Permit Application Status

B0600928


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0600928
Building Permit - Commercial
Certificate of Occupancy
REORGANIZED SCHOOL DIST NO 7
NEW COMMERCIAL
NEW CENTRAL OFFICE BLDG
06/15/2006
07/31/2006
01/12/2008
07/18/2007
Locations
Contacts
JE DUNN CONSTRUCTION, Address:929 HOLMES  
HAMILTON AND STERRETT, Address:231 SW NOEL ST  
EDWARDS MCDOWELL, Address:330 E 14TH AVE  
CRAWFORD MECHANICAL CONTRACTOR INC, Address:2033 SE M 291 HWY  
CUSTOM ELECTRIC CONSTRUCTION, Address:203 E. WALNUT  
PROFESSIONAL SERVICES INDUSTRIES, Address:1211 W CAMBRIDGE CIRCLE DRIVE  
HOLLIS & MILLER GROUP INC, Address:220 NW EXECUTIVE WAY  
REORGANIZED SCHOOL DIST NO 7, Address:600 SE MILLER  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/27/2007 10/29/2010
Correction

Codes Administration - 2003 IBC 2406.1 - Human impact loads. Individual glazed areas, including glass mirrors, in hazardous locations as defined in Section 2406.3 shall comply with Sections 2406.1 through 2406.1.5.
Correction

Codes Administration - A hood is not shown over the range in Breakroom 240.
Correction

Codes Administration - I am unable to locate information on the kitchen hoods to be installed.
Correction

Codes Administration - 2003 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work.
Correction

Codes Administration - 2003 IBC 1704.1.1 - Building permit requirements. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with Section 106.1 as a condition for permit issuance. This statement shall include a complete list of materials and work requiring special inspections by this section, the inspections to be performed and a list of the individuals, approved agencies or firms intended to be retained for conducting such inspections.
Correction

Codes Administration - 2003 IBC 1210.2 - Walls. Walls within 2 feet of urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture.
Correction

Codes Administration - 2003 IBC 1210.1 - Floors. In other than dwelling units, toilet and bathing floors shall have a smooth, hard, nonabsorbent surface that extends upward onto the walls at least 6 inches.
Correction

Codes Administration - 2003 IBC 1110.1 - Signs. Required accessible elements shall be identified by the International Symbol of Accessiblity a the following locations: 1. Accessible parking spaces required by Section 1106.1 except where the total number of parking spaces provided is four or less. 2. Accessible passenger loading zones. 3. Accessbile areas of refuge required by Section 1007.6. 4. Accessible rooms where multiple single-user toilet or bathing rooms are clustered in a single location. 5. Accessible entrances where not all entrances are accessible. 6. Accessible check-out aisles where not all aisles are accessible. The sign, where provided, shall be above the check-out aisle in the same location as the checkout aisle number or type of check-out identification. 7. Unisex toilet and bathing rooms. 8. Accessible dressing, fitting and locker rooms where not all such rooms are accessible.
Correction

Codes Administration - 2003 IBC 1109.4 - Kitchens and kitchenettes. Where kitchens and kitchenettes are provided in accessible spaces or rooms, they shall be accessible in accordance with ICC A117.1.
Correction

Codes Administration - 2003 IBC 1004.1 - Design occupant load. In determining means of egress requirements, the number of occupants for whom meansof egress facilities shall be provided shall be established by the largest number computed in accordance with Sections 1004.1.1 through 1004.1.3.
Correction

Codes Administration - ANSI A117.1-1998 804.7.6 - Refrigerator/Freezer. Combination refrigerators and freezers shall have at least 50 percent of the freezer space 54 inches maximum above the floor or ground. The clear floor or ground space shall be positioned for a parallel approach to the space dedicated to a refrigerator/freezer with the centerline of the clear floor or ground space offset 24 inches maximum from the centerline of the dedicated space.
Correction

Codes Administration - ANSI A117.1-1998 804.7 - Appliances. Where provided, kitchen appliances shall comply with Sections 804.7.1 through 804.7.6.
Correction

Codes Administration - I am unable to locate information regarding the protection of penetrations of fire-resistive assemblies.
Correction

Codes Administration - I am unable to locate the listing for the fire-resistant wall assembly at the elevator and elevator mechanical room.
Correction

Codes Administration - Sheet L101 Detail L3 shows that the elevation of the lower and upper landings are both 1014.44 feet.
Correction

Fire Department: Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the code official is authorized to require a key box to be installed in an accessible location. The key box shall be of an approved type and shall contain keys to gain access as required by the code official.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

Codes Administration - This project has been reviewed as a non-separated mixed use. As the most restrictive occupancy type is the A-3 it has been used to calculate the maximum area, height and stories.
Correction

Codes Administration - The project code information indicates that the building meets the allowances for unlimited area per Section 507.3. As the building is a mixed use which includes an assembly occupancy, this is no longer true.
Correction

Codes Administration - The project code information indicates that the occupancy is a type B. As the occupant load of the Board Room and the second floor Conference room is greater than 50 they must be classified based on their use which is A-3.
Correction

Codes Administration - I am unable to locate structural calculations for this project.
Correction

Fire Department- Provide specifications and tank size for the generator.
Correction

Fire Department- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-1300.
Correction

Fire Department- Fire Department Connection (FDC). It is not necessary to have a remote pedestal FDC if a wall FDC is accessible without any obstructions.
Correction

Codes Administration - 2003 IBC 707.4 - Fire-resistance rating. Shaft enclosures shall have a fire-resistance rating of not less than 2 hours where connecting four stories or more and not less than 1 hour where connecting less than four stories. The number of stories connected by the shaft enclosure shall include any basements but not any mezzanines. Shaft enclosures shall be constructed as fire barriers in accordance with Section 706. Shaft enclosures shall have a fire-resistance rating not less than the floor assembly pentrated, but need not exceed 2 hours.
Correction

Codes Administration - 2003 IBC 302.1.1 - Incidental use areas. Spaces which are incidental to the main occupancy shall be separated or protected, or both, in accordance with Table 302.1.1 or the building shall be classified as a mixed occupancy and comply with Section 302.3. Areas that are incidental to the main occupancy shall be classified in accordance with the main occupancy of the portion of the building in which the incidental use area is located.
Correction

Codes Administration - 2003 IBC 3002.3 - Emergency signs. An approved pictorial sign of a standardized design shall be posted adjacent to each elevator call station on all floors instructing occupants to use the exit stairways and not to use the elevators in case of fire. The sign shall read: IN FIRE EMERGENCY, DO NOT USE ELEVATOR. USE EXIT STAIRS. The emergency sign shall not be required for elevators that are part of an accessible means of egress complying with Section 1007.4.
Correction

CA - Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated prusuant to sections 701.350 to 701.380.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration Department prior to the state insection so that a member of the staff can witness the inspection.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department- 907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. 3. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

CA - Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $19,133.00 $19,133.00 Paid 07/31/2006
84 Water Meters $750.00 $750.00 Paid 07/31/2006
85 Water Taps $16,404.00 $16,404.00 Paid 07/31/2006
89 Sewer Tap Fees $1,530.00 $1,530.00 Paid 07/31/2006
Right of Way Permit $35.00 $35.00 Paid 07/31/2006
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 08/31/2006
Correction
Partial Correction
08/31/2006
PERIMETER GRADE BEAM + INTEGRAL COLUMN FOOTINGS D/10-D/8-B/8-B/6-A/6-A/2.7- OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Footing Inspection - Commercial Partial 09/01/2006
Correction
Partial Correction
09/01/2006
PERIMETER GRADE BEAM + INTEGRAL COLUMN FOOTINGS D/10-D/8-B/8-B/6-A/6-A/2.7-A/1-G/1-G/2-H.5/2- OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Footing Inspection - Commercial Partial 09/06/2006
Correction
Corrective Action Required
09/06/2006
Footing support (IRC) EXTERIOR - A.1/4 INTERIOR - B/5, C/5, C/6, E/5, E/6, E/7, E/8, E/9 OK TO POUR PIER PADS INTERIOR & EXTERIOR
Correction
Partial Correction
09/06/2006
Footing support (IRC) INTERIOR - (D/10 - F/10), (F/10 - F/11) EXTERIOR - (D/10 - D/11.5), (D/11.5 - F/11.5), (F/11.5 - F/11), (F/11 - K/11) OK TO POUR SW TO SE CORNER INTERIOR & EXTERIOR
Water Service Inspection - Commercial Request Complete 9/6/2006 9/6/2006 09/06/2006
Footing Inspection - Commercial Partial 09/07/2006
Correction
Partial Correction
09/07/2006
Footing support (IRC) EXTERIOR - A.1/4 INTERIOR - B/5, C/5, C/6, E/5, E/6, E/7, E/8, E/9 OK TO POUR PIER PADS INTERIOR & EXTERIOR
Correction
Partial Correction
09/07/2006
Footing support (IRC) PIER PADS (2) @ J/9, H/9 OK TO POUR INTERIOR
Correction
Partial Correction
09/07/2006
Footing support (IRC) APPROVED FROM (K/11 - K/7) OK TO POUR EXTERIOR SE CORNER
Water Service Inspection Partial 09/07/2006
Correction
Partial Correction
09/07/2006
None 300' OF COPPER INSTALLED - NORTH OF NORTH PARKING LOT NW CORNER
Underslab Plumbing Inspection - Commercial Partial 09/07/2006
Correction
Partial Correction
09/07/2006
COMMENTS FOLLOWING PIPES INSTALLED TO FIRST RISE INTO BUILDING: 8" STORM @ D/8.5; 8" STORM @ A/3.8; 6" STORM @ H/2; 3" STORM @ B/7 FOLLOWING PIPES INSTALLED TO JUST INSIDE FOUNDATION: 8" STORM @ B/7 APPROVED TO COVER AS FOLLOWS
Underground Plumbing Inspection - Commercial Partial 09/07/2006
Correction
Partial Correction
09/07/2006
STORM SEWERS PIPING APPROVED TO JUST BEYOND FOUNDATION. 3" & 8" STORMS @ B/7; 8" STORM @ D/8.5; 8" STORM @ A/3.8; 6" STORM @ H/2; NOTE: CLEANOUTS NOT YET INSTALLED PER PLAN APPROVED TO COVER AS FOLLOWS
Water Service Inspection - Commercial Request Complete 9/7/2006 9/7/2006 09/07/2006
Footing Inspection - Commercial Partial 09/08/2006
Correction
Partial Correction
09/08/2006
Footing support (IRC) 2 PIER PADS @ J/8 & J/7 FOOTING @ (G/7-G/8), (G/8-H/8), (H/8-H/7), (H/7-G/7) OK TO POUR INTERIOR
Underground Plumbing Inspection - Commercial Partial 09/12/2006
Correction
Resolved
09/12/2006
REPAIR OF POLY WRAP ON FIRE LINE REPAIRED WHERE DAMAGED IN STORM SEWER TRENCH
Footing Inspection - Commercial Partial 09/12/2006
Correction
Partial Correction
09/12/2006
ISOLATED COLUMN FOOTINGS C/4; E/4; DOUBLE @ E.5/5.3; F/5; F/6; NW CORNER OF ELEV PIT SLAB; OK TO POUR WHEN READY LOCATIONS LISTED BELOW:
Correction
Resolved
09/12/2006
ELEVATOR PIT SLAB OK TO POUR WHEN READY
Water Service Inspection Partial 09/13/2006
Correction
Resolved
09/13/2006
DAMAGE TO WATER SERVICE LINE DAMAGED SECTION REPLACED FROM TRENCH EXCAVATION FOR F.P. SERVICE LINE
Underground Electrical Inspection - Commercial Partial 09/13/2006
Correction
Partial Correction
09/13/2006
PREPARATION TO POUR LIGHT POLE BASES SIX WEST OF WEST BUILDING ENTRANCE; OK TO POUR WHEN READY BASES LISTED BELOW
Foundation Inspection - Commercial Passed 09/13/2006
Correction
Resolved
09/13/2006
ELEVATOR PIT WALLS OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 09/13/2006
Correction
Partial Correction
09/13/2006
CIP CONCRETE WALLS SURROUNDING ROOM 151 LOWER 8' AFTER CORNER BARS AND SPACERS IN PLACE; OK TO POUR WHEN READY PORTIONS LISTED BELOW:
Footing Inspection - Commercial Partial 09/13/2006
Correction
Partial Correction
09/13/2006
INTERIOR WALL FOOTINGS + INTEGRAL COLUMN FOOTINGS ON (G) FROM (8) TO (11); (H)/(7) TO (H.7)/(7) TO (H.7)/(6) TO (J.8)/(6); OK TO POUR WHEN READY SECTIONS LISTED BELOW:
Underground Electrical Inspection - Commercial Partial 09/14/2006
Correction
Partial Correction
09/14/2006
U/G CONDUIT BETWEEN LIGHT POLE BASES BETWEEN SIX POLE BASES WEST OF WEST BLDG ENTRANCE; OK TO COVER WHEN READY SECTIONS LISTED BELOW:
Correction
Partial Correction
09/14/2006
CONNECTION OF GROUNDING ELECTRODE CONDUCTOR THREE 120' WEST OF WEST BLDG ENTRANCE; TO GROUND ROD @ L.P. BASE OK TO COVER AT BASES:
Rough Framing Inspection - Commercial Partial 09/14/2006
Correction
Partial Correction
09/14/2006
CIP CONCRETE WALLS SURROUNDING ROOM 151 LOWER 8'; TOP-OUT OF WALLS OK TO POUR WHEN READY PORTIONS LISTED BELOW:
Footing Inspection - Commercial Partial 09/14/2006
Correction
Partial Correction
09/14/2006
INTERIOR WALL FOOTINGS + INTEGRAL COLUMN FOOTINGS ON (G) FROM (8) TO (11); (H)/(7) TO (H.7)/(7) TO (H.7)/(6) TO (J.8)/(6); (G)/(2.1) TO (G)/(5) TO (J.2)/(5); OK TO POUR WHEN READY SECTIONS LISTED BELOW:
Water Service Inspection - Commercial Request Complete 9/13/2006 9/14/2006 09/14/2006
Underground Electrical Inspection - Commercial Partial 09/15/2006
Correction
Partial Correction
09/15/2006
CONNECTION OF GROUNDING ELECTRODE CONDUCTOR THREE 120' WEST OF WEST BLDG ENTRANCE; TWO NORTHMOST AT NEAR LINE; TO GROUND ROD @ L.P. BASE OK TO COVER AT BASES:
Sewer Service Inspection Partial 09/15/2006
Correction
Partial Correction
09/15/2006
SANITARY SEWER SERVICE INSTALLATION FROM 8' E OF E B/L 40' E TO NEAR W EDGE OF DRIVE AISLE; OK TO COVER WHEN READY SEGMENTS DESCRIBED BELOW:
Footing Inspection - Commercial Partial 09/15/2006
Correction
Partial Correction
09/15/2006
ISOLATED COLUMN FOOTINGS C/4; E/4; DOUBLE @ E.5/5.3; F/5; F/6; NW CORNER OF ELEV PIT SLAB; H/3; J/3; OK TO POUR WHEN READY LOCATIONS LISTED BELOW:
Correction
Partial Correction
09/15/2006
INTERIOR WALL FOOTINGS + INTEGRAL COLUMN FOOTINGS ON (G) FROM (8) TO (11); (H)/(7) TO (H.7)/(7) TO (H.7)/(6) TO (J.8)/(6); (G)/(2.1) TO (G)/(5) TO (J.2)/(5); ON (5) FROM (J.2) TO (J.8); PERIMETER OF RESTROOMS 118 & 119; OK TO POUR WHEN READY SECTIONS LISTED BELOW:
Underground Electrical Inspection - Commercial Partial 09/18/2006
Correction
Partial Correction
09/18/2006
CONNECTION OF GROUNDING ELECTRODE CONDUCTOR SIX 50' & 120' WEST OF WEST BLDG ENTRANCE; TO GROUND ROD @ L.P. BASE OK TO COVER AT BASES:
Underground Electrical Inspection - Commercial Request Complete 9/18/2006 9/18/2006 09/18/2006
Underground Electrical Inspection - Commercial Partial 09/19/2006
Correction
Resolved
09/19/2006
SECONDARY SERVICE CONDUIT BANK XFRMR PAD TO BLDG ENTRY
Underslab Plumbing Inspection - Commercial Partial 09/19/2006
Correction
Resolved
09/19/2006
COMMENTS FOLLOWING PIPES INSTALLED TO FIRST RISE INTO BUILDING: 8" STORM @ D/8.5; 8" STORM @ A/3.8; 6" STORM @ H/2; 3" STORM @ B/7 FOLLOWING PIPES INSTALLED TO JUST INSIDE FOUNDATION: 8" STORM @ B/7 APPROVED TO COVER AS FOLLOWS
Correction
Partial Correction
09/19/2006
UNDER-SLAB DRAIN ON (E.6) FROM (10) TO (6.5); OK TO COVER WHEN READY SECTIONS LISTED BELOW:
Sewer Service Inspection Partial 09/19/2006
Correction
Partial Correction
09/19/2006
SANITARY SEWER SERVICE INSTALLATION FROM 8' E OF E B/L 40' E TO NEAR W EDGE OF DRIVE AISLE; FROM W EDGE OF DRIVE AISLE TO C.O. @ 6+19.60 56'; FROM 6+19.60 56' NORTH TO 5+63.60; OK TO COVER WHEN READY SEGMENTS DESCRIBED BELOW:
Footing Inspection - Commercial Passed 09/19/2006
Correction
Resolved
09/19/2006
Footing support (IRC) PIER PADS (2) @ J/9, H/9 INTERIOR
Correction
Resolved
09/19/2006
Footing support (IRC) APPROVED FROM (K/11 - K/7) EXTERIOR SE CORNER
Correction
Resolved
09/19/2006
INTERIOR WALL FOOTINGS + INTEGRAL COLUMN FOOTINGS ON (G) FROM (8) TO (11); (H)/(7) TO (H.7)/(7) TO (H.7)/(6) TO (J.8)/(6); (G)/(2.1) TO (G)/(5) TO (J.2)/(5); ON (5) FROM (J.2) TO (J.8); PERIMETER OF RESTROOMS 118 & 119; SECTIONS LISTED BELOW:
Correction
Resolved
09/19/2006
PERIMETER GRADE BEAM + INTEGRAL COLUMN FOOTINGS D/10-D/8-B/8-B/6-A/6-A/2.7-A/1-G/1-G/2-H.5/2; 2/H.4-2/K-K/7.3 + EAST STAIR/ENTRANCE PERIMETER OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Correction
Resolved
09/19/2006
Footing support (IRC) EXTERIOR - A.1/4 INTERIOR - B/5, C/5, C/6, E/5, E/6, E/7, E/8, E/9 PIER PADS INTERIOR & EXTERIOR
Correction
Resolved
09/19/2006
Footing support (IRC) INTERIOR - (D/10 - F/10), (F/10 - F/11) EXTERIOR - (D/10 - D/11.5), (D/11.5 - F/11.5), (F/11.5 - F/11), (F/11 - K/11) SW TO SE CORNER INTERIOR & EXTERIOR
Correction
Resolved
09/19/2006
Footing support (IRC) 2 PIER PADS @ J/8 & J/7 FOOTING @ (G/7-G/8), (G/8-H/8), (H/8-H/7), (H/7-G/7) INTERIOR
Correction
Resolved
09/19/2006
ISOLATED COLUMN FOOTINGS C/4; E/4; DOUBLE @ E.5/5.3; F/5; F/6; NW CORNER OF ELEV PIT SLAB; H/3; J/3; LOCATIONS LISTED BELOW:
Correction
Resolved
09/19/2006
ELEVATOR PIT SLAB
Sewer Service Inspection Partial 09/19/2006
Correction
Partial Correction
09/19/2006
SANITARY SEWER SERVICE INSTALLATION UNDER STREET EAST OF BUILDING TO CLEANOUT EAST OF STREET. 9-16-06 UNDER STREET
Sewer Service Inspection - Commercial Request Complete 9/19/2006 9/19/2006 09/19/2006
Foundation Inspection - Commercial Partial 09/20/2006
Correction
Partial Correction
09/20/2006
STEM WALL OVER PREVIOUSLY-POURED GRADE BEAM (G)/(10) TO (G)/(7) TO (H.6)/(7); OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Underslab Plumbing Inspection - Commercial Partial 09/20/2006
Correction
Resolved
09/20/2006
COMMENTS 1) TO FIRST RISE INTO BUILDING: 8" STORM @ D/8.5; 8" STORM @ A/3.8; 6" ST @ H/2; 3" ST @ B/7 2) TO JUST INSIDE FOUNDATION: 8" STORM @ B/7 FOLLOWING STORM PIPING:
Correction
Partial Correction
09/20/2006
UNDER-SLAB DRAIN ON (E.6) FROM (10) TO (5.8); W & S SIDES OF ELEV PIT; OK TO COVER WHEN READY SECTIONS LISTED BELOW:
Correction
Partial Correction
09/20/2006
UNDER-SLAB PVC DWV PIPING (7.5) TO (10) x (D) TO (G); OK TO COVER WHEN READY FOLLOWING AREAS/SECTIONS
Sewer Service Inspection Partial 09/21/2006
Correction
Partial Correction
09/21/2006
SANITARY SEWER SERVICE INSTALLATION FROM 8' E OF E B/L E TO C.O. @ 6+19.60 56'; FRM 6+19.60 56' N TO 5+63.60; 0+35.10 40' S TO 0+75.10; OK TO COVER WHEN READY SEGMENTS DESCRIBED BELOW:
Underslab Plumbing Inspection - Commercial Partial 09/21/2006
Correction
Partial Correction
09/21/2006
UNDER-SLAB DRAIN ON (E.6) FROM (10) TO (1); PERIMETER OF ELEV PIT; OK TO COVER WHEN READY SECTIONS LISTED BELOW:
Underground Plumbing Inspection - Commercial Request Complete 9/21/2006 9/21/2006 09/21/2006
Sewer Service Inspection - Commercial Request Complete 9/21/2006 9/21/2006 09/21/2006
Underslab Plumbing Inspection - Commercial Partial 09/22/2006
Correction
Partial Correction
09/22/2006
UNDER-SLAB PVC DWV PIPING (7.5) TO (10) x (D) TO (G); 2" W FROM A.8/2.5 & A.1/4.2 & F.5/4.2 ALL TO F.5/6.3; OK TO COVER WHEN READY FOLLOWING AREAS/SECTIONS
Correction
Resolved
09/22/2006
UNDER-SLAB DRAIN ON (E.6) FROM (10) TO (1) THEN 5' N OF B/L AND CONNECTED TO STORM SEWER; PERIMETER OF ELEV PIT; OK TO COVER WHEN READY SECTIONS LISTED BELOW:
Sewer Service Inspection Partial 09/25/2006
Correction
Partial Correction
09/25/2006
SANITARY SEWER SERVICE INSTALLATION FROM 8' E OF E B/L E TO C.O. @ 6+19.60 56'; FRM 6+19.60 56' N TO 5+63.60; 0+35.10 TO 1+19.10; 3+39.60 N TO CONNECTION TO PUSHED PIPE UNDER TUDOR; CONN TO PUSHED PIPE @S CURB @TUDOR N TO 4+95.00; OK TO COVER WHEN READY SEGMENTS DESCRIBED BELOW:
Foundation Inspection - Commercial Partial 09/25/2006
Correction
Partial Correction
09/25/2006
STEM WALL OVER PREVIOUSLY-POURED GRADE BEAM (G)/(10) TO (G)/(7) TO (H.6)/(7); H/7 TO H.7/7 TO H.7/6 TO K/6 TO K/5 TO G/5 TO G/2.3; OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Underslab Plumbing Inspection - Commercial Partial 09/25/2006
Correction
Partial Correction
09/25/2006
UNDER-SLAB PVC DWV PIPING (7.5) TO (10) x (D) TO (G); 2" W FROM A.8/2.5 & A.1/4.2 & F.5/4.2 ALL TO F.5/6.3; VISUAL INSP + AIR TEST ON ALL WEST OF (G); OK TO COVER WHEN READY FOLLOWING AREAS/SECTIONS
Footing Inspection - Commercial Passed 09/25/2006
Correction
Resolved
09/25/2006
TRASH ENCLOSURE GRADE BEAM ENSURE 3" RE-BAR COVERAGE OK TO POUR WHEN READY
Sewer Service Inspection - Commercial Request Complete 9/25/2006 9/25/2006 09/25/2006
Underslab Plumbing Inspection - Commercial Partial 09/26/2006
Correction
Resolved
09/26/2006
COMMENTS FOLLOWING STORM PIPING:
Correction
Resolved
09/26/2006
STORM SEWER PIPING OUTSIDE/TO B/L 1) TO FIRST RISE INTO BUILDING: 8" STORM @ D/8.5; 8" STORM @ A/3.8; 6" ST @ H/2; 3" ST @ B/7 2) TO JUST INSIDE FOUNDATION: 8" STORM @ B/7
Correction
Partial Correction
09/26/2006
STORM SEWER PIPING INSIDE B/L V ONLY: ON (6.6) FROM B/L @(B) TO (G); V+PT: FROM G/8.9 TO B/L @(11) + 5' S; OK TO COVER WHEN READY V=VISUAL / PRESS TEST=PT
Sewer Service Inspection Partial 09/26/2006
Correction
Partial Correction
09/26/2006
SANITARY SEWER SERVICE INSTALLATION FROM 8' E OF E B/L E TO C.O. @ 6+19.60 56'; FRM 6+19.60 56' N TO 5+63.60; 0+35.10 TO 2+94.00; 3+39.60 N TO CONNECTION TO PUSHED PIPE UNDER TUDOR; CONN TO PUSHED PIPE @S CURB @TUDOR N TO 4+95.00; OK TO COVER WHEN READY SEGMENTS DESCRIBED BELOW:
Sewer Service Inspection - Commercial Request Complete 9/26/2006 9/26/2006 09/26/2006
Foundation Inspection - Commercial Partial 09/27/2006
Correction
Partial Correction
09/27/2006
STEM WALL OVER PREVIOUSLY-POURED GRADE BEAM (G)/(10) TO (G)/(7) TO (H.6)/(7); H/7 TO H.7/7 TO H.7/6 TO K/6 TO K/5 TO G/5 TO G/2.3; A/2.6 TO A/1 TO G/1 TO G/2.4; PERIMETER OF RMS 118 & 119 OK TO POUR WHEN READY SECTIONS DESCRIBED BELOW:
Sewer Service Inspection Partial 09/27/2006
Correction
Partial Correction
09/27/2006
SANITARY SEWER SERVICE INSTALLATION FROM 8' E OF E B/L E TO C.O. @ 6+19.60 56'; FRM 6+19.60 56' N TO 5+63.60; 0+35.10 TO 2+94.00; 3+39.60 N TO CONNECTION TO PUSHED PIPE UNDER TUDOR; CONN TO PUSHED PIPE @S CURB @TUDOR N TO 4+95.00; 2+94.00 TO CONNECT @ 3+39.60 OK TO COVER WHEN READY SEGMENTS DESCRIBED BELOW:
Sewer Service Inspection - Commercial Request Complete 9/26/2006 9/27/2006 09/27/2006
Water Service Inspection Passed 09/28/2006
Correction
Resolved
09/28/2006
INSTALLATION OF LAWN IRRIGATION WATER SERVICE TEE / VALVE AT FIRE MAIN TO METER/WELL
Correction
Resolved
09/28/2006
DOMESTIC WATER SERVICE INSTALLATION TAP SLEEVE, VALVE TO METER/WELL + 30" SOUTH
Correction
Resolved
09/28/2006
DAMAGE TO WATER SERVICE LINE
Correction
Resolved
09/28/2006
None NW CORNER TO NEAR METER LOCATION
Underslab Plumbing Inspection - Commercial Partial 09/28/2006
Correction
Partial Correction
09/28/2006
UNDER-SLAB PVC DWV PIPING VISUAL INSP + AIR TEST ON ALL WEST OF (G); ELEV PIT SUMP PUMP DRAIN; V&PT ON W&V AT/FROM 3 LAVS @ G.7/7; V=VISUAL / PRESS TEST=PT OK TO COVER WHEN READY FOLLOWING AREAS/SECTIONS
Sewer Service Inspection Passed 09/28/2006
Correction
Resolved
09/28/2006
SANITARY SEWER SERVICE INSTALLATION FROM 8' E OF E B/L E TO C.O. @ 6+19.60 56'; FRM 6+19.60 56' N TO 5+63.60; 0+35.10 TO 2+94.00; 3+39.60 N TO CONNECTION TO PUSHED PIPE UNDER TUDOR; CONN TO PUSHED PIPE @S CURB @TUDOR N TO 4+95.00; COMPLETE FROM TUDOR RD SOUTH TO CONN @ 5+63.60 OK TO COVER WHEN READY SEGMENTS DESCRIBED BELOW:
Water Service Inspection - Commercial Request Complete 9/28/2006 9/28/2006 09/28/2006
Underslab Plumbing Inspection - Commercial Partial 10/02/2006
Correction
Resolved
10/02/2006
STORM SEWER PIPING INSIDE B/L OK TO COVER WHEN READY VISUAL INSP + PRESS TEST
Correction
Resolved
10/02/2006
STORM SEWER PIPING OUTSIDE/TO B/L
Correction
Partial Correction
10/02/2006
UNDER-SLAB PVC DWV PIPING VISUAL INSP + AIR TEST ON ALL EXCEPT AT/FROM RMS 132&133 + EWC'S @ H.3/5; ELEV PIT SUMP PUMP DRAIN; V=VISUAL / PRESS TEST=PT OK TO COVER WHEN READY FOLLOWING AREAS/SECTIONS
Correction
Resolved
10/02/2006
UNDER-SLAB DRAIN
Correction
Resolved
10/02/2006
COMMENTS
Underslab Electrical Inspection - Commercial Partial 10/02/2006
Correction
Partial Correction
10/02/2006
UNDER-FLOOR ELECTRICAL CONDUIT/BOXES WEST OF (G) x SOUTH OF (4); MATERIAL & WORKMANSHIP OK TO COVER WHEN READY:
Underslab Electrical Inspection - Commercial Partial 10/03/2006
Correction
Partial Correction
10/03/2006
UNDER-FLOOR ELECTRICAL CONDUIT/BOXES (A) TO (G) x (1) TO (10) + (G) TO (K) x (6) TO (7); MATERIAL & WORKMANSHIP OK TO COVER WHEN READY:
Underslab Plumbing Inspection - Commercial Partial 10/03/2006
Correction
Partial Correction
10/03/2006
UNDER-SLAB PVC DWV PIPING VISUAL INSP OK ON ALL W&V -- FINAL PRESSURE TEST YET TO BE WITNESSED ELEV PIT SUMP PUMP DRAIN OK OK TO COVER WHEN READY FOLLOWING AREAS/SECTIONS
Underground Plumbing Inspection - Commercial Passed 10/03/2006
Correction
Resolved
10/03/2006
STORM SEWERS 3" & 8" STORMS @ B/7; 8" STORM @ D/8.5; 8" STORM @ A/3.8; 6" STORM @ H/2 OUTSIDE BUILDING
Correction
Resolved
10/03/2006
CONNECTIONS OF ROOF DRAIN SYSTEM TO EXTERIOR STORM SEWER AT G.2/11.2 & AT A.6/6.7 OK TO COVER WHEN READY
Underslab Plumbing Inspection - Commercial Passed 10/04/2006
Correction
Resolved
10/04/2006
UNDER-SLAB PVC DWV PIPING
Correction
Resolved
10/04/2006
STORM SEWER PIPING INSIDE B/L
Sewer Service Inspection Passed 10/05/2006
Correction
Resolved
10/05/2006
SANITARY SEWER SERVICE INSTALLATION
Correction
Resolved
10/05/2006
CONNECTION OF BUILDING DRAIN TO SEWER SERVICE LINE AT STA 7+11.50
Underground Electrical Inspection - Commercial Partial 10/05/2006
Correction
Partial Correction
10/05/2006
PREPARATION TO POUR LIGHT POLE BASES SIX WEST OF WEST BUILDING ENTRANCE; PARKING LOT NEAR SW CORNER; OK TO POUR WHEN READY BASES LISTED BELOW
Correction
Partial Correction
10/05/2006
U/G CONDUIT BETWEEN LIGHT POLE BASES BETWEEN SIX POLE BASES WEST OF WEST BLDG ENTRANCE; WEST EDGE + SOUTH EDGE OF PARKING LOT; OK TO COVER WHEN READY SECTIONS LISTED BELOW:
Underground Electrical Inspection - Commercial Request Complete 10/4/2006 10/5/2006 10/05/2006
Underground Electrical Inspection - Commercial Partial 10/06/2006
Correction
Partial Correction
10/06/2006
CONNECTION OF GROUNDING ELECTRODE CONDUCTOR SEE BASES & CONDUIT ITEMS
Correction
Partial Correction
10/06/2006
U/G CONDUIT BETWEEN LIGHT POLE BASES BETWEEN SIX POLE BASES WEST OF WEST BLDG ENTRANCE; WEST EDGE OF PARKING LOT + SOUTH EDGE OF PARKING LOT AS FAR EAST AS (19); OK TO COVER WHEN READY SECTIONS LISTED BELOW:
Correction
Partial Correction
10/06/2006
PREPARATION TO POUR LIGHT POLE BASES # 1-10 COMPLETE W/ CONDUIT & GROUND; 11, 13, 14 OK TO POUR -- BUT NO CONDUIT NOR GROUND; OK TO POUR WHEN READY PERMIT DRWG BASES LISTED:
Underground Electrical Inspection - Commercial Request Complete 10/5/2006 10/6/2006 10/06/2006
Underslab Electrical Inspection - Commercial Partial 10/09/2006
Correction
Partial Correction
10/09/2006
UNDER-FLOOR ELECTRICAL CONDUIT/BOXES (A) TO (G) x (1) TO (10) + (G) TO (K) x (6) TO (7); EAST OF (G) x NORTH OF (5); MATERIAL & WORKMANSHIP OK TO COVER WHEN READY:
Underslab Electrical Inspection - Commercial Passed 10/10/2006
Correction
Resolved
10/10/2006
UNDER-FLOOR ELECTRICAL CONDUIT/BOXES (A) TO (G) x (1) TO (10) + (G) TO (K) x (6) TO (7); EAST OF (G) x NORTH OF (5); EAST OF (G) x SOUTH OF (6) MATERIAL & WORKMANSHIP OK TO COVER WHEN READY:
Underground Electrical Inspection - Commercial Partial 10/12/2006
Correction
Partial Correction
10/12/2006
PREPARATION TO POUR LIGHT POLE BASES # 1-10 COMPLETE W/ CONDUIT & GROUND; 11, 12, 13, 14, 15, 16, 17, 19, 20 OK TO POUR -- BUT NO CONDUIT NOR GROUND; OK TO POUR WHEN READY PERMIT DRWG BASES LISTED:
Underground Electrical Inspection - Commercial Request Complete 10/11/2006 10/12/2006 10/12/2006
Underground Electrical Inspection - Commercial Partial 10/13/2006
Underground Electrical Inspection - Commercial Partial 10/16/2006
Correction
Partial Correction
10/16/2006
PREPARATION TO POUR LIGHT POLE BASES # 1-20; OK TO POUR WHEN READY PERMIT DRWG BASES LISTED:
Correction
Partial Correction
10/16/2006
U/G CONDUIT BETWEEN LIGHT POLE BASES 1-12; 14-17; OK TO COVER WHEN READY SECTIONS LISTED BELOW:
Correction
Partial Correction
10/16/2006
CONNECTION OF GROUNDING ELECTRODE CONDUCTOR 1-12; 14-17; OK TO COVER WHEN READY AT FOLLOWING POLE BASES:
Underground Electrical Inspection - Commercial Request Complete 10/13/2006 10/16/2006 10/16/2006
Electrical Service Inspection Partial 10/17/2006
Correction
Partial Correction
10/17/2006
TEMPORARY ELECTRICAL SERVICE OK FOR CONNECTION WHEN READY, EXCEPT: 1) SECURE STAND TO SLAB TO PREVENT DISPLACEMENT 2) SURROUND AREA (3 SIDES) TO PREVENT ENCROACHMENT SET ON WOOD STAND ON BUILDING SLAB
Underground Electrical Inspection - Commercial Partial 10/19/2006
Correction
Partial Correction
10/19/2006
U/G CONDUIT BETWEEN LIGHT POLE BASES 1-20; OK TO COVER WHEN READY SECTIONS LISTED BELOW:
Correction
Partial Correction
10/19/2006
CONNECTION OF GROUNDING ELECTRODE CONDUCTOR 1-19; OK TO COVER WHEN READY AT FOLLOWING POLE BASES:
Underground Electrical Inspection - Commercial Request Complete 10/19/2006 10/19/2006 10/19/2006
Underground Electrical Inspection - Commercial Partial 11/03/2006
Correction
Partial Correction
11/03/2006
CONNECTION OF GROUNDING ELECTRODE CONDUCTOR 1-19; 11-03-06-- N.E. CORNER OF LOT (1) LIGHT POLE BASE UNDERGROUND - APPROVED OK TO COVER WHEN READY AT FOLLOWING POLE BASES:
Underground Electrical Inspection - Commercial Request Complete 11/3/2006 11/3/2006 11/03/2006
Electrical Service Inspection Partial 11/07/2006
Correction
Partial Correction
11/07/2006
TEMPORARY ELECTRICAL SERVICE OK FOR TEMPORARY SERVICE CONNECTION WHEN READY. SET ON WOOD STAND ON BUILDING SLAB
Underground Electrical Inspection - Commercial Partial 11/13/2006
Correction
Partial Correction
11/13/2006
PREPARATION TO POUR LIGHT POLE BASES PARKING LOT POLE LIGHTS #1-21; OK TO POUR WHEN READY PERMIT DRWG BASES LISTED:
Correction
Partial Correction
11/13/2006
U/G CONDUIT BETWEEN LIGHT POLE BASES PARKING LOT POLE LIGHTS #1-21; OK TO COVER WHEN READY SECTIONS LISTED BELOW:
Correction
Partial Correction
11/13/2006
CONNECTION OF GROUNDING ELECTRODE CONDUCTOR PARKING LOT POLE LIGHTS #1-21; OK TO COVER WHEN READY AT FOLLOWING POLE BASES:
Underground Electrical Inspection - Commercial Request Complete 11/13/2006 11/13/2006 11/13/2006
Rough Framing Inspection - Commercial Partial 11/20/2006
Suspended Slab Inspection Not Ready 11/20/2006
Correction
Corrective Action Required
11/20/2006
PREP TO POUR SLAB ON DECK SECOND FLOOR DECK OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Request Complete 11/17/2006 11/20/2006 11/20/2006
Suspended Slab Inspection Not Ready 11/22/2006
Correction
Corrective Action Required
11/22/2006
PREP TO POUR SLAB ON DECK SECOND FLOOR DECK
Suspended Slab Inspection Failed 11/27/2006
Correction
Corrective Action Required
11/27/2006
PREP TO POUR SLAB ON DECK PARTIAL INSPEDCTION ONLY- NORTH SIDE ONLY INSPECTED SECOND FLOOR DECK
Suspended Slab Inspection Passed 11/28/2006
Correction
Resolved
11/28/2006
PREP TO POUR SLAB ON DECK ENTIRE 2ND FLOOR DECK OK TO POUR WHEN READY
All Rough Inspection - Commercial Partial 12/22/2006
Correction
Partial Correction
12/22/2006
WALL FRAMING + IN-WALL SYSTEMS UNLESS ALLOWED BY SPECIFICATIONS -- THEN OK TO COVER EXTERIOR WALLS WHEN READY CLOSE/REPAIR OPENINGS IN WALL SHEATHING
Rough Plumbing Inspection - Commercial Partial 01/04/2007
Correction
Partial Correction
01/04/2007
PIPING FOR ROOF DRAINS + OVERFLOW DRAINS ALL SOUTH OF (7); WATER TESTED & APPROVED AT LOCATIONS BELOW:
All Rough Inspection - Commercial Partial 01/04/2007
Correction
Partial Correction
01/04/2007
WALL FRAMING + IN-WALL SYSTEMS NOT APPROVED: WEST OF (F) x SOUTH OF (6); EXTERIOR WALLS 1ST FLOOR OK TO COVER WHEN READY
Rough Plumbing Inspection - Commercial Partial 01/05/2007
Correction
Partial Correction
01/05/2007
PIPING FOR ROOF DRAINS + OVERFLOW DRAINS ALL EXCEPT AT E & W CANOPIES WATER TESTED & APPROVED AT LOCATIONS BELOW:
All Rough Inspection - Commercial Failed 01/05/2007
Correction
Partial Correction
01/05/2007
WALL FRAMING + IN-WALL SYSTEMS NOT APPROVED: 1ST FLR WEST OF (F) x SOUTH OF (6); 139; NOT APPROVED: 2ND FLR EXT WALLS SOUTH OF (7) EXTERIOR WALLS 1ST FLOOR OK TO COVER WHEN READY
All Rough Inspection - Commercial Partial 01/08/2007
Correction
Partial Correction
01/08/2007
WALL FRAMING + IN-WALL SYSTEMS EXTERIOR WALLS 1ST FLOOR; 2ND FLOOR EXTERIOR WALLS (EXCEPT WALLS ABOVE LOBBY COVERED WITHOUT INSPECTION); OK TO COVER WHEN READY SPACES/WALLS BELOW:
All Rough Inspection - Commercial Partial 01/11/2007
Rough Plumbing Inspection - Commercial Passed 01/11/2007
Correction
Resolved
01/11/2007
PIPING FOR ROOF DRAINS + OVERFLOW DRAINS ALL EXCEPT AT E & W CANOPIES; CHECK/TIGHTEN SEEPING BANDS @ E & W CANOPIES -- THEN OK WATER TESTED & APPROVED AT LOCATIONS BELOW:
All Rough Inspection - Commercial Partial 01/16/2007
Correction
Partial Correction
01/16/2007
WALL FRAMING + IN-WALL SYSTEMS EXTERIOR WALLS 1ST FLOOR; 2ND FLOOR EXTERIOR WALLS (EXCEPT WALLS ABOVE LOBBY COVERED WITHOUT INSPECTION); OK TO COVER WHEN READY SPACES/WALLS BELOW:
Above Ceiling Inspection Not Ready 01/16/2007
Correction
Corrective Action Required
01/16/2007
READINESS FOR INSPECTION NOT READY FOR INSPECTION
Gas Piping Inspection - Commercial Partial 01/16/2007
Correction
Partial Correction
01/16/2007
GAS PIPING ROUGH WELDED PIPING; MATERIAL & WORKMANSHIP VISUAL INSPECTION
Gas Service Inspection - Commercial Passed 01/16/2007
Correction
Resolved
01/16/2007
TEST PRESSURE LEVEL ON WELDED PIPING RELEASE GAS SERVICE FOR TEMPORARY HEAT HELD STEADY AT ~65 PSI FOR >=30 MIN
Rough Mechanical Inspection - Commercial Partial 01/16/2007
Correction
Partial Correction
01/16/2007
IN-WALL SUPPLY AIR DUCTWORK OK TO COVER WHEN READY AT FIRST FLOOR LEVEL
Miscellaneous Inspection Passed 01/19/2007
Rough Electrical Inspection - Commercial Passed 01/19/2007
All Rough Inspection - Commercial Partial 01/19/2007
Correction
Resolved
01/19/2007
WALL FRAMING + IN-WALL SYSTEMS
Correction
Partial Correction
01/19/2007
WALL FRAMING RESTING ON BUILDING STRUCTURE + IN-WALL SYSTEMS ALL WALLS 1ST FLOOR EXCEPT RESTROOMS 132&133 AND 118&119; 2ND FLOOR EXTERIOR WALLS (EXCEPT WALLS ABOVE LOBBY COVERED WITHOUT INSPECTION); OK TO COVER WHEN READY WALLS/SPACES LISTED BELOW
Correction
Corrective Action Required
01/19/2007
WALLS RESTING ON RAISED FLOOR + IN-WALL SYSTEMS NOT READY
All Rough Inspection - Commercial Partial 01/26/2007
Correction
Partial Correction
01/26/2007
WALL FRAMING RESTING ON BUILDING STRUCTURE + IN-WALL SYSTEMS 1ST FLOOR: ALL WALLS EXCEPT RESTROOMS 132&133 AND 118&119; 2ND FLOOR: EXTERIOR WALLS; G/7 TO J/7 TO J/6.2 TO J.4/6.2; G/5 TO K/5; OK TO COVER WHEN READY WALLS/SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 01/30/2007
Correction
Partial Correction
01/30/2007
WALL FRAMING RESTING ON BUILDING STRUCTURE + IN-WALL SYSTEMS 1ST FLOOR: ALL WALLS FRAMING + M/E/P INCL PRESS TEST DWV 2ND FLOOR: ALL WALLS FRAMING + M/E/P INCL PRESS TEST DWV EXCEPT H2O @ 220, 237, & 238 OK TO COVER WHEN READY WALLS/SPACES LISTED BELOW
Rated Assembly Inspection Partial 01/30/2007
Correction
Partial Correction
01/30/2007
RATED WALL & CEILING ASSEMBLIES @ ELEV EQPMT RM 131 FRAMING + LINER BOARD AT N WALL; 5/8" TYPE X GWB INTERIOR FACE OF WALLS; OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Rough Framing Inspection - Commercial Request Complete 1/29/2007 1/30/2007 01/30/2007
Electrical Service Inspection Not Ready 02/02/2007
Correction
Corrective Action Required
02/02/2007
READINESS FOR INSPECTION CALL FOR INSPECTION AFTER PREPARATION IS COMPLETE WORK REQUESTED FOR INSP NOT COMPLETED
Electrical Service Inspection Partial 02/05/2007
Correction
Resolved
02/05/2007
TEMPORARY ELECTRICAL SERVICE
Correction
Resolved
02/05/2007
READINESS FOR INSPECTION
Correction
Partial Correction
02/05/2007
PERMANENT ELECTRICAL SERVICE INSTALLATION ENSURE RESTRICTED ACCESS TO ELECTRICAL ROOM BEFORE REQUESTING SERVICE ACTIVATION. IN ADDITION TO UFER AND WATER LINE GROUNDS, GROUNDING ELECTRODE CONDUCTORS TO BE INSTALLED TO: 1) BUILDING STEEL AND 2) DRIVEN GROUND ROD 1200 AMPS RELEASE SERVICE
All Rough Inspection - Commercial Partial 02/05/2007
Correction
Resolved
02/05/2007
WALL FRAMING RESTING ON BUILDING STRUCTURE + IN-WALL SYSTEMS 1ST FLOOR AND 2ND FLOOR COMPLETE AFTER ALL LEVEL-TO-LEVEL PENETRATIONS ARE FIRE-BLOCKED. OK TO COVER WHEN READY WALLS/SPACES LISTED BELOW
Above Ceiling Inspection Partial 02/07/2007
Correction
Resolved
02/07/2007
READINESS FOR INSPECTION
Correction
Partial Correction
02/07/2007
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS VESTIBULE 100 + W ENTRANCE CANOPY; OK TO COVER WHEN READY SPACES LISTED BELOW:
Miscellaneous Inspection Passed 02/07/2007
Rated Assembly Inspection Partial 02/07/2007
Correction
Partial Correction
02/07/2007
RATED WALL & CEILING ASSEMBLIES @ ELEV EQPMT RM 131 FRAMING + LINER BOARD AT N WALL; 5/8" TYPE X GWB INTERIOR FACE OF WALLS; CEILING FRAMING + UPPER LAYER 5/8" TYPE X GWB; OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
All Rough Inspection - Commercial Partial 02/07/2007
Correction
Partial Correction
02/07/2007
SYSTEMS UNDER RAISED FLOOR ELECTRICAL AT SPACES 115-128; PARTIAL APPROVAL ON FOLLOWING COMPONENTS:
Above Ceiling Inspection Partial 02/08/2007
Correction
Partial Correction
02/08/2007
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS W ENTRANCE CANOPY; VESTIBULE/CORRIDOR 100/101/102/104; BOARD RM 107; CORRIDOR 201; OK TO COVER WHEN READY SPACES LISTED BELOW:
All Rough Inspection - Commercial Partial 02/09/2007
Correction
Partial Correction
02/09/2007
WALLS RESTING ON RAISED FLOOR + IN-WALL SYSTEMS 135-138; 141-144; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Rough Electrical Inspection - Commercial Failed 02/16/2007
Correction
Corrective Action Required
02/16/2007
ROUGH ELECTRICAL 1ST FLOOR IN-WALL: 145,146,150. 120,121,123,124,125,126 , OK TO COVER. LEAVE 115 NORTH WEST CORNER HALL WALL OPEN BREAKROOM 122 LEAVE OPEN. SEE ROOMS NUMBERS
Above Ceiling Inspection Partial 02/16/2007
Correction
Partial Correction
02/16/2007
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS W ENTRANCE CANOPY; VESTIBULE/CORRIDOR 100/101/102/104; BOARD RM 107; CORRIDOR 201;VESTIBULE 147; OK TO COVER WHEN READY SPACES LISTED BELOW:
Rated Assembly Inspection Partial 02/16/2007
Correction
Partial Correction
02/16/2007
RATED WALL & CEILING ASSEMBLIES @ ELEV EQPMT RM 131 FRAMING + LINER BOARD AT N WALL; 5/8" TYPE X GWB INTERIOR FACE OF WALLS; CEILING FRAMING + UPPER LAYER 5/8" TYPE X GWB; CEILING ROOM 131 , 2ND LAYER APPROVED. OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Rated Assembly Inspection Failed 02/20/2007
Correction
Corrective Action Required
02/20/2007
RATED ELEVATOR SHAFT ENCLOSURE SEAL ALL GAPS IN INNER LINER BOARD FACE
All Rough Inspection - Commercial Partial 02/20/2007
Correction
Partial Correction
02/20/2007
WALLS RESTING ON RAISED FLOOR + IN-WALL SYSTEMS 115-117; 122; 129; 135-138; 141-144; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Rated Assembly Inspection Failed 02/23/2007
Correction
Partial Correction
02/23/2007
RATED WALL & CEILING ASSEMBLIES @ ELEV EQPMT RM 131 FRAMING + LINER BOARD AT N WALL; 5/8" TYPE X GWB INTERIOR FACE OF WALLS; CEILING FRAMING + UPPER LAYER 5/8" TYPE X GWB; CEILING ROOM 131 , 2ND LAYER APPROVED. OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
Correction
Resolved
02/23/2007
RATED ELEVATOR SHAFT ENCLOSURE SEAL ALL GAPS IN INNER LINER BOARD FACE
Above Ceiling Inspection Partial 02/27/2007
Correction
Partial Correction
02/27/2007
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS W ENTRANCE CANOPY; VESTIBULE/CORRIDOR 100/101/102/104; BOARD RM 107; CORRIDOR 201;VESTIBULE 147; SOFFIT @ E ENTRANCE; OK TO COVER WHEN READY SPACES LISTED BELOW:
All Rough Inspection - Commercial Partial 02/27/2007
Correction
Partial Correction
02/27/2007
WALLS RESTING ON RAISED FLOOR + IN-WALL SYSTEMS 115-117; 122; 129; 135-138; 141-144; 2ND FLR N OF (5); OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Rated Assembly Inspection Partial 02/27/2007
Correction
Partial Correction
02/27/2007
RATED WALL & CEILING ASSEMBLIES @ ELEV EQPMT RM 131 FRAMING + LINER BOARD AT N WALL; 5/8" TYPE X GWB INTERIOR FACE OF WALLS; CEILING FRAMING + UPPER LAYER 5/8" TYPE X GWB; ROOM 131 CEILING TWO LAYERS, WITH MUD RINGS REPLACED FOR GWB THICKNESS; OK TO COVER WHEN READY PORTIONS DESCRIBED BELOW:
All Rough Inspection - Commercial Partial 03/01/2007
Correction
Partial Correction
03/01/2007
WALLS RESTING ON RAISED FLOOR + IN-WALL SYSTEMS 115-117; 122; 129; 135-138; 141-144; 2ND FLR N OF (5); 228-233; OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Not Ready 03/05/2007
Correction
Partial Correction
03/05/2007
WALLS RESTING ON RAISED FLOOR + IN-WALL SYSTEMS 115-117; 122; 129; 135-138; 141-144; 2ND FLR N OF (5); 228-233; REMAINDER OF WALLS @ 2ND FLR SOUTH: NOT READY FOR INSPECTION OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Underground Electrical Inspection - Commercial Partial 03/06/2007
Correction
Resolved
03/06/2007
PREPARATION TO POUR LIGHT POLE BASES
Correction
Resolved
03/06/2007
U/G CONDUIT BETWEEN LIGHT POLE BASES
Correction
Resolved
03/06/2007
CONNECTION OF GROUNDING ELECTRODE CONDUCTOR
Correction
Resolved
03/06/2007
SECONDARY SERVICE CONDUIT BANK
Correction
Partial Correction
03/06/2007
UNDERGROUND CONDUIT TO MONUMENT SIGN INSTALLATION IN PROGRESS MAINTAIN 18" MIN DEPTH
All Rough Inspection - Commercial Not Ready 03/06/2007
Correction
Partial Correction
03/06/2007
WALLS RESTING ON RAISED FLOOR + IN-WALL SYSTEMS 115-117; 122; 129; 135-138; 141-144; 2ND FLR N OF (5); 228-233; REMAINDER OF WALLS @ 2ND FLR SOUTH: NOT READY FOR INSPECTION 1) SEVERED STUDS NOT REPLACED 2) SOME JAMB STUDS NOT FULLY SCREWED AT BOTTOM TRACK OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
All Rough Inspection - Commercial Partial 03/07/2007
Correction
Resolved
03/07/2007
WALLS RESTING ON RAISED FLOOR + IN-WALL SYSTEMS 1ST FLOOR COMPLETE; 2ND FLOOR COMPLETE OK TO COVER WHEN READY WALLS@SPACES LISTED BELOW
Above Ceiling Inspection Partial 03/08/2007
Correction
Partial Correction
03/08/2007
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS W ENTRANCE CANOPY; VESTIBULE/CORRIDOR 100/101/102/104; BOARD RM 107; CORRIDOR 201;VESTIBULE 147; SOFFIT @ E ENTRANCE; SOFFITS AT RECESSES @ G.8/8 & H.6/8 IN RM 246; NOTE: BULKHEAD ON (H.2) IN RM 246 COVERED WITHOUT INSPECTION OK TO COVER WHEN READY SPACES LISTED BELOW:
Gas Piping Inspection - Commercial Passed 03/26/2007
Correction
Resolved
03/26/2007
GAS PIPING ROUGH HIGH-PRESSURE WELDED PIPING; MEDIUM-PRESSURE PIPING MATERIAL & WORKMANSHIP VISUAL INSPECTION
Correction
Resolved
03/26/2007
FINAL PRESSURE TEST HELD STEADY AT >= 10 PSI FOR >=30 MIN ENTIRE SYSTEM TEST PRESSURE LEVEL
Gas Service Inspection - Commercial Passed 03/26/2007
Correction
Resolved
03/26/2007
TEST PRESSURE LEVEL ON WELDED PIPING HIGH-PRESSURE PIPING
Underground Electrical Inspection - Commercial Partial 03/26/2007
Correction
Resolved
03/26/2007
UNDERGROUND CONDUIT TO MONUMENT SIGN
Correction
Partial Correction
03/26/2007
GROUNDING OF EXTERIOR/SITE LIGHTS TWO @ WEST ENTRANCE + 2 BOLLARD LITES N OF BLDG
Underground Electrical Inspection - Commercial Request Complete 3/26/2007 3/26/2007 03/26/2007
Rated Assembly Inspection Partial 03/29/2007
Correction
Resolved
03/29/2007
RATED ELEVATOR SHAFT ENCLOSURE 1ST , 2ND FLOOR AROUND ELEVATOE SHAFT DOORS APPROVED SEAL ALL GAPS IN INNER LINER BOARD FACE
Above Ceiling Inspection Partial 03/30/2007
Correction
Partial Correction
03/30/2007
1st FLOOR ALL 1ST FLOOR AREA APPROVED EXEPT THE FOLLOWING: 1. MAIN CORRIDOR 2. BOARD ROOM NORTH SIDE. APPROVED FOR CEILING TILE EXEPT AROUND CEILING HEAT UNITS
Rated Assembly Inspection Partial 03/30/2007
Correction
Resolved
03/30/2007
RATED ELEVATOR SHAFT ENCLOSURE 1ST , 2ND FLOOR AROUND ELEVATOE SHAFT DOORS APPROVED SEAL ALL GAPS IN INNER LINER BOARD FACE
Correction
Corrective Action Required
03/30/2007
ELEVATOR - EXTERIOR LAYER 1ST LAYER APPROVED EXTERIOR OF ELEVATOR
Rough Framing Inspection - Commercial Request Complete 3/30/2007 3/30/2007 03/30/2007
Rated Assembly Inspection Passed 04/02/2007
Correction
Resolved
04/02/2007
RATED WALL & CEILING ASSEMBLIES @ ELEV EQPMT RM 131
Correction
Resolved
04/02/2007
RATED ELEVATOR SHAFT ENCLOSURE 1ST & 2ND FLOORS LINER BOARD @ INNER FACE+ TWO LAYERS 5/8" TYPE X
Underground Electrical Inspection - Commercial Partial 04/05/2007
Correction
Partial Correction
04/05/2007
GROUNDING OF EXTERIOR/SITE LIGHTS TWO @ WEST ENTRANCE; 2 BOLLARD LITES @ OUTER CURB N OF BLDG; FOUR S6 L.P. BASES N & S OF BLDG OK TO COVER WHEN READY AT FOLLOWING LOCATIONS:
All Rough Inspection - Commercial Partial 04/05/2007
Correction
Resolved
04/05/2007
WALL FRAMING RESTING ON BUILDING STRUCTURE + IN-WALL SYSTEMS ELEVATOR FRONTS @ 1ST & 2ND FLOOR; 1ST FLOOR AND 2ND FLOOR COMPLETE OK TO COVER WHEN READY WALLS/SPACES LISTED BELOW
Correction
Partial Correction
04/05/2007
SYSTEMS UNDER RAISED FLOOR ELECTRICAL BRANCH SYSTEMS AT SPACES 115-128; PEDESTAL GROUNDING CONNECTIONS AT 5 LOCATIONS 1ST & 2ND FLOORS NOTE: DATA SYSTEM GROUNDING CONNECTIONS WERE INSTALLED & COVERED WITHOUT INSPECTION PARTIAL APPROVAL ON FOLLOWING COMPONENTS:
Above Ceiling Inspection Partial 04/05/2007
Correction
Partial Correction
04/05/2007
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS W ENTRANCE CANOPY; VESTIBULE/CORRIDOR 100/101/102/104; BOARD RM 107; CORRIDOR 201;VESTIBULE 147; SOFFIT @ E ENTRANCE; SOFFITS AT RECESSES @ G.8/8 & H.6/8 IN RM 246; SOFFITS @ DOOR 132 & CORR 202 OK TO COVER WHEN READY SPACES LISTED BELOW:
Correction
Partial Correction
04/05/2007
2ND FLOOR ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS 208-214; 216-216; 219-226; OK TO COVER WHEN READY FOLLOWING SPACES:
Underground Electrical Inspection - Commercial Request Complete 4/4/2007 4/5/2007 04/05/2007
All Rough Inspection - Commercial Passed 04/09/2007
Correction
Resolved
04/09/2007
WALL FRAMING RESTING ON BUILDING STRUCTURE + IN-WALL SYSTEMS
Correction
Resolved
04/09/2007
WALLS RESTING ON RAISED FLOOR + IN-WALL SYSTEMS
Correction
Resolved
04/09/2007
SYSTEMS UNDER RAISED FLOOR ELECTRICAL BRANCH SYSTEMS AT SPACES 115-128; PEDESTAL GROUNDING CONNECTIONS AT 5 LOCATIONS 1ST & 2ND FLOORS; DATA SYSTEMS CABLE TRAY GROUNDING CONNECTIONS -- NO ISSUES FOUND; JUMPER CONNECTION TO BUS BARS SUBJECT TO APPROVAL WHEN READY FOR INSPECTION HVAC; ELECT; L.V. ELECT NO REMAINING ISSUES
Underground Electrical Inspection - Commercial Passed 04/13/2007
Correction
Resolved
04/13/2007
CONNECTION OF GROUNDING ELECTRODE CONDUCTOR
Correction
Resolved
04/13/2007
GROUNDING OF EXTERIOR/SITE LIGHTS
Correction
Resolved
04/13/2007
GROUNDING CONDUCTOR + GROUND RODS OUTSIDE SW BLDG CORNER + AT EMERGENCY GENSET
Above Ceiling Inspection Partial 04/13/2007
Correction
Resolved
04/13/2007
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS
Correction
Partial Correction
04/13/2007
2ND FLOOR ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS 203-205; 208-214; 216-216; 219-226; 227; 234; 236-243; 245-246; OK TO COVER WHEN READY FOLLOWING SPACES:
Underground Electrical Inspection - Commercial Request Complete 4/13/2007 4/13/2007 04/13/2007
Above Ceiling Inspection Partial 04/16/2007
Correction
Partial Correction
04/16/2007
1st FLOOR ALL 1ST FLOOR AREA APPROVED EXEPT THE FOLLOWING: 1. MAIN CORRIDOR 2. BOARD ROOM NORTH SIDE. APPROVED FOR CEILING TILE EXCEPT AROUND CEILING HEAT UNITS
Correction
Partial Correction
04/16/2007
2ND FLOOR ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS 203-205; 208-214; 216-216; 217-218; 219-227; 234; 236-243; 245-246; OK TO COVER WHEN READY FOLLOWING SPACES:
Correction
Partial Correction
04/16/2007
INSTALLATION/PIPING OF RADIANT HEAT CEILING TILES COMPLETE INSULATION + HANGERS; ENSURE COPPER TUBING IS PROPERLY SUPPORTED, ALONG WITH FLOW CONTROL VALVE BODIES; MAINTAIN CLEARANCE ABOVE GRID & OTHER MEP SYSTEMS; ENSURE NO SIGNIFICANT CONSTRICTION OF TUBING ISSUES DISCUSSED W/ JED PROCEED ACCORDINGLY
All Rough Inspection - Commercial Passed 04/20/2007
Correction
Resolved
04/20/2007
DIAZ WALL BOARD ROOM 1ST FLOOR APPROVED TO COVER
Above Ceiling Inspection Partial 04/23/2007
Correction
Resolved
04/23/2007
GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS
Correction
Partial Correction
04/23/2007
2ND FLOOR ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS 203-205; 208-214; 216-216; 217-218; 219-227; 234; 236-243; 245-246; OK TO COVER WHEN READY FOLLOWING SPACES:
Correction
Partial Correction
04/23/2007
INSTALLATION/PIPING OF RADIANT HEAT CEILING TILES 2ND FLOOR COMPLETE; OK TO COVER WHEN READY AREAS LISTED BELOW:
Above Ceiling Inspection Partial 05/11/2007
Correction
Partial Correction
05/11/2007
2ND FLOOR ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS 202; 203-205; 207; 208-214; 216-227; 234; 236-243; 245-246; OK TO COVER WHEN READY FOLLOWING SPACES:
Correction
Partial Correction
05/11/2007
1ST FLOOR ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS 101; 104; 108; 110; 151; OK TO COVER WHEN READY SPACES LISTED BELOW:
Above Ceiling Inspection Partial 05/16/2007
Correction
Partial Correction
05/16/2007
None RM - 106 APPROVED, CORR. 201 APPROVED RM - 107 PARTIAL APPROVAL = 2 VALVES ON SOUTH SIDE OF ROOM HAVE NOT BEEN WIRED OK TO COVER 1ST + 2ND FLOOR
Above Ceiling Inspection Passed 05/17/2007
Correction
Resolved
05/17/2007
1st FLOOR ALL OK TO COVER WHEN READY
Correction
Resolved
05/17/2007
2ND FLOOR ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS 201; 202; 203-205; 207; 208-214; 216-227; 234; 236-243; 245-246; OK TO COVER WHEN READY FOLLOWING SPACES:
Correction
Resolved
05/17/2007
INSTALLATION/PIPING OF RADIANT HEAT CEILING TILES OK TO COVER WHEN READY
Correction
Resolved
05/17/2007
1ST FLOOR ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS 101; 104; 106; 107; 108; 110; 151; OK TO COVER WHEN READY SPACES LISTED BELOW:
Correction
Resolved
05/17/2007
None
Rough Framing Inspection - Commercial Passed 05/18/2007
Correction
Resolved
05/18/2007
CIP CONCRETE WALLS SURROUNDING ROOM 151
Rough Mechanical Inspection - Commercial Passed 05/18/2007
Correction
Resolved
05/18/2007
IN-WALL SUPPLY AIR DUCTWORK
Foundation Inspection - Commercial Passed 05/18/2007
Correction
Resolved
05/18/2007
ELEVATOR PIT WALLS
Correction
Resolved
05/18/2007
STEM WALL OVER PREVIOUSLY-POURED GRADE BEAM
Rough Electrical Inspection - Commercial Passed 05/18/2007
Correction
Resolved
05/18/2007
ROUGH ELECTRICAL 1ST FLOOR
Electrical Service Inspection Passed 05/18/2007
Correction
Resolved
05/18/2007
PERMANENT ELECTRICAL SERVICE INSTALLATION
Occupancy Inspection - Codes Commercial Not Ready 05/18/2007
Correction
Corrective Action Required
05/18/2007
Receive Fire Department approval
Correction
Corrective Action Required
05/18/2007
Receive Water Utilities Approval
Correction
Corrective Action Required
05/18/2007
Receive Planning & Development Approval
Correction
Corrective Action Required
05/18/2007
Receive Public Works Approval
Occupancy Inspection - Codes Commercial Not Ready 05/21/2007
Occupancy Inspection - Codes Commercial Failed 06/07/2007
Occupancy Inspection - Codes Commercial Failed 06/08/2007
Correction
Corrective Action Required
06/08/2007
Receive Fire Department approval SEE REPORT PROVIDED COORDINATE W/ CPT DIR
Correction
Corrective Action Required
06/08/2007
Receive Water Utilities Approval COORDINATE W/ BEN HASKAMP
Correction
Corrective Action Required
06/08/2007
Receive Planning & Development Approval COORDINATE W/ TOM SCANNEL CARD PROVIDED
Correction
Corrective Action Required
06/08/2007
Receive Public Works Approval COORDINATE W/ SHAWN GRAFF CARD PROVIDED
Correction
Resolved
06/08/2007
PVC RISERS AT NORTH PROPERTY LINE
Correction
Resolved
06/08/2007
LIGHTNING PROTECTION SYSTEM SEE BELOW
Correction
Corrective Action Required
06/08/2007
ROOFTOP CLEANUP REMOVE ANY DEBRIS ESPECIALLY METAL
Correction
Resolved
06/08/2007
INSTALLATION OF ELECTRICAL RECEPTACLES/SWITCHES
Correction
Resolved
06/08/2007
SERVICE RECEPTACLE AT RTU-1
Correction
Resolved
06/08/2007
ELECTRICAL RECEPTACLES WITH OPEN GROUND
Correction
Resolved
06/08/2007
LABELING OF ELECTRICAL EQUIPMENT, SWITCHES, CIRCUIT BREAKERS
Correction
Resolved
06/08/2007
ELECTRICAL PANEL DOORS
Correction
Corrective Action Required
06/08/2007
INSTALLATION OF DISHWASHERS IRC P2717.2: DRAIN DISCHARGE LINE MUST RISE TO UNDERSIDE OF COUNTER AND BE SECURELY FASTENED (OR APPROVED ALTERNATE MEANS TO PROVIDE HIGH POINT IN DISCHARGE LINE.) BACKFLOW PREVENTION SUBJECT TO APPROVAL
Correction
Corrective Action Required
06/08/2007
INSTALLATION OF COOKING RANGES SUBJECT TO APPROVAL. SEE MANUFACTURER'S INSTRUCTIONS AND USE ANTI-TIP HARDWARE PROVIDED. ACCESSIBLE CORD&PLUG CONSTITUTES COMPLIANT DISCONNECT; OTHERWISE PROVIDE LOCKABLE BREAKER PER NEC 422.31B ANTI-TIP PROVISION + ELECTRICAL DISCONNECT
Correction
Corrective Action Required
06/08/2007
GYPSUM WALLBOARD AT BOARDROOM ELECT ROOM EAST WALL NOT FULLY SCREWED TO STUD
Correction
Corrective Action Required
06/08/2007
INSTALLATION OF ICEMAKERS DEMONSTRATE CONFORMING BACKFLOW PREVENT DEVICES
Correction
Corrective Action Required
06/08/2007
ANCHORING OF PUMPS AT MECHANICAL ROOM NOT ANCHORED TO PAD
Correction
Corrective Action Required
06/08/2007
ANCHORING OF BYPASS FEEDER TANK AT MECH RM NOT ANCHORED TO FLOOR
Correction
Resolved
06/08/2007
STATE APPROVAL OF ELEVATOR INSTALLATION COPY PROVIDED
Correction
Corrective Action Required
06/08/2007
REQUIRED ELECTRICAL RECEPTACLE OUTLETS NOT FOUND AT ROOFTOP WITHIN 7.5 M OF LIEBERT CONDENSERS
Correction
Corrective Action Required
06/08/2007
PLUMBING VENTS TO ROOF ABOVE BOARD ROOM APPEAR TO BE PLUGGED WITH TEST BULBS
Correction
Resolved
06/08/2007
LIGHTNING PROTECTION AT STAFF BREAK PATIO L.P. SUBCONTRACTOR STATES NOT REQUIRED DUE TO NO ROOF, AND ENCOMPASSED BY AREA OF INFLUENCE BONDING PER DRAWING NOT FOUND
Occupancy Inspection - Codes Commercial Failed 07/02/2007
Correction
Resolved
07/02/2007
ROOFTOP CLEANUP
Correction
Partial Correction
07/02/2007
INSTALLATION OF DISHWASHERS IRC P2717.2: DRAIN DISCHARGE LINE MUST RISE TO UNDERSIDE OF COUNTER AND BE SECURELY FASTENED (OR APPROVED ALTERNATE MEANS TO PROVIDE HIGH POINT IN DISCHARGE LINE.) BACKFLOW PREVENTION SUBJECT TO APPROVAL
Correction
Resolved
07/02/2007
INSTALLATION OF COOKING RANGES ANTI-TIP PROVISION
Correction
Resolved
07/02/2007
GYPSUM WALLBOARD AT BOARDROOM ELECT ROOM EAST WALL
Correction
Resolved
07/02/2007
INSTALLATION OF ICEMAKERS
Correction
Resolved
07/02/2007
ANCHORING OF PUMPS AT MECHANICAL ROOM
Correction
Resolved
07/02/2007
ANCHORING OF BYPASS FEEDER TANK AT MECH RM
Correction
Partial Correction
07/02/2007
REQUIRED ELECTRICAL RECEPTACLE OUTLETS NOT FOUND AT ROOF ABOVE BOARD ROOM AT ROOFTOP WITHIN 7.5 M OF LIEBERT CONDENSER
Occupancy Inspection - Codes Commercial Failed 07/03/2007
Correction
Resolved
07/03/2007
Receive Fire Department approval PER JOE DIR 6/19/07
Correction
Resolved
07/03/2007
Receive Water Utilities Approval PER BEN HASKAMP 6/15/07
Correction
Resolved
07/03/2007
INSTALLATION OF DISHWASHERS
Correction
Resolved
07/03/2007
INSTALLATION OF COOKING RANGES
Correction
Resolved
07/03/2007
REQUIRED ELECTRICAL RECEPTACLE OUTLETS AT ROOFTOP HVAC UNITS
Correction
Resolved
07/03/2007
PLUMBING VENTS TO ROOF ABOVE BOARD ROOM
Occupancy Inspection - Codes Commercial Passed 07/17/2007
Correction
Resolved
07/17/2007
Receive Planning & Development Approval PER TOM SCANNEL 7/17/07
Correction
Resolved
07/17/2007
Receive Public Works Approval PER RAY SHICK 7/16/07
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.