Summary
B0501740
Building Permit - Commercial
Certificate of Occupancy
DEERBROOK COVENANT CHURCH
ALTERATION COMMERCIAL
NEW CLASSROOMS & OFFICE
09/27/2005
01/10/2006
07/09/2006
03/14/2006
Locations
Contacts
HGK CONSTRUCTION MANAGEMENT, Address:6532 BLUE RIDGE CUT-OFF  
GUENTHER MILLS KEATING ARCHITECTS, Address:6532 BLUE RIDGE CUTOFF  
DEERBROOK COVENANT CHURCH, Address:200 NE TUDOR RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 03/26/2006 10/29/2010
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

Fire Department- Where required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Exit sign placement shall be such that no point in an exit access corridor is more than 100 feet (30 480 mm) from the nearest visible exit sign.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department: Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the code official is authorized to require a key box to be installed in an accessible location. The key box shall be of an approved type and shall contain keys to gain access as required by the code official.
Correction

Fire Department; The required fire-resistance rating of fire-resistance-rated construction (including walls, fire stops, shaft enclosures, partitions and floors) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings, and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance rated assemblies shall be protected by self-closing or automatic- closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department: Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required fire protection systems shall be extended, altered, or augmented as necessary to maintain and continue pro-tection whenever the building is altered, remodeled or added to.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $248.00 $248.00 Paid 01/10/2006
24 BLDG Plan Check Fees $18.20 $18.20 Paid 01/10/2006
25 Electrical Permit Fee $45.00 $45.00 Paid 01/10/2006
25 Mechanical Permit Fees $19.50 $19.50 Paid 01/10/2006
25 Plumbing Permit Fees $19.00 $19.00 Paid 01/10/2006
89 Sewer Tap Fees $120.00 $120.00 Paid 01/10/2006
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Failed 01/13/2006
Correction
Partial Correction
01/13/2006
None OK TO INSULATE DO NOT ROCK ROOM 207
Correction
Corrective Action Required
01/13/2006
Wiring Installation and Support (IRC) NO CONDUIT RUNNING TO J-BOX - SUPER STATED IT WAS TO BE LOW VOLTAGE - I WOULD PREFER TO SEE IT PRIOR TO COVERING WALLS RM 207, SW WALL
All Rough Inspection - Commercial Passed 01/19/2006
Correction
Resolved
01/19/2006
None OK TO INSULATE OK TO INSTALL GWB
Correction
Resolved
01/19/2006
Wiring Installation and Support (IRC)
All Rough Inspection - Commercial Partial 02/02/2006
Correction
Partial Correction
02/02/2006
L.G. STEEL FRAMING AND SYSTEMS ROUGH-IN AT NEW STAIR OK TO COVER WHEN READY SOFFIT + STOR BELOW STAIR + GUARD ALONGSIDE
Correction
Resolved
02/02/2006
None
Rough Framing Inspection - Commercial Request Complete 2/1/2006 2/2/2006 02/02/2006
Above Ceiling Inspection Failed 02/28/2006
Correction
Corrective Action Required
02/28/2006
SPRINKLER FIRE PROTECTION PIPING SEE PIPE JOINT AT 219 SOUTH MUST BE APPROVED BY FIRE DEPARTMENT
Correction
Corrective Action Required
02/28/2006
FIRE ALARM JUNCTION BOX ABOVE TOP OF STAIR 111 NOT CLOSED
Correction
Corrective Action Required
02/28/2006
MC ELECTRICAL CABLE ABOVE RM 203 NOT TERMINATED
Correction
Corrective Action Required
02/28/2006
SECURING/SUPPORT OF MC ELECTRICAL CABLE NEC 300-11 & 334-10 [ALLOWABLE EXCEPTION: FIXTURE WHIPS NOT IN EXCESS OF 6` LONG] 4.5' MAX INTERVALS AND WITHIN 12" OF BOXES
Correction
Corrective Action Required
02/28/2006
RADIUS BENDS OF HVAC FLEXIBLE DUCTS AT FITTING CONNECTIONS
Correction
Corrective Action Required
02/28/2006
SUPPORT OF HVAC FLEXIBLE DUCT SUPPORT AT MAX INTERVALS PER MFGRS INSTRUCTIONS TYPICALLY NOT MORE THAN 5' ON CENTER WITH MIN 1-1/2" WIDE STRAPS, PER SMACNA, ADC AND MANUFACTURERS INSTRUCTIONS TO STRUCTURE NOT TO OTHER MEP SYSTEMS
Above Ceiling Inspection Failed 03/01/2006
Correction
Corrective Action Required
03/01/2006
READINESS FOR INSPECTION NO CORRECTIONS MADE SINCE 2/28/06
Correction
Corrective Action Required
03/01/2006
SPRINKLER FIRE PROTECTION PIPING SEE PIPE JOINT AT 219 SOUTH ADVISE TO REPAIR JOINT TO PREVENT FUTURE LEAKS
Above Ceiling Inspection Failed 03/06/2006
Correction
Resolved
03/06/2006
FIRE ALARM JUNCTION BOX ABOVE TOP OF STAIR 111
Correction
Corrective Action Required
03/06/2006
MC ELECTRICAL CABLE ABOVE RM 203 NOT TERMINATED
Correction
Corrective Action Required
03/06/2006
SECURING/SUPPORT OF MC ELECTRICAL CABLE NEC 300-11 & 334-10 [ALLOWABLE EXCEPTION: FIXTURE WHIPS NOT IN EXCESS OF 6` LONG] 4.5' MAX INTERVALS AND WITHIN 12" OF BOXES
Correction
Corrective Action Required
03/06/2006
SUPPORT OF HVAC FLEXIBLE DUCT SUPPORT AT MAX INTERVALS PER MFGRS INSTRUCTIONS TYPICALLY NOT MORE THAN 5' ON CENTER WITH MIN 1-1/2" WIDE STRAPS, PER SMACNA, ADC AND MANUFACTURERS INSTRUCTIONS TO STRUCTURE NOT TO OTHER MEP SYSTEMS
Above Ceiling Inspection Partial 03/08/2006
Correction
Resolved
03/08/2006
SUPPORT OF HVAC FLEXIBLE DUCT
Correction
Resolved
03/08/2006
RADIUS BENDS OF HVAC FLEXIBLE DUCTS
Correction
Resolved
03/08/2006
SECURING/SUPPORT OF MC ELECTRICAL CABLE
Correction
Resolved
03/08/2006
MC ELECTRICAL CABLE ABOVE RM 203
Correction
Partial Correction
03/08/2006
SPRINKLER FIRE PROTECTION PIPING SEE PIPE JOINT AT 219 SOUTH ADVISE TO REPAIR JOINT TO PREVENT FUTURE LEAKS
Correction
Resolved
03/08/2006
READINESS FOR INSPECTION APPROVED TO COVER
Above Ceiling Inspection Passed 03/14/2006
Correction
Resolved
03/14/2006
READINESS FOR INSPECTION
Correction
Resolved
03/14/2006
SPRINKLER FIRE PROTECTION PIPING
Occupancy Inspection - Codes Commercial Passed 03/14/2006
Correction
Resolved
03/14/2006
LABELING OF ELECTRICAL CIRCUIT BREAKERS CHECK ALL ENSURE ALL LABELED
Correction
Resolved
03/14/2006
Receive Fire Department approval NO ISSUES PRESENTED
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home