Permit Application Status

B0600233


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0600233
Building Permit - Commercial
Certificate of Occupancy
JONES TODD S
NEW TENANT FINISH
TENANT FINISH
02/24/2006
03/13/2006
09/09/2006
05/25/2006
Locations
Contacts
AGMP ARCHITECTS, Address:226 SE DOUGLAS  
D. L. KIRBY PROPERTIES, Address:826 NE SWANN RD  
JONES TODD S, Address:1324 NE WINDSOR DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 09/02/2006 10/29/2010
Correction

Codes Administration - 2003 IBC 1109.12.3 - Point of sales and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed.
Correction

Codes Administration - 2003 IBC 1210.2 - Walls. Walls within 2 feet of urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture.
Correction

Codes Administration - As indicated on the shell building and several of the tenant space reviews for this building, the rated demising walls are not required. If they are shown on the plans, than they will have to be installed per code.
Correction

Codes Administration - The plans do not indicate how the furnace is to be supported.
Correction

Codes Administration - The furnace detail does not match the system to be installed.
Correction

Codes Adminsitration - Floor Plan Note 3 on Sheet TF-1 references a fire sprinkler. This building is not sprinkled.
Correction

Codes Administration - I am unable to locate information/details on the wall construction.
Correction

Codes Administration - 2003 IMC 307.2.3 - Auxiliary and secondary drain systems. In addition to the requirements of Section 307.2.1, a secondary drain or auxiliary drain pan shall be required for each cooling or evaporator coil where damage to any building components will occur as a result of overflow fron the equipment drain pan or stoppage in the condensate drain piping.
Correction

Fire Department- The plans indicate this is a sprinklered building, and it is not.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - A Certificate of Occupancy will not be issued for a tenant finish until a minimum of a Temporary Occupancy has been issued for the shell building.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

Fire Department; The required fire-resistance rating of fire-resistance-rated construction (including walls, fire stops, shaft enclosures, partitions and floors) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings, and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance rated assemblies shall be protected by self-closing or automatic- closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $120.35 $120.35 Paid 03/13/2006
89 Sewer Tap Fees $90.00 $90.00 Paid 03/13/2006
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Passed 03/14/2006
Correction
Resolved
03/14/2006
ATTACHMENT OF NM ELECTRICAL CABLE TO FURRING STRIPS PROTECTION IN PROGRESS WHERE < 1-1/4" FROM FACE
Correction
Resolved
03/14/2006
WALL FRAMING + IN-WALL SYSTEMS OK TO COVER WHEN READY AFTER NM CABLES PROTECTED
Electrical Service Inspection Passed 03/14/2006
Correction
Resolved
03/14/2006
ELECTRICAL SERVICE INSTALLATION RELEASE SERVICE
Above Ceiling Inspection Partial 04/18/2006
Correction
Partial Correction
04/18/2006
CEILING FRAMING + ABOVE-CEILING SYSTEMS ROUGH FOR ACCESS TO REINSPECT HVAC UNIT ABOVE 108 WHEN PIPING, CONDENSATE DRAIN, & WIRING ARE COMPLETED OK TO COVER WHEN READY EXCEPT OFC 109 WEST END
Above Ceiling Inspection Passed 05/24/2006
Correction
Resolved
05/24/2006
CEILING FRAMING + ABOVE-CEILING SYSTEMS ROUGH HVAC UNIT ABOVE 108
Occupancy Inspection - Codes Commercial Passed 05/24/2006
Correction
Resolved
05/24/2006
Receive Fire Department approval PER J DIR 5/24/06
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home