B0502035
Building Permit - Commercial
Final Completion
MIDWEST DIVISION LSH LLC
PARTIAL COMMERCIAL
FOUNDATION STRUCTURAL STEEL UNDERSLAB
11/11/2005
12/05/2005
06/03/2006
12/18/2007
Locations
Contacts
J E DUNN CONSTRUCTION, Address:929 HOLMES  
MIDWEST DIVISION LSH LLC, Address:PO BOX 1504  
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 05/16/2006 10/29/2010
Correction

CA - This is an "at risk permit". Construction shall be in accordance with plans submitted for permit approval. The applicant understands that issuance of this permit does not guaranty issuance of a full permit.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $4,888.38 $4,888.38 Paid 12/05/2005
0120 Building Permit Fee $7,665.37 $7,665.37 Paid 03/30/2006
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 01/10/2006
Correction
Partial Correction
01/10/2006
GRADE BEAM + INTEGRAL PIER CAP POUR PREP K/8.5 TO K.5/8.5 TO K.5/9.5 TO K/9.5; OK TO POUR WHEN READY PORTIONS LISTED BELOW:
Piers/Caissons Inspection - Commercial Partial 03/16/2006
Correction
Partial Correction
03/16/2006
Piers 8 vert. #6 installed per plans. 30" Diameter. D-1, D-2, D-3, D-4, D-5
Piers/Caissons Inspection - Commercial Partial 03/22/2006
Correction
Partial Correction
03/22/2006
Piers APPROVED STATUS: D-1, D-2, D-3, D-4, D-5, D.3-6, D-7.2, D-8, D-9, D-10, E-1, E-2, E-3, E-4, E-5, E-6, E-7.2, F-6, G-6, F-5, G-5, F-4, G-4, F-3, G-3, F-2, G-2, F-1, G-1, H-1,
Piers/Caissons Inspection - Commercial Partial 03/24/2006
Correction
Partial Correction
03/24/2006
Piers APPROVED STATUS: D-1, D-2, D-3, D-4, D-5, D.3-6, D-7.2, D-8, D-9, D-10, D-11.4, D-11.7, D.5-14, D.6-15, E-1, E-2, E-3, E-4, E-5, E-6, E-7.2, E-11, E-12, E-13, F-6, G-6, F-5, G-5, F-4, G-4, F-3, G-3, F-2, G-2, F-1, G-1, H-1,
Piers/Caissons Inspection - Commercial Partial 03/27/2006
Correction
Partial Correction
03/27/2006
Piers APPROVED STATUS: D-1, D-2, D-3, D-4, D-5, D.3-6, D-7.2, D-8, D-9, D-10, D-11.4, D-11.7, D-13, D-14, D-15, E-15, E-14, D.5-14, D.6-15, E-1, E-2, E-3, E-4, E-5, E-6, E-7.2, E-11, E-12, E-13, F-6, G-6, F-5, G-5, F-4, G-4, F-3, G-3, F-2, G-2, F-1, G-1, H-1,
Correction
Partial Correction
03/27/2006
Piers APPROVED STATUS CONTINUED: F-7.2, F-8, F-9, F-10, F-12, F-13, G-7.2, G-8, G-9, D-10, G-11
Piers/Caissons Inspection - Commercial Partial 03/28/2006
Correction
Partial Correction
03/28/2006
Piers APPROVED STATUS: D-1, D-2, D-3, D-4, D-5, D.3-6, D-7.2, D-8, D-9, D-10, D-11.4, D-11.7, D-13, D-14, D-15, E-15, E-14, D.5-14, D.6-15, E-1, E-2, E-3, E-4, E-5, E-6, E-7.2, E-11, E-12, E-13, F-6, G-6, F-5, G-5, F-4, G-4, F-3, G-3, F-2, G-2, F-1, G-1, H-1 PIERS LISTED BELOW
Correction
Partial Correction
03/28/2006
Piers APPROVED STATUS CONTINUED: F-7.2, F-8, F-9, F-10, F-12, F-13, G-7.2, G-8, G-9, D-10, G-11, G-12, G-13, H-8, H-9, H-10, H-11, H-12, H-13, G.7-13, H-14, H-15, H-16, H-17, H.3-19, H.8-19, J.3-19, H.3-19, J.3-18, H.3-17, J-17, J.7-17 PIERS LISTED BELOW
Footing Inspection - Commercial Partial 03/28/2006
Correction
Partial Correction
03/28/2006
Grade Beams (Note: 24 Bar diameters overlap per plans) 1 LINE: D LINE THROUGH J LINE APPROVED D LINE: TO 0.5 APPROVED G LINE: TO 0.5 APPROVED SECTIONS LISTED BELOW
Footing Inspection - Commercial Partial 03/29/2006
Correction
Partial Correction
03/29/2006
Grade Beams (Note: 24 Bar diameters overlap per plans) 1 LINE: D LINE THROUGH J LINE APPROVED D LINE: TO 0.5 APPROVED G LINE: TO 4 LINE APPROVED SECTIONS LISTED BELOW
Piers/Caissons Inspection - Commercial Partial 03/29/2006
Correction
Partial Correction
03/29/2006
Piers APPROVED STATUS CONTINUED: F-7.2, F-8, F-9, F-10, F-12, F-13, G-7.2, G-8, G-9, D-10, G-11, G-12, G-13, H-8, H-9, H-10, H-11, H-12, H-13, G.7-13, H-14, H-15, H-16, H-17, H.3-19, H.8-19, J.3-19, H.3-19, J.3-18, H.3-17, J-17, J.7-17 PIERS LISTED BELOW
Correction
Partial Correction
03/29/2006
PIERS APPROVED STATUS CONTINUED: N-12, K-15, J-15, J-14, K-14, J-13, J.6-13, L-13, M-13, N-13, P-13, P-12.6 PIERS LISTED BELOW
Footing Inspection - Commercial Partial 03/30/2006
Correction
Partial Correction
03/30/2006
Grade Beams (Note: 24 Bar diameters overlap per plans) 1 LINE: D LINE THROUGH J LINE APPROVED D LINE: TO 0.5 APPROVED, TO 4.5 APPROVED G LINE: TO 0.5 APPROVED 4 LINE: D TO C.4 APPROVED SECTIONS LISTED BELOW
Piers/Caissons Inspection - Commercial Partial 03/30/2006
Correction
Partial Correction
03/30/2006
Piers N-12.6, M-12, L-12, A-12, J.6-12, H.4-12, M-11, L-11, K-11 PIERS LISTED BELOW
Miscellaneous Inspection Partial 04/04/2006
Correction
Partial Correction
04/04/2006
CONCRETE ENCASED ELECTRODE CONCRETE ENCASED ELECTRODE FOR GROUNDING ELECTRODE SYSTEM APPROVED. TWO LOCATIONS IN D-LINE ATTACHED TO FOOTING STEEL. 1 LOCATION TO BE DETERMINED.
Footing Inspection - Commercial Partial 04/04/2006
Correction
Partial Correction
04/04/2006
Grade Beams (Note: 24 Bar diameters overlap per plans) 1 LINE: D LINE THROUGH J LINE APPROVED D LINE: TO 0.5 APPROVED, TO 4.5 APPROVED G LINE: TO 0.5 APPROVED 4 LINE: D TO C.4 APPROVED 4 LINE: A LINE TO D LINE SECTIONS LISTED BELOW
Correction
Partial Correction
04/04/2006
SPREAD FOOTING 4-A, 5-A, 6-A, 6-B, 6-C APPROVED
Footing Inspection - Commercial Partial 04/12/2006
Correction
Corrective Action Required
04/12/2006
None SHET S-201B LINE 15 (NOTE: NORTH & SOUTH THIRDS ALREADY POURED) LINE 13 FIRST 20' FROM LINE F LINE F FROM LINE 12 TO LINE 15 TIM ATKINS (KLEINFELDER) INSPECTED SECTIONS OF LINE 15 ALREADY POURED - WILL INCLUDE ON HIS REPORT Portions Listed Below
Footing Inspection - Commercial Partial 04/17/2006
Correction
Partial Correction
04/17/2006
None SHET S-201B LINE 15 (NOTE: NORTH & SOUTH THIRDS ALREADY POURED) LINE 13 FIRST 20' FROM LINE F LINE F FROM LINE 12 TO LINE 15 TIM ATKINS (KLEINFELDER) INSPECTED SECTIONS OF LINE 15 ALREADY POURED - WILL INCLUDE ON HIS REPORT Portions Listed Below
Correction
Partial Correction
04/17/2006
GRADE BEAMS 10 LINE-FROM G.7 TO K H.3-FROM 17 TO 19 19-H.3 TO J.7 J.7-17 TO 19 17-H TO H.3 AND J.7 TO K.4
Footing Inspection - Commercial Partial 04/21/2006
Correction
Partial Correction
04/21/2006
None SHEET S-201D LINE P FROM 11 TO 12 LINE 11 FROM P TO K LINE M FROM 11 TO 13 T. AKINS - KLIENFELDER - INSPCTED LINE 13 & WILL INSPECT LINEL L
Footing Inspection - Commercial Partial 05/04/2006
Correction
Resolved
05/04/2006
Footing support (IRC) ELEVATOR PIT AT (12.8 LINE & H.2 LINE) ELEVATOR FOOTING OK TO COVER
Footing Inspection - Commercial Partial 05/05/2006
Correction
Resolved
05/05/2006
Footing support (IRC) ELEVATOR PIT AT (12.8 LINE & H.2 LINE), (6.4 LINE & H.4 LINE), (K.3 LINE & 1.7 LINE) ELEVATOR FOOTING OK TO COVER
Footing Inspection - Commercial Partial 05/19/2006
Correction
Partial Correction
05/19/2006
Footing Pads Approved L-1.7, L-2.4, L-14,L-14.4
Underslab Plumbing Inspection - Commercial Partial 06/01/2006
Correction
Partial Correction
06/01/2006
UNDERSLAB PLUMBING TRACKED UNDER FULL PERMIT
Underground Electrical Inspection - Commercial Request Complete 6/8/2006 6/9/2006 06/09/2006
Underground Electrical Inspection - Commercial Request Complete 6/14/2006 6/15/2006 06/15/2006
Underground Electrical Inspection - Commercial Request Complete 6/15/2006 6/16/2006 06/16/2006
Footing Inspection - Commercial Partial 06/19/2006
Correction
Partial Correction
06/19/2006
Footing support (IRC) (A.8 - C.9) LINE FROM (1.2 - 3.3) LINE - AREA SERVING GENERATOR AND TRANSFORMERS EXTERIOR
Underground Electrical Inspection - Commercial Request Complete 6/16/2006 6/19/2006 06/19/2006
Underslab Electrical Inspection - Commercial Passed 06/20/2006
Foundation Inspection - Commercial Partial 06/20/2006
Correction
Partial Correction
06/20/2006
SCREEN WALL FOR TRANSFORMER PAD WEST WALL AND SOUTH WALL APPROVED.
Underground Electrical Inspection - Commercial Request Complete 6/20/2006 6/21/2006 06/21/2006
Underground Electrical Inspection - Commercial Request Complete 6/21/2006 6/22/2006 06/22/2006
Underground Electrical Inspection - Commercial Request Complete 6/22/2006 6/23/2006 06/23/2006
Underground Electrical Inspection - Commercial Request Complete 6/28/2006 6/28/2006 06/28/2006
Underground Electrical Inspection - Commercial Request Complete 6/28/2006 6/29/2006 06/29/2006
Underslab Electrical Inspection - Commercial Partial 07/06/2006
Correction
Partial Correction
07/06/2006
TEXT APPROVED TO COVER CONDUITS UNDER MAIN ELECTRICAL ROOM & MOB MAIN ELECTRICAL ROOM AT COLUMNS D/1-D/2 & D.3/1-D.3/2
Underground Electrical Inspection - Commercial Request Complete 7/5/2006 7/6/2006 07/06/2006
Footing Inspection - Commercial Partial 07/07/2006
Correction
Resolved
07/07/2006
MAIN LEVEL FREEZER @ H.3/1 APPROVED PER SPECIAL INSPECTORS. POURED PRIOR TO CITY INSPECTION
Underground Electrical Inspection - Commercial Partial 07/07/2006
Correction
Corrective Action Required
07/07/2006
TEXT APPROVED TO COVER CONDUIT AS FOLLOWS: ELECTRICAL ROOMS AT J/5 & G/6
Underground Electrical Inspection - Commercial Request Complete 7/6/2006 7/7/2006 07/07/2006
Underground Electrical Inspection - Commercial Request Complete 7/7/2006 7/10/2006 07/10/2006
Underslab Electrical Inspection - Commercial Partial 07/12/2006
Correction
Partial Correction
07/12/2006
TEXT APPROVED TO COVER CONDUITS AS FOLLOWS: -UNDER MAIN ELECTRICAL ROOM & MOB MAIN ELECTRICAL ROOM AT COLUMNS D/1-D/2 & D.3/1-D.3/2 -BETWEEN COLUMS D/8-D/9 THRU G/8-G/9 -2" CONDUITS STARTING AT 9.3/K TO J/11
Underground Electrical Inspection - Commercial Request Complete 7/11/2006 7/12/2006 07/12/2006
Underground Electrical Inspection - Commercial Request Complete 7/13/2006 7/14/2006 07/14/2006
Underground Electrical Inspection - Commercial Request Complete 7/14/2006 7/17/2006 07/17/2006
Underslab Plumbing Inspection - Commercial Partial 07/19/2006
Correction
Partial Correction
07/19/2006
None -UNDERSLAB PARTIAL APPROVAL - PENDING CORE DRILLING (3) ALONG 11 LINE, 1 ALONG 13 LINE, 2 ALONG P LINE AND PIPE RUN SERVING CORE AT (M-12.6) LINE -UNDERSLAB APPROVED - FROM (K-P) BETWEEN (11-13) LINES AREA D SOUTHERN MOST AREA
Underground Electrical Inspection - Commercial Request Complete 7/18/2006 7/19/2006 07/19/2006
Underslab Electrical Inspection - Commercial Partial 07/20/2006
Correction
Partial Correction
07/20/2006
PHONE LINES 6 - 4" CONDUITS TURNED UP AT (J.4 & C.4) LINE - THIS LINES RUN FROM OUTSIDE THE BUILDING @ (J.4 & C.1) TO (J.4 & C.4) SOUTH SIDE OF AREA "A"
Underground Electrical Inspection - Commercial Request Complete 7/19/2006 7/20/2006 07/20/2006
Underground Electrical Inspection - Commercial Request Complete 7/21/2006 7/24/2006 07/24/2006
Underground Electrical Inspection - Commercial Request Complete 7/24/2006 7/25/2006 07/25/2006
Underground Electrical Inspection - Commercial Request Complete 7/25/2006 7/26/2006 07/26/2006
Underground Electrical Inspection - Commercial Request Complete 7/26/2006 7/27/2006 07/27/2006
Underground Electrical Inspection - Commercial Request Complete 7/27/2006 7/28/2006 07/28/2006
Underground Electrical Inspection - Commercial Request Complete 8/1/2006 8/2/2006 08/02/2006
Underground Electrical Inspection - Commercial Request Complete 8/2/2006 8/3/2006 08/03/2006
Underground Electrical Inspection - Commercial Request Complete 8/3/2006 8/4/2006 08/04/2006
Underground Electrical Inspection - Commercial Request Complete 8/7/2006 8/8/2006 08/08/2006
Underground Electrical Inspection - Commercial Request Complete 8/9/2006 8/10/2006 08/10/2006
Underground Electrical Inspection - Commercial Request Complete 8/9/2006 8/10/2006 08/10/2006
Underground Electrical Inspection - Commercial Request Complete 8/10/2006 8/11/2006 08/11/2006
Underground Electrical Inspection - Commercial Request Complete 8/14/2006 8/15/2006 08/15/2006
Underground Electrical Inspection - Commercial Request Complete 8/17/2006 8/18/2006 08/18/2006
Underground Electrical Inspection - Commercial Partial 08/22/2006
Correction
Partial Correction
08/22/2006
None 10 #4" CONDUITS APPROVED UP TO 20' SE OF TRANSFORMER
Underslab Plumbing Inspection - Commercial Partial 08/22/2006
Correction
Partial Correction
08/22/2006
None APPROVED - (4-6) LINE BETWEEN (A-D) LINE NORTH SIDE
Underground Electrical Inspection - Commercial Request Complete 8/22/2006 8/22/2006 08/22/2006
Underground Electrical Inspection - Commercial Request Complete 8/22/2006 8/23/2006 08/23/2006
Underground Electrical Inspection - Commercial Partial 08/24/2006
Correction
Partial Correction
08/24/2006
None 10 #4" CONDUITS APPROVED UP TO 20' SE OF TRANSFORMER
Correction
Partial Correction
08/24/2006
None TURN UP FOR TRANSFORMER GROUPS COMPLETE EXTERIOR
Correction
Partial Correction
08/24/2006
None NORTH OARKING LOT - ALL HAS BEEN APPROVED EXCEPT 2 AREAS 1.(2) NORTH SECTION IN MIDDLE OF PARKING LOT - 2. SE CORNER HAS NOT BEEN DONE N PARKING LOT
Underground Electrical Inspection - Commercial Request Complete 8/23/2006 8/24/2006 08/24/2006
Underground Electrical Inspection - Commercial Request Complete 8/24/2006 8/25/2006 08/25/2006
Underground Electrical Inspection - Commercial Request Complete 9/5/2006 9/6/2006 09/06/2006
Underground Electrical Inspection - Commercial Request Complete 9/7/2006 9/8/2006 09/08/2006
Underground Electrical Inspection - Commercial Request Complete 9/12/2006 9/13/2006 09/13/2006
Underground Electrical Inspection - Commercial Request Complete 9/14/2006 9/15/2006 09/15/2006
Underground Electrical Inspection - Commercial Request Complete 9/18/2006 9/19/2006 09/19/2006
Rough Framing Inspection - Commercial Request Complete 9/21/2006 9/22/2006 09/22/2006
Underground Electrical Inspection - Commercial Request Complete 9/25/2006 9/26/2006 09/26/2006
Underground Electrical Inspection - Commercial Request Complete 10/9/2006 10/10/2006 10/10/2006
Underground Electrical Inspection - Commercial Request Complete 10/11/2006 10/12/2006 10/12/2006
Underground Electrical Inspection - Commercial Request Complete 10/16/2006 10/17/2006 10/17/2006
Erosion Control Inspection Residential Partial 03/30/2007
Correction
Partial Correction
03/30/2007
Tracking Mud, Debris Keep Street Clean.
Final Inspection - Commercial Passed 12/12/2007
Correction
Resolved
12/12/2007
None
Miscellaneous Inspection Passed 12/18/2007
Correction
Resolved
12/18/2007
CONCRETE ENCASED ELECTRODE
Foundation Inspection - Commercial Passed 12/18/2007
Correction
Resolved
12/18/2007
SCREEN WALL FOR TRANSFORMER PAD WEST WALL AND SOUTH WALL APPROVED.
Underground Electrical Inspection - Commercial Passed 12/18/2007
Correction
Resolved
12/18/2007
TEXT APPROVED TO COVER CONDUIT AS FOLLOWS: ELECTRICAL ROOMS AT J/5 & G/6
Correction
Resolved
12/18/2007
None 10 #4" CONDUITS APPROVED UP TO 20' SE OF TRANSFORMER
Correction
Resolved
12/18/2007
None TURN UP FOR TRANSFORMER GROUPS COMPLETE EXTERIOR
Correction
Resolved
12/18/2007
None NORTH OARKING LOT - ALL HAS BEEN APPROVED EXCEPT 2 AREAS 1.(2) NORTH SECTION IN MIDDLE OF PARKING LOT - 2. SE CORNER HAS NOT BEEN DONE N PARKING LOT
Footing Inspection - Commercial Passed 12/18/2007
Correction
Resolved
12/18/2007
GRADE BEAM + INTEGRAL PIER CAP POUR PREP K/8.5 TO K.5/8.5 TO K.5/9.5 TO K/9.5; OK TO POUR WHEN READY PORTIONS LISTED BELOW:
Correction
Resolved
12/18/2007
Grade Beams (Note: 24 Bar diameters overlap per plans) 1 LINE: D LINE THROUGH J LINE APPROVED D LINE: TO 0.5 APPROVED, TO 4.5 APPROVED G LINE: TO 0.5 APPROVED 4 LINE: D TO C.4 APPROVED 4 LINE: A LINE TO D LINE SECTIONS LISTED BELOW
Correction
Resolved
12/18/2007
SPREAD FOOTING 4-A, 5-A, 6-A, 6-B, 6-C APPROVED
Correction
Resolved
12/18/2007
None SHET S-201B LINE 15 (NOTE: NORTH & SOUTH THIRDS ALREADY POURED) LINE 13 FIRST 20' FROM LINE F LINE F FROM LINE 12 TO LINE 15 TIM ATKINS (KLEINFELDER) INSPECTED SECTIONS OF LINE 15 ALREADY POURED - WILL INCLUDE ON HIS REPORT Portions Listed Below
Correction
Resolved
12/18/2007
GRADE BEAMS 10 LINE-FROM G.7 TO K H.3-FROM 17 TO 19 19-H.3 TO J.7 J.7-17 TO 19 17-H TO H.3 AND J.7 TO K.4
Correction
Resolved
12/18/2007
None SHEET S-201D LINE P FROM 11 TO 12 LINE 11 FROM P TO K LINE M FROM 11 TO 13 T. AKINS - KLIENFELDER - INSPCTED LINE 13 & WILL INSPECT LINEL L
Correction
Resolved
12/18/2007
Footing Pads Approved L-1.7, L-2.4, L-14,L-14.4
Correction
Resolved
12/18/2007
Footing support (IRC) (A.8 - C.9) LINE FROM (1.2 - 3.3) LINE - AREA SERVING GENERATOR AND TRANSFORMERS EXTERIOR
Piers/Caissons Inspection - Commercial Passed 12/18/2007
Correction
Resolved
12/18/2007
Piers APPROVED STATUS: D-1, D-2, D-3, D-4, D-5, D.3-6, D-7.2, D-8, D-9, D-10, D-11.4, D-11.7, D-13, D-14, D-15, E-15, E-14, D.5-14, D.6-15, E-1, E-2, E-3, E-4, E-5, E-6, E-7.2, E-11, E-12, E-13, F-6, G-6, F-5, G-5, F-4, G-4, F-3, G-3, F-2, G-2, F-1, G-1, H-1 PIERS LISTED BELOW
Correction
Resolved
12/18/2007
Piers APPROVED STATUS CONTINUED: F-7.2, F-8, F-9, F-10, F-12, F-13, G-7.2, G-8, G-9, D-10, G-11, G-12, G-13, H-8, H-9, H-10, H-11, H-12, H-13, G.7-13, H-14, H-15, H-16, H-17, H.3-19, H.8-19, J.3-19, H.3-19, J.3-18, H.3-17, J-17, J.7-17 PIERS LISTED BELOW
Correction
Resolved
12/18/2007
Piers N-12.6, M-12, L-12, A-12, J.6-12, H.4-12, M-11, L-11, K-11 PIERS LISTED BELOW
Underslab Plumbing Inspection - Commercial Passed 12/18/2007
Correction
Resolved
12/18/2007
UNDERSLAB PLUMBING TRACKED UNDER FULL PERMIT
Correction
Resolved
12/18/2007
None -UNDERSLAB PARTIAL APPROVAL - PENDING CORE DRILLING (3) ALONG 11 LINE, 1 ALONG 13 LINE, 2 ALONG P LINE AND PIPE RUN SERVING CORE AT (M-12.6) LINE -UNDERSLAB APPROVED - FROM (K-P) BETWEEN (11-13) LINES AREA D SOUTHERN MOST AREA
Correction
Resolved
12/18/2007
None APPROVED - (4-6) LINE BETWEEN (A-D) LINE NORTH SIDE
Underslab Electrical Inspection - Commercial Passed 12/18/2007
Correction
Resolved
12/18/2007
TEXT APPROVED TO COVER CONDUITS AS FOLLOWS: -UNDER MAIN ELECTRICAL ROOM & MOB MAIN ELECTRICAL ROOM AT COLUMNS D/1-D/2 & D.3/1-D.3/2 -BETWEEN COLUMS D/8-D/9 THRU G/8-G/9 -2" CONDUITS STARTING AT 9.3/K TO J/11
Correction
Resolved
12/18/2007
PHONE LINES 6 - 4" CONDUITS TURNED UP AT (J.4 & C.4) LINE - THIS LINES RUN FROM OUTSIDE THE BUILDING @ (J.4 & C.1) TO (J.4 & C.4) SOUTH SIDE OF AREA "A"
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home