Permit Application Status

B0603094


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0603094
Building Permit - Commercial
Final Completion
MCBOB LLC
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB
10/20/2006
10/20/2006
04/18/2007
04/09/2007
Locations
Contacts
DAVIDSON DESIGN GROUP, Address:11301STRANG LINE ROAD  
KLEINFELDER, Address:7802 BARTON  
MEYER BROTHERS BLDG CO, Address:200 NE MISSOURI RD. STE 100  
MCBOB LLC, Address:3200 NW OUTER RD S  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 04/18/2007 10/29/2010
Correction

CA - This is an "at risk permit". Construction shall be in accordance with plans submitted for permit approval. The applicant understands that issuance of this permit does not guaranty issuance of a full permit.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

Codes Administration - 2003 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work.
Correction

Codes Administration - 2003 IBC 1704.1.1 - Building permit requirements. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with Section 106.1 as a condition for permit issuance. This statement shall include a complete list of materials and work requiring special inspections by this section, the inspections to be performed and a list of the individuals, approved agencies or firms intended to be retained for conducting such inspections.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $332.38 $332.38 Paid 10/20/2006
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Miscellaneous Inspection Failed 10/24/2006
Correction
Corrective Action Required
10/24/2006
Premises Identification (IRC) PROPERTY MUST BE IDENTIFIABLE FROM STREET FOR ALL INSPECTIONS. NO FURTHER INSPECTIONS UNTIL COMPLIANT.
Footing Inspection - Commercial Partial 10/24/2006
Correction
Partial Correction
10/24/2006
INTERIOR COLUMN PADS APPROVED TO POUR ALL (10) PIER PADS
Footing Inspection - Commercial Partial 10/25/2006
Correction
Partial Correction
10/25/2006
None SHEET S200 LINE D FROM 2.8 TO 1. LINE 1 FROM B TO J. LINE 2 FROM B TO D. LINE J FROM 1 TO 3. LINE 3 FROM I TO J. LINE I FROM 3 TO 3.8. LINE E
Miscellaneous Inspection Passed 10/26/2006
Correction
Resolved
10/26/2006
Premises Identification (IRC)
Footing Inspection - Commercial Partial 10/26/2006
Correction
Partial Correction
10/26/2006
None SHEET S200 LINE D FROM 2.8 TO 1. LINE 1 FROM B TO J. LINE 2 FROM B TO D. LINE J FROM 1 TO 3. LINE 7 FROM E TO K LINE K FROM 4 TO 7 LINE I FROM 3.5 TO 4 LINE 3 FROM I TO J. LINE I FROM 3 TO 3.8. LINE E
Footing Inspection - Commercial Partial 10/30/2006
Correction
Partial Correction
10/30/2006
None LINE D ALL LINE 1, B TO J. LINE 2, B TO D. LINE J, 1 TO 3. LINE 7, E TO K LINE K, 4 TO 7 LINE I FROM 3 TO 4 LINE 3, I TO J & A TO D LINE E, 6 TO 7 LINE 6, C TO E LINE 5, A TO C LINE E ALL LINE A, 2.9 TO 5
Underslab Plumbing Inspection - Commercial Partial 11/02/2006
Correction
Partial Correction
11/02/2006
None WASTE PIPING APPROVED SOUTH OF COLUMN 4 AND INCLUDES WASTE UP TO CLEANOUT AT APPROX. E/3.3
Underslab Plumbing Inspection - Commercial Partial 11/02/2006
Correction
Partial Correction
11/02/2006
None ALL WASTE & WATER PIPING APPROVED EXCEPT FOR ANY PIPING SERVING STORM DRAINS OR SERVICE AREA
Underslab Plumbing Inspection - Commercial Partial 11/06/2006
Correction
Resolved
11/06/2006
None STORM DRAINS OR SERVICE AREA ALL WASTE & WATER PIPING EXCEPT FOR ANY SERVING
Correction
Partial Correction
11/06/2006
UNDER-SLAB ROOF DRAIN / STORM WATER PIPING THRU-WALL + 90 EL UP AT (A.6/5); OK TO COVER WHEN READY PORTIONS LISTED BELOW:
Correction
Partial Correction
11/06/2006
UNDER-SLAB GREASE WASTE PIPING ON (3.3) FROM (A) TO (D.6); ON (D.6) FROM (3.3) TO (2.5); OK TO COVER WHEN READY PORTIONS LISTED BELOW:
Sewer Service Inspection - Commercial Request Complete 11/7/2006 11/7/2006 11/07/2006
Underslab Plumbing Inspection - Commercial Partial 11/09/2006
Correction
Resolved
11/09/2006
None ALL WASTE & WATER PIPING
Correction
Resolved
11/09/2006
UNDER-SLAB ROOF DRAIN / STORM WATER PIPING
Correction
Partial Correction
11/09/2006
UNDER-SLAB GREASE WASTE PIPING ALL UNDERSLAB PLUMBING. NOTE: GREASE INTERCEPTOR NOT YET INSPECTED. OK TO COVER WHEN READY PORTIONS LISTED BELOW:
Underslab Electrical Inspection - Commercial Passed 11/09/2006
Underslab Plumbing Inspection - Commercial Passed 11/15/2006
Correction
Resolved
11/15/2006
UNDER-SLAB GREASE WASTE PIPING
Water Service Inspection Partial 11/21/2006
Correction
Partial Correction
11/21/2006
None TO METER SITE
Water Service Inspection - Commercial Request Complete 11/20/2006 11/21/2006 11/21/2006
Water Service Inspection Passed 12/22/2006
Correction
Resolved
12/22/2006
None
Water Service Inspection - Commercial Request Complete 12/22/2006 12/22/2006 12/22/2006
Sewer Service Inspection - Commercial Request Complete 12/28/2006 12/28/2006 12/28/2006
Final Inspection - Commercial Passed 04/06/2007
Footing Inspection - Commercial Passed 04/06/2007
Correction
Resolved
04/06/2007
INTERIOR COLUMN PADS APPROVED TO POUR ALL (10) PIER PADS
Correction
Resolved
04/06/2007
None LINE D ALL LINE 1, B TO J. LINE 2, B TO D. LINE J, 1 TO 3. LINE 7, E TO K LINE K, 4 TO 7 LINE I FROM 3 TO 4 LINE 3, I TO J & A TO D LINE E, 6 TO 7 LINE 6, C TO E LINE 5, A TO C LINE E ALL LINE A, 2.9 TO 5
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.