Permit Application Status

B0700168


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0700168
Building Permit - Commercial
Final Completion
CHAPEL RIDGE RETAIL LLC
NEW SHELL BUILDING
NEW RETAIL SHELL BUILDING
01/31/2007
04/17/2007
10/14/2007
04/11/2008
Locations
Contacts
DAVIDSON BROWN, Address:11301STRANG LINE ROAD  
KLEINFELDER, Address:7802 BARTON  
UNITED HEATING & COOLING, Address:301 DUCK RD  
CAPITAL CONSTRUCTION SERVICES, Address:2642 NE HAGAN RD  
BLUE SPRINGS ELECTRICAL, Address:3402 LAKESHORE DR  
CLEARLINE PLUMBING, Address:14922 KNORPP RD  
CHAPEL RIDGE RETAIL LLC, Address:3215 NE CARNEGIE DR STE 200  
ROCKY TOP HOLDINGS LLC, Address:244 W MILL ST STE 101  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 08/12/2007 10/29/2010
Correction

Fire Derpartment; When fire apparatus access roads or a water supply for fire protection is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction except when approved alternative methods of protection are provided.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

Codes Administration - As this building has been classified as Type II-B, all wood roof decking shall be fire-treated.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

Codes Administration - 2003 IBC 1203.2 - Attic spaces. Enclosed attics and enclosed rafter spaces formed where ceilings are applied directly to the underside of roof framing members shall have cross ventilation for each separate space by ventilating openings protected against the entrance of rain and snow. Blocking and bridging shall be arranged so as not to interfere with the movement of air. A minimum of 1 inch of airspace shall be provided between the insulation and the roof sheathing. The net free ventilation area shall not be less than 1/150 of the area of the space ventilated, with 50 percent of the required ventilation area provided by ventilatiors located in the upper portion of the space to be ventilated at least 3 feet above eave or cornice vents with the balance of the required ventilation provided by eave or cornice vents.
Correction

Codes Administration - 2003 IBC 1209.2 - Attic spaces. An opening not less than 20 inches by 30 inches shall be provided to any attic area having a clear height of over 30 inches. A 30-inch minimum clear headroom in the attic space shall be provided at or above the access opening.
Correction

Codes Administration - 2003 IBC 1704.1.1 - Building permit requirements. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with Section 106.1 as a condition for permit issuance. This statement shall include a complete list of materials and work requiring special inspections by this section, the inspections to be performed and a list of the individuals, approved agencies or firms intended to be retained for conducting such inspections.
Correction

Codes Administration - 2003 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-1300.
Correction

Codes Administration - Per the email from Justin Bridges dated 08-08-07, the construction type of this structure is to be Type II-B. The plan review has been based on this information.
Correction

Codes Administration - The Code Review indicates that 75 percent increase in allowable area is availabe due to available side yards. This is not correct as a portion of the structure is within 30 feet of the property line.
Correction

Codes Administration - The address assigned to this property is 3680 NE Akins Dr. The address assigned to the next property to the North is 3700 which does not allow for each of the possible tenants in this structure to have their own numbered address.
Correction

Codes Administration - The plans show two separate electric meter bank locations. Each location shall have signage identifing it and indicating the location of the other meter bank. Each meter/disconnect shall be labeled as the purpose/space it serves.
Correction

Codes Administration - The project cost has not been provided.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Tenant finish plans shall be submitted to the Codes Administration Department prior to any interior alteration or improvments. Permits shall be obtained prior to any performing any work which requires permits.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department: Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the code official is authorized to require a key box to be installed in an accessible location. The key box shall be of an approved type and shall contain keys to gain access as required by the code official.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Fire Department- 907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. 3. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

Codes Administration - 2003 IPC 708.3.2 - Building sewers. Building sewers shall be provided with cleanouts located not more than 100 feet apart measured from the upstream entrance of the cleanout. For building sewers 8 inches and larger, manholes shall be provided and located not more than 200 feet from the junction of the building drain and building sewer, at each change in direction and at intervals of not more than 400 feet apart. Manholes and manhole covers shall be of an approved type.
Correction

Codes Administration - 2003 IPC 708.3.3 - Change of direction. Cleanouts shall be installed at each change of direction of the building drain or horizontal waste or soil lines greater than 45 degrees (0.79 rad). Where more than one change of direction occurs in a run of piping, only one cleanout shall be required for each 40 feet (12,192 mm) of developed length of the drainage piping.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Lee's Summit Code of Ordinance - Sec.17-309 - Smoking. A. "No Smoking" signs or the international "No Smoking" symbol (consisting of a pictorial representation of a burning cigarette enclosed in a red circle with a red bar across it) shall be clearly and conspicicuously posted at every public place and place of emplyment where smoking is prohibited by this Article, by the owner, operator, manager, or other person in control of that place. B. Every public place and place of employment where smoking is prohibited by this Article shall have posted at every entrance a conspicuous sign clearly stating that smoking is prohibited.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $6,620.56 $6,620.56 Paid 04/17/2007
84 Water Meters $625.00 $625.00 Paid 04/17/2007
85 Water Taps $13,670.00 $13,670.00 Paid 04/17/2007
Right of Way Permit $35.00 $35.00 Paid 04/17/2007
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Miscellaneous Inspection Failed 05/14/2007
Correction
Corrective Action Required
05/14/2007
Premises Identification (IRC) PROPERTY TO BE IDENTIFIABLE FROM STREET FOR ALL INSPECTIONS
Correction
Corrective Action Required
05/14/2007
APPROVED DRAWINGS APPROVED DRAWINGS MUST BE ON SITE FOR ALL INSPECTIONS.
Water Service Inspection Passed 05/14/2007
Correction
Resolved
05/14/2007
None
Erosion Control Inspection Residential Failed 05/14/2007
Correction
Corrective Action Required
05/14/2007
Erosion Control INADEQUATE EROSION CONTROL. 2 DAYS TO COMPLY
Correction
Resolved
05/14/2007
Tracking Mud, Debris
Water Service Inspection - Commercial Request Complete 5/14/2007 5/14/2007 05/14/2007
Footing Inspection - Commercial Partial 06/05/2007
Correction
Partial Correction
06/05/2007
TEXT APPROVED TO POUR AS FOLLOWS: NORTH WALL, ALL EAST WALL, 1 THRU 5.5 WEST WALL, 1 THRU 1.9
Footing Inspection - Commercial Partial 06/07/2007
Correction
Partial Correction
06/07/2007
TEXT APPROVED TO POUR AS FOLLOWS: NORTH WALL, ALL EAST WALL, 1 THRU 7.1 WEST WALL, 1 THRU 7.3 GRADE BEAM, LINE 7 PADS: B,7; B,5; B,4; B,3; B,2; B,1.6; A.7,1.6;
Footing Inspection - Commercial Partial 06/13/2007
Correction
Partial Correction
06/13/2007
TEXT APPROVED TO POUR AS FOLLOWS: ALL FOOTINGS ALL PADS EXCEPT C.6,8.4; C.6,8; C.6,7.4 & (6) EXTERIOR
Underslab Plumbing Inspection - Commercial Partial 06/13/2007
Correction
Partial Correction
06/13/2007
None APPROVED TO COVER 6"W MAIN NORTH OF COLUMN LINE 6
Foundation Inspection - Commercial Partial 06/14/2007
Correction
Partial Correction
06/14/2007
COMMENTS APPROVED TO POUR AS FOLLOWS: COLUMN LINE 7 & APPROX. 10' ADJACENT
Footing Inspection - Commercial Partial 06/14/2007
Correction
Partial Correction
06/14/2007
TEXT APPROVED TO POUR AS FOLLOWS: ALL FOOTINGS ALL PADS EXCEPT (6) EXTERIOR
Foundation Inspection - Commercial Passed 06/15/2007
Correction
Resolved
06/15/2007
COMMENTS
Underslab Plumbing Inspection - Commercial Passed 06/15/2007
Correction
Resolved
06/15/2007
None
Footing Inspection - Commercial Passed 06/15/2007
Correction
Resolved
06/15/2007
TEXT
Underslab Electrical Inspection - Commercial Partial 06/15/2007
Correction
Partial Correction
06/15/2007
None APPROVED TO COVER ALL TO NORTH OF COLUMN 7
Erosion Control Inspection Residential Failed 06/20/2007
Correction
Corrective Action Required
06/20/2007
Erosion Control INADEQUATE EROSION CONTROL. 2 DAYS TO COMPLY
Correction
Corrective Action Required
06/20/2007
Tracking Mud, Debris STREET CLEANUP REQUIRED. 2 DAYS TO COMPLY
Underslab Electrical Inspection - Commercial Partial 06/20/2007
Correction
Partial Correction
06/20/2007
None APPROVED TO COVER ALL TO NORTH OF COLUMN 9
Underground Electrical Inspection - Commercial Request Complete 6/19/2007 6/20/2007 06/20/2007
Underslab Electrical Inspection - Commercial Passed 06/21/2007
Correction
Resolved
06/21/2007
None
Underground Electrical Inspection - Commercial Request Complete 6/21/2007 6/21/2007 06/21/2007
Erosion Control Inspection Residential Passed 07/16/2007
Correction
Resolved
07/16/2007
Erosion Control
Correction
Resolved
07/16/2007
Tracking Mud, Debris
Electrical Service Inspection Passed 07/16/2007
Correction
Resolved
07/16/2007
None 100 AMP TEMP. SERVICE - APPROVED - RELEASE
Driveway Inspection Passed 07/19/2007
Underground Electrical Inspection - Commercial Partial 07/25/2007
Correction
Partial Correction
07/25/2007
LIGHT POLES & CONDUIT (4) POLES & RELATED CONDUITS IN FRONT NE OF BUILDING APPROVED TO POUR/COVER
Underground Electrical Inspection - Commercial Request Complete 7/24/2007 7/25/2007 07/25/2007
Underground Electrical Inspection - Commercial Partial 08/09/2007
Correction
Partial Correction
08/09/2007
LIGHT POLES & CONDUIT (4) POLES & RELATED CONDUITS IN FRONT NE OF BUILDING APPROVED TO POUR/COVER (3) POLES & RELATED CONDUITS IN SW CORNER OF BUILDING APPROVED TO POUR/COVER
Sidewalk Inspection Partial 08/16/2007
Sidewalk Inspection Partial 08/16/2007
Rough Framing Inspection - Commercial Partial 09/11/2007
Correction
Partial Correction
09/11/2007
ROOF PARAPET APPROVED TO COVER Roof
Miscellaneous Inspection Passed 09/11/2007
Correction
Resolved
09/11/2007
Premises Identification (IRC) PROPERTY TO BE IDENTIFIABLE FROM STREET FOR ALL INSPECTIONS
Correction
Resolved
09/11/2007
APPROVED DRAWINGS APPROVED DRAWINGS MUST BE ON SITE FOR ALL INSPECTIONS.
Rough Framing Inspection - Commercial Request Complete 9/10/2007 9/11/2007 09/11/2007
Electrical Service Inspection Failed 10/09/2007
Correction
Corrective Action Required
10/09/2007
System Service Ground (IRC) PLANS CALL FOR INDIVIDUAL #3/0 GROUND TO WATER/STEEL. COMMON #3/0 INSTALLED. PROVIDE INFORMATION TO VERIFY THAT #3/0 IS ADEQUATE FOR SIMULTANEOUS USE
Correction
Corrective Action Required
10/09/2007
TEXT 1- BUILDING MUST BE "DRYED IN" PRIOR TO RELEASE OF SERVICES 2- LABEL PANELS & METERS TO MATCH 3- LABEL EACH METER BANK TO INDICATE MULTIPLE SERVICES
Rough Framing Inspection - Commercial Partial 10/09/2007
Correction
Partial Correction
10/09/2007
SPRINKLER ROOM APPROVED TO INSULATE AND ROCK SPRINKLER ROOM WALLS SPRINKLER ROOM
Correction
Resolved
10/09/2007
ROOF PARAPET APPROVED TO COVER Roof
Rough Framing Inspection - Commercial Request Complete 10/8/2007 10/9/2007 10/09/2007
Electrical Service Inspection Partial 10/31/2007
Correction
Resolved
10/31/2007
System Service Ground (IRC)
Correction
Corrective Action Required
10/31/2007
TEXT LABEL EACH METER BANK TO INDICATE MULTIPLE SERVICES (AT FINAL)
Correction
Resolved
10/31/2007
None 100 AMP TEMP. SERVICE - APPROVED - RELEASE RELEASE SOUTH HOUSE PANEL & NORTH PANEL 'O'
Driveway Inspection Passed 11/12/2007
Sidewalk Inspection Partial 11/13/2007
Sidewalk Inspection Passed 11/16/2007
Gas Piping Inspection - Commercial Failed 01/07/2008
Correction
Corrective Action Required
01/07/2008
Gas Piping Support (IRC) STRAP GAS PIPE TO SUPPORT BLOCKS ALL UNITS. ROOF
Gas Service Inspection - Commercial Failed 01/07/2008
Correction
Partial Correction
01/07/2008
None GAS PIPE TO ROOF TOP UNITS NUMBERING FROM THE NORTH UNIT AS # 1 THROUGH TO SOUTH UNIT AS # 22. THE FOLLOWING UNITS 1,2,3,4,5,9,10,14,15,16,17 AND 18 GAS TEST PRESSURE APPROVED AT 15 PSI. HOLD GAS UNTIL ALL GAS PIPE IS LABELED.
Correction
Corrective Action Required
01/07/2008
ADDRESS / LABEL GAS PIPE AS TO UNIT SUPPLIED ADDRES OR LABEL EACH GAS PIPE. AT THE WALL / METER
Gas Service Inspection - Commercial Failed 01/09/2008
Correction
Corrective Action Required
01/09/2008
Gas Test Pressure (IRC) THESE TWO ADDRESS - GAS PIPE REQUIRES A MINIMUM OF 10 PSI FOR PRESSURE TEST. SUITE 106 AND 128
Correction
Partial Correction
01/09/2008
None GAS PIPE LABELED SUITE #s 100, 102, 104, 108, 110, 112, 114, 116, 118, 120, 122, 124, 126, 130, 132, 134, 136, 138, 140, AND 142 GAS TEST PRESSURE APPROVED. TEST PRESSURE 15 PSI - RELEASE 20 GAS METERS.
Correction
Partial Correction
01/09/2008
ADDRESS / LABEL GAS PIPE AS TO UNIT SUPPLIED LABEL EACH GAS PIPE WITH A PERMANENT LABEL AS TO THE UNIT / SUITE SERVED. AT THE WALL / METER
Erosion Control Inspection Residential Passed 01/09/2008
Correction
Resolved
01/09/2008
Tracking Mud, Debris
Gas Piping Inspection - Commercial Partial 01/09/2008
Correction
Partial Correction
01/09/2008
Gas Piping Support (IRC) LABEL EACH GAS PIPE WITH A PERMANENT LABEL AS TO UNIT / SUITE SERVED. ROOF
Gas Piping Inspection - Commercial Partial 01/10/2008
Correction
Partial Correction
01/10/2008
Gas Piping Support (IRC) LABEL EACH GAS PIPE WITH A PERMANENT LABEL AS TO UNIT / SUITE SERVED. ROOF
Gas Service Inspection - Commercial Failed 01/10/2008
Correction
Corrective Action Required
01/10/2008
Gas Test Pressure (IRC) THESE TWO ADDRESS - GAS PIPE REQUIRES A MINIMUM OF 10 PSI FOR PRESSURE TEST. NO PRESSURE ON 106 OR 128 GAS PIPE 1 - 10 - 08. SUITE 106 AND 128
Gas Piping Inspection - Commercial Partial 01/11/2008
Gas Service Inspection - Commercial Passed 01/11/2008
Correction
Resolved
01/11/2008
None GAS APPROVED SUITE 106 - TEST PRESSURE 18 PSI. - RELEASE. GAS APPROVED SUITE 128 - TEST PRESSURE 17 PSI - RELEASE. 106 & 128
Correction
Resolved
01/11/2008
Gas Test Pressure (IRC) SUITE 106 AND 128
Correction
Resolved
01/11/2008
None
Correction
Resolved
01/11/2008
ADDRESS / LABEL GAS PIPE AS TO UNIT SUPPLIED AT THE WALL / METER
Electrical Service Inspection Passed 01/31/2008
Correction
Resolved
01/31/2008
TEXT
Underground Electrical Inspection - Commercial Passed 01/31/2008
Correction
Resolved
01/31/2008
LIGHT POLES & CONDUIT
Final Inspection - Commercial Failed 01/31/2008
Correction
Corrective Action Required
01/31/2008
COMPLETE SOFFIT COVERINGS Exterior
Correction
Corrective Action Required
01/31/2008
Grading (IRC) COMPLETE SOD & PROVIDE MEANS TO DIRECT WATER MIN. 36" AWAY FROM FOUNDATION Exterior
Correction
Corrective Action Required
01/31/2008
BACKFLOW PREVENTER ROUTE OVERFLOW PIPING FROM BACKFLOW PREVENTER TO APPROVED LOCATION SPRINKLER ROOM
Correction
Corrective Action Required
01/31/2008
TEMP. HEATING PROVIDE GFCI PROTECTED RECEPTACLE W/IN 25' FROM ANY SERVICEABLE EQUIPMENT. PROVIDE DISCONNECT SWITCHES AT ANY ACTIVE ROOF TOP UNIT Roof
Correction
Corrective Action Required
01/31/2008
APPROVALS FROM OTHER DEPARTMENTS PROVIDE APPROVAL FROM WATER DEPARTMENT PROVIDE APPROVAL FROM PUBLIC WORKS PROVIDE APPROVAL FROM PLANNING & DEVELOPMENT UNDER SEPARATE COVER
Correction
Corrective Action Required
01/31/2008
Required Inspections NOTE: NO RECORD OF SEWER INSPECTION.
Gas Piping Inspection - Commercial Passed 01/31/2008
Correction
Resolved
01/31/2008
Gas Piping Support (IRC)
Rough Framing Inspection - Commercial Passed 01/31/2008
Correction
Resolved
01/31/2008
SPRINKLER ROOM APPROVED TO INSULATE AND ROCK SPRINKLER ROOM WALLS NOTE: REMAINDER OF ROUGH FRAMING INSPECTION COVERED UNDER FINAL BUILDING SPRINKLER ROOM
Sewer Service Inspection Passed 03/27/2008
Correction
Resolved
03/27/2008
None SEWER INSPECTED AND APPROVED BY JON HALEY, PUBLIC WORKS
Final Inspection - Commercial Failed 04/04/2008
Correction
Resolved
04/04/2008
Required Inspections SEE BELOW
Correction
Resolved
04/04/2008
COMPLETE SOFFIT COVERINGS
Correction
Resolved
04/04/2008
Grading (IRC)
Correction
Resolved
04/04/2008
BACKFLOW PREVENTER SPRINKLER ROOM O/F PIPING IN PROGRESS
Correction
Resolved
04/04/2008
TEMP. HEATING
Correction
Resolved
04/04/2008
APPROVALS FROM OTHER DEPARTMENTS SEE BELOW
Correction
Resolved
04/04/2008
Receive Fire Department approval PER K MARTIN 4/4/08
Correction
Resolved
04/04/2008
Receive Water Utilities Approval PER BEN HASKAMP 4/4/08
Correction
Resolved
04/04/2008
Receive Public Works Approval PER JON HALEY 4/4/08
Correction
Corrective Action Required
04/04/2008
Receive Planning & Development Approval COORDINATE W/ T SCANNEL PHONE 816-969-1603
Final Inspection - Commercial Failed 04/04/2008
Correction
Corrective Action Required
04/04/2008
APPROVALS FROM OTHER DEPARTMENTS WATER DEPARTMENT (APPROVED BY B. HASKAMP) PROVIDE APPROVAL FROM PUBLIC WORKS PROVIDE APPROVAL FROM PLANNING & DEVELOPMENT UNDER SEPARATE COVER
Final Inspection - Commercial Passed 04/10/2008
Correction
Resolved
04/10/2008
Required Inspections
Correction
Resolved
04/10/2008
COMPLETE SOFFIT COVERINGS
Correction
Resolved
04/10/2008
Grading (IRC)
Correction
Resolved
04/10/2008
BACKFLOW PREVENTER
Correction
Resolved
04/10/2008
TEMP. HEATING
Correction
Resolved
04/10/2008
APPROVALS FROM OTHER DEPARTMENTS
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home