Permit Application Status

B0601028


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0601028
Building Permit - Commercial
Certificate of Occupancy
COMMERCE BANK NA
NEW COMMERCIAL
NEW BANK
06/29/2006
08/10/2006
02/06/2007
05/09/2007
Locations
Contacts
REES MASILIONIS TURLEY, Address:908 BROADWAY 6TH FLR  
HARMON CONSTRUCTION INC, Address:18989 W 158TH ST  
COMMERCE BANK NA, Address:8000 FORSYTH BLVD STE 1300  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/13/2007 10/29/2010
Correction

Codes Administration - 2003 IBC 1210.1 - Floors. In other than dwelling units, toilet and bathing floors shall have a smooth, hard, nonabsorbent surface that extends upward onto the walls at least 6 inches.
Correction

Codes Administration - 2003 IBC 1210.2 - Walls. Walls within 2 feet of urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

Codes Administration - Copies of the engineered truss package were not provided at the time of permit application.
Correction

Fire Department: Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the code official is authorized to require a key box to be installed in an accessible location. The key box shall be of an approved type and shall contain keys to gain access as required by the code official.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

Codes Administration - 2003 IPC 608.14 - Location of backflow preventers. Access shall be provided to backflow preventers as specified by the installation instructions of the approved manufacturer.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

All backflow prevention assemblies must be tested and reports filed with the Lee's Summit Water Utilities Backflow Division (816-969-7636) within 30 days from the date installed.
Correction

All proposed hose bibb connections must have an approved (vacuum breaker) backflow preventer.
Correction

Codes Administration - ANSI A117.1-1998 804.7.6 - Refrigerator/Freezer. Combination refrigerators and freezers shall have at least 50 percent of the freezer space 54 inches maximum above the floor or ground. The clear floor or ground space shall be positioned for a parallel approach to the space dedicated to a refrigerator/freezer with the centerline of the clear floor or ground space offset 24 inches maximum from the centerline of the dedicated space.
Correction

Road Improviements. The Developer shall design, engineer and construct the Road Improvements. The City shall issue no temporary or final Certificates of Occupancy for any of the Development until the City or MoDOT, as appropriate, has issued a Certificate of Substantial Completion for the Road Improvements (the "Certificate of Completion").
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department; IFC 1003.3.1.8 Egress doors shall be readily openable from the egress side without the use of akey or special knowledge or effort. Exit doors shall not be locked, chained, barred, latched or otherwise rendered unusable. All locking devises shall be of an approved type. IFC 1003.3.1.8
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department; Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the code official.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $3,971.00 $3,971.00 Paid 08/10/2006
84 Water Meters $200.00 $200.00 Paid 08/10/2006
85 Water Taps $5,468.00 $5,468.00 Paid 08/10/2006
89 Sewer Tap Fees $240.00 $240.00 Paid 08/10/2006
Middle Big Creek Watershed $267.84 $267.84 Paid 08/10/2006
84 Water Meters $400.00 $400.00 Paid 10/04/2006
85 Water Taps $1,367.00 $1,367.00 Paid 10/04/2006
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Passed 09/26/2006
Correction
Resolved
09/26/2006
Erosion Control
Footing Inspection - Commercial Failed 09/26/2006
Correction
Partial Correction
09/26/2006
Footing Reinforcement (IRC) LINE 5 EAST TO A SOUTH TO G WEST TO 2.0 INTERIOR PIERS APPROVED LINE H PIERS 5 , 2 APPROVED
Footing Inspection - Commercial Partial 09/27/2006
Correction
Partial Correction
09/27/2006
Footing Reinforcement (IRC) PENDING PSI REPORT LINE 5-BACK TO 2
Correction
Partial Correction
09/27/2006
Footing Reinforcement (IRC) LINE 5 EAST TO A SOUTH TO G WEST TO 2.0 INTERIOR PIERS APPROVED LINE H PIERS 5 , 2 APPROVED
Sewer Service Inspection Passed 09/27/2006
Correction
Resolved
09/27/2006
None
Water Service Inspection Failed 09/27/2006
Correction
Partial Correction
09/27/2006
None OK TO 30' NORTH OF CURB
Sewer Service Inspection - Commercial Request Complete 9/27/2006 9/27/2006 09/27/2006
Water Service Inspection - Commercial Request Complete 9/27/2006 9/27/2006 09/27/2006
Foundation Inspection - Commercial Passed 10/03/2006
Correction
Resolved
10/03/2006
None
Water Service Inspection Passed 10/06/2006
Correction
Resolved
10/06/2006
None
Correction
Resolved
10/06/2006
None OK TO 30' NORTH OF CURB
Underground Plumbing Inspection - Commercial Passed 10/06/2006
Correction
Resolved
10/06/2006
STORM DRAINS STORM DRAINS - APPROVED
Underslab Plumbing Inspection - Commercial Passed 10/06/2006
Correction
Resolved
10/06/2006
None
Underslab Electrical Inspection - Commercial Passed 10/06/2006
Correction
Resolved
10/06/2006
None
Sewer Service Inspection - Commercial Request Complete 10/6/2006 10/6/2006 10/06/2006
Water Service Inspection - Commercial Request Complete 10/6/2006 10/6/2006 10/06/2006
Rough Framing Inspection - Commercial Failed 11/15/2006
Correction
Partial Correction
11/15/2006
EXTERIOR WALL FRAMING NORTH, EAST AND WEST EXTERIOR WALLS APPROVED TO COVER EXTERIOR. RECALL FOR SOUTH WALL WHEN COMPLETE
Rough Framing Inspection - Commercial Request Complete 11/14/2006 11/15/2006 11/15/2006
Piers/Caissons Inspection - Commercial Failed 11/16/2006
Correction
Partial Correction
11/16/2006
LIGHT POLE BASE TRENCH BETWEEN POLES NOT INSPECTED PIERS APPROVED APPROVED TO POUR
Rough Framing Inspection - Commercial Failed 11/22/2006
Correction
Resolved
11/22/2006
None SOUTH WALL - APPROVED
Correction
Partial Correction
11/22/2006
EXTERIOR WALL FRAMING NORTH, EAST AND WEST EXTERIOR WALLS APPROVED TO COVER EXTERIOR.
Rough Framing Inspection - Commercial Request Complete 11/21/2006 11/22/2006 11/22/2006
Rough Framing Inspection - Commercial Failed 12/04/2006
Correction
Partial Correction
12/04/2006
PSI REPORT NO DEFICIENCIE WERE NOTED. Dated 11-03-06
Footing Inspection - Commercial Passed 12/04/2006
Correction
Resolved
12/04/2006
Footing Reinforcement (IRC) LINE 5 EAST TO A SOUTH TO G WEST TO 2.0 INTERIOR PIERS APPROVED LINE H PIERS 5 , 2 APPROVED
Correction
Resolved
12/04/2006
Footing Reinforcement (IRC) PENDING PSI REPORT 10-11-06 REPORT ON FILE LINE 5-BACK TO 2
Rough Framing Inspection - Commercial Failed 12/12/2006
Correction
Partial Correction
12/12/2006
PSI REPORT NO DEFICIENCIE WERE NOTED. Rows A-H lines 1-6- completed. Dated 11-03-06
Rough Electrical Inspection - Commercial Failed 12/14/2006
Correction
Corrective Action Required
12/14/2006
Wiring Securing to Boxes (IRC) SECURE CABLE WITHIN 12" OF BOX MC
Underground Electrical Inspection - Commercial Failed 12/14/2006
Correction
Partial Correction
12/14/2006
LIGHT POLES SOUTH LIGHT POLE TRENCH - APPROVED EAST SIDE - PARTIAL OK TO COVER BETWEEN POLE BASES-- LEAVE ENDS OPEN FOR INSPECTION
Rough Plumbing Inspection - Commercial Passed 12/14/2006
Correction
Resolved
12/14/2006
None
Rough Framing Inspection - Commercial Failed 12/14/2006
Correction
Resolved
12/14/2006
EXTERIOR WALL FRAMING NORTH, EAST AND WEST EXTERIOR WALLS APPROVED TO COVER EXTERIOR.
Correction
Resolved
12/14/2006
PSI REPORT NO DEFICIENCIE WERE NOTED. Rows A-H lines 1-6- completed. Dated 11-03-06
Correction
Resolved
12/14/2006
Roof Truss Design Drawings (IRC) CLOCK TOWER APPROVED
Correction
Partial Correction
12/14/2006
INTERIOR WALL FRAMING APPROVED TO ROCK (1) ONE SIDE. ( SEE ELECTRICAL ROUG)
Underground Electrical Inspection - Commercial Request Complete 12/14/2006 12/14/2006 12/14/2006
Underground Electrical Inspection - Commercial Failed 12/18/2006
Correction
Partial Correction
12/18/2006
LIGHT POLES - LEAVE ENDS OPEN FOR GROUND ROD INSPECTION
Underground Electrical Inspection - Commercial Request Complete 12/18/2006 12/18/2006 12/18/2006
Gas Service Inspection - Commercial Passed 12/19/2006
Correction
Resolved
12/19/2006
None
Gas Piping Inspection - Commercial Passed 12/19/2006
Correction
Resolved
12/19/2006
None
Rough Electrical Inspection - Commercial Failed 12/28/2006
Correction
Partial Correction
12/28/2006
Wiring Securing to Boxes (IRC) RECALL WHEN ENTRY CANLIGHTS ARE INSTALLED
Above Ceiling Inspection Failed 01/02/2007
Correction
Corrective Action Required
01/02/2007
BATHROOMS NORTH BATH NEEDS FLEX DUCT EXTENDED TO CEILING RECALL WHEN COMPLETE
Above Ceiling Inspection Passed 01/05/2007
Correction
Resolved
01/05/2007
BATHROOMS
Correction
Resolved
01/05/2007
FRONT ENTRY APPROVED FOR ROCK
Rough Electrical Inspection - Commercial Passed 01/05/2007
Correction
Resolved
01/05/2007
Wiring Securing to Boxes (IRC) FRONT ENTRY
Correction
Resolved
01/05/2007
LIGHT POLES GROUND AT LIGHT POLES APPROVED TRENCH - APPROVED OK TO COVER, BOTH
Rough Electrical Inspection - Commercial Passed 01/11/2007
Correction
Resolved
01/11/2007
None 2 GROUND RODS FOR LIGHTING PROTECTION - APPROVED
Rough Electrical Inspection - Commercial Passed 01/24/2007
Correction
Resolved
01/24/2007
DRIVE THROUGH ELECTRICAL IN CEILING OF DRIVE THROUGH -APPROVED
Electrical Service Inspection Passed 02/20/2007
Correction
Resolved
02/20/2007
None 400 amp
Above Ceiling Inspection Failed 02/20/2007
Correction
Corrective Action Required
02/20/2007
None COMPLETE CANLIGHTS, INSTALL PANEL COVER AT NORTHWEAST CORNER. OK TO INSTALL TILE , LEAVE OPEN AREAS TO INSPECT
Above Ceiling Inspection Passed 03/05/2007
Correction
Resolved
03/05/2007
None
Underground Electrical Inspection - Commercial Passed 03/13/2007
Correction
Resolved
03/13/2007
LIGHT POLES
Correction
Resolved
03/13/2007
DRIVE THROUGH AM--UNDER DRIVE ELECTICAL REQUIRED TO BE 24" BELOW GRADE. ----PM INSPECTION ON DRIVE THROUGH UNDERGROUND ELECTICAL -- APPROVED UNDERGROUND ELECTRICAL DRIVE THRU APPROVED
Underground Electrical Inspection - Commercial Request Complete 3/12/2007 3/13/2007 03/13/2007
Underground Electrical Inspection - Commercial Request Complete 3/13/2007 3/13/2007 03/13/2007
Driveway Inspection Passed 03/14/2007
Occupancy Inspection - Codes Commercial Failed 03/19/2007
Correction
Corrective Action Required
03/19/2007
Receive Planning & Development Approval
Correction
Corrective Action Required
03/19/2007
Grading (IRC) FINAL GRADE, SOD. EXTERIOR
Correction
Corrective Action Required
03/19/2007
Prevent Physical Damage (IRC) 1. CLOCKS NOT COMPLETE. 2 LIGHTING AT DRIVE THRU AND ENTRY. 3. BUBBLE COVERS AT ROOF TOP. ELECTICAL
Correction
Corrective Action Required
03/19/2007
ROOFTOP SECURE HVAC DRAIN
Correction
Corrective Action Required
03/19/2007
None 1. LICENSE TAX. 2. CERTIFICATE OF SUBSTANTIAL COMPLETION FOR THE ROAD IMPROVEMENTS. 3. REMOVAL OF JOB TRAILER. SEE BELOW
Correction
Corrective Action Required
03/19/2007
Receive Water Utilities Approval BACKFLOW TEST REPORTS
Correction
Corrective Action Required
03/19/2007
Receive Fire Department approval
Correction
Corrective Action Required
03/19/2007
Receive Public Works Approval
Sidewalk Inspection Partial 04/05/2007
Sidewalk Inspection Partial 04/06/2007
Sidewalk Inspection Passed 04/10/2007
Occupancy Inspection - Codes Commercial Failed 04/25/2007
Correction
Resolved
04/25/2007
Receive Fire Department approval
Correction
Corrective Action Required
04/25/2007
Receive Planning & Development Approval FAILED 3-19-07
Occupancy Inspection - Codes Commercial Failed 04/26/2007
Correction
Resolved
04/26/2007
Receive Public Works Approval APPROVED PER BRIAN BYRD
Correction
Resolved
04/26/2007
Grading (IRC)
Correction
Resolved
04/26/2007
Prevent Physical Damage (IRC)
Correction
Resolved
04/26/2007
ROOFTOP
Correction
Resolved
04/26/2007
None
Correction
Resolved
04/26/2007
TCO
Occupancy Inspection - Codes Commercial Failed 05/01/2007
Correction
Corrective Action Required
05/01/2007
Receive Water Utilities Approval
Correction
Resolved
05/01/2007
Receive Planning & Development Approval
Occupancy Inspection - Codes Commercial Passed 05/03/2007
Correction
Resolved
05/03/2007
Receive Water Utilities Approval
Piers/Caissons Inspection - Commercial Passed 05/08/2007
Correction
Resolved
05/08/2007
LIGHT POLE BASE TRENCH BETWEEN POLES NOT INSPECTED PIERS APPROVED APPROVED TO POUR
Rough Framing Inspection - Commercial Passed 05/08/2007
Correction
Resolved
05/08/2007
INTERIOR WALL FRAMING
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home