Permit Application Status

B0500982


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0500982
Demolition
Final Completion
CITY OF LEES SUMMIT
DEMO COMPLETE COMMERCIAL
Demo Airport Hanger LT
06/09/2005
06/09/2005
12/06/2005
10/19/2007
Locations
Contacts
CITY OF LEE'S SUMMIT, PUBLIC WORKS, Address:DENA MEZGER, CITY ENGINEER  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 12/06/2005 10/29/2010
Correction

NOTE: The contractor must contact the Missouri Department of Natural Resources at 1-800-361-4827 prior to starting the demolition.
Correction

Codes Administration- Erosion control shall be provided in conformance with Article VIII, Section VIII(c) & (d) and details 48 and 48A of the City of Lee's Summit Design and Construction Manual. Erosion control devices shall be installed and maintained during all phases of the construction process. Failure to provide or maintain erosion control may result in an issuance of a stop work order which is authorized by Article I, Section XXIV.
Verify Reviews and Inspections Approved 06/09/2005
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $10.00 $10.00 Paid 06/09/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Demo Passed 10/18/2007
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home