Summary
B0501310
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
ALTERATION COMMERCIAL
FIRE DEPARTMENT 2ND FLOOR PARTITIONS
07/27/2005
08/01/2005
01/28/2006
01/09/2007
Locations
Contacts
CITY OF LEES SUMMIT, Address:207 SW MARKET ST  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/28/2006 10/29/2010
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $26.00 $26.00 Paid 08/01/2005
25 Mechanical Permit Fees $15.00 $15.00 Paid 08/01/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Partial 08/17/2005
Correction
Partial Correction
08/17/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH NORTH WALL OF LIVING ROOM; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
All Rough Inspection - Commercial Partial 08/26/2005
Correction
Partial Correction
08/26/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH NORTH WALL OF LIVING ROOM; NORTH & EAST WALLS OF NEW TRAINING ROOM; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
All Rough Inspection - Commercial Partial 09/16/2005
Correction
Partial Correction
09/16/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH NORTH WALL OF LIVING ROOM; NORTH & EAST WALLS OF NEW TRAINING ROOM; BUNKS SE CORNER + ADDED CLOSET; ENTRY TO MENS RR; DOOR OPNG @ WEIGHT RM SW; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
All Rough Inspection - Commercial Partial 10/11/2005
Correction
Partial Correction
10/11/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH NORTH WALL OF LIVING ROOM; NORTH & EAST WALLS OF NEW TRAINING ROOM; BUNKS SE CORNER + ADDED CLOSET; ENTRY TO MENS RR; DOOR OPNG @ WEIGHT RM SW; BUNK AREA WEST ROOMS FRAMING ONLY OK; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Occupancy Inspection - Codes Commercial Partial 10/12/2005
Correction
Partial Correction
10/12/2005
PHASED OCCUPANCY OF RENOVATED SPACES TRAINING ROOM; WEIGHT ROOM; OK TO OCCUPY SPACES LISTED BELOW:
Issue Temporary C of O Complete 10/11/2005 10/12/2005 10/12/2005
All Rough Inspection - Commercial Partial 10/17/2005
Correction
Partial Correction
10/17/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH NORTH WALL OF LIVING ROOM; NORTH & EAST WALLS OF NEW TRAINING ROOM; BUNKS SE CORNER + ADDED CLOSET; ENTRY TO MENS RR; DOOR OPNG @ WEIGHT RM SW; BUNK AREA FRAMING ONLY OK; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 10/13/2005 10/17/2005 10/17/2005
Above Ceiling Inspection Failed 11/03/2005
Correction
Corrective Action Required
11/03/2005
CEILING FRAMING + ABOVE-CEILING SYSTEMS ROUGH @ NEW BUNK AREA BEFORE COVERING: 1) SUPPORT HVAC FLEX DUCT PER SMACNA & MFGR'S INSTRUCTIONS 2) SUPPORT/SECURE MC ELECTRICAL CABLE PER NEC 3) INSTALL SEISMIC TIES ON ALL 2X2 & 2X4 ELECT LUMINAIRES 4) REPLACE MISSING/DISPLACED THERMAL INSULATION @ N WALL CORRECT ISSUES BELOW AND RECEIVE APPROVAL
Above Ceiling Inspection Passed 11/04/2005
Correction
Resolved
11/04/2005
CEILING FRAMING + ABOVE-CEILING SYSTEMS ROUGH @ NEW BUNK AREA
Above Ceiling Inspection Passed 11/04/2005
Correction
Resolved
11/04/2005
CEILING FRAMING + ABOVE-CEILING SYSTEMS ROUGH @ NEW BUNK AREA
Occupancy Inspection - Codes Commercial Partial 11/04/2005
Correction
Partial Correction
11/04/2005
PHASED OCCUPANCY OF RENOVATED SPACES TRAINING ROOM; WEIGHT ROOM; WEST BUNK ROOMS, CONTINGENT ON FD APPROVAL; OK TO OCCUPY SPACES LISTED BELOW:
All Rough Inspection - Commercial Passed 12/02/2005
Correction
Resolved
12/02/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH
Occupancy Inspection - Codes Commercial Partial 12/02/2005
Correction
Partial Correction
12/02/2005
PHASED OCCUPANCY OF RENOVATED SPACES TRAINING ROOM; WEIGHT ROOM; WEST BUNK ROOMS; EAST BUNK ROOMS, CONTINGENT ON FD APPROVAL OK TO OCCUPY SPACES LISTED BELOW:
Occupancy Inspection - Codes Commercial Passed 01/08/2007
Correction
Resolved
01/08/2007
PHASED OCCUPANCY OF RENOVATED SPACES
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home