction
11/08/2012
ANY REMAINING ISSUES OUTSIDE OF BUILDING LINES ON THE THREE VOGUE/HARTLEY RESIDENSE / COMMERCIAL BUILDINGS ARE TO BE RESOLVED AS PART OF FINAL INSPECTION OF VOGUE/HARTLEY PARKING GARAGE BUILDING PERMIT.
Misc
Partial Correction
11/08/2012
RESOLVE ANY PLANNING AND DEVELOPMENT ISSUES INTEGRAL TO THIS BUILDING. CHRIS HUGHEY TO BE CONSULTED.
Misc
Corrective Action Required
10/31/2012
BOTTOM RAIL OF BALCONY GUARDS MUST NOT ALLOW PASSAGE OF 4" SPHERE. PLANNED INSTALLATION OF PAVER TILE WILL RESOLVE.
Misc
Resolved
11/08/2012
1) GARAGE / RESIDENCE SEPARATION: CLOSE WALL GWB TIGHT TO FLOOR OR STEM WALL. 2) SEAL ALL PENETRATIONS 3) COVER PVC PLUMBING STACK CLEANOUTS WITH NON-COMBUSTIBLE MATERIAL; BUT MUST REMAIN USABLE
Misc
Resolved
11/08/2012
MODIFY OR SUPPORT HOSE BIB IN 101 GARAGE -- PROJECTS EXCESSIVELY FROM WALL
Misc
Resolved
11/08/2012
ELIMINATE EXPOSED PAPRE-FACED INSULATION AT FURNACE ROOMS
Misc
Resolved
11/08/2012
ENSURE WATER HEATER TPR DISCHARGES ARE PIPED TO WITHIN 6" OF FLOOR OR RECEPTACLE. EXAMPLE: 101
Misc
Resolved
11/08/2012
GFCI RECEPTACLE @ 104 2ND FLR BALCONY NOT TRIPPING ON TEST.
Misc
Resolved
11/08/2012
NEC 370-20; IRC E3806.5-6 SET-BACK OF ELECTRICAL RECEPTACLE / SWITCH BOXES: 1/4" MAXIMUM SET-BACK @ NON-COMBUSTIBLE SURFACES. SEE AT KITCHEN BACKSPLASHES.
Misc
Resolved
11/08/2012
NEC 380-10; 410-56(f) / IRC E3901.10; E3902.6 SECURING OF ELECTRICAL RECEPTACLES / SWITCHES: SOME NOT TIGHT TO BOX; CHECK ALL AND ENSURE NONE ARE "SOFT" OR LOOSE SIDE-TO-SIDE.
Occupancy Inspection - Codes Commercial Temporary C of O 11/16/2012 11/16/2012 at 12:00 AM 11/16/2012
Misc
Partial Correction
11/08/2012
ANY REMAINING ISSUES OUTSIDE OF BUILDING LINES ON THE THREE VOGUE/HARTLEY RESIDENSE / COMMERCIAL BUILDINGS ARE TO BE RESOLVED AS PART OF FINAL INSPECTION OF VOGUE/HARTLEY PARKING GARAGE BUILDING PERMIT.
Misc
Partial Correction
11/08/2012
RESOLVE ANY PLANNING AND DEVELOPMENT ISSUES INTEGRAL TO THIS BUILDING. CHRIS HUGHEY TO BE CONSULTED.
Misc
Resolved
11/16/2012
BOTTOM RAIL OF BALCONY GUARDS MUST NOT ALLOW PASSAGE OF 4" SPHERE. PLANNED INSTALLATION OF PAVER TILE WILL RESOLVE.
Occupancy Inspection - Codes Commercial Full C of O 11/21/2012 at 12:00 AM 11/21/2012
Misc
Resolved
11/21/2012
ANY REMAINING ISSUES OUTSIDE OF BUILDING LINES ON THE THREE VOGUE/HARTLEY RESIDENSE / COMMERCIAL BUILDINGS ARE TO BE RESOLVED AS PART OF FINAL INSPECTION OF VOGUE/HARTLEY PARKING GARAGE BUILDING PERMIT.
Misc
Resolved
11/21/2012
RESOLVE ANY PLANNING AND DEVELOPMENT ISSUES INTEGRAL TO THIS BUILDING. CHRIS HUGHEY TO BE CONSULTED.
All Rough Inspection - Commercial Passed 11/21/2012 at 12:00 AM 11/26/2012
Documents & Images
Date Uploaded File Type Document Name
06/11/2012 Letter Dill Scope of Work
07/10/2012 Letter Inspection Summary
10/31/2012 Letter Inspection Summary
11/08/2012 Letter Temporary Certificate of Occupancy
11/16/2012 Letter Temporary Certificate of Occupancy
11/21/2012 Letter Field Certificate of Occupancy
11/26/2012 Letter Final Certificate of Occupancy
06/21/2013 Letter Building Permit
01/15/2014 Letter DOC011514-008.pdf
09/19/2017 Letter b0700400 Vogue Townhome scope 06112012
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home