Permit Application Status

B0601688


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0601688
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
NEW COMMERCIAL
SOCCER RESTROOM
07/31/2006
10/05/2006
04/03/2007
09/10/2007
Locations
Contacts
BOWMAN BOWMAN NOVICK INC, Address:411 NICHOLS RD SUITE 246  
UNIVERSAL ELECTRIC, Address:PO BOX 3628  
HYTEC PLUMBING, INC., Address:PO BOX 331  
FPC, Address:301 SE DOUGLAS ST SUITE 201  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/27/2007 10/29/2010
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $162.45 $162.45 Paid 10/05/2006
89 Sewer Tap Fees $150.00 $150.00 Paid 10/05/2006
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Not Ready 06/13/2007
Correction
Corrective Action Required
06/13/2007
Approved Plans NO APPROVED PLANS ON SITE.
Footing Inspection - Commercial Passed 06/14/2007
Correction
Resolved
06/14/2007
None AS PER PLANS
Correction
Resolved
06/14/2007
Approved Plans NO APPROVED PLANS ON SITE.
Sewer Service Inspection Partial 06/14/2007
Correction
Partial Correction
06/14/2007
See Comment PLANS CALL FOR 1 1/2" PVC - 1 1/4" PVC INSTALLED. EITHER REPLAE WITH 1 1/2" OR HAVE ENGINEER SUBMIT CHANGE AUTHORIZING 1 1/4" PVC COVER AT OWN RISK
Sewer Service Inspection - Commercial Request Complete 6/14/2007 6/14/2007 06/14/2007
Water Service Inspection Failed 06/20/2007
Correction
Corrective Action Required
06/20/2007
Buried UNCOVER & CALL FOR INSPECTION
Underground Plumbing Inspection - Commercial Request Complete 6/19/2007 6/20/2007 06/20/2007
Water Service Inspection Partial 06/21/2007
Correction
Resolved
06/21/2007
Buried UNCOVER & CALL FOR INSPECTION
Correction
Partial Correction
06/21/2007
None 2" PVC FROM TAP TO WITHIN 30' OF FOUNDATION
Underground Electrical Inspection - Commercial Partial 06/21/2007
Correction
Partial Correction
06/21/2007
None TO A POINT APPROX. 500' FROM FOUNDATION
Underground Electrical Inspection - Commercial Request Complete 6/21/2007 6/21/2007 06/21/2007
Water Service Inspection - Commercial Request Complete 6/21/2007 6/21/2007 06/21/2007
Underslab Plumbing Inspection - Commercial Not Ready 06/22/2007
Correction
Corrective Action Required
06/22/2007
Approved Plans Not On Site
Underground Electrical Inspection - Commercial Partial 06/25/2007
Correction
Partial Correction
06/25/2007
None TO A POINT APPROX 100' FROM FOUNDATION
Correction
Resolved
06/25/2007
None TO A POINT APPROX. 500' FROM FOUNDATION
Underslab Plumbing Inspection - Commercial Passed 06/25/2007
Correction
Resolved
06/25/2007
None
Correction
Resolved
06/25/2007
Approved Plans Not On Site
All Rough Inspection - Commercial Passed 08/14/2007
Correction
Resolved
08/14/2007
None
Sewer Service Inspection Partial 08/16/2007
Correction
Partial Correction
08/16/2007
See Comment FROM GRINDER PUMP TO SEWER MAIN - PLANS CALL FOR 1 1/2" PVC - 1 1/4" PVC INSTALLED. EITHER REPLACE WITH 1 1/2" OR HAVE ENGINEER SUBMIT CHANGE AUTHORIZING 1 1/4" PVC PUBLIC WORKS MUST APPROVE FITTING AT JUNTION OF SEWER MAIN COVER AT OWN RISK
Correction
Resolved
08/16/2007
None FROM RESTROOM TO GRINDER PUMP
Sewer Service Inspection - Commercial Request Complete 8/16/2007 8/16/2007 08/16/2007
Occupancy Inspection - Codes Commercial Failed 08/31/2007
Correction
Corrective Action Required
08/31/2007
SEE CORRECTIONS SEWER - WATER - UNDERGROUND ELECT.
Correction
Corrective Action Required
08/31/2007
ACCESS NO ONE ON SIGHT. BUILDING LOCKED. CALLED JOE - 564-6824 - NO ANSWER. NO MESSAGE LEFT. VOICE MAIL FULL.
Water Service Inspection Partial 08/31/2007
Correction
Partial Correction
08/31/2007
None 2" PVC FROM TAP TO WITHIN 30' OF FOUNDATION
Underground Electrical Inspection - Commercial Partial 08/31/2007
Sewer Service Inspection Partial 08/31/2007
Water Service Inspection Passed 09/07/2007
Correction
Resolved
09/07/2007
Buried
Correction
Resolved
09/07/2007
None
Sewer Service Inspection Passed 09/07/2007
Correction
Resolved
09/07/2007
See Comment FROM GRINDER PUMP TO SEWER MAIN - PLANS CALL FOR 1 1/2" PVC - 1 1/4" PVC INSTALLED. EITHER REPLACE WITH 1 1/2" OR HAVE ENGINEER SUBMIT CHANGE AUTHORIZING 1 1/4" PVC ENGR LETTER RECEIVED 1-1/4" LINE OK
Underground Electrical Inspection - Commercial Passed 09/07/2007
Correction
Resolved
09/07/2007
None
Correction
Resolved
09/07/2007
None
Occupancy Inspection - Codes Commercial Passed 09/07/2007
Correction
Resolved
09/07/2007
ACCESS
Correction
Resolved
09/07/2007
SEE CORRECTIONS
Final Inspection - Commercial Passed 09/07/2007
Correction
Resolved
09/07/2007
FIANL INSPECTION CLOSE PERMIT
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home