Permit Application Status

B0700047


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0700047
Building Permit - Residential
Certificate of Occupancy
JOHN KNOX VILLAGE
NEW SINGLE FAMILY
HOUSE
01/08/2007
04/23/2007
10/20/2007
11/14/2007
Locations
Contacts
TEAGUE ELECTRIC CONSTRUCTION, INC., Address:11325 STRANG LINE RD.  
UNITED PLUMBING AND SERVICE CO INC, Address:301 DUCK RD  
UNITED HEATING & COOLING, Address:301 DUCK RD  
THE WEITZ COMPANY, Address:8900 INDEIAN CREEK PKWY  
JOHN KNOX VILLAGE, Address:400 NW MURRAY RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 10/03/2007 10/29/2010
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - The holder of this permit agrees and understands that only persons authorized per LSCO 7-130 are permitted to perform electrical, plumbing or mechanical work authorized by this permit.
Correction

In a combined effort with both the R-4, and the R-7 School Districts the City of Lee's Summit is working together to educate the development community on a new program, the "Lee's Summit Voluntary Residential Development Surcharge". This is a program, which will help raise capital to build new schools for our community. Brochures are available at the front counter of both the Planning and Development and the Codes Administration departments. You can also find more information on the City of Lee's Summit web site at lees-summit.mo.us. (For more information please contact the Board of Education at 986-2400).
Correction

CA - If decks are not shown on plot plans submitted at the time of permit application for the structure, and decks are proposed to be installed prior to occupancy, a separate approval and permit is required prior to construction of such deck(s).
Correction

CA - The holder of this permit agrees and understands that the work authorized by this permit shall be performed in accordance with the 2003 International Residential Code as amended by Chapter 7 of the Lee's Summit Code of Ordinances.
Correction

All residential projects applied for after May 6, 2006 shall have a maximum stair rise of 7-3/4 inches and a minimum tread depth of 10". This project was applied for after May 6, 2006 and therefore must comply with this requirement.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-122 - Any excavation for foundations and/or footings of buildings and structures shall be backfilled within twenty-eight (28) days from the date of permit issuance unless otherwise approved by the building official.
Correction

CA - LSCO 7-128 (a)1 - Retaining walls which are over 4 feet in height measured from the bottom of the footing to the top of the wall of the wall shall be designed and sealed by a professional engineer or architect registered in the State of Missouri. In addition, the building official may waive the requirements for a permit or engineered drawings for walls over 4 feet in height if it is deemed unnecessary to require such submittals due to the location and type of wall to be installed.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-168 A - Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place before inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C 94; the concrete need not be on the job.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

CA - LSCO 7-930 - All dwellings shall have a controlled method of water disposal from the roofs that will collect and discharge all roof drainage to the ground at least 3 feet from the foundation walls or to an approved drainage system.
Correction

Codes Administration - 2003 IRC 311.5.2 - Headroom. The minimum headroom in all parts of the stairway shall not be less than 6 feet 8 inches measured vertically from the sloped plane adjoining the tread nosing or from the floor surface of the landing or platform.
Correction

Codes Administration - 2003 IRC 401.3 - Drainage. Surface drainage shall be diverted to a storm sewer conveyance or other approved point of collection so as to not create a hazard. Lots shall be graded so as to drain surface water away from foundation walls. The grade away from foundation wall shall fall a minimum of 6 inches with the first 10 feet. Exception: Where lot lines, walls, slopes or other physical barriers prohibit 6 inches of fall within 10 feet, drains or swales shall be provided to ensure drainage away from the structure.
Correction

Codes Administration - 2003 IRC 403.1.6 - Foundation anchorage. When braced wall panels are supported directly on continous foundations, the wall wood sill plate or cold-formed steel bottom track shall be anchored to the foundation in accordance with this section. The wood sole plate at exterior walls in monolithic slabs and wood sill plate shall be anchored to the foundation with anchor bolts spaced a maximum of 6 feet (1829 mm) on center. There shall be a minimum of two bolts per plate section with one bolt located not more than 12 inches (305 mm) or less than seven bolt diameters from each end of the plate section. In Seismic Design Categories D1 and D2, anchor bolts shall also be spaced at 6 feet (1829 mm) on center and located with 12 inches (305 mm) from the ends of the plate section at interior braced wall lines when required by Section R602.10.9 to be supported on a continous foundation. Bolts shall be at least 1/2 inch (12.7 mm) in diameter and shall extend a minimum of 7 inches (178 mm) into masonry or concrete. Interior bearing wall sole plates on monolithic slab foundations shall be positively anchored with approved fasteners. A nut and washer shall be tightened on each bolt to the plate. Sills and sole plates shall be protected against decay and termites wher required by Sections R318 and R319. Cold-formed steel framing systems shall be fastened to the wood sill plates or anchored directly to the foundation as required in Section R505.3.1 or R603.1.1. Exceptions: 1. Foundation anchor straps, space as required to provide equivalent anchorage to 1/2-inch-diameter (12.7 mm) anchor bolts. 2. Walls 24 inches total in length or shorter connecting offset braced wall panels shall be anchored to the foundation with a minimum of one anchor bolt located in the center third of the plate section and shall be attached to adjacent braced wall panels per Figure R602.10.5 at corners. 3. Walls 12 inches total length or shorter connecting offset braced wall panels shall be permitted to be connected to the foundation without anchor bolts. The wall shall be attached to adjacent braced wall panels per Figure 602.10.5. As amended by the City of Lee's Summit.
Correction

Codes Administration - 2003 IRC 407.1.7.3 - Foundation elevation. On graded sites, the top of any exterior foundation shall extend aboe the elevation of the street gutter at point of discharge or the inlet of an approved drainage device a minimum of 12 inches plus 2 percent. Alternate elevations are permitted sublect to the approval of the building official, provided it can be demonstrated tha required drainage to the point of discharge and away from the structure is provided at all locations on the site.
Correction

Codes Administration - 2003 IRC 405.1 - Concrete or masonry foundations. Drains shall be provided around all concrete or masonry foundations that retain earth and enclose habitable or usable spaces located below grade. Drainage tiles, gravel or crushed stone drains, perforated pipe or other approved systems or materials shall be installed at or below the area to be protected and shall discharge by gravity or mechanical means into an approved drainage system. Gravel or crushed stone drains shall extend at least 1 foot beyond the outside edge of the footing and 6 inches above the top of the footing and be covered with an approved filter membrane material. The top of open joints of drain tiles shall be protected with strips of building paper, and the drainage tiles or perforated pipe shall be placed on a mimum of 2 inches of washed gravel or crushed rock at lease on sieve size larger than the tile joint openings or perforation and covered with not less than 6 inches of the same material.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $699.86 $699.86 Paid 04/23/2007
84 Water Meters $600.00 $600.00 Paid 04/23/2007
85 Water Taps $6,835.00 $6,835.00 Paid 04/23/2007
89 Sewer Tap Fees $240.00 $240.00 Paid 04/23/2007
Right of Way Permit $35.00 $35.00 Paid 04/23/2007
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Failed 06/11/2007
Correction
Corrective Action Required
06/11/2007
MISC MISC -GROUND TO WATER WHEN WATER LINE AVAILABLE -CLOSE OPENING AT BACK OF METER ENCLOSURE
All Rough Inspection - Residential Failed 06/11/2007
Correction
Corrective Action Required
06/11/2007
MISC FIREBLOCKING -FB ALL HIDDEN SPACES FROM ATTIC-BEHIND DINING AND MASTER BEDROOM -FB KITCHEN WALL FROM SOFFIT AND ATTIC
Correction
Corrective Action Required
06/11/2007
MISC ATTIC MECHANICAL UNITS -INSTALL MIN 24" WIDE WALKWAY FROM ATTIC OPENING TO MECHANICAL UNITS, AND MIN 30"X30" WORK PLATFORM IN FRONT OF UNITS
Correction
Corrective Action Required
06/11/2007
P2603.2.1 Water/DWV Preotection Against Physical Damage (IRC) PROTECT PVC AT KITCHEN WALL, @ WALL TOP PLATE
Correction
Corrective Action Required
06/11/2007
MISC PROVIDE CRAWL SPACE VENTILATION PER PLAN
Correction
Corrective Action Required
06/11/2007
MISC COMPLETE TRADES IN CRAWL SPACE OK TO INSULATE. DO NOT ROCK
Miscellaneous Inspection Failed - Stop Work 06/13/2007
Correction
Corrective Action Required
06/13/2007
R325 Premises Identification (IRC) HAVE JOB ADDRESS POSTED = TO BE VISIBLE FROM THE ROAD
All Rough Inspection - Residential Failed 06/13/2007
Correction
Resolved
06/13/2007
MISC FIREBLOCKING -FB ALL HIDDEN SPACES FROM ATTIC-BEHIND DINING AND MASTER BEDROOM -FB KITCHEN WALL FROM SOFFIT AND ATTIC
Correction
Resolved
06/13/2007
MISC ATTIC MECHANICAL UNITS -INSTALL MIN 24" WIDE WALKWAY FROM ATTIC OPENING TO MECHANICAL UNITS, AND MIN 30"X30" WORK PLATFORM IN FRONT OF UNITS
Correction
Resolved
06/13/2007
P2603.2.1 Water/DWV Preotection Against Physical Damage (IRC) PROTECT PVC AT KITCHEN WALL, @ WALL TOP PLATE
Correction
Resolved
06/13/2007
MISC COMPLETE TRADES IN CRAWL SPACE OK TO INSULATE. OK TO ROCK
Underground Electrical Inspection - Residential Not Ready 07/05/2007
Correction
Resolved
07/05/2007
MISC BURIED CONDUIT FOR SITE ELECTRICAL INTO/AROUND CUL-DE-SAC APPROX 80% EXPOSED
Correction
Corrective Action Required
07/05/2007
MISC PREP TO POUR CONCRETE LIGHT POLE BASES NOT READY FOR INSPECTION
Correction
Corrective Action Required
07/05/2007
MISC GROUNDING OF SITE LIGHT POLES NOT READY FOR INSPECTION
Underground Electrical Inspection - Residential Request Complete 7/5/2007 7/5/2007 07/05/2007
Miscellaneous Inspection Passed 07/11/2007
Correction
Resolved
07/11/2007
R325 Premises Identification (IRC)
Occupancy Inspection - Codes Residential Not Ready 07/11/2007
Correction
Corrective Action Required
07/11/2007
FD Approval Receive Fire Department approval
Correction
Corrective Action Required
07/11/2007
PD Approval Receive Planning & Development Approval
Correction
Corrective Action Required
07/11/2007
PW Approval Receive Public Works Approval
Correction
Corrective Action Required
07/11/2007
W/U Approval Receive Water Utilities Approval
Underground Electrical Inspection - Residential Partial 07/12/2007
Correction
Resolved
07/12/2007
MISC PREP TO POUR CONCRETE LIGHT POLE BASES NINE POLE BASES OK TO POUR WHEN READY
All Rough Inspection - Residential Passed 07/12/2007
Correction
Resolved
07/12/2007
MISC PROVIDE CRAWL SPACE VENTILATION PER PLAN SEE FINAL INSPECTION
Occupancy Inspection - Codes Residential Not Ready 07/12/2007
Correction
Corrective Action Required
07/12/2007
MISC SEALING OF PERIMETER OF ELECTRICAL METER SOCKET CAULK OR MOTAR
Correction
Corrective Action Required
07/12/2007
MISC CRAWL SPACE VENTILATION @ NORTH END NOT INSTALLED
Electrical Service Inspection Failed 07/12/2007
Correction
Corrective Action Required
07/12/2007
MISC MISC GROUND TO WATER SERVICE AT POINT OF BLDG ENTRY
Underground Electrical Inspection - Residential Request Complete 7/12/2007 7/12/2007 07/12/2007
Electrical Service Inspection Failed 07/13/2007
Correction
Corrective Action Required
07/13/2007
MISC MISC WATERLINE GROUND REQUIRED FROM POINT OF DISCONNECT
Driveway Inspection Passed 07/19/2007
Electrical Service Inspection Passed 07/31/2007
Correction
Resolved
07/31/2007
MISC MISC 200 AMPS RELEASE SERVICE
Occupancy Inspection - Codes Residential Failed 08/09/2007
Correction
Partial Correction
08/09/2007
FD Approval Receive Fire Department approval SEE REPORT PROVIDED
Correction
Corrective Action Required
08/09/2007
PD Approval Receive Planning & Development Approval FINISH SITEWORK/LANDSCAPING NOT READY FOR INSPECTION REQUEST WHEN READY
Correction
Partial Correction
08/09/2007
PW Approval Receive Public Works Approval WHEN READY RE-VEGATATION OF SITE REQUEST REINSPECTION
Correction
Resolved
08/09/2007
W/U Approval Receive Water Utilities Approval NO ISSUES PRESENTED
Correction
Resolved
08/09/2007
MISC SEALING OF PERIMETER OF ELECTRICAL METER SOCKET
Correction
Resolved
08/09/2007
MISC CRAWL SPACE VENTILATION @ NORTH END
Correction
Corrective Action Required
08/09/2007
MISC ATTIC ACCESS HATCH COVER MUST BE GWB OR OTHER NON-COMBUSTIBLE
Correction
Corrective Action Required
08/09/2007
MISC ELECTRICAL RECEPTACLE AT APPLIANCE GARAGE NOT GFCI PROTECTED
Correction
Corrective Action Required
08/09/2007
MISC GAS SERVICE TO BUILDING NOT YET INSTALLED SUBJECT TO APPROVAL
Correction
Corrective Action Required
08/09/2007
MISC COMPLETION OF SITE LIGHTING NOT YET COMPLETED SUBJECT TO APPROVAL
Correction
Corrective Action Required
08/09/2007
MISC USE / OCCUPANCY APPROVAL STATUS UNTIL APPROVED OK TO SET UP FOR BUSINESS NO STAFF OR PUBLIC
Underground Electrical Inspection - Residential Partial 08/09/2007
Correction
Resolved
08/09/2007
MISC BURIED CONDUIT FOR SITE ELECTRICAL
Correction
Resolved
08/09/2007
MISC PREP TO POUR CONCRETE LIGHT POLE BASES
Underground Electrical Inspection - Residential Partial 08/10/2007
Correction
Resolved
08/10/2007
MISC BURIED CONDUIT FOR SITE ELECTRICAL INCLUDING AT MEYER METER AND AT MONUMENT SIGN
Occupancy Inspection - Codes Residential Failed 08/10/2007
Correction
Resolved
08/10/2007
MISC ELECTRICAL RECEPTACLE AT APPLIANCE GARAGE
Underground Electrical Inspection - Residential Request Complete 8/10/2007 8/10/2007 08/10/2007
Electrical Service Inspection Passed 08/13/2007
Correction
Resolved
08/13/2007
MISC PEDESTAL-MOUNTED ELECTRICAL SERVICE INSTALLATION RELEASE 100 AMP SERVICE AS "2005 MONUMENT" MEYER METER FOR MONUMENT SIGN/SITE LIGHTS
Occupancy Inspection - Codes Residential Failed 08/13/2007
Occupancy Inspection - Codes Residential Failed 08/15/2007
Correction
Resolved
08/15/2007
FD Approval Receive Fire Department approval PER JOE DIR 8/15/07
Correction
Resolved
08/15/2007
MISC ATTIC ACCESS HATCH COVER
Correction
Partial Correction
08/15/2007
MISC USE / OCCUPANCY APPROVAL STATUS SEE TEMPORARY OCCUPANCY
Correction
Corrective Action Required
08/15/2007
MISC SAFETY GLAZING AT HAZARDOUS LOCATIONS SIDELIGHT AT SOUTH DOOR NOT TEMPERED GLASS
Underground Electrical Inspection - Residential Passed 09/04/2007
Correction
Resolved
09/04/2007
MISC GROUNDING OF SITE LIGHT POLES INSIDE POLES WHEN THEY ARE ERECTED GROUND RODS + CONDUCTOR READY FOR TERMINATION
Occupancy Inspection - Codes Residential Failed 09/06/2007
Correction
Resolved
09/06/2007
PD Approval Receive Planning & Development Approval PER TOM SCANNELL 9/5/07
Correction
Resolved
09/06/2007
MISC COMPLETION OF SITE LIGHTING
Occupancy Inspection - Codes Residential Failed 09/10/2007
Correction
Resolved
09/10/2007
MISC SAFETY GLAZING AT HAZARDOUS LOCATIONS
Underground Electrical Inspection - Residential Passed 11/07/2007
Correction
Resolved
11/07/2007
MISC BURIED CONDUIT FOR SITE ELECTRICAL
Correction
Resolved
11/07/2007
MISC GROUNDING OF SITE LIGHT POLES
Occupancy Inspection - Codes Residential Failed 11/07/2007
Gas Piping Inspection - Residential Passed 11/09/2007
Correction
Resolved
11/09/2007
MISC TEST PRESSURE LEVEL VISUAL INSPECTION PERFORMED / APPROVED AS PART OF ALL-ROUGH INSPECTION HELD STEADY AT >= 10 PSI FOR >=10 MIN
Occupancy Inspection - Codes Residential Passed 11/13/2007
Correction
Resolved
11/13/2007
PW Approval Receive Public Works Approval
Correction
Resolved
11/13/2007
MISC GAS SERVICE TO BUILDING
Correction
Resolved
11/13/2007
MISC USE / OCCUPANCY APPROVAL STATUS
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home