Permit Application Status

B0600721


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0600721
Building Permit - Commercial
Certificate of Occupancy
BANK OF LEES SUMMIT
ALTERATION COMMERCIAL
BANK OF LEES SUMMIT REMODEL
05/08/2006
06/19/2006
12/16/2006
10/02/2006
Locations
Contacts
A L HUBER, Address:10770 EL MONTE  
KENNETH M FRASHIER & ASSOCIATES, Address:620 SE M-291 SUITE 104  
BANK OF LEES SUMMIT, Address:210 S MAIN  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 11/20/2006 10/29/2010
Correction

Codes Administration - 2003 IBC 1210.2 - Walls. Walls within 2 feet of urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture.
Correction

Fire Department- Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. Exit doors shall not be locked, chained, barred, latched or otherwise rendered unusable. All locking devises shall be of an approved type. IFC 1003.3.1.8
Correction

Fire Department- Where required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Exit sign placement shall be such that no point in an exit access corridor is more than 100 feet (30 480 mm) from the nearest visible exit sign.
Correction

Codes Administration - The scale is not provided on the detail drawings on Sheet 1.
Correction

Codes Administration - The plans do not include a code analysis.
Correction

Codes Administration - 2003 IBC 1506.1 - Scope. The requiements set forth in this section shall apply to the application of roof-coverings materials specified herein. Roof coverings shall be applied in accordance with this chapter and the manufacturer's installation instructions. Installation of roof coverings shall comply with the applicable provisions of Section 1507.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

Fire Department; Required means of egress components shall be maintained during construction and demolition.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $2,276.86 $2,276.86 Paid 06/19/2006
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Partial 07/07/2006
Correction
Partial Correction
07/07/2006
WALL FRAMING + IN-WALL SYSTEMS BASEMENT LEVEL; OK TO COVER WHEN READY WALLS AT SPACES LISTED:
Underslab Plumbing Inspection - Commercial Passed 07/13/2006
Correction
Resolved
07/13/2006
UNDER-SLAB DWV PIPING RESTROOM OK TO COVER WHEN READY
All Rough Inspection - Commercial Partial 07/13/2006
Correction
Corrective Action Required
07/13/2006
WALL FRAMING + IN-WALL SYSTEMS BASEMENT LEVEL EXCEPT RESTROOMS OK; RESTROOMS: 1) ISOLATE COPPER PIPE FROM STEEL STUDS; 2) APPLY SHIELD PLATES TO PROTECT COPPER PIPE < 1-1/2" FROM FACE OF STUDS; 3) SUPPORT AND SECURE COPPER PIPE IN FURNACE ROOM OK TO COVER WHEN READY WALLS AT SPACES LISTED:
Correction
Corrective Action Required
07/13/2006
AIR ADMITTANCE VALVE AT VENT STACK SUBJECT TO APPROVAL
All Rough Inspection - Commercial Partial 07/17/2006
Correction
Partial Correction
07/17/2006
WALL FRAMING + IN-WALL SYSTEMS BASEMENT LEVEL COMPLETE EXCEPT SUPPORT AND SECURE COPPER PIPE IN FURNACE ROOM OK TO COVER WHEN READY WALLS AT SPACES LISTED:
Correction
Resolved
07/17/2006
AIR ADMITTANCE VALVE AT VENT STACK OK AS EXCEPTION TO L.S. PLUMBING CODE
Correction
Partial Correction
07/17/2006
COLUMN ENCLOSURES AT DRIVE-THROUGH CANOPY EXCEPT TWO TO ENCLOSE ROOF DRAIN LINES SCREW ALL STUD FLANGES OK TO COVER WHEN READY
Footing Inspection - Commercial Passed 07/19/2006
Correction
Resolved
07/19/2006
GRADE BEAMS(2) FOR VESTIBULE EXTENSION OK TO POUR WHEN READY
All Rough Inspection - Commercial Partial 07/20/2006
Correction
Resolved
07/20/2006
COLUMN ENCLOSURES AT DRIVE-THROUGH CANOPY OK TO COVER WHEN READY
Rough Plumbing Inspection - Commercial Passed 07/20/2006
Correction
Resolved
07/20/2006
ROOF DRAIN LINES INSIDE COLUMN ENCLOSURES OK TO COVER WHEN READY
Underground Plumbing Inspection - Commercial Request Complete 7/20/2006 7/21/2006 07/21/2006
All Rough Inspection - Commercial Partial 07/24/2006
Correction
Partial Correction
07/24/2006
WALL FRAMING + IN-WALL SYSTEMS BASEMENT LEVEL COMPLETE; 1ST FLR COUPON BOOTH; OK TO COVER WHEN READY WALLS AT SPACES LISTED:
Above Ceiling Inspection Partial 07/24/2006
Correction
Partial Correction
07/24/2006
CEILING FRAMING + ABOVE-CEILING SYSTEMS BASEMENT LEVEL; OK TO COVER WHEN READY SPACES LISTED BELOW:
Footing Inspection - Commercial Passed 07/25/2006
Correction
Resolved
07/25/2006
GRADE BEAMS(2) FOR VESTIBULE EXTENSION
Correction
Resolved
07/25/2006
FOOTINGS (2) TO SUPPORT WALL PROJECTIONS PER WALL SECTION 2/4 OK TO POUR WHEN READY
All Rough Inspection - Commercial Partial 07/27/2006
Correction
Partial Correction
07/27/2006
WALL FRAMING + IN-WALL SYSTEMS BASEMENT LEVEL COMPLETE; 1ST FLR COUPON BOOTH; COPIER/PRINTER WEST WALL; OK TO COVER WHEN READY WALLS AT SPACES LISTED:
Correction
Corrective Action Required
07/27/2006
PARAPET/FASCIA FRAMING AT DRIVE THROUGH CANOPY
All Rough Inspection - Commercial Partial 07/28/2006
Correction
Resolved
07/28/2006
AIR ADMITTANCE VALVE AT VENT STACK OK AS EXCEPTION TO L.S. PLUMBING CODE
Correction
Resolved
07/28/2006
COLUMN ENCLOSURES AT DRIVE-THROUGH CANOPY
Correction
Resolved
07/28/2006
PARAPET/FASCIA FRAMING AT DRIVE THROUGH CANOPY OK TO COVER WHEN READY
Correction
Resolved
07/28/2006
SOFFIT FRAMING AT NW BLDG CORNER OK TO COVER WHEN READY
All Rough Inspection - Commercial Partial 08/01/2006
Correction
Partial Correction
08/01/2006
WALL FRAMING + IN-WALL SYSTEMS BASEMENT LEVEL COMPLETE; 1ST FLR COUPON BOOTH; COPIER/PRINTER WEST WALL; IN-FILL OF EXSTG OPNG SOUTH EXT WALL NEAR SW CORNER; OK TO COVER WHEN READY WALLS AT SPACES LISTED:
Correction
Resolved
08/01/2006
PARAPET/FASCIA FRAMING AT DRIVE THROUGH CANOPY WEST END OF BLDG OK TO COVER WHEN READY INCL ABOVE EXSTG ROOF @
Correction
Partial Correction
08/01/2006
NEW/REPAIRED FRAMING & ELECTRICAL AT REPLACED SOFFIT SOUTH EXT WALL EAST 50" (REMOVE EXSTG ELECT CIRCUIT; REPLACE ROTTED SECTIONS OF 2x6 FACER; SUPPORT MC CABLE @ MAX 4.5' INTERVALS); OK TO COVER WHEN READY PORTIONS LISTED BELOW:
All Rough Inspection - Commercial Partial 08/04/2006
Correction
Partial Correction
08/04/2006
WALL FRAMING + IN-WALL SYSTEMS BASEMENT LEVEL COMPLETE; 1ST FLR COUPON BOOTH; COPIER/PRINTER WEST WALL; IN-FILL OF EXSTG OPNG SOUTH EXT WALL NEAR SW CORNER; COLUMNS + WALL IN-FILL @ S ELEVATION; COLUMNS & SOFFITS @ E ELEVATION; OK TO COVER WHEN READY WALLS AT SPACES LISTED:
Occupancy Inspection - Codes Commercial Partial 08/04/2006
Correction
Partial Correction
08/04/2006
OCCUPANCY OF BASEMENT SPACES SPACES 01; 02; 03; SOUTH RR; TO BE RESOLVED NLT 8/10: 1) EMERGENCY & EXIT LIGHTING MODIFICATIONS PER CPT DIR 2) INSTALL CLOSER AT BOTTOM STAIRWELL DOOR EXCLUDING BOILER 05 FOLLOWING OK THRU 8/10/06
All Rough Inspection - Commercial Partial 08/09/2006
Correction
Partial Correction
08/09/2006
WALL FRAMING + IN-WALL SYSTEMS BASEMENT LEVEL COMPLETE; 1ST FLR COUPON BOOTH; COPIER/PRINTER WEST WALL; IN-FILL OF EXSTG OPNG SOUTH EXT WALL NEAR SW CORNER; COLUMNS + WALL IN-FILL @ S ELEVATION; COLUMNS & SOFFITS @ E ELEVATION; 106; 107; NEW 116; OK TO COVER WHEN READY WALLS AT SPACES LISTED:
Correction
Partial Correction
08/09/2006
NEW/REPAIRED FRAMING & ELECTRICAL AT REPLACED SOFFIT SOUTH EXTERIOR ELEVATION COMPLETE INCLUDING CANOPY OK TO COVER WHEN READY PORTIONS LISTED BELOW:
Gas Piping Inspection - Commercial Passed 08/09/2006
Correction
Resolved
08/09/2006
REVISED FEEDER PIPING SERVING WATER HEATER @ BOILER RM AT 15 PSI FOR >15 MIN TEST PRESSURE LEVEL HELD STEADY
All Rough Inspection - Commercial Partial 08/10/2006
Correction
Partial Correction
08/10/2006
WALL FRAMING + IN-WALL SYSTEMS BASEMENT LEVEL COMPLETE; 1ST FLR COUPON BOOTH; COPIER/PRINTER WEST WALL; IN-FILL OF EXSTG OPNG SOUTH EXT WALL NEAR SW CORNER; COLUMNS + WALL IN-FILL @ S ELEVATION; COLUMNS & SOFFITS @ E ELEVATION; 106; 107; NEW 116; 117; 118 EXCL SW C ORNER; OK TO COVER WHEN READY WALLS AT SPACES LISTED:
Above Ceiling Inspection Partial 08/10/2006
Correction
Partial Correction
08/10/2006
CEILING FRAMING + ABOVE-CEILING SYSTEMS BASEMENT LEVEL; 113 AFTER EXISTING CONDUIT IS SUPPORTED & BOXES ARE CLOSED; OK TO COVER WHEN READY SPACES LISTED BELOW:
All Rough Inspection - Commercial Partial 08/15/2006
Correction
Partial Correction
08/15/2006
WALL FRAMING + IN-WALL SYSTEMS BASEMENT LEVEL COMPLETE; 1ST FLR COUPON BOOTH; COPIER/PRINTER WEST WALL; IN-FILL OF EXSTG OPNG SOUTH EXT WALL NEAR SW CORNER; COLUMNS + WALL IN-FILL @ S ELEVATION; COLUMNS & SOFFITS @ E ELEVATION; 106; 107; NEW 116; 117; 118 SW AFTER FLOOR PENS FB'D; OK TO COVER WHEN READY WALLS AT SPACES LISTED:
Above Ceiling Inspection Partial 08/15/2006
Correction
Partial Correction
08/15/2006
CEILING FRAMING + ABOVE-CEILING SYSTEMS BASEMENT LEVEL COMPLETE; 113 AFTER EXISTING CONDUIT IS SUPPORTED & BOXES ARE CLOSED; 116 AFTER ABANDONED HANGERS REMOVED AND HVAC CONNECTED; OK TO COVER WHEN READY SPACES LISTED BELOW:
All Rough Inspection - Commercial Partial 08/17/2006
Correction
Resolved
08/17/2006
NEW WALL FACADE & MANSARD FRAMING & ELECTRICAL @ EXTERIOR NE OK TO COVER WHEN READY
Correction
Resolved
08/17/2006
FRAMING + ELECT AT COLUMN IN 1ST FLR OPEN AREA OK TO COVER WHEN READY
Above Ceiling Inspection Partial 08/17/2006
Correction
Partial Correction
08/17/2006
CEILING FRAMING + ABOVE-CEILING SYSTEMS BASEMENT LEVEL COMPLETE; 113 AFTER EXISTING CONDUIT IS SUPPORTED & BOXES ARE CLOSED; 116 AFTER ABANDONED HANGERS REMOVED AND HVAC CONNECTED; 7; BORDER ONLY AT 6; OK TO COVER WHEN READY SPACES LISTED BELOW:
Above Ceiling Inspection Partial 08/22/2006
Correction
Resolved
08/22/2006
None Room 106
Above Ceiling Inspection Partial 08/25/2006
Correction
Partial Correction
08/25/2006
CEILING FRAMING + ABOVE-CEILING SYSTEMS BASEMENT LEVEL COMPLETE; 113 AFTER EXISTING CONDUIT IS SUPPORTED & BOXES ARE CLOSED; 116; 7; 6; 106; OK TO COVER WHEN READY SPACES LISTED BELOW:
Correction
Resolved
08/25/2006
None
Correction
Partial Correction
08/25/2006
DRIVE THROUGH CANOPY SEAL WEST WALL OF BUILDING ABOVE CEILING LINE TO RESIST ENTRY BY INSECTS, MOISTURE, RODENTS,.. OK TO COVER WHEN READY EXCEPT EAST 3'
All Rough Inspection - Commercial Partial 08/30/2006
Correction
Partial Correction
08/30/2006
WALL FRAMING + IN-WALL SYSTEMS BASEMENT LEVEL COMPLETE; 1ST FLR COUPON BOOTH; COPIER/PRINTER WEST WALL; IN-FILL OF EXSTG OPNG SOUTH EXT WALL NEAR SW CORNER; COLUMNS + WALL IN-FILL @ S ELEV; COLUMNS & SOFFITS @ E ELEV; 106; 107; NEW 116; 117; 118 SW AFTER FLOOR PENS FB'D; 101 N&S WALLS OK TO COVER WHEN READY WALLS AT SPACES LISTED:
Above Ceiling Inspection Partial 08/30/2006
Correction
Resolved
08/30/2006
DRIVE THROUGH CANOPY OK TO COVER WHEN READY
Above Ceiling Inspection Partial 09/07/2006
Correction
Partial Correction
09/07/2006
None -ABOVE-CEILING AT BOTH SIDES OF ENTRANCE VESTIBULE-OK TO DROP CEILING TILES -VESTIBULE ABOVE-CEILING: 1) SECURE NEAR END OF EMT 2) INSTALL EXTENSION RING FOR J-BOX SERVING CEILING HEATER 3) COMPLETE TERMINATING WIRINGS IN J-BOX, CLOSE BOX
Above Ceiling Inspection Partial 09/08/2006
Correction
Resolved
09/08/2006
None -ABOVE-CEILING AT BOTH SIDES OF ENTRANCE VESTIBULE-OK -ENTRANCE VESTIBULE-OK
Above Ceiling Inspection Passed 09/22/2006
Correction
Resolved
09/22/2006
CEILING FRAMING + ABOVE-CEILING SYSTEMS
Correction
Resolved
09/22/2006
None
Correction
Resolved
09/22/2006
DRIVE THROUGH CANOPY
Correction
Resolved
09/22/2006
None
All Rough Inspection - Commercial Passed 09/22/2006
Correction
Resolved
09/22/2006
WALL FRAMING + IN-WALL SYSTEMS
Correction
Resolved
09/22/2006
AIR ADMITTANCE VALVE AT VENT STACK
Correction
Resolved
09/22/2006
COLUMN ENCLOSURES AT DRIVE-THROUGH CANOPY
Correction
Resolved
09/22/2006
PARAPET/FASCIA FRAMING AT DRIVE THROUGH CANOPY
Correction
Resolved
09/22/2006
SOFFIT FRAMING AT NW BLDG CORNER
Correction
Resolved
09/22/2006
NEW/REPAIRED FRAMING & ELECTRICAL AT REPLACED SOFFIT
Correction
Resolved
09/22/2006
NEW WALL FACADE & MANSARD FRAMING & ELECTRICAL @ EXTERIOR NE
Correction
Resolved
09/22/2006
FRAMING + ELECT AT COLUMN IN 1ST FLR OPEN AREA
Occupancy Inspection - Codes Commercial Partial 09/22/2006
Correction
Resolved
09/22/2006
OCCUPANCY OF BASEMENT SPACES EXCLUDING BOILER 05 FOLLOWING OK THRU 8/10/06
Correction
Corrective Action Required
09/22/2006
ISSUES @ BOILER 05 DISCUSSED ON SITE LISTED BY MARK/A.L. HUBER
Correction
Corrective Action Required
09/22/2006
ROOFTOP INSPECTION CLEAN/CLEAR ALL MATERIAL +CONDENSATE LINE BROKEN
Correction
Corrective Action Required
09/22/2006
Receive Fire Department approval
Correction
Corrective Action Required
09/22/2006
Receive Water Utilities Approval
Occupancy Inspection - Codes Commercial Partial 09/28/2006
Correction
Resolved
09/28/2006
Receive Fire Department approval PER J DIR 9/28/06
Occupancy Inspection - Codes Commercial Passed 09/29/2006
Correction
Resolved
09/29/2006
OCCUPANCY OF BASEMENT SPACES
Correction
Resolved
09/29/2006
ISSUES @ BOILER 05
Correction
Resolved
09/29/2006
ROOFTOP INSPECTION
Correction
Resolved
09/29/2006
Receive Water Utilities Approval NO ISSUES PRESENTED
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home