Summary
B0501496
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
PARTIAL COMMERCIAL
CITY HALL PARKING GARAGE - FOUNDATION AND UNDERSLAB
08/19/2005
10/07/2005
04/05/2006
03/03/2006
Locations
Contacts
WALTER P. MOORE, Address:902 MAIN ST.  
TERRACON CONSULTANTS INC, Address:13910 W 96TH TR  
TITAN CONSTRUCTION ORGANIZATION, Address:11865 S CONLEY  
SHAUGHNESSY FICKEL AND SCOTT ARCHITECTS, Address:1150 GRAND BLVD SUITE 400  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 02/15/2006 10/29/2010
Correction

CA - This is an "at risk permit". Construction shall be in accordance with plans submitted for permit approval. The applicant understands that issuance of this permit does not guaranty issuance of a full permit.
Correction

Codes Administration - 2003 IBC 1704.1.1 - Building permit requirements. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with Section 106.1 as a condition for permit issuance. This statement shall include a complete list of materials and work requiring special inspections by this section, the inspections to be performed and a list of the individuals, approved agencies or firms intended to be retained for conducting such inspections.
Correction

Codes Administration - 2003 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $902.00 $902.00 Paid 10/07/2005
24 BLDG Plan Check Fees $35.00 $35.00 Paid 10/07/2005
25 Plumbing Permit Fees $15.00 $15.00 Paid 10/07/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Passed 11/18/2005
Correction
Resolved
11/18/2005
TEMPORARY ELECTRICAL SERVICE INSTALLATION 200 AMP RELEASE SERVICE
Footing Inspection - Commercial Partial 11/18/2005
Correction
Partial Correction
11/18/2005
SPREAD FOOTINGS + INTEGRAL COLUMN FOOTINGS ON (1) FROM (B.5) TO (G.5); OK TO POUR WHEN READY SEGMENTS LISTED BELOW:
Footing Inspection - Commercial Partial 11/23/2005
Correction
Partial Correction
11/23/2005
SPREAD FOOTINGS + INTEGRAL COLUMN FOOTINGS ON (1) FROM (B.5) TO (G.5); ON (2) FROM (G) TO (J); OK TO POUR WHEN READY SEGMENTS LISTED BELOW:
Footing Inspection - Commercial Not Ready 11/29/2005
Correction
Corrective Action Required
11/29/2005
SPREAD FOOTINGS + INTEGRAL COLUMN FOOTINGS ON (1) FROM (B.5) TO (G.5); ON (2) FROM (G) TO (J); 11/29/05 NOT READY OK TO POUR WHEN READY SEGMENTS LISTED BELOW:
Footing Inspection - Commercial Partial 11/30/2005
Correction
Partial Correction
11/30/2005
SPREAD FOOTINGS + INTEGRAL COLUMN FOOTINGS ON (1) FROM (B.5) TO (G.5); ON (2) FROM (G) TO (J); ON (A) FROM (1.9) TO (2.1) + ON (2.1) FROM (A) TO (A.6); ON (2) FROM (G.2) TO (D.5); OK TO POUR WHEN READY SEGMENTS LISTED BELOW:
Footing Inspection - Commercial Partial 12/02/2005
Correction
Partial Correction
12/02/2005
SPREAD FOOTINGS + INTEGRAL COLUMN FOOTINGS ON (1) FROM (B.5) TO (G.5); ON (2) FROM (G) TO (J); ON (A) FROM (1.9) TO (2.1) + ON (2.1) FROM (A) TO (A.6); ON (2) FROM (G.2) TO (D.5); ON (2) FROM (D.5) TO (D/2) ; ON (D) FROM (2) TO (2.1); OK TO POUR WHEN READY SEGMENTS LISTED BELOW:
Footing Inspection - Commercial Partial 12/16/2005
Correction
Partial Correction
12/16/2005
SPREAD FOOTINGS + INTEGRAL COLUMN FOOTINGS (1):(B.5)-(G.5); (2):(G)-(J); (A):(1.9)-(2.1) + (2.1):(A)-(A.6); ON (2) FROM (G.2) TO (D.5); ON (2) FROM (D.5) TO (D/2) ; ON (D) FROM (2) TO (2.1); ON (1) FROM (B.5) TO (A); ON (A) FROM (1.9) TO (1) AT RISK DUE TO COL (A) NOT IN SCHEDULE OK TO POUR WHEN READY SEGMENTS LISTED BELOW:
Footing Inspection - Commercial Partial 12/20/2005
Correction
Partial Correction
12/20/2005
SPREAD FOOTINGS + INTEGRAL COLUMN FOOTINGS (1):(B.5)-(G.5); (2):(G)-(J); (A):(1.9)-(2.1) + (2.1):(A)-(A.6); (2):(G.2)-(D.5); (2):(D.5)-(D/2); (D):(2)-(2.1); (1):(B.5)-(A); (A):(1.9)-(1); ON (1) FROM (G.3) TO (H.5); OK TO POUR WHEN READY SEGMENTS LISTED BELOW:
Correction
Partial Correction
12/20/2005
ISOLATED COLUMN FOOTINGS 2/B; 2/C; OK TO POUR WHEN READY FOOTINGS LISTED BELOW:
Footing Inspection - Commercial Partial 12/22/2005
Correction
Partial Correction
12/22/2005
ISOLATED COLUMN FOOTINGS 2/B; 2/C; 2/K; OK TO POUR WHEN READY FOOTINGS LISTED BELOW:
Footing Inspection - Commercial Partial 12/28/2005
Correction
Partial Correction
12/28/2005
Footing support (IRC) ELEVATOR PIT OK TO POUR
Footing Inspection - Commercial Partial 01/04/2006
Correction
Partial Correction
01/04/2006
SPREAD FOOTINGS + INTEGRAL COLUMN FOOTINGS (1):(B.5)-(G.5);(2):(G)-(J);(A):(1.9)-(2.1)+(2.1):(A)-(A.6);(2):(G.2)-(D.5); (2):(D.5)-(D/2);(D):(2)-(2.1);(1):(B.5)-(A);(A):(1.9)-(1);(1):(G.3)-(H.5);ON (2.1) FROM (A.3) TO (B); ON (B) FROM (2.1) TO (3); ON (3) FROM (B) TO (C.8); ON (D) FROM (2) TO 2.8) OK TO POUR WHEN READY SEGMENTS LISTED BELOW:
Underslab Plumbing Inspection - Commercial Partial 01/04/2006
Correction
Partial Correction
01/04/2006
ROOF DRAIN STORM PIPING UNDER BASEMENT SLAB ON (1.3) FROM (A) TO (E); ON (B.7) FROM (1.3) TO (1.9); OK TO COVER WHEN READY PORTIONS LISTED BELOW:
Underslab Plumbing Inspection - Commercial Partial 01/05/2006
Correction
Partial Correction
01/05/2006
ROOF DRAIN STORM PIPING UNDER BASEMENT SLAB ON (1.3) FROM (A) TO (E); ON (B.7) FROM (1.3) TO (1.9); ON (1.3) FROM (E) TO (G.3); OK TO COVER WHEN READY PORTIONS LISTED BELOW:
Footing Inspection - Commercial Partial 01/05/2006
Correction
Partial Correction
01/05/2006
SPREAD FOOTINGS + INTEGRAL COLUMN FOOTINGS ON (1) FROM (A) TO (H.5);(2):(G)-(J);(A):(1.9)-(2.1)+(2.1):(A)-(A.6); (2):(G.2)-(D.5); (2):(D.5)-(D/2);(D):(2)-(2.1);(A):(1.9)-(1); (2.1) FROM (A.3) TO (B); (B) FROM (2.1) TO (3); (3) FROM (B) TO (C.8); (D) FROM (2) TO 2.8); ON (3) FROM (C.8) TO (E.7); OK TO POUR WHEN READY SEGMENTS LISTED BELOW:
Underslab Plumbing Inspection - Commercial Partial 01/09/2006
Correction
Partial Correction
01/09/2006
ROOF DRAIN STORM PIPING UNDER BASEMENT SLAB ON (1.3) FROM (A) TO (E); ON (B.7) FROM (1.3) TO (1.9); ON (1.3) FROM (E) TO (G.3); ON (1.3) FROM (G.3) TO (J.2); ON (J.2) FROM (1.3) TO (2); OK TO COVER WHEN READY PORTIONS LISTED BELOW:
Footing Inspection - Commercial Partial 01/19/2006
Correction
Partial Correction
01/19/2006
SPREAD FOOTINGS + INTEGRAL COLUMN FOOTINGS ON (1):(A)-(H.5); ON (2):(D)-(J);(A):(1.9)-(2.1)+(2.1):(A)-(A.6); (D):(2)-(2.1);(A):(1.9)-(1); (2.1) FROM (A.3) TO (B); (B) FROM (2.1) TO (3); (3) FROM (B) TO (C.8); (D) FROM (2) TO 2.8); ON (3): (C.8)-(E.7); ON (3): (J.7)-(L); ON (L): (1.2) TO (3); OK TO POUR WHEN READY SEGMENTS LISTED BELOW:
Footing Inspection - Commercial Passed 02/21/2006
Correction
Resolved
02/21/2006
SPREAD FOOTINGS + INTEGRAL COLUMN FOOTINGS (1):(A)-(H.5); (2):(D)-(J); (A):(1.9)-(2.1)+(2.1):(A)-(A.6); (D):(2)-(2.1); (A):(1.9)-(1); (2.1):(A.3)-(B); (B):(2.1)-(3); (3):(B)-(C.8); (D):(2)-(2.8); (3):(C.8)-(E.7); (3):(J.7)-(L); (L):(1.2)-(3); ON (L) FROM (1) TO (1.2); ON (1) FROM (H.5) TO (L) OK TO POUR WHEN READY SEGMENTS LISTED BELOW:
Correction
Resolved
02/21/2006
ISOLATED COLUMN FOOTINGS
Correction
Resolved
02/21/2006
Footing support (IRC) ELEVATOR PIT
Final Inspection - Commercial Passed 03/01/2006
Correction
Resolved
03/01/2006
CLOSE PERMIT POUR OF SLAB ON-GRADE IN PROGRESS
Underslab Plumbing Inspection - Commercial Passed 03/01/2006
Correction
Resolved
03/01/2006
ROOF DRAIN STORM PIPING UNDER BASEMENT SLAB
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home