Permit Application Status

B0603461


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0603461
Demolition
Final Completion
ADESA MISSOURI INC
DEMO PARTIAL COMMERCIAL
INTERIOR DEMOLITION
11/20/2006
11/20/2006
05/19/2007
07/06/2007
Locations
Contacts
SPECIAL T CONSTRUCTION, Address:507 NW 1891  
ADESA MISSOURI INC, Address:13085 HAMILTON CROSSING BLVD STE 500  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 05/19/2007 10/29/2010
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

NOTE: The contractor must contact the Missouri Department of Natural Resources at 1-800-361-4827 prior to starting the demolition.
Verify Reviews and Inspections Approved 11/20/2006
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $30.00 $30.00 Paid 11/20/2006
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Building Inspection - Residential Passed 07/05/2007
Correction
Resolved
07/05/2007
NONE None CLOSE PERMIT
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home