Permit Application Status

B0600040


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0600040
Building Permit - Commercial
Certificate of Occupancy
JOHN KNOX VILLAGE
ALTERATION COMMERCIAL
LOCKER ROOM RENOVATION
01/10/2006
02/21/2006
08/20/2006
05/01/2006
Locations
Contacts
GASTINGER WALKER HARDEN ARCHITECTS, Address:817 WYANDOTTE  
THE WEITZ COMPANY, Address:9900 W 109TH ST  
JOHN KNOX VILLAGE, Address:400 NW MURRAY RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 08/08/2006 10/29/2010
Correction

Codes Administration - 2003 IBC 1109.2 - Toilet and bathing facilities. Toilet rooms and bathing facilities shall be accessible. Where a floor level is not required to be connected by an accessible route, the only toilet rooms or bathing facilities provided within the facility shall not be located on the inaccessible floor. At least one of each type of fixture, element, control or dispenser in each accessible toilet room and bathing facility shall be accessible.
Correction

Codes Administration - A not on the plans indicates that there will be a wood base cabinet under at the sinks in the accessible toilet rooms. This sink needs to be accessible.
Correction

Codes Administration - ANSI A117.1 - 1998 803.4 - Benches. A bench complying with Section 903 shall be provided within the room.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Any deviation from the approved plans shall be approved by the City of Lee's Summit. This shall include but is not limited to building layout, facilities provided, building materials and equipment, finishes used, landscaping and site improvements. Information about the changes shall be submitted to the Codes Administration Department for review and a determination will be provided within five (5) working days.
Correction

Fire Department; Required means of egress components shall be maintained during construction and demolition.
Correction

Fire Department: Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required fire protection systems shall be extended, altered, or augmented as necessary to maintain and continue pro-tection whenever the building is altered, remodeled or added to.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-7343.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $369.49 $369.49 Paid 02/21/2006
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 03/15/2006
Correction
Partial Correction
03/15/2006
UNDER-SLAB PVC DWV PIPING ALL EXCEPT TRAP PRIMERS + SHOWER DRAINS OK TO COVER WHEN READY PORTIONS LISTED BELOW:
Underslab Plumbing Inspection - Commercial Passed 03/16/2006
Correction
Resolved
03/16/2006
UNDER-SLAB PVC DWV PIPING OK TO COVER
All Rough Inspection - Commercial Not Ready 04/11/2006
Correction
Corrective Action Required
04/11/2006
NOT READY FOR INSPECTION NOTE: PROVIDE INFORMATION FROM ENGINEER OF ARCHITECT ON WALL BETWEEN MEN'S & WOMEN'S LOCKER ROOMS. IS IT LOAD BEARING?
All Rough Inspection - Commercial Failed 04/12/2006
Correction
Corrective Action Required
04/12/2006
NOT READY FOR INSPECTION NOTE: PROVIDE INFORMATION FROM ENGINEER OF ARCHITECT ON WALL BETWEEN MEN'S & WOMEN'S LOCKER ROOMS. IS IT LOAD BEARING?
Correction
Corrective Action Required
04/12/2006
Girder and Header Spans REPLACE HEADER BETWEEN MEN'S & WOMEN'S LOCKERROOMS
Correction
Corrective Action Required
04/12/2006
Bathroom ventilation (IRC) INSTALL BATH FANS IN WATER CLOSETS
Correction
Corrective Action Required
04/12/2006
See Comment OKAY TO INSULATE, OKAY TO ROCK - EXCEPT CEILINGS AND WALL BETWEEN MEN'S & WOMEN'S LOCKEROOMS
Occupancy Inspection - Codes Commercial Passed 04/28/2006
Correction
Resolved
04/28/2006
Receive Fire Department approval PER KEITH MARTIN 4/28/06
Correction
Resolved
04/28/2006
CODES ADMIN ISSUES NONE FOUND
All Rough Inspection - Commercial Passed 05/01/2006
Correction
Resolved
05/01/2006
NOT READY FOR INSPECTION
Correction
Resolved
05/01/2006
Girder and Header Spans
Correction
Resolved
05/01/2006
Bathroom ventilation (IRC)
Correction
Resolved
05/01/2006
See Comment
Occupancy Inspection - Codes Commercial Passed 05/01/2006
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home