Summary
B0501956
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
NEW TENANT FINISH
TENANT FINISH
10/28/2005
11/09/2005
05/08/2006
02/15/2006
Locations
Contacts
J E DUNN CONSTRUCTION, Address:929 HOLMES  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 04/26/2006 10/29/2010
Correction

Fire Department: Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators, and relief devices and valves, shall comply with NFPA 99 and the general provisions of this chapter. Documentation shall be provided of the pressure test of at least 150 psi for a minimum of 24 hours on installers letterhead.
Correction

CA - A Certificate of Occupancy will not be issued for a tenant finish until a minimum of a Temporary Occupancy has been issued for the shell building.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-7343.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $525.23 $525.23 Paid 11/09/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Electrical Inspection - Commercial Passed 11/17/2005
Correction
Resolved
11/17/2005
CONDUIT + BOXES FOR DATA/CONTROL MATERIAL & WORKMANSHIP OK TO COVER WHEN READY
Underslab Plumbing Inspection - Commercial Passed 11/17/2005
Correction
Resolved
11/17/2005
UNDER-SLAB MED GAS PIPING MATERIAL & WORKMANSHIP OK TO COVER WHEN READY
All Rough Inspection - Commercial Failed 12/14/2005
Correction
Corrective Action Required
12/14/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH EXCEPT TOP DEEP/SLIP TRACK AND SLAP STUDS. REINFORCE STUDS WITH CUT FLANGES. SPACES INSPECTED: 1C197; 199 EXCEPT W WALL; 200 EXCEPT W WALL; 201; 205; 206; 207-210 EXCEPT S WALL; SCREW BOTH STUD FLANGES TOP & BOTTOM TRACKS
All Rough Inspection - Commercial Partial 12/15/2005
Correction
Partial Correction
12/15/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH 1C197 EXCEPT NW WALL WHERE COPPER PIPING TO BE ISOLATED FROM STEEL FRAMING; 199; 200; 201; 205; 206; 207-210 EXCEPT S WALL N/R; OK TO COVER WHEN READY WALLS @ AREAS LISTED:
All Rough Inspection - Commercial Partial 12/16/2005
Correction
Partial Correction
12/16/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH 1C197 EXCEPT NW WALL WHERE COPPER PIPING TO BE ISOLATED FROM STEEL FRAMING; 199; 200; 201; 204 S,W WALLS, N WALL EXCL E 8'; 205; 206; 207-210; OK TO COVER WHEN READY WALLS @ AREAS LISTED:
All Rough Inspection - Commercial Passed 12/22/2005
Correction
Resolved
12/22/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH 1C197; 199; 200; 201; 204; 205; 206; 207-210; ALL WALLS OK TO COVER WHEN READY OK TO COVER WHEN READY WALLS @ AREAS LISTED:
Above Ceiling Inspection Partial 01/24/2006
Correction
Partial Correction
01/24/2006
CEILING FRAMING + ABOVE-CEILING SYSTEMS ROUGH SEAL ALL PENETRATIONS IN SMOKE & SOUND WALLS; THEN OK TO COVER WHEN READY @: IC199-203; 205-210; OK TO COVER WHEN READY SPACES LISTED BELOW:
Above Ceiling Inspection Passed 01/25/2006
Correction
Resolved
01/25/2006
CEILING FRAMING + ABOVE-CEILING SYSTEMS ROUGH CLOSE ALL BOXES; REMOVE TEMPORARY ELECTRICAL WIRING. THEN OK TO COVER WHEN READY @: IC199-203; 205-210; 204 OK TO COVER WHEN READY SPACES LISTED BELOW:
Occupancy Inspection - Codes Commercial Failed 02/09/2006
Correction
Corrective Action Required
02/09/2006
Receive Fire Department approval FD REPORT PROVIDED
Correction
Resolved
02/09/2006
Receive Water Utilities Approval NO ISSUES PRESENTED
Correction
Corrective Action Required
02/09/2006
SMOKE GASKETS AT DOORS IN SMOKE WALLS TO BE INSTALLED
Correction
Partial Correction
02/09/2006
OCCUPANCY APPROVAL STATUS OK TO INSTALL EQUIPMENT
Occupancy Inspection - Codes Commercial Passed 02/14/2006
Correction
Resolved
02/14/2006
OCCUPANCY APPROVAL STATUS
Correction
Resolved
02/14/2006
SMOKE GASKETS AT DOORS IN SMOKE WALLS
Correction
Resolved
02/14/2006
Receive Fire Department approval NO REMAINING ISSUES OF RECORD
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home