Permit Application Status

B0600790


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0600790
Building Permit - Commercial
Certificate of Occupancy
SOUTH SUMMIT CHRISTIAN CHURCH INC
NEW COMMERCIAL
NEW CHURCH
05/22/2006
06/16/2006
12/13/2006
04/11/2008
Locations
Contacts
HGK CONSTRUCTION MANAGEMENT, Address:6532 BLUE RIDGE CUT OFF  
BRINTON ELECTRIC COMPANY, INC., Address:9616 E. 55TH ST  
CENTRAL PLUMBING HTG & A/C INC, Address:13707 WYANDOTTE  
UNITED HEATING & COOLING, Address:301 DUCK RD  
GUENTHER MILLS KEATING ARCHITECTS, Address:6532 BLUE RIDGE CUTOFF  
SOUTH SUMMIT CHRISTIAN CHURCH INC, Address:1121 SW HOOK RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 12/13/2006 10/29/2010
Correction

Codes Administration - ANSI A117.1-1998 804.7.6 - Refrigerator/Freezer. Combination refrigerators and freezers shall have at least 50 percent of the freezer space 54 inches maximum above the floor or ground. The clear floor or ground space shall be positioned for a parallel approach to the space dedicated to a refrigerator/freezer with the centerline of the clear floor or ground space offset 24 inches maximum from the centerline of the dedicated space.
Correction

CA - ANSI A117.1-1998 606.5 - Bowl depth. Sinks shall be 6.5 inches deep maximum. Multiple compartment sinks shall have at least one compartment complying with this requirement.
Correction

Codes Administration - 2003 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
Correction

Codes Administration - 2003 IBC 1014.1 - Exit or exit access doorways required. Two exits or exit access doorways from any space shall be provided where one of the following conditions exists: 1. The occupant load of the space exceeds the value in Table 1014.1. 2. The common path of egress travel exceeds the limitations of Section 1013.3. 3. Where required by Sections 1014.3, 1014.4 and 1014.5.
Correction

Codes Administration - 2003 IBC 1109.2 - Toilet and bathing facilities. Toilet rooms and bathing facilities shall be accessible. Where a floor level is not required to be connected by an accessible route, the only toilet rooms or bathing facilities provided within the facility shall not be located on the inaccessible floor. At least one of each type of fixture, element, control or dispenser in each accessible toilet room and bathing facility shall be accessible.
Correction

Codes Administration - 2003 IBC 1110.1 - Signs. Required accessible elements shall be identified by the International Symbol of Accessiblity a the following locations: 1. Accessible parking spaces required by Section 1106.1 except where the total number of parking spaces provided is four or less. 2. Accessible passenger loading zones. 3. Accessbile areas of refuge required by Section 1007.6. 4. Accessible rooms where multiple single-user toilet or bathing rooms are clustered in a single location. 5. Accessible entrances where not all entrances are accessible. 6. Accessible check-out aisles where not all aisles are accessible. The sign, where provided, shall be above the check-out aisle in the same location as the checkout aisle number or type of check-out identification. 7. Unisex toilet and bathing rooms. 8. Accessible dressing, fitting and locker rooms where not all such rooms are accessible.
Correction

Codes Administration - 2003 IBC 1210.1 - Floors. In other than dwelling units, toilet and bathing floors shall have a smooth, hard, nonabsorbent surface that extends upward onto the walls at least 6 inches.
Correction

Codes Administration - 2003 IBC 1210.2 - Walls. Walls within 2 feet of urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture.
Correction

Codes Administration - 2003 IBC 2406.1 - Human impact loads. Individual glazed areas, including glass mirrors, in hazardous locations as defined in Section 2406.3 shall comply with Sections 2406.1 through 2406.1.5.
Correction

Fire Department- Egress doors shall be readily openable from the egress side without the use of akey or special knowledge or effort. Exit doors shall not be locked, chained, barred, latched or otherwise rendered unusable. All locking devises shall be of an approved type. IFC 1003.3.1.8
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-1300.
Correction

Fire Department- Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
Correction

Codes Administration - A demolition permit is required for the removal of the existing structure and utilites. The water service shall be abandoned per the requirements of the City of Lee's Summit.
Correction

Codes Administration - A permit can not be issued for this project until Codes Administration has received a copy of the letter from Jackson County approving the design of the private sewage disposal system.
Correction

Codes Administration - The size of the new water meter and the existing water meter to be removed is not provided on the plans.
Correction

Codes Administration - The total allowable area with increases provided in the code analysis is incorrect. As this is a fully sprinkled one story buiding with at least 30 feet clear space on all sides the total allowable area is 45,125 square feet.
Correction

Codes Administration - I am unable to locate information on the door hardware.
Correction

Codes Administration - Information is not provided for the construction of the platform in the sanctuary.
Correction

Codes Administration - I am unable to locate information regarding the R-value of the insulation to be installed on the HVAC ducts located on the exterior of the building.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department: Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the code official is authorized to require a key box to be installed in an accessible location. The key box shall be of an approved type and shall contain keys to gain access as required by the code official.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Fire Department- 907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. 3. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

Codes Administration - 2003 IPC 608.14 - Location of backflow preventers. Access shall be provided to backflow preventers as specified by the installation instructions of the approved manufacturer.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

All backflow prevention assemblies must be tested and reports filed with the Lee's Summit Water Utilities Backflow Division (816-969-7636) within 30 days from the date installed.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $3,001.23 $3,001.23 Paid 06/16/2006
84 Water Meters $625.00 $625.00 Paid 06/16/2006
85 Water Taps $10,936.00 $10,936.00 Paid 06/16/2006
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 07/19/2006
Correction
Partial Correction
07/19/2006
None -WEST SIDE:GRADE BEAM FROM B1-F2, 4-5.5 & 2-4.0 COLUMN PADS-APPROVED PER PLAN
Footing Inspection - Commercial Partial 07/26/2006
Correction
Partial Correction
07/26/2006
None -WEST SIDE:GRADE BEAM FROM B1-F2, 4-5.5 & 2-4.0 COLUMN PADS-APPROVED PER PLAN -EAST SIDE: GRADE BEAM FROM A4-F2, 4-5.5 & 6-4.0 COLUMN PADS-APPROVED
Footing Inspection - Commercial Partial 08/10/2006
Correction
Partial Correction
08/10/2006
None 15 FT SECTION OF FROST FOOTING AT EAST SIDE WHERE ELECTRICAL SERVICE IS LOCATED. GRADE SHALL BE ONE FOOT BELOW TOP OF FOOTING
Electrical Service Inspection Failed 08/10/2006
Correction
Partial Correction
08/10/2006
GROUNDING TO FOOTING STEEL APPROVED
Water Service Inspection Failed 12/06/2006
Correction
Corrective Action Required
12/06/2006
None DO NOT BACKFILL WHERE BEARING SOIL ADJACENT TO GRADE BEAM WAS REMOVED. HAVE ENGINEER TO ADDRESS THIS. OK TO BACKFILL THE REMAINING RUN OF 2" WATER LINE
Water Service Inspection - Commercial Request Complete 12/6/2006 12/6/2006 12/06/2006
Water Service Inspection - Commercial Request Complete 12/6/2006 12/6/2006 12/06/2006
Erosion Control Inspection Residential Failed 02/05/2007
Correction
Corrective Action Required
02/05/2007
Erosion Control DEFICIENT EROSION CONTROL INSTALLATION. EROSION CONTROL SHALL BE INSTALLED ALONG STREET NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Rough Framing Inspection - Commercial Failed 02/05/2007
Correction
Partial Correction
02/05/2007
None -EXTERIOR WALL ONLY-OK TO SHEETROCK INSIDE WHEN READY
Correction
Corrective Action Required
02/05/2007
EXTERIOR PANEL SCREW PATTERN -HAVE ENGINEER ADDRESS SCREW PATTERN FOR DESIGN SHEAR STRENGTH. EXTERIOR GYPSUM BOARDS INSTALLED. SCREW PATTERN SHOULD BE 7" ON CENTER AT EDGE AND IN BETWEEN
Correction
Corrective Action Required
02/05/2007
BRACE STUD WALL TO LATERAL BEAM AT EAST SIDE OF EXTERIOR WALL
Rough Framing Inspection - Commercial Request Complete 2/2/2007 2/5/2007 02/05/2007
Rough Framing Inspection - Commercial Request Complete 2/2/2007 2/5/2007 02/05/2007
All Rough Inspection - Commercial Failed 02/06/2007
Correction
Corrective Action Required
02/06/2007
Stud Size & Spacing (IRC) HAVE PLAN REVISED FOR INTERIOR WALL ALONG SANTUARY. PLAN CALLS FOR 6" WALL
Correction
Corrective Action Required
02/06/2007
IN-WALL -OK TO ROCK ALL WALL EXCEPT FOR BELOW -DO NOT SHEETROCK INTERIOR WALLS WHERE PLUMBING IS NOT COMPLETED.
Rough Framing Inspection - Commercial Failed 02/06/2007
Correction
Partial Correction
02/06/2007
None -EXTERIOR WALL ONLY-OK TO SHEETROCK WHEN READY
Correction
Partial Correction
02/06/2007
EXTERIOR PANEL SCREW PATTERN -8"X8" SCREW PATTERN-OK PROVIDE ENGINEER LETTER FOR EXTERIOR WALL REGARDING REQUIRED SCREW PATTERN
Correction
Corrective Action Required
02/06/2007
BRACE STUD WALL TO LATERAL BEAM AT EAST SIDE OF EXTERIOR WALL MECH RM AND ADMIN OFFICE
Rough Framing Inspection - Commercial Request Complete 2/6/2007 2/6/2007 02/06/2007
Rough Framing Inspection - Commercial Request Complete 2/6/2007 2/6/2007 02/06/2007
Miscellaneous Inspection Failed 02/28/2007
Correction
Corrective Action Required
02/28/2007
INSTALLATION PER MANUFACTURERS INSTRUCTIONS NUMEROUS AREAS WHERE SPACING IS GREATER THAN 8" APART - VERTICAL EXTERIOR NORTHWEST SIDE
Miscellaneous Inspection Passed 03/01/2007
Correction
Resolved
03/01/2007
INSTALLATION PER MANUFACTURERS INSTRUCTIONS NUMEROUS AREAS WHERE SPACING IS GREATER THAN 8" APART - VERTICAL EXTERIOR NORTHWEST SIDE
Rough Plumbing Inspection - Commercial Failed 03/02/2007
Correction
Corrective Action Required
03/02/2007
Water/DWV Preotection Against Physical Damage (IRC) INSTALL PROTECTIVE PLATES WHERE REQUIRED - SOUTHWEST BATH ROOM GROUP
Gas Piping Inspection - Commercial Passed 03/02/2007
Gas Service Inspection - Commercial Passed 03/02/2007
Electrical Service Inspection Failed 04/26/2007
Correction
Corrective Action Required
04/26/2007
GROUNDING TO FOOTING STEEL APPROVED 27-APR-07: WHERE IS THE GROUNDING ELECTRODE CONDUCTOR FROM CONCRETE STEEL? GROUNDING CONDUCTOR TO FOOTING STEEL WAS INSPECTED AND VERIFIED BEFORE THIS SERVICE INSPECTION. -GEC SHALL BE CONTINUOUS TO SERVICE DISCONNECTING MEANS
Correction
Corrective Action Required
04/26/2007
IDENTIFICATION OF GROUNDING ELECTRODE CONDUCTOR TAPE GREEN FOR G.E.C AT CONNECTION TO BUILDING STEEL AND WATER
Correction
Corrective Action Required
04/26/2007
UNDERGROUND WATER PIPE GROUNDING ELECTRODE BOND UNDERGROUND PORTABLE WATER PIPE TO UNDERGROUND FIRE SPRINKLER WATER PIPING AHEAD OF JOINTS
Correction
Corrective Action Required
04/26/2007
SECURE FLEXIBLE CONDUIT WITHIN 12" OF PANELS
Correction
Corrective Action Required
04/26/2007
IDENTIFICATION OF SYSTEM BONDING JUMPER IDENTIFY SYSTEM BONDING JUMPER IN TRANSFORMER
Correction
Corrective Action Required
04/26/2007
SUBMIT CHANGE TO PLAN TO INCLUDE TRANSFORMER
Above Ceiling Inspection Failed 05/03/2007
Correction
Corrective Action Required
05/03/2007
INSTALL CEILING LIGHTING FOR WEST MECHANICAL RM
Correction
Corrective Action Required
05/03/2007
MECHANICAL -INSTALL CEILING REGISTER TO GRID-SANCTUARY -SUPPORT ALL FLEXIBLE DUCTS EVERY 5 FT-THROUGHOUT
Correction
Corrective Action Required
05/03/2007
PLUMBING -SECURE WATER LINES/PVC ABOVE MAN RESTROOM -INSTALL VTR FLASHING BOOT AT ROOF PENETRATION
Correction
Corrective Action Required
05/03/2007
ELECTRICAL -SECURELY FASTEN ALL MC WITHIN 12" OF ALL BOXES -COMPLETE WIRING ABOVE SANCTUARY CEILING -INSTALL EXIT LUMINAIRE OUTSIDE RESTROOM IN INFANT RM SIDE PER PLAN
Correction
Corrective Action Required
05/03/2007
MISC -INSTALL RECEPTACLE FOR DRINKING FOUNTAINS
Electrical Service Inspection Failed 05/03/2007
Correction
Corrective Action Required
05/03/2007
GROUNDING TO FOOTING STEEL APPROVED 27-APR-07: WHERE IS THE GROUNDING ELECTRODE CONDUCTOR FROM CONCRETE STEEL? GROUNDING CONDUCTOR TO FOOTING STEEL WAS INSPECTED AND VERIFIED BEFORE THIS SERVICE INSPECTION. -GEC SHALL BE CONTINUOUS TO SERVICE DISCONNECTING MEANS
Correction
Resolved
05/03/2007
IDENTIFICATION OF GROUNDING ELECTRODE CONDUCTOR OK-CODE DOES NOT REQUIRE
Correction
Resolved
05/03/2007
IDENTIFICATION OF SYSTEM BONDING JUMPER OK-CODE DOES NOT REQUIRE. SORRY
Above Ceiling Inspection Passed 05/07/2007
Correction
Resolved
05/07/2007
INSTALL CEILING LIGHTING FOR WEST MECHANICAL RM
Correction
Resolved
05/07/2007
MECHANICAL -INSTALL CEILING REGISTER TO GRID-SANCTUARY -SUPPORT ALL FLEXIBLE DUCTS EVERY 5 FT-THROUGHOUT
Correction
Resolved
05/07/2007
PLUMBING -SECURE WATER LINES/PVC ABOVE MAN RESTROOM -INSTALL VTR FLASHING BOOT AT ROOF PENETRATION
Correction
Resolved
05/07/2007
ELECTRICAL -SECURELY FASTEN ALL MC WITHIN 12" OF ALL BOXES -COMPLETE WIRING ABOVE SANCTUARY CEILING -INSTALL EXIT LUMINAIRE OUTSIDE RESTROOM IN INFANT RM SIDE PER PLAN
Correction
Resolved
05/07/2007
MISC -INSTALL RECEPTACLE FOR DRINKING FOUNTAINS
Electrical Service Inspection Failed 05/08/2007
Correction
Resolved
05/08/2007
GROUNDING TO FOOTING STEEL APPROVED OK
Correction
Partial Correction
05/08/2007
SUBMIT CHANGE TO PLAN TO INCLUDE TRANSFORMER -COMPLETE THE REST OF ELECTRICAL EQUIPMENTS INSTALLATIONS ON PLAN. -APPROVED FOR RELEASE OF 600 AMP NORMAL SERVICE
Driveway Inspection Passed 05/08/2007
Electrical Service Inspection Failed 05/09/2007
Correction
Partial Correction
05/09/2007
UNDERGROUND WATER PIPE GROUNDING ELECTRODE BOND UNDERGROUND PORTABLE WATER PIPE TO UNDERGROUND FIRE SPRINKLER WATER PIPING AHEAD OF JOINTS
Correction
Partial Correction
05/09/2007
SECURE FLEXIBLE CONDUIT WITHIN 12" OF PANELS
Underground Electrical Inspection - Commercial Failed 05/21/2007
Correction
Corrective Action Required
05/21/2007
UNDERGROUND INSTALLATION -ALL UNDERGROUND ELECTRICAL ACROSS PARKING LOT AREAS SHALL BE MIN 24" BELOW SURFACE. PROVIDE VERIFICATION
Piers/Caissons Inspection - Commercial Failed 05/21/2007
Correction
Corrective Action Required
05/21/2007
LIGHT POLES SHALL BE DONE PER PLAN -CONDUITS SHALL BE MIN 24" BELOW SURFACE -PIERS 6 FT DOWN AND 2 FT UP -ALL REBARS ARRANGEMENT SHALL BE PER PLAN: 8 #7 @ 12" OC VERT, 8 #3 @ 6"OC HOR., ETC -REBARS SHALL BE LAPPED AND TIED TOGETHER -SHALL HAVE MIN 3" REBAR CLEARANCE FROM SOIL
Correction
Corrective Action Required
05/21/2007
LIGHT POLES SHALL BE DONE PER PLAN -CONT- -GROUNDING RODS INSTALLATION SHALL BE INSTALLED AS SHOWN ON PLAN
Correction
Corrective Action Required
05/21/2007
ALL DEBRIS AND WATER SHALL BE REMOVED FROM PIER BOTTOM
Underground Electrical Inspection - Commercial Request Complete 5/21/2007 5/21/2007 05/21/2007
Underground Electrical Inspection - Commercial Request Complete 5/21/2007 5/21/2007 05/21/2007
Piers/Caissons Inspection - Commercial Passed 05/25/2007
Correction
Resolved
05/25/2007
LIGHT POLES SHALL BE DONE PER PLAN
Correction
Resolved
05/25/2007
LIGHT POLES SHALL BE DONE PER PLAN -CONT-
Correction
Resolved
05/25/2007
ALL DEBRIS AND WATER SHALL BE REMOVED FROM PIER BOTTOM
Underground Electrical Inspection - Commercial Request Complete 5/25/2007 5/25/2007 05/25/2007
Underground Electrical Inspection - Commercial Request Complete 5/25/2007 5/25/2007 05/25/2007
All Rough Inspection - Commercial Failed 05/30/2007
Correction
Resolved
05/30/2007
Stud Size & Spacing (IRC) HAVE PLAN REVISED FOR INTERIOR WALL ALONG SANTUARY. PLAN CALLS FOR 6" WALL
Occupancy Inspection - Codes Commercial Failed 05/30/2007
Correction
Corrective Action Required
05/30/2007
Receive Fire Department approval
Correction
Corrective Action Required
05/30/2007
Receive Public Works Approval
Correction
Corrective Action Required
05/30/2007
Receive Water Utilities Approval
Correction
Corrective Action Required
05/30/2007
Receive Planning & Development Approval
Correction
Corrective Action Required
05/30/2007
Grading (IRC) COMPLETE LANDSCAPING PER PLAN. EAST SIDE OF BUILDING SHALL HAVE FINAL GRADE WITHIN 12" OF TOP OF FOOTING IN ORDER TO MEET TRENCH FOOTING FROST DEPTH REQUIREMENT
Correction
Corrective Action Required
05/30/2007
ALLROUGH, UNDERGROUND ELECTRICAL, AND WALL FRAMING THESE INSPECTIONS ARE NOT FULLY APPROVED. IN-WALL PLUMBING WAS NOT COMPLETED AT ALLROUGH INSPECTION, BRACING TO EXTERIOR WALL AT EAST SIDE NOT INSTALLED, UNDERGROUND ELECTRICAL TO LIGHT POLES NOT INSPECTED
Correction
Corrective Action Required
05/30/2007
Outdoor GFCI Receptacles (IRC) -WEATHER-PROOF COVERS FOR EXTERIOR GFCI NOT INSTALLED -EXTENSION RINGS NOT INSTALLED THAT SHALL EXTEND TO SURFACE OF WALL FINISH
Correction
Corrective Action Required
05/30/2007
LIQUIDTIGHT FLEXIBLE CONDUITS TO EXTERIOR MECHANICAL UNITS -SHALL BE SECURELY FASTEN WITHIN 12" OF DISCONNECTS AND UNITS, AND EVERY 3 FT ON CENTER
Correction
Corrective Action Required
05/30/2007
SEAL EXTERIOR
Correction
Corrective Action Required
05/30/2007
GAS SERVICE NOT IN PLACE
Rough Framing Inspection - Commercial Failed 05/30/2007
Correction
Partial Correction
05/30/2007
None -EXTERIOR WALL ONLY-OK TO SHEETROCK WHEN READY
Correction
Resolved
05/30/2007
EXTERIOR PANEL SCREW PATTERN -8"X8" SCREW PATTERN-OK
Correction
Corrective Action Required
05/30/2007
BRACE STUD WALL TO LATERAL BEAM AT EAST SIDE OF EXTERIOR WALL MECH RM AND ADMIN OFFICE
Occupancy Inspection - Codes Commercial Failed 05/31/2007
Correction
Corrective Action Required
05/31/2007
Receive Fire Department approval COMPLETE SPRINKLER SYSTEM
Correction
Corrective Action Required
05/31/2007
Grading (IRC) COMPLETE LANDSCAPING PER PLAN. EAST SIDE OF BUILDING SHALL HAVE FINAL GRADE WITHIN 12" OF TOP OF FOOTING IN ORDER TO MEET TRENCH FOOTING FROST DEPTH REQUIREMENT
Correction
Corrective Action Required
05/31/2007
ALLROUGH, UNDERGROUND ELECTRICAL, AND WALL FRAMING WATER INSPECTION. THESE INSPECTIONS ARE NOT FULLY APPROVED. IN-WALL PLUMBING WAS NOT COMPLETED AT ALLROUGH INSPECTION, BRACING TO EXTERIOR WALL AT EAST SIDE NOT INSTALLED, UNDERGROUND ELECTRICAL TO LIGHT POLES AND SEWER PUMPS NOT INSPECTED
Correction
Corrective Action Required
05/31/2007
Outdoor GFCI Receptacles (IRC) -WEATHER-PROOF COVERS FOR EXTERIOR GFCI NOT INSTALLED. EXTERIOR RECEPTACLES SHALL BE WEATHER-PROTECTED WHETHER PLUG IS INSERTED OR NOT -EXTENSION RINGS NOT INSTALLED THAT SHALL EXTEND TO SURFACE OF WALL FINISH
Correction
Corrective Action Required
05/31/2007
RESOLVE LICENSE TAX ISSUE CONTACT CODE DEPARTMENT
Correction
Corrective Action Required
05/31/2007
Premises Identification (IRC) PROVIDE PERMANENT ADDRESS
Correction
Corrective Action Required
05/31/2007
COMPLETE TRASH AREA ENCLOSURE
Correction
Corrective Action Required
05/31/2007
COMPLETE PARKING LOT -ASPHALT PLACEMENT -ACCESSIBLE PARKING LOTS, MARKINGS/STRIPINGS, ACCESSIBLE SIGNS AND ROUTE, ETC
Correction
Corrective Action Required
05/31/2007
COMPLETE OTHER EXTERIOR ITEMS -SIDEWALK LIGHTING -GUTTER/DOWNSPOUTS -BUILDING DRAIN CLEANOUT
Correction
Corrective Action Required
05/31/2007
SERVICE GROUNDING BOND BUILDING SPRINKLER UNDERGROUND WATER PIPING SYSTEM TO PORTABLE WATER SERVICE LINE WITH JUMPER SIZED PER NEC 250.66
Correction
Corrective Action Required
05/31/2007
SECURE ALL MC AND FLEXIBLE METAL CONDUITS WITHIN 12" OF BOXES SPRINKLER RM, ELECTRICAL SERVICE RM
Correction
Corrective Action Required
05/31/2007
INSTALL CEILING LIGHT FIXTURE AT NW CORNER
Correction
Corrective Action Required
05/31/2007
ELECTRICAL PANELS -CLOSE ALL BREAKER OPENINGS -LABEL ALL BREAKERS -SECURE FMC WITHIN 12" OF PANELS -SEAL UNDERGROUND CONDUITS TO MAIN SERVICE DISCONNECT
Correction
Corrective Action Required
05/31/2007
ADDED TRANSFORMER -PROVIDE VISUAL ACCESS TO ADDED TRANSFORMER INTERIOR AND ALSO GROUNDING CONNECTION TO BUILDING STEEL -SECURE FMC WITHIN 12" OF PANEL
Correction
Corrective Action Required
05/31/2007
PROVIDE PROPER BREAKER SIZE FOR EXTERIOR MECHANICAL PER LABELS FOR BIGGER MECHANICAL UNITS. CURRENTLY INSTALL 100 AMP BREAKERS
Correction
Corrective Action Required
05/31/2007
WATER HEATER INSIDE MOP RM -PROVIDE A DISCONNECT WITHIN SIGHT OF WATER HEATER -INSTALL EXPANSION TANK
Correction
Corrective Action Required
05/31/2007
EXIT SIGNS PROVIDE 2 EXIT SIGNS AS DRAWN ON PLAN FOR INFANT ROOM
Correction
Corrective Action Required
05/31/2007
PRIVATE SEWER SYSTEM PROVIDE LETTER OF COMPLIANCE WITH INTERNATIONAL PRIVATE SEWAGE DISPOSAL CODE FOR INSTALLATION OF THE PRIVATE SEWER SYSTEM.
Correction
Corrective Action Required
05/31/2007
SPECIAL INSPECTION PROVIDE LETTER OF COMPLETE INSPECTION FROM PSI WITH ALL DISCREPENCIES RESOLVED
All Rough Inspection - Commercial Failed 05/31/2007
Correction
Corrective Action Required
05/31/2007
IN-WALL -OK TO ROCK ALL WALL EXCEPT FOR BELOW -DO NOT SHEETROCK INTERIOR WALLS WHERE PLUMBING IS NOT COMPLETED.
Water Service Inspection Failed 05/31/2007
Correction
Corrective Action Required
05/31/2007
None DO NOT BACKFILL WHERE BEARING SOIL ADJACENT TO GRADE BEAM WAS REMOVED. HAVE ENGINEER TO ADDRESS THIS. OK TO BACKFILL THE REMAINING RUN OF 2" WATER LINE
Underground Electrical Inspection - Commercial Failed 05/31/2007
Rough Plumbing Inspection - Commercial Failed 05/31/2007
Correction
Corrective Action Required
05/31/2007
Water/DWV Preotection Against Physical Damage (IRC) INSTALL PROTECTIVE PLATES WHERE REQUIRED - SOUTHWEST BATH ROOM GROUP
Rough Framing Inspection - Commercial Failed 05/31/2007
Correction
Partial Correction
05/31/2007
None -EXTERIOR WALL ONLY-OK TO SHEETROCK WHEN READY
Occupancy Inspection - Codes Commercial Failed 06/01/2007
Correction
Corrective Action Required
06/01/2007
ELECTRICAL PANELS -CLOSE ALL BREAKER OPENINGS -LABEL ALL BREAKERS -SECURE FMC WITHIN 12" OF PANELS -SEAL UNDERGROUND CONDUITS TO MAIN SERVICE DISCONNECT
Correction
Resolved
06/01/2007
ADDED TRANSFORMER
Correction
Resolved
06/01/2007
SPECIAL INSPECTION
All Rough Inspection - Commercial Passed 06/01/2007
Correction
Resolved
06/01/2007
IN-WALL
Electrical Service Inspection Passed 06/01/2007
Correction
Resolved
06/01/2007
IDENTIFICATION OF GROUNDING ELECTRODE CONDUCTOR
Correction
Resolved
06/01/2007
UNDERGROUND WATER PIPE GROUNDING ELECTRODE SEE FINAL
Correction
Resolved
06/01/2007
SECURE FLEXIBLE CONDUIT WITHIN 12" OF PANELS SEE FINAL
Correction
Resolved
06/01/2007
SUBMIT CHANGE TO PLAN TO INCLUDE TRANSFORMER
Underground Electrical Inspection - Commercial Passed 06/01/2007
Correction
Resolved
06/01/2007
UNDERGROUND INSTALLATION -ALL UNDERGROUND ELECTRICAL ACROSS PARKING LOT AREAS SHALL BE MIN 24" BELOW SURFACE. PROVIDE VERIFICATION SEE FINAL
Water Service Inspection Passed 06/01/2007
Correction
Resolved
06/01/2007
None DO NOT BACKFILL WHERE BEARING SOIL ADJACENT TO GRADE BEAM WAS REMOVED. HAVE ENGINEER TO ADDRESS THIS. SEE FINAL
Rough Framing Inspection - Commercial Passed 06/01/2007
Correction
Resolved
06/01/2007
None
Correction
Resolved
06/01/2007
BRACE STUD WALL TO LATERAL BEAM AT EAST SIDE OF EXTERIOR WALL
Footing Inspection - Commercial Passed 06/01/2007
Correction
Resolved
06/01/2007
None -WEST SIDE:GRADE BEAM FROM B1-F2, 4-5.5 & 2-4.0 COLUMN PADS-APPROVED PER PLAN -EAST SIDE: GRADE BEAM FROM A4-F2, 4-5.5 & 6-4.0 COLUMN PADS-APPROVED
Correction
Resolved
06/01/2007
None 15 FT SECTION OF FROST FOOTING AT EAST SIDE WHERE ELECTRICAL SERVICE IS LOCATED. GRADE SHALL BE ONE FOOT BELOW TOP OF FOOTING
Rough Plumbing Inspection - Commercial Passed 06/01/2007
Correction
Resolved
06/01/2007
Water/DWV Preotection Against Physical Damage (IRC) INSTALL PROTECTIVE PLATES WHERE REQUIRED - SOUTHWEST BATH ROOM GROUP SEE FINAL
Rough Mechanical Inspection - Commercial Passed 06/01/2007
Erosion Control Inspection Residential Passed 06/01/2007
Correction
Resolved
06/01/2007
Erosion Control
Occupancy Inspection - Codes Commercial Failed 06/06/2007
Correction
Corrective Action Required
06/06/2007
Grading (IRC) COMPLETE LANDSCAPING PER PLAN. EAST SIDE OF BUILDING SHALL HAVE FINAL GRADE WITHIN 12" OF TOP OF FOOTING IN ORDER TO MEET TRENCH FOOTING FROST DEPTH REQUIREMENT
Correction
Corrective Action Required
06/06/2007
ALLROUGH, UNDERGROUND ELECTRICAL, AND WALL FRAMING WATER INSPECTION. HAVE ENGINEER WRITE LETTER ADRRESSING WATER LINE TRENCH OBSERVED DURING WATER INSPECTION
Correction
Resolved
06/06/2007
Outdoor GFCI Receptacles (IRC)
Correction
Corrective Action Required
06/06/2007
LIQUIDTIGHT FLEXIBLE CONDUITS TO EXTERIOR MECHANICAL UNITS -SHALL BE SECURELY FASTEN WITHIN 12" OF DISCONNECTS AND UNITS, AND EVERY 3 FT ON CENTER
Correction
Resolved
06/06/2007
SEAL EXTERIOR
Correction
Resolved
06/06/2007
GAS SERVICE NOT IN PLACE
Correction
Resolved
06/06/2007
RESOLVE LICENSE TAX ISSUE
Correction
Resolved
06/06/2007
Premises Identification (IRC)
Correction
Corrective Action Required
06/06/2007
COMPLETE OTHER EXTERIOR ITEMS -SIDEWALK LIGHTING -GUTTER/DOWNSPOUTS
Correction
Resolved
06/06/2007
INSTALL CEILING LIGHT FIXTURE AT NW CORNER
Correction
Corrective Action Required
06/06/2007
ELECTRICAL PANELS -LABEL ALL BREAKERS -SECURE FMC WITHIN 12" OF PANELS
Correction
Corrective Action Required
06/06/2007
PROVIDE PROPER BREAKER SIZE FOR EXTERIOR MECHANICAL PER LABELS FOR BIGGER MECHANICAL UNITS. CURRENTLY INSTALL 100 AMP BREAKERS. LABEL CALLS FOR MAX OF 90 AMP BREAKERS FOR 2 BIGGER UNITS
Correction
Resolved
06/06/2007
WATER HEATER INSIDE MOP RM
Correction
Resolved
06/06/2007
EXIT SIGNS
Correction
Corrective Action Required
06/06/2007
PRIVATE SEWER SYSTEM PROVIDE LETTER OF COMPLIANCE WITH JACKSON COUNTY REQUIREMENT FOR INSTALLATION OF THE PRIVATE SEWER SYSTEM.
Correction
Corrective Action Required
06/06/2007
MISC -INSTALL FLOOR DRAIN-FIRE SPRINKLER RM -CLOSE ELECTRICAL BOX OPENING ABOVE ELECTRICAL RM -CAP LOW VOLTAGE FLOOR BOX OPENING IN SANCTUARY. FLUSH W/ FLOOR, OR MAX 1/4" BEVEL ABOVE FLOOR -BEVEL AT FRONT ENTRANCE DOOR THRESHOLD
Occupancy Inspection - Codes Commercial Failed 06/08/2007
Correction
Resolved
06/08/2007
ALLROUGH, UNDERGROUND ELECTRICAL, AND WALL FRAMING
Correction
Resolved
06/08/2007
COMPLETE PARKING LOT
Correction
Resolved
06/08/2007
SECURE ALL MC AND FLEXIBLE METAL CONDUITS WITHIN 12" OF BOXES
Correction
Resolved
06/08/2007
ELECTRICAL PANELS
Correction
Resolved
06/08/2007
PROVIDE PROPER BREAKER SIZE FOR EXTERIOR MECHANICAL PER LABELS
Correction
Resolved
06/08/2007
PRIVATE SEWER SYSTEM RECEIVED LETTER OF COMPLIANCE WITH DNR AND JACKSON COUNTY REQUIREMENT FOR INSTALLATION OF THE PRIVATE SEWER SYSTEM.
Correction
Corrective Action Required
06/08/2007
MISC -INSTALL FLOOR DRAIN-FIRE SPRINKLER RM -CLOSE ELECTRICAL BOX OPENING ABOVE ELECTRICAL RM -BEVEL AT FRONT ENTRANCE DOOR THRESHOLD
Occupancy Inspection - Codes Commercial Failed 10/03/2007
Correction
Resolved
10/03/2007
Receive Fire Department approval
Occupancy Inspection - Codes Commercial Failed 10/12/2007
Correction
Resolved
10/12/2007
Receive Planning & Development Approval
Occupancy Inspection - Codes Commercial Failed 12/12/2007
Correction
Resolved
12/12/2007
COMPLETE TRASH AREA ENCLOSURE
Correction
Resolved
12/12/2007
COMPLETE OTHER EXTERIOR ITEMS
Occupancy Inspection - Codes Commercial Failed 12/14/2007
Correction
Resolved
12/14/2007
Receive Public Works Approval
Occupancy Inspection - Codes Commercial Failed 12/18/2007
Correction
Corrective Action Required
12/18/2007
Receive Water Utilities Approval
Correction
Corrective Action Required
12/18/2007
Grading (IRC) COMPLETE LANDSCAPING PER PLAN. EAST SIDE OF BUILDING SHALL HAVE FINAL GRADE WITHIN 12" OF TOP OF FOOTING IN ORDER TO MEET TRENCH FOOTING FROST DEPTH REQUIREMENT
Correction
Resolved
12/18/2007
LIQUIDTIGHT FLEXIBLE CONDUITS TO EXTERIOR MECHANICAL UNITS
Correction
Corrective Action Required
12/18/2007
SERVICE GROUNDING BOND BUILDING SPRINKLER UNDERGROUND WATER PIPING SYSTEM TO PORTABLE WATER SERVICE LINE WITH JUMPER SIZED PER NEC 250.66
Correction
Corrective Action Required
12/18/2007
MISC -INSTALL FLOOR DRAIN-FIRE SPRINKLER RM
Occupancy Inspection - Codes Commercial Failed 12/21/2007
Correction
Resolved
12/21/2007
Receive Water Utilities Approval
Correction
Corrective Action Required
12/21/2007
Grading (IRC) COMPLETE LANDSCAPING PER PLAN. EAST SIDE OF BUILDING SHALL HAVE FINAL GRADE WITHIN 12" OF TOP OF FOOTING IN ORDER TO MEET TRENCH FOOTING FROST DEPTH REQUIREMENT
Occupancy Inspection - Codes Commercial Passed 04/10/2008
Correction
Resolved
04/10/2008
Grading (IRC)
Correction
Resolved
04/10/2008
SERVICE GROUNDING
Correction
Resolved
04/10/2008
MISC
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home