B0501206
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
NEW COMMERCIAL
CITY HALL PARKING GARAGE
07/11/2005
11/30/2005
05/29/2006
12/12/2007
Locations
Contacts
TERRACON CONSULTANTS INC, Address:13910 W 96TH TR  
WALTER P. MOORE, Address:902 MAIN ST.  
SHAUGHNESSY FICKEL AND SCOTT ARCHITECTS, Address:1150 GRAND BLVD SUITE 400  
TITAN CONSTRUCTION, Address:11868 S CONLEY  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 05/14/2006 10/29/2010
Correction

Codes Administration - 2003 IBC 1704.1.1 - Building permit requirements. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with Section 106.1 as a condition for permit issuance. This statement shall include a complete list of materials and work requiring special inspections by this section, the inspections to be performed and a list of the individuals, approved agencies or firms intended to be retained for conducting such inspections.
Correction

Codes Administration - 2003 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work.
Correction

Codes Administration - A copy of the structural calculations was not provided at the time of permit application.
Correction

Codes Administration - Copies of the precast panel package were not provided at the time of permit application.
Correction

Fire Department- Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant.
Correction

Fire Department- IFC 905.3.1(amended) Building height. Class I standpipe systems shall be installed throughout buildings where the floor level of the highest story is located more than two storys above the lowest level of the fire department vehicle access, or where the floor level of the lowest story is located more than two-storys below the highest level of fire department vehicle access. Exceptions: 1. Class I standpipes are allowed in buildings equipped throughout with an automatic sprinklersystem in accordance with Section 903.3.1.1 or 903.3.1.2. 2. Class I manual standpipes are allowed in open parking garages where the highest floor is located not more than 150 feet (45 720 mm) above the lowest level of fire department vehicle access. 3. Class I manual dry standpipes are allowed in open parking garages that are subject to freezing temperatures, provided that the hose connections are located as required for Class II standpipes in accordance with Section 905.5. 4. Class I standpipes are allowed in basements equipped throughout with an automatic sprinkler system.
Correction

Fire Department- The drive along the west side of the garage shall be a posted fire lane.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative.
Correction

CA - Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration Department prior to the state insection so that a member of the staff can witness the inspection.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department: Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the code official is authorized to require a key box to be installed in an accessible location. The key box shall be of an approved type and shall contain keys to gain access as required by the code official.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-7343.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $7,154.00 $7,154.00 Paid 11/30/2005
24 BLDG Plan Check Fees $139.20 $139.20 Paid 11/30/2005
25 Electrical Permit Fee $215.00 $215.00 Paid 11/30/2005
25 Mechanical Permit Fees $46.00 $46.00 Paid 11/30/2005
25 Plumbing Permit Fees $35.00 $35.00 Paid 11/30/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Framing Inspection - Commercial Partial 12/06/2005
Correction
Partial Correction
12/06/2005
C.I.P. CONCRETE COLUMNS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL 2/E; 2/F; 2/G; 2/H; 2/J; 1/C; 1/D; 1/E; 1/F; 1/G; CALL WHEN CHAIRS IN PLACE COLUMNS LISTED BELOW
Rough Framing Inspection - Commercial Partial 12/19/2005
Correction
Partial Correction
12/19/2005
C.I.P. CONCRETE COLUMNS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL 2/E; 2/F; 2/G; 2/H; 2/J; 1/C; 1/D; 1/E; 1/F; 1/G; 2/A; 2.1/A; 1/B; 2/D; DO NOT POUR 1.1/A UNTIL DESIGN CLARIFIED AND APPROVED OK TO POUR WHEN READY COLUMNS LISTED BELOW
Rough Framing Inspection - Commercial Partial 12/20/2005
Correction
Partial Correction
12/20/2005
C.I.P. CONCRETE COLUMNS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL 2/E; 2/F; 2/G; 2/H; 2/J; 1/C; 1/D; 1/E; 1/F; 1/G; 2/A; 2.1/A; 1/B; 2/D; 1.1/A OK PER ENGR CLARIFICATION 12/20; OK TO POUR WHEN READY COLUMNS LISTED BELOW
Rough Framing Inspection - Commercial Partial 12/21/2005
Correction
Partial Correction
12/21/2005
C.I.P. CONCRETE COLUMNS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL 2/E; 2/F; 2/G; 2/H; 2/J; 1/C; 1/D; 1/E; 1/F; 1/G; 2/A; 2.1/A; 1/B; 2/D; 1.1/A OK PER ENGR CLARIFICATION 12/20; 1/H; 2/B; 2/C; OK TO POUR WHEN READY COLUMNS LISTED BELOW
Rough Framing Inspection - Commercial Partial 12/22/2005
Correction
Partial Correction
12/22/2005
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL WALL ON (2) FROM (E) TO (H); OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Partial 12/28/2005
Correction
Partial Correction
12/28/2005
COLUMNS AND WALL SECTIONS 1ST FLOOR LEVEL OF COLUMNS @ J:2, K:2 1ST FLOOR LEVEL WALL SECTION BETWEEN D:2 & E:2 OK TO COVER OK TO POUR
Rough Framing Inspection - Commercial Partial 12/30/2005
Correction
Partial Correction
12/30/2005
None LINE J:5 TO F:3 COLUMNS - 3:F, 3:G, 3:H, 3:J
Rough Framing Inspection - Commercial Partial 01/02/2006
Correction
Partial Correction
01/02/2006
C.I.P. CONCRETE COLUMNS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL 2/E; 2/F; 2/G; 2/H; 2/J; 1/C; 1/D; 1/E; 1/F; 1/G; 2/A; 2.1/A; 1/B; 2/D; 1.1/A OK PER ENGR CLARIFICATION 12/20; 1/H; 2/B; 2/C; 2/K; OK TO POUR WHEN READY COLUMNS LISTED BELOW
Correction
Partial Correction
01/02/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL ON (2) FROM (E) TO (H); ON (2) FROM (D) TO (E); OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Partial 01/03/2006
Correction
Partial Correction
01/03/2006
C.I.P. CONCRETE COLUMNS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL 2/E; 2/F; 2/G; 2/H; 2/J; 1/C; 1/D; 1/E; 1/F; 1/G; 2/A; 2.1/A; 1/B; 2/D; 1.1/A; 12/20; 1/H; 2/B; 2/C; 2/K; 3/G ; 3/H ; 3/J; NOT APPROVED: 3/F OK TO POUR WHEN READY COLUMNS LISTED BELOW
Rough Framing Inspection - Commercial Partial 01/05/2006
Correction
Partial Correction
01/05/2006
C.I.P. CONCRETE COLUMNS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL 2/E; 2/F; 2/G; 2/H; 2/J; 1/C; 1/D; 1/E; 1/F; 1/G; 2/A; 2.1/A; 1/B; 2/D; 1.1/A; 12/20; 1/H; 2/B; 2/C; 2/K; 3/F; 3/G ; 3/H ; 3/J; B/2.1; B/3; C/3; OK TO POUR WHEN READY COLUMNS LISTED BELOW
Rough Framing Inspection - Commercial Request Complete 1/5/2006 1/5/2006 01/05/2006
Rough Framing Inspection - Commercial Partial 01/06/2006
Correction
Partial Correction
01/06/2006
C.I.P. CONCRETE COLUMNS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL 2/E; 2/F; 2/G; 2/H; 2/J; 1/C; 1/D; 1/E; 1/F; 1/G; 2/A; 2.1/A; 1/B; 2/D; 1.1/A; 12/20; 1/H; 2/B; 2/C; 2/K; 3/F; 3/G ; 3/H ; 3/J; B/2.1; B/3; C/3; D/3; E/3; OK TO POUR WHEN READY COLUMNS LISTED BELOW
Correction
Partial Correction
01/06/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL ON (2) FROM (E) TO (H); ON (2) FROM (D) TO (E); ON (1) FROM (E.4) TO (G.8); OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 1/5/2006 1/6/2006 01/06/2006
Rough Framing Inspection - Commercial Request Complete 1/6/2006 1/6/2006 01/06/2006
Rough Framing Inspection - Commercial Partial 01/09/2006
Correction
Partial Correction
01/09/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL ON (2) FROM (E) TO (H); ON (2) FROM (D) TO (E); ON (1) FROM (E.4) TO (G.8); ON (1) FROM (C.2) TO (E.4); OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Partial 01/10/2006
Correction
Partial Correction
01/10/2006
C.I.P. CONCRETE COLUMNS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL 2/E; 2/F; 2/G; 2/H; 2/J; 1/C; 1/D; 1/E; 1/F; 1/G; 2/A; 2.1/A; 1/B; 2/D; 1.1/A; 12/20; 1/H; 2/B; 2/C; 2/K; 3/F; 3/G ; 3/H ; 3/J; B/2.1; B/3; C/3; D/3; E/3; J/2; K/2; OK TO POUR WHEN READY COLUMNS LISTED BELOW
Correction
Partial Correction
01/10/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL ON (2) FROM (E) TO (H); ON (2) FROM (D) TO (E); LINE J:5 TO F:3; ON (2) FROM (D) TO (E); ON (1) FROM (E.4) TO (G.8); ON (1) FROM (C.2) TO (E.4); OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Correction
Resolved
01/10/2006
COLUMNS AND WALL SECTIONS
Correction
Resolved
01/10/2006
None
Rough Framing Inspection - Commercial Partial 01/12/2006
Correction
Partial Correction
01/12/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL ON (2) FROM (E) TO (H); ON (2) FROM (D) TO (E); LINE J:5 TO F:3; ON (2) FROM (D) TO (E); ON (1) FROM (E.4) TO (G.8); ON (1) FROM (C.2) TO (E.4); ON (1) FROM (A.4) TO (C.2); OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 1/11/2006 1/12/2006 01/12/2006
Rough Framing Inspection - Commercial Partial 01/13/2006
Correction
Partial Correction
01/13/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL ON (2) FROM (E) TO (H); ON (2) FROM (D) TO (E); LINE J:5 TO F:3; ON (2) FROM (D) TO (E); ON (1) FROM (E.4) TO (G.8); ON (1) FROM (C.2) TO (E.4); ON (1) FROM (A.4) TO (C.2); ON (1) FROM (A) TO (A.4); ON (A) FROM (1) TO (1.7); ON (D) FROM (2) TO (3); OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 1/12/2006 1/13/2006 01/13/2006
Rough Framing Inspection - Commercial Partial 01/18/2006
Correction
Partial Correction
01/18/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL ON (2) FROM (D) TO (H); LINE J:5 TO F:3; ON (1) FROM (E.4) TO (G.8); ON (1) FROM (A) TO (E.4); ON (A) FROM (1) TO (1.7); ON (D) FROM (2) TO (3); ON (A) FROM (1.7) TO 7' S OF (2.1); OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 1/17/2006 1/18/2006 01/18/2006
Rough Framing Inspection - Commercial Request Complete 1/18/2006 1/19/2006 01/19/2006
Rough Framing Inspection - Commercial Partial 01/20/2006
Correction
Partial Correction
01/20/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL ON (2) FROM (D) TO (H); LINE J:5 TO F:3; ON (1) FROM (E.4) TO (G.8); ON (1) FROM (A) TO (E.4); ON (A) FROM (1) TO (1.7); ON (D) FROM (2) TO (3); ON (A) FROM (1.7) TO 7' S OF (2.1); ON (3) FROM (B.3) TO (C.7); OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Partial 01/23/2006
Correction
Partial Correction
01/23/2006
C.I.P. CONCRETE COLUMNS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL 2/E; 2/F; 2/G; 2/H; 2/J; 1/C; 1/D; 1/E; 1/F; 1/G; 2/A; 2.1/A; 1/B; 2/D; 1.1/A; 12/20; 1/H; 2/B; 2/C; 2/K; 3/F; 3/G ; 3/H ; 3/J; B/2.1; B/3; C/3; D/3; E/3; J/2; K/2; L/2; L/2.9(L/3); K/3; OK TO POUR WHEN READY COLUMNS LISTED BELOW
Rough Framing Inspection - Commercial Request Complete 1/19/2006 1/23/2006 01/23/2006
Rough Framing Inspection - Commercial Request Complete 1/23/2006 1/23/2006 01/23/2006
Rough Framing Inspection - Commercial Partial 01/25/2006
Correction
Partial Correction
01/25/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL ON (2) FROM (D) TO (H); LINE J:5 TO F:3; ON (1) FROM (E.4) TO (G.8); ON (1) FROM (A) TO (E.4); (D):(2)-(3); ON (A) FROM (1) TO 7' S OF (2.1); COMPLETE NE CORNER ON (A) & (3) + AREAWAY; ON (3) FROM (C.7) TO (E.3) EXCL BEAM; OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 1/24/2006 1/25/2006 01/25/2006
Rough Framing Inspection - Commercial Partial 01/26/2006
Correction
Partial Correction
01/26/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL ON (2) FROM (D) TO (H); LINE J:5 TO F:3; ON (1) FROM (E.4) TO (G.8); ON (1) FROM (A) TO (E.4); (D):(2)-(3); ON (A) FROM (1) TO 7' S OF (2.1); COMPLETE NE CORNER ON (A) & (3) + AREAWAY INCL ELEV CORRECTION; ON (3) FROM (C.7) TO (E.3) EXCL BEAM; OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Partial 01/31/2006
Correction
Partial Correction
01/31/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL (2):(D)-(H); (D):(2)-(3); LINE J:5 TO F:3; ON (1) FROM (E.4) TO (G.8); ON (1) FROM (A) TO (E.4); ON (A) COMPLETE; COMPLETE NE CORNER ON + AREAWAY; ON (3) FROM (C.7) TO (E.3) INCL BEAM; AREAWAY; ON (3) FROM (E.7) TO (H) EXCL BEAM; OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Correction
Partial Correction
01/31/2006
LANDING SUPPORT WALL FROM T/O/F TO 1ST ELEVATED LEVEL @ STAIR "A" OK TO POUR WHEN READY
Correction
Partial Correction
01/31/2006
PROTECTION WING WALL @ ELEVATOR SHAFT LOWER LEVEL OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 02/02/2006
Correction
Partial Correction
02/02/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL (2):(D)-(H); (D):(2)-(3); LINE J:5 TO F:3; ON (1) FROM (E.4) TO (G.8); ON (1) FROM (A) TO (E.4); ON (A) COMPLETE; COMPLETE NE CORNER ON + AREAWAY; ON (3) FROM (C.7) TO (E.3) INCL BEAM; AREAWAY; ON (3) FROM (E.7) TO (L) EXCL BEAM; OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 2/2/2006 2/2/2006 02/02/2006
Rough Framing Inspection - Commercial Partial 02/03/2006
Correction
Partial Correction
02/03/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL (2):(D)-(H); (D):(2)-(3); LINE J:5 TO F:3; ON (1) FROM (E.4) TO (G.8); ON (1) FROM (A) TO (E.4); ON (A) COMPLETE; COMPLETE NE CORNER ON + AREAWAY; ON (3) FROM (C.7) TO (H) INCL BEAM; AREAWAY; ON (3) FROM (H) TO (L) EXCL BEAM; OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 2/2/2006 2/3/2006 02/03/2006
Rough Framing Inspection - Commercial Partial 02/06/2006
Correction
Partial Correction
02/06/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL (2):(D)-(H); (D):(2)-(3); LINE J:5 TO F:3; ON (1) FROM (E.4) TO (G.8); ON (1) FROM (A) TO (E.4); ON (A) COMPLETE; COMPLETE NE CORNER ON + AREAWAY; ON (3) FROM (C.7) TO (H) INCL BEAM; AREAWAY; ON (3) FROM (H) TO (L) EXCL BEAM; ON (L) FROM (2.2) TO (3); OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 2/6/2006 2/6/2006 02/06/2006
Rough Framing Inspection - Commercial Partial 02/09/2006
Correction
Partial Correction
02/09/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL (2):(D)-(H); (D):(2)-(3); LINE J:5 TO F:3; ON (1) FROM (E.4) TO (G.8); ON (1) FROM (A) TO (E.4); ON (A) COMPLETE; COMPLETE NE CORNER ON + AREAWAY; ON (3) FROM (C.7) TO (H) INCL BEAM; AREAWAY; ON (3) FROM (H) TO (L) EXCL BEAM; ON (L) FROM (1.5) TO (3); OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 2/9/2006 2/9/2006 02/09/2006
Rough Framing Inspection - Commercial Request Complete 2/21/2006 2/21/2006 02/21/2006
Rough Framing Inspection - Commercial Partial 02/22/2006
Correction
Partial Correction
02/22/2006
C.I.P. CONCRETE COLUMNS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL 2/E; 2/F; 2/G; 2/H; 2/J; 1/C; 1/D; 1/E; 1/F; 1/G; 2/A; 2.1/A; 1/B; 2/D; 1.1/A; 12/20; 1/H; 2/B; 2/C; 2/K; 3/F; 3/G ; 3/H ; 3/J; B/2.1; B/3; C/3; D/3; E/3; J/2; K/2; L/2; L/2.9(L/3); K/3; J/1; K/1; L/1; OK TO POUR WHEN READY COLUMNS LISTED BELOW
Correction
Partial Correction
02/22/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL (2):(D)-(H); (D):(2)-(3); LINE J:5 TO F:3; ON (1) FROM (E.4) TO (G.8); ON (A) COMPLETE; COMPLETE NE CORNER ON + AREAWAY; ON (3) FROM (C.7) TO (H) INCL BEAM; AREAWAY; ON (3) FROM (H) TO (L) EXCL BEAM; ON (L) FROM (1.5) TO (3); ON (1) FROM (A) TO (H.1); OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 2/21/2006 2/22/2006 02/22/2006
Rough Framing Inspection - Commercial Partial 02/23/2006
Correction
Partial Correction
02/23/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL (2):(D)-(H); (D):(2)-(3); LINE J:5 TO F:3; ON (1) FROM (E.4) TO (G.8); ON (A) COMPLETE; COMPLETE NE CORNER ON + AREAWAY; ON (3) FROM (C.7) TO (H) INCL BEAM; AREAWAY; ON (3) FROM (H) TO (L) EXCL BEAM; ON (L) FROM (1) TO (3); ON (1) FROM (A) TO (L); OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 2/22/2006 2/23/2006 02/23/2006
Rough Framing Inspection - Commercial Partial 02/27/2006
Correction
Partial Correction
02/27/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL PERIMETER WALLS COMPLETE; LANDING SUPPORT WALL @ STAIR "B"; OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 2/27/2006 2/27/2006 02/27/2006
Suspended Slab Inspection Failed 03/01/2006
Correction
Corrective Action Required
03/01/2006
POST-TENSIONED DECK SLAB PREP FOR POUR CONTINGENT ON TERRACON + STRUCTURAL ENGINEER: PORTIONS LISTED BELOW OK TO POUR WHEN READY
Suspended Slab Inspection Partial 03/03/2006
Correction
Partial Correction
03/03/2006
POST-TENSIONED DECK SLAB PREP FOR POUR CONTINGENT ON TERRACON + STRUCTURAL ENGINEER: 1ST LEVEL S OF (2) FROM (A) TO (F.2) + N OF (2) FROM (A) TO (D); PORTIONS LISTED BELOW OK TO POUR WHEN READY
Suspended Slab Inspection Partial 03/27/2006
Correction
Partial Correction
03/27/2006
POST-TENSIONED DECK SLAB PREP FOR POUR CONTINGENT ON TERRACON + STRUCTURAL ENGINEER: 1ST LEVEL S OF (2) FROM (A) TO (F.2) + N OF (2) FROM (A) TO (D); 1ST LEVEL S OF (2) FROM (F.2) TO (K) + N OF (2) FROM (K) TO (F.8); PORTIONS LISTED BELOW OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 03/29/2006
Correction
Resolved
03/29/2006
C.I.P. CONCRETE COLUMNS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL
Correction
Resolved
03/29/2006
C.I.P. CONCRETE WALLS -- TOP OF FOOTING TO 1ST ELEVATED LEVEL
Correction
Resolved
03/29/2006
COLUMNS AND WALL SECTIONS
Correction
Resolved
03/29/2006
None
Correction
Resolved
03/29/2006
LANDING SUPPORT WALL FROM T/O/F TO 1ST ELEVATED LEVEL @ STAIR "A"
Correction
Partial Correction
03/29/2006
PROTECTION WING WALL @ ELEVATOR SHAFT BASEMENT LEVEL; 1ST LEVEL POURED INTEGRAL WITH ELEVATOR N & W WALLS + LANDING SUPPORT WALL; OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Correction
Partial Correction
03/29/2006
CIP CONCRETE COLUMNS -- LEVEL ONE TO LEVEL TWO G/1; G/2; G/3; H/1; H/2; H/3; J/1; J/2; J/3; K/1; K/2; K/3; L/1; L/2; L/3; OK TO POUR WHEN READY COLUMNS LISTED BELOW:
Rough Framing Inspection - Commercial Partial 04/03/2006
Correction
Partial Correction
04/03/2006
RISERS & LANDING APPROVED TO POUR LOWER TWO RISERS AND INTERMMEDIATE LANDING. @ STAIR 'A'
Correction
Partial Correction
04/03/2006
LANDING SUPPORT STEM WALLS @ STAIR 'C'
Suspended Slab Inspection Partial 04/10/2006
Correction
Partial Correction
04/10/2006
POST-TENSIONED DECK SLAB PREP FOR POUR CONTINGENT ON TERRACON + STRUCTURAL ENGINEER: 1ST LEVEL S OF (2) FROM (A) TO (F.2) + N OF (2) FROM (A) TO (D); 1ST LEVEL S OF (2) FROM (F.2) TO (K) + N OF (2) FROM (K) TO (F.8); 2ND LEVEL LINES 1-2, A-F.2: LINES 2-3, A-F.8 PORTIONS LISTED BELOW OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 04/12/2006
Correction
Partial Correction
04/12/2006
1ST LEVEL CMU FRAMING APPROVED TO COMPLETE DEMISING WALL BETWEEN B.106 ELEC. ROOM & B.105 GENERATOR ROOM 1ST LEVEL
Correction
Partial Correction
04/12/2006
CIP CONCRETE COLUMNS - LEVEL 2 TO LEVEL 3 F/3; E/3; D/3; C/3; B/3; C/2; D/2; E/2; F/2; A/2; C/1; E/1; D/1; C/1; OK TO POUR WHEN READY COLUMNS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 4/11/2006 4/12/2006 04/12/2006
Rough Framing Inspection - Commercial Partial 04/14/2006
Correction
Partial Correction
04/14/2006
CIP CONCRETE COLUMNS - LEVEL 2 TO LEVEL 3 F/3; E/3; D/3; C/3; B/3; C/2; D/2; E/2; F/2; A/2; C/1; E/1; D/1; C/1;ALL COLUMNS EAST OF AND INCLUDING LINE F. PENDING APPROVAL BY SPECIAL INSPECTORS. OK TO POUR WHEN READY COLUMNS LISTED BELOW:
Rough Framing Inspection - Commercial Partial 04/19/2006
Correction
Partial Correction
04/19/2006
1ST LEVEL CMU FRAMING APPROVED TO COMPLETE DEMISING WALL BETWEEN B.106 ELEC. ROOM & B.105 GENERATOR ROOM; SO WALL OF RM 102 OK TO GROUT & VIBRATE; BASEMENT LEVEL PLACEMENT/REINFORCEMENT
Rough Framing Inspection - Commercial Request Complete 4/18/2006 4/19/2006 04/19/2006
Rough Framing Inspection - Commercial Partial 04/21/2006
Correction
Partial Correction
04/21/2006
1ST LEVEL CMU FRAMING APPROVED TO COMPLETE DEMISING WALL BETWEEN B.106 ELEC. ROOM & B.105 GENERATOR ROOM; S, W, N WALLS OF RM 102 OK TO GROUT & VIBRATE; FUTURE CMU INSPECTIONS TO BE REPORTED BY TERRACON TO LSCA BASEMENT LEVEL PLACEMENT/REINFORCEMENT
Rough Framing Inspection - Commercial Request Complete 4/20/2006 4/21/2006 04/21/2006
Rough Framing Inspection - Commercial Partial 04/26/2006
Correction
Partial Correction
04/26/2006
LANDING SUPPORT STEM WALLS STAIR C; STAIR A: FROM BASEMENT LANDING TO LEVEL 1 LANDING; OK TO POUR WHEN READY PORTIONS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 4/25/2006 4/26/2006 04/26/2006
Suspended Slab Inspection Partial 05/01/2006
Correction
Partial Correction
05/01/2006
POST-TENSIONED DECK SLAB PREP FOR POUR CONTINGENT ON TERRACON + STRUCTURAL ENGINEER: POURS 1; 2; 3; 4; PORTIONS LISTED BELOW OK TO POUR WHEN READY
Rough Plumbing Inspection - Commercial Partial 05/03/2006
Correction
Resolved
05/03/2006
SUMP PUMP INSTALLATION NO ISSUES FOUND
Correction
Partial Correction
05/03/2006
STORM DRAIN PIPING PRESSURE TEST FROM PUMP ROOM TO 2ND LVL
Rough Framing Inspection - Commercial Partial 05/04/2006
Correction
Resolved
05/04/2006
PROTECTION WING WALL @ ELEVATOR SHAFT BASEMENT LEVEL; 1ST LEVEL POURED INTEGRAL WITH ELEVATOR N & W WALLS + LANDING SUPPORT WALL; OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Correction
Resolved
05/04/2006
CIP CONCRETE COLUMNS -- LEVEL ONE TO LEVEL TWO G/1; G/2; G/3; H/1; H/2; H/3; J/1; J/2; J/3; K/1; K/2; K/3; L/1; L/2; L/3; OK TO POUR WHEN READY COLUMNS LISTED BELOW:
Correction
Resolved
05/04/2006
RISERS & LANDING LOWER TWO RISERS AND INTERMMEDIATE LANDING. @ STAIR 'A' APPROVED TO POUR
Correction
Resolved
05/04/2006
LANDING SUPPORT STEM WALLS STAIR C; STAIR A: FROM BASEMENT LANDING TO LEVEL 1 LANDING; OK TO POUR WHEN READY PORTIONS LISTED BELOW:
Correction
Resolved
05/04/2006
1ST LEVEL CMU FRAMING APPROVED TO COMPLETE DEMISING WALL BETWEEN B.106 ELEC. ROOM & B.105 GENERATOR ROOM; S, W, N WALLS OF RM 102 OK TO GROUT & VIBRATE; FUTURE CMU INSPECTIONS TO BE REPORTED BY TERRACON TO LSCA BASEMENT LEVEL PLACEMENT/REINFORCEMENT
Correction
Partial Correction
05/04/2006
CIP CONCRETE COLUMNS - LEVEL 2 TO LEVEL 3 F/3; E/3; D/3; C/3; B/3; C/2; D/2; E/2; F/2; A/2; C/1; E/1; D/1; C/1;ALL COLUMNS EAST OF AND INCLUDING LINE F; G/1; H/1; J/1; K/1; L/1; G/2; H/2; J/2; K/2; L/2; PENDING APPROVAL BY SPECIAL INSPECTORS. OK TO POUR WHEN READY COLUMNS LISTED BELOW:
Rough Framing Inspection - Commercial Partial 05/05/2006
Correction
Partial Correction
05/05/2006
PROTECTION WING WALL @ ELEVATOR SHAFT COMPONENTS FOLLOWING: BASEMENT LEVEL; 1ST & 2ND LEVELS POURED INTEGRAL WITH ELEVATOR N & W WALLS + W WALL @ STAIR "B"; N-S @ (G.8) + E-W @ (1.2) OK TO POUR WHEN READY
Correction
Partial Correction
05/05/2006
CIP CONCRETE COLUMNS - LEVEL 2 TO LEVEL 3 F/3; E/3; D/3; C/3; B/3; C/2; D/2; E/2; F/2; A/2; C/1; E/1; D/1; C/1;ALL COLUMNS EAST OF AND INCLUDING LINE F; G/1; H/1; J/1; K/1; L/1; G/2; H/2; J/2; K/2; L/2; G/3; H/3; J/3; K/3; L/2.9; PENDING APPROVAL BY SPECIAL INSPECTORS. OK TO POUR WHEN READY COLUMNS LISTED BELOW:
Rough Framing Inspection - Commercial Partial 05/10/2006
Correction
Partial Correction
05/10/2006
RISERS & LANDING LOWER TWO RISERS AND INTERMMEDIATE LANDING; FROM LEVEL 1 TO LEVEL 2; @ STAIR 'A' APPROVED TO POUR
Suspended Slab Inspection Partial 05/11/2006
Correction
Partial Correction
05/11/2006
POST-TENSIONED DECK SLAB PREP FOR POUR CONTINGENT ON TERRACON + STRUCTURAL ENGINEER: POURS 1; 2; 3; 4; 5; PORTIONS LISTED BELOW OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 05/15/2006
Correction
Partial Correction
05/15/2006
RISERS & LANDING AT STAIR 'A': LOWER TWO RISERS AND INTERMMEDIATE LANDING; FROM LEVEL 1 TO LEVEL 2; AT STAIR 'B': FROM BASEMENT TO LEVEL 1; OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Correction
Resolved
05/15/2006
LANDING SUPPORT STEM WALLS STAIR C; STAIR A: FROM BASEMENT TO LEVEL 1; OK TO POUR WHEN READY PORTIONS LISTED BELOW:
Electrical Service Inspection Passed 05/15/2006
Correction
Resolved
05/15/2006
ELECTRICAL SERVICE INSTALLATION ENSURE PANEL FRONT IS IN PLACE BEFORE REQUESTING SERVICE ACTIVATION. 277/480V 3PH 4W - 225 AMP RELEASE SERVICE
Rough Framing Inspection - Commercial Partial 05/18/2006
Correction
Resolved
05/18/2006
LANDING SUPPORT WALL FROM T/O/F TO 1ST ELEVATED LEVEL @ STAIR "A"
Correction
Partial Correction
05/18/2006
LANDING SUPPORT STEM WALLS STAIR C; STAIR A: FROM BASEMENT TO LEVEL 1; FROM EL. 1019.60 TO 1030.10; OK TO POUR WHEN READY PORTIONS LISTED BELOW:
Suspended Slab Inspection Passed 05/22/2006
Correction
Resolved
05/22/2006
POST-TENSIONED DECK SLAB PREP FOR POUR CONTINGENT ON TERRACON + STRUCTURAL ENGINEER INSPECTION: POURS 1; 2; 3; 4; 5; 6 PORTIONS LISTED BELOW OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 05/24/2006
Correction
Partial Correction
05/24/2006
RISERS & LANDING AT STAIR 'A': LOWER TWO RISERS AND INTERMMEDIATE LANDING; FROM LEVEL 1 TO LEVEL 2; AT STAIR 'B': FROM BASEMENT TO LEVEL 1; AT STAIR 'C': FROM LEVEL 1 TO LEVEL 2; OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Correction
Resolved
05/24/2006
CIP CONCRETE COLUMNS - STUBS TO PARAPET ELEVATION H/1; J/1; K/1; H/2; J/2; L/2; G/3; H/3; J/3 REMAINING STUB COLUMNS POURED WITHOUT CITY INSPECTION REQUESTED/PERFORMED OK TO POUR WHEN READY COLUMNS LISTED BELOW:
Rough Framing Inspection - Commercial Partial 05/30/2006
Correction
Partial Correction
05/30/2006
UPPER LEVEL BARRIER WALL ON (G) FROM (2) TO (3); OK TO POUR WHEN READY SECTIONS SHOWN BELOW:
Rough Framing Inspection - Commercial Partial 05/31/2006
Correction
Partial Correction
05/31/2006
RISERS & LANDING AT STAIR 'A': LOWER TWO RISERS AND INTERMMEDIATE LANDING; FROM LEVEL 1 TO LEVEL 2; FROM ELEV 1024.85 TO 1035.35 AT STAIR 'B': FROM BASEMENT TO LEVEL 1; AT STAIR 'C': FROM LEVEL 1 TO LEVEL 2; OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Correction
Partial Correction
05/31/2006
LANDING SUPPORT STEM WALLS STAIR A: FROM BASEMENT TO LEVEL 1; FROM EL. 1019.60 TO 1030.10; STAIR C WEST WALL FROM ELEV 1024.60 TO 1035.10 OK TO POUR WHEN READY PORTIONS LISTED BELOW:
Rough Framing Inspection - Commercial Partial 06/01/2006
Correction
Partial Correction
06/01/2006
RISERS & LANDING AT STAIR 'A': LOWER TWO RISERS AND INTERMMEDIATE LANDING; FROM LEVEL 1 TO LEVEL 2; FROM ELEV 1024.85 TO 1035.35 AT STAIR 'B': FROM BASEMENT TO LEVEL 1; FROM LEVEL 1 TO LEVEL 2; AT STAIR 'C': FROM LEVEL 1 TO LEVEL 2; OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Partial 06/06/2006
Correction
Partial Correction
06/06/2006
RISERS & LANDING AT STAIR 'A': LOWER TWO RISERS AND INTERMMEDIATE LANDING; FROM LEVEL 1 TO LEVEL 2; FROM ELEV 1024.85 TO 1035.35 AT STAIR 'B': FROM BASEMENT TO LEVEL 1; FROM LEVEL 1 TO LEVEL 2; AT STAIR 'C': FROM LEVEL 1 TO LEVEL 2; FROM LEVEL 2 TO LEVEL 3; OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 6/5/2006 6/6/2006 06/06/2006
Rough Framing Inspection - Commercial Partial 06/07/2006
Correction
Resolved
06/07/2006
RISERS & LANDING STAIR 'A': LOWER 2 RISERS AND INTERMMEDIATE LANDING; FROM LEVEL 1 TO LEVEL 2; FROM ELEV 1024.85 TO 1035.35 STAIR 'B': FROM BASEMENT TO LEVEL 1; FROM LEVEL 1 TO LEVEL 2; FROM LEVEL 2 TO LEVEL 3 STAIR 'C': FROM LEVEL 1 TO LEVEL 2; FROM LEVEL 2 TO LEVEL 3 OK TO POUR WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 6/7/2006 6/7/2006 06/07/2006
Underground Plumbing Inspection - Commercial Partial 07/10/2006
Correction
Partial Correction
07/10/2006
UNDERGROUND STORM WATER DETENTION SYSTEM CHAMBERS, MANIFOLDS, AND UNDERDRAIN SYSTEM EXCEPT AT TWO MANHOLES; OK TO COVER WHEN READY COMPONENTS DESCRIBED:
Gas Piping Inspection - Commercial Failed 07/18/2006
Correction
Corrective Action Required
07/18/2006
LATERAL SUPPORT OF PIPE ABOVE GENERATOR UNIT SUPPORT PIPE LATERALLY PREVENT DAMAGE TO JOINTS
Gas Service Inspection - Commercial Partial 07/18/2006
Correction
Partial Correction
07/18/2006
TEST PRESSURE LEVEL RELEASE GAS SERVICE. WHEN SERVICE IS ACTIVATED REQUEST WITNESS OF SOAP TEST TO DEMONSTRATE NO LEAKAGE AT JOINTS DOWNSTREAM FROM SHUT-OFF VALVE. HELD STEADY AT >= 10 PSI FOR >=15 MIN
Underground Plumbing Inspection - Commercial Passed 08/16/2006
Correction
Resolved
08/16/2006
UNDERGROUND STORM WATER DETENTION SYSTEM
Rough Framing Inspection - Commercial Passed 08/16/2006
Correction
Resolved
08/16/2006
LANDING SUPPORT WALL FROM T/O/F TO 1ST ELEVATED LEVEL
Correction
Resolved
08/16/2006
PROTECTION WING WALL @ ELEVATOR SHAFT
Correction
Resolved
08/16/2006
CIP CONCRETE COLUMNS -- LEVEL ONE TO LEVEL TWO
Correction
Resolved
08/16/2006
RISERS & LANDING
Correction
Resolved
08/16/2006
LANDING SUPPORT STEM WALLS
Correction
Resolved
08/16/2006
1ST LEVEL CMU FRAMING
Correction
Resolved
08/16/2006
CIP CONCRETE COLUMNS - LEVEL 2 TO LEVEL 3
Correction
Resolved
08/16/2006
CIP CONCRETE COLUMNS - STUBS TO PARAPET ELEVATION
Correction
Resolved
08/16/2006
UPPER LEVEL BARRIER WALL
Gas Service Inspection - Commercial Passed 08/16/2006
Correction
Resolved
08/16/2006
TEST PRESSURE LEVEL
Rough Plumbing Inspection - Commercial Passed 08/16/2006
Correction
Resolved
08/16/2006
SUMP PUMP INSTALLATION
Correction
Resolved
08/16/2006
STORM DRAIN PIPING
Final Inspection - Commercial Failed 08/16/2006
Correction
Corrective Action Required
08/16/2006
Receive Fire Department approval
Correction
Corrective Action Required
08/16/2006
Receive Planning & Development Approval
Correction
Corrective Action Required
08/16/2006
Receive Public Works Approval
Correction
Corrective Action Required
08/16/2006
Receive Water Utilities Approval
Final Inspection - Commercial Failed 08/17/2006
Correction
Resolved
08/17/2006
Receive Water Utilities Approval PER BEN HASKAMP 8/17/06
Final Inspection - Commercial Failed 08/18/2006
Correction
Partial Correction
08/18/2006
Receive Fire Department approval PER KEITH MARTIN 8/18/06 EXCEPT 3RD LEVEL EX-SIGNS
Correction
Corrective Action Required
08/18/2006
Receive Planning & Development Approval CONTACT MIKE GORECKI PHONE 816-969-1680
Correction
Corrective Action Required
08/18/2006
Receive Public Works Approval CONTACT SHAWN GRAFF PHONE 816-969-1827
Correction
Corrective Action Required
08/18/2006
GENERATOR ENGINE VENT STACK PROTECT FROM IMPACT + ISOLATE DUE TO HEAT LEVEL
Correction
Corrective Action Required
08/18/2006
LIGHTNING PROTECTION SYSTEM NOT COMPLETED SUBJECT TO APPROVAL
Correction
Corrective Action Required
08/18/2006
GUARDS AND HANDRAILS AT STAIRS COMPLETE INSTALLATION
Correction
Corrective Action Required
08/18/2006
FLOOR OPENINGS AT WALL OPENINGS CLOSE TO < 4"
Correction
Resolved
08/18/2006
STATE ELEVATOR INSPECTION APPROVAL REPORT PROVIDED
Correction
Corrective Action Required
08/18/2006
PROTECTION OF SPRINKLER FIRE PROTECTION PIPING AT FLOOR LEVEL PROTECT FROM IMPACT
Correction
Corrective Action Required
08/18/2006
WALL OPENINGS BELOW 42" AFF CLOSE PERMANENT OR PROVIDE TEMPORARY GUARD
Correction
Corrective Action Required
08/18/2006
EMERGENCY GENERATOR DEMONSTRATE OPERABILTY
Correction
Corrective Action Required
08/18/2006
LABELING OF ELECTRICAL CIRCUIT BREAKERS NEC 408.4; IRC E36O6.2. EACH BREAKER MUST BE LABELED. MUST BE LEGIBLE; SPECIFIC. USE DIRECTIONS (e.g. NE, SW) RATHER THAN ROOM NUMBERS; NO DITTO MARKS OR CONTINUATION SYMBOLS EXCEPT @ MULTIPLE POLE BREAKERS. LABEL UNUSED BREAKERS "SPARE" LABEL ALL CB'S & SWITCHES IDENTIFY ALL CB POSITIONS
Correction
Corrective Action Required
08/18/2006
LABELING OF ELECTRICAL PANELS & SWITCHES TO BE COMPLETED
Correction
Corrective Action Required
08/18/2006
OPENINGS IN CABLE GUARDS SOME => 4"
Final Inspection - Commercial Failed 08/19/2006
Correction
Corrective Action Required
08/19/2006
HONEYCOMBED BEAM BOTTOMS 1ST LEVEL NW REPAIR PER STRUCT ENGR
Correction
Corrective Action Required
08/19/2006
SECURING OF AREAWAY AT NE CORNER PREVENT ACCIDENTAL ENTRY
Final Inspection - Commercial Failed 08/21/2006
Correction
Partial Correction
08/21/2006
GENERATOR ENGINE VENT STACK HOWEVER, PROVIDE BOLLARDS OR OTHER PROTECTION FROM IMPACT HEAT LEVEL MEASURED ~ 90F ISOLATION NOT REQUIRED
Correction
Partial Correction
08/21/2006
GUARDS AND HANDRAILS AT STAIRS TEMP PROTECTION INSTALLED COMPLETE PERMANENT UNITS
Correction
Partial Correction
08/21/2006
FLOOR OPENINGS AT WALL OPENINGS TEMP PROTECTION INSTALLED COMPLETE PERM CLOSURES
Correction
Corrective Action Required
08/21/2006
PROTECTION OF SPRINKLER FIRE PROTECTION PIPING OTHER PROTECTION FROM IMPACT AT 1ST LEVEL PROVIDE BOLLARDS OR
Correction
Partial Correction
08/21/2006
WALL OPENINGS BELOW 42" AFF TEMPORARY GUARDS PROVIDED PERMANENT INSTALL PENDING
Correction
Resolved
08/21/2006
EMERGENCY GENERATOR OPERABILTY DEMONSTRATED 8/18/06
Correction
Partial Correction
08/21/2006
SECURING OF AREAWAY AT NE CORNER PREVENT ACCIDENTAL ENTRY TEMP BARRIER IN PLACE
Correction
Corrective Action Required
08/21/2006
FINISH ELECTRICAL AT 3RD LEVEL WORK IN PROGRESS SUBJECT TO APPROVAL
Correction
Corrective Action Required
08/21/2006
WALKWAY ADA WARNING DOMES NOT YET INSTALLED
Correction
Corrective Action Required
08/21/2006
CONSTRUCTION OF STAIRWELL PENTHOUSES IN PROGRESS
Above Ceiling Inspection Passed 08/29/2006
Correction
Resolved
08/29/2006
CEILING FRAMING + ABOVE-CEILING SYSTEMS STAIR PENTHOUSES #1, 2, 3 OK TO COVER WHEN READY
Rough Framing Inspection - Commercial Request Complete 8/28/2006 8/29/2006 08/29/2006
Final Inspection - Commercial Failed 08/31/2006
Correction
Partial Correction
08/31/2006
LOAD TEST OF WALL LOUVER PANEL FILE PHOTOS PROVIDED BY TITAN CONSTR PERFORMED / WITNESSED BY STRUCT ENGR +ARCHITECT
Footing Inspection - Commercial Passed 09/26/2006
Correction
Resolved
09/26/2006
FOOTINGS FOR MONUMENT SIGN & PEDESTAL SIGN PER ASI 7 OK TO POUR WHEN READY
Foundation Inspection - Commercial Passed 09/27/2006
Correction
Resolved
09/27/2006
PREP TO POUR MONUMENT SIGN WALL OK TO POUR WHEN READY
Final Inspection - Commercial Failed 10/04/2006
Final Inspection - Commercial Failed 10/06/2006
Final Inspection - Commercial Failed 10/09/2006
Correction
Corrective Action Required
10/09/2006
LIGHTNING PROTECTION SYSTEM NOT COMPLETED SUBJECT TO APPROVAL
Correction
Partial Correction
10/09/2006
GUARDS AND HANDRAILS AT STAIRS TO BE COMPLETED
Correction
Resolved
10/09/2006
WALL OPENINGS BELOW 42" AFF
Correction
Resolved
10/09/2006
HONEYCOMBED BEAM BOTTOMS REPAIRED
Correction
Resolved
10/09/2006
SECURING OF AREAWAY AT NE CORNER
Correction
Partial Correction
10/09/2006
FINISH ELECTRICAL AT 3RD LEVEL AND SECURITY SYSTEM COMPLETE EXCEPT FOR PENTHOUSE LIGHTNING PROT
Correction
Resolved
10/09/2006
WALKWAY ADA WARNING DOMES INSTALLED
Correction
Corrective Action Required
10/09/2006
CONSTRUCTION OF STAIRWELL PENTHOUSES 1) LIGHTNING PROTECTION TO BE COMPLETED 2) SECURITY CAMERA INSTALLATION/WIRING TO BE COMPLETED 3) GUARDS/HANDRAILS AT STAIRWELL & GLASS WALL INCOMPLETE COMPLETE EXCEPT ISSUES BELOW:
Correction
Resolved
10/09/2006
LOAD TEST OF WALL LOUVER PANEL FILE PHOTOS PROVIDED BY TITAN CONSTR. TEST DATA ON RECORD. RESULTS APPROVED BY A/E AND CITY ARCHITECT. PERFORMED / WITNESSED BY STRUCT ENGR +ARCHITECT
Final Inspection - Commercial Failed 10/09/2006
Miscellaneous Inspection Passed 11/07/2006
Final Inspection - Commercial Failed 11/08/2006
Correction
Corrective Action Required
11/08/2006
GENERATOR ENGINE VENT STACK PROVIDE BOLLARDS OR OTHER IMPACT PROTECTION
Correction
Resolved
11/08/2006
LIGHTNING PROTECTION SYSTEM
Correction
Corrective Action Required
11/08/2006
PROTECTION OF SPRINKLER FIRE PROTECTION PIPING 1ST LEVEL SW PROVIDE BOLLARDS OR OTHER IMPACT PROTECTION
Correction
Resolved
11/08/2006
FINISH ELECTRICAL AT 3RD LEVEL
Correction
Resolved
11/08/2006
CONSTRUCTION OF STAIRWELL PENTHOUSES
Correction
Resolved
11/08/2006
LOAD TEST OF WALL LOUVER PANEL
Gas Piping Inspection - Commercial Passed 11/08/2006
Correction
Resolved
11/08/2006
LATERAL SUPPORT OF PIPE ABOVE GENERATOR UNIT
Final Inspection - Commercial Failed 11/09/2006
Correction
Corrective Action Required
11/09/2006
LABELING OF ELECTRICAL CIRCUIT BREAKERS NEC 408.4: CHECK/CORRECT LABELING AS DISCUSSED LABEL ALL CB'S & SWITCHES IDENTIFY ALL CB POSITIONS
Correction
Resolved
11/09/2006
LABELING OF ELECTRICAL PANELS & SWITCHES
Final Inspection - Commercial Failed 11/30/2006
Correction
Resolved
11/30/2006
Receive Fire Department approval PER KEITH MARTIN 11/30/06
Correction
Corrective Action Required
11/30/2006
Receive Planning & Development Approval CONTACT MIKE GORECKI PHONE 816-969-1680
Correction
Resolved
11/30/2006
LABELING OF ELECTRICAL CIRCUIT BREAKERS
Final Inspection - Commercial Failed 12/04/2006
Final Inspection - Commercial Failed 11/13/2007
Correction
Resolved
11/13/2007
GENERATOR ENGINE VENT STACK PROTECTION ADEQUATE PER A/E & CITY ARCHITECT
Correction
Resolved
11/13/2007
GUARDS AND HANDRAILS AT STAIRS
Correction
Resolved
11/13/2007
FLOOR OPENINGS AT WALL OPENINGS CLOSURES INSTALLED
Correction
Resolved
11/13/2007
PROTECTION OF SPRINKLER FIRE PROTECTION PIPING PROTECTION ADEQUATE PER A/E & CITY ARCHITECT
Final Inspection - Commercial Passed 12/11/2007
Correction
Resolved
12/11/2007
Receive Planning & Development Approval NO REMAINING ISSUES ON RECORD
Correction
Resolved
12/11/2007
Receive Public Works Approval PER SHAWN GRAFF
Correction
Resolved
12/11/2007
OPENINGS IN CABLE GUARDS CMR APPROVED 12/10/07
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home