Permit Application Status

B0501922


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0501922
Building Permit - Commercial
Final Completion
ABUNDANT LIFE BAPTIST CHURCH OF LEES SUMMIT
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB PERMIT
10/24/2005
11/21/2005
05/20/2006
04/24/2007
Locations
Contacts
LYTLE CONSTRUCTION INC, Address:1051 SE BROADWAY DR  
ABUNDANT LIFE BAPTIST CHURCH OF LEES SUMMIT, Address:414 SW PERSELS RD, Phone:(816) 554-8181  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 05/20/2006 10/29/2010
Correction

Fire Department- Provide a complete set of plans for review.
Correction

Fire Department- Indicate type of seating to be used in the movie theater.
Correction

Fire Department- Where required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Exit sign placement shall be such that no point in an exit access corridor is more than 100 feet (30 480 mm) from the nearest visible exit sign.
Correction

Fire Department: Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department; Required means of egress components shall be maintained during construction and demolition.
Correction

Fire Department;A site plan depicting proposed fire apparatus access, location of fire lanes and parking areas and for fire hydrant locations shall be submitted to the fire department for review and approval prior to construction.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

Fire Department: Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required fire protection systems shall be extended, altered, or augmented as necessary to maintain and continue pro-tection whenever the building is altered, remodeled or added to.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
0120 Building Permit Fee $287.64 $287.64 Paid 11/21/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Failed 12/06/2005
Correction
Partial Correction
12/06/2005
Footing support (IRC) THIS PORTION OF THE BUILDING HAS BEEN APPROVED TO POUR SOUTH SIDE A LINE:(1 LINE TO 6 LINE)
Footing Inspection - Commercial Failed 12/13/2005
Correction
Partial Correction
12/13/2005
Footing support (IRC) THIS PORTION OF THE BUILDING HAS BEEN APPROVED TO POUR SOUTH SIDE A LINE:(1 LINE TO 6 LINE)
Correction
Corrective Action Required
12/13/2005
Footing support (IRC) OK TO POUR THROUGH FOLLOWING LOCATION - 1 LINE (A LINE: D LINE) & D LINE (1 LINE: 3.4 LINE) WEST AND NORTH SIDE POUR WHEN READY
Footing Inspection - Commercial Failed 12/20/2005
Correction
Resolved
12/20/2005
Footing support (IRC) THIS PORTION OF THE BUILDING HAS BEEN APPROVED TO POUR SOUTH SIDE A LINE:(1 LINE TO 6 LINE)
Correction
Resolved
12/20/2005
Footing support (IRC) OK TO POUR THROUGH FOLLOWING LOCATION - 1 LINE (A LINE: D LINE) & D LINE (1 LINE: 3.4 LINE) WEST AND NORTH SIDE POUR WHEN READY
Correction
Partial Correction
12/20/2005
Footing support (IRC) OK TO POUR AREAS - E LINE (5.2 LINE TO 6 LINE), 6 LINE (E LINE TO A.2 LINE) INTERIOR PADS @ B2, B3 & B4 LINES EAST SIDE OF BUILDING POUR WHEN READY
Footing Inspection - Commercial Failed 12/21/2005
Correction
Resolved
12/21/2005
Footing support (IRC) OK TO POUR AREAS - E LINE (5.2 LINE TO 6 LINE), 6 LINE (E LINE TO A.2 LINE) INTERIOR PADS @ B2, B3 & B4 LINES EAST SIDE OF BUILDING POUR WHEN READY
Correction
Partial Correction
12/21/2005
Footing support (IRC) INTERIOR PADS APPROVED - B:5, C:2, C:3, C:4, C:5 & C.8:5 INTERIOR PADS OK TO POUR WHEN READY
Footing Inspection - Commercial Passed 01/19/2006
Correction
Resolved
01/19/2006
Footing support (IRC) INTERIOR PADS APPROVED - B:5, C:2, C:3, C:4, C:5 & C.8:5 INTERIOR PADS OK TO POUR WHEN READY
Correction
Resolved
01/19/2006
Footing support (IRC) D LINE: (3.4 LINE TO 4 LINE) E LINE: (4.5 LINE TO 5.2 LINE) STAIRWELL @ (4 LINE TO 4.5 LINE) FROM (E.3 LINE TO C.7 LINE) PERIMETER OK TO POUR
Foundation Inspection - Commercial Passed 01/25/2006
Correction
Resolved
01/25/2006
None ONLY WALL INSPECTION PERFORMED BY THE CITY - SEE SPECIAL INSPECTOR RESULTS FOR OTHER WALL APPROVALS STAIRWELL WALL INSPECTION
Underslab Plumbing Inspection - Commercial Passed 01/31/2006
Correction
Resolved
01/31/2006
None
Final Plumbing Inspection - Commercial Passed 04/23/2007
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home