Permit Application Status

B0500644


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0500644
Building Permit - Commercial
Certificate of Occupancy
ELWANDA ROGERS/D L ROGERS CORP
NEW COMMERCIAL
SONIC AMERICA'S DRIVE IN
04/25/2005
01/17/2006
07/16/2006
06/06/2006
Locations
Contacts
BSW INTERNATIONAL, Address:ONE WEST 3RD ST SUITE 800  
VALOR CONSTRUCTION INC, Address:5602 E 139TH ST  
ELWANDA ROGERS/D L ROGERS CORP, Address:5013 DAVIS BLVD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/17/2006 10/29/2010
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

Codes Administration - For the Health Department inspection contact Chris Saxton with the Jackson County Public Works Department, Environmental Services Division at 816-881-4455. Occupancy approval is required by the City of Lee's Summit prior to issuance of any type of occupancy.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-7343.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

Codes Administration - 2003 IPC 608.1 - General. A potable water supply system shall be designed, installed and maintained in such a manner so as to prevent contamination from nonpotable liquids, solids or gases being introduced into the potable water supply through cross-connections or any other piping connections to the system. Backflow preventer applications shall conform to Table 608.1, except as specifically stated in Sections 608.2 through 608.16.9.
Correction

Codes Administration - 2003 IBC 1008.1.6 - Thresholds. Thresholds at doorways shall not exceed 0.75 inch in height for sliding doors serving dwelling units or 0.5 inch for other doors. Raised thresholds and floor level changes greater than 0.25 inch at doorways shall beveled with a slope not greater than one unit vertical in two units horizontal.
Correction

Codes Administration - 2003 IBC 1008.1.8.1 - Hardware. Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 shall not require tight grasping, tight pinching or twisting of the wrist to operate.
Correction

Codes Administration - LSCO 7-1102.1 - Demolition permit required. Unless otherwise approved by the building official, the demolition of structures or buildings, partial or complete, shall require a demolition permit. Fees for demolition permits shall be in accordance with the City of Lee's Summit, MO Fee Schedule.
Correction

Fire Department- Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. Exit doors shall not be locked, chained, barred, latched or otherwise rendered unusable. All locking devises shall be of an approved type. IFC 1003.3.1.8
Correction

Fire Department- Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. 3. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble.
Correction

Codes Administration - The plans must be approved by the Health Department prior to permit approval. Contact Steve Hutchens with the Jackson County Public Works Department at 816-881-4471.
Correction

Codes Administration - An engineered design for the retaining walls have not been provided.
Correction

Codes Administration - The plans do not clearly indicate if the existing water tap and meter are to be reused or if it is to be relocated.
Correction

Codes Administration - The outflow on the grease interceptor does not connect to the building sewer on the civil plans. It is shown to run past it.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $1,352.00 $1,352.00 Paid 01/17/2006
24 BLDG Plan Check Fees $42.50 $42.50 Paid 01/17/2006
25 Electrical Permit Fee $133.41 $133.41 Paid 01/17/2006
25 Mechanical Permit Fees $70.00 $70.00 Paid 01/17/2006
25 Plumbing Permit Fees $83.00 $83.00 Paid 01/17/2006
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Partial 02/03/2006
Correction
Partial Correction
02/03/2006
JUMPER TO GRADE BEAM GROUND CLAMP G.E.C. TO RE-BAR BEFORE CONCRETE POUR
Correction
Partial Correction
02/03/2006
TEMPORARY ELECTRICAL SERVICE INSTALLATION 100 AMP RELEASE SERVICE
Underground Electrical Inspection - Commercial Partial 02/03/2006
Correction
Partial Correction
02/03/2006
SECONDARY SERVICE CONDUIT FROM XFRMR TO BLDG SWEEPS @ XFRMR OK
Footing Inspection - Commercial Partial 02/03/2006
Correction
Partial Correction
02/03/2006
PERIMETER GRADE BEAM ACI 7.7.1: OK TO POUR WHEN READY ENSURE RE-BAR COVERAGE >= 3" TO BOTTOMS/BANKS
Retaining Wall Inspection Partial 02/06/2006
Correction
Partial Correction
02/06/2006
REINFORCED SOIL RETAINING WALL INSTALLATION OF LEVELING BED; WORK IN PROGRESS NO ISSUES NOTED
Retaining Wall Inspection Partial 02/07/2006
Correction
Partial Correction
02/07/2006
REINFORCED SOIL RETAINING WALL 2/6/06 INSTALLATION OF LEVELING BED W/I/P; 2/7/06 BLOCK + GRID W/I/P; WORK IN PROGRESS NO ISSUES NOTED
Retaining Wall Inspection Partial 02/08/2006
Correction
Partial Correction
02/08/2006
REINFORCED SOIL RETAINING WALL 2/6/06 INSTALLATION OF LEVELING BED W/I/P; 2/7/06 BLOCK + GRID W/I/P; 2/8/06 BLOCK/GRID + FENCE SONO TUBE PLACEMENT NEARING COMPLETION WORK IN PROGRESS NO ISSUES NOTED
Retaining Wall Inspection Passed 02/09/2006
Correction
Resolved
02/09/2006
REINFORCED SOIL RETAINING WALL 2/6/06 INSTALLATION OF LEVELING BED W/I/P; 2/7/06 BLOCK + GRID W/I/P; 2/8/06 BLOCK/GRID + FENCE SONO TUBE PLACEMENT NEARING COMPLETION; 2/9/06 SUBSTANTIALLY COMPLETED AT EAST PROPERTY LINE
Underslab Plumbing Inspection - Commercial Passed 02/09/2006
Correction
Resolved
02/09/2006
UNDER-SLAB DWV PIPING OK TO COVER WHEN READY
Underslab Electrical Inspection - Commercial Passed 02/14/2006
Correction
Resolved
02/14/2006
UNDER-FLOOR ELECTRICAL CONDUIT/BOXES MATERIAL & WORKMANSHIP OK TO COVER WHEN READY
All Rough Inspection - Commercial Failed 03/10/2006
Correction
Corrective Action Required
03/10/2006
Wiring Installation and Support (IRC) ALL MC CABLE TO BE SECURED TO STRUCTURE WITHIN 12" OF JUNCTION BOXES. THROUGHOUT
Correction
Corrective Action Required
03/10/2006
None DO NOT INSULATE DO NOT ROCK
Correction
Corrective Action Required
03/10/2006
Bearing (Joist/Beam Girder) (IRC) PROVIDE SHIMS UNDER HEADER AT JACK STUDS. EAST ENTRY VESTIBULE
Correction
Corrective Action Required
03/10/2006
Foundation Anchor Bolts (IRC) 1- TIGHTEN ALL FOUNDATION ANCHOR NUTS. 2- PROVIDE FOUNDATION ANCHOR BOLTS WITHIN 12" OF EACH WALL END. THROUGHOUT
Correction
Corrective Action Required
03/10/2006
Prevent Physical Damage (IRC) PROVIDE NAIL GUARDS AT ALL NON-METALLIC CONDUIT WITHIN 1-1/4" OF NAILING SURFACE. (INCLUDING AT METAL STUDS) THROUGHOUT
Correction
Corrective Action Required
03/10/2006
Water/DWV Preotection Against Physical Damage (IRC) PROVIDE NAIL GUARDS AT ALL DWV & WATER PIPING WITHIN 1-1/2" OF NAILING SURFACE. (INCLUDING AT METAL STUDS) THROUGHOUT
Correction
Corrective Action Required
03/10/2006
Fireblocking (IRC) PROVIDE FIRE BLOCKING AT TOP PLATES IN CONCEALED LOCATIONS. UTIL. RM. & RESTROOMS
Retaining Wall Inspection Partial 03/14/2006
Correction
Partial Correction
03/14/2006
REINFORCED SOIL RETAINING WALL 3/14/06: FOOTING PAD + LOWER COURSES IN PROGRESS; AT NORTH PROPERTY LINE COMPONENTS APPROVED BELOW
Retaining Wall Inspection Passed 03/15/2006
Correction
Resolved
03/15/2006
REINFORCED SOIL RETAINING WALL 3/14/06: FOOTING PAD + LOWER COURSES IN PROGRESS; 3/15/06: COMPLETE EXCEPT FOR CAP COURSE AT NORTH PROPERTY LINE COMPONENTS APPROVED BELOW
Retaining Wall Inspection Request Complete 3/14/2006 3/15/2006 03/15/2006
Piers/Caissons Inspection - Commercial Partial 03/16/2006
Correction
Partial Correction
03/16/2006
None EAST AND BUILDING CANOPY PIERS APPROVED WEST CANOPY NOT INSPECTED YET CANOPY PIERS OK TO POUR
Piers/Caissons Inspection - Commercial Passed 03/16/2006
Correction
Resolved
03/16/2006
READINESS FOR INSPECTION
Correction
Resolved
03/16/2006
CANOPY PIER POUR PREP KEEP DIRT OUT OF POURS OK TO POUR WHEN READY ENSURE >=3" RE-BAR COVER
Water Service Inspection Passed 03/24/2006
Correction
Resolved
03/24/2006
WATER SERVICE INSTALLATION OK TO COVER WHEN READY FROM BUILDING ENTRY TO NEAR METER LOCATION
Sewer Service Inspection Passed 03/24/2006
Correction
Resolved
03/24/2006
GREASE WASTE PIPING OK TO COVER WHEN READY FROM BLDG ENTRY TO GREASE INTERCEPTOR
Water Service Inspection - Commercial Request Complete 3/24/2006 3/24/2006 03/24/2006
Sewer Service Inspection - Commercial Request Complete 3/24/2006 3/24/2006 03/24/2006
Sewer Service Inspection Passed 03/27/2006
Correction
Resolved
03/27/2006
SANITARY SEWER SERVICE INSTALLATION TO CONNECTION AT STUB FROM BUILDING ENTRY TO TIE-IN @ GREASE INTERCEPT
Sewer Service Inspection - Commercial Request Complete 3/27/2006 3/27/2006 03/27/2006
Above Ceiling Inspection Failed 04/07/2006
Correction
Partial Correction
04/07/2006
ABOVE-CEILING ELECTRICAL ONLY -PROVIDE EXTENSION BOXES FOR ALL OVERFILLED 4"X4"X2.125" BOXES WITH MORE THAN 13 CONDUCTOR FILLS-OK AT 2ND INSPECTION
Electrical Service Inspection Partial 04/07/2006
Correction
Corrective Action Required
04/07/2006
INSULATING FITTINGS FOR #4 OR LARGER UNGROUNDED CONDUCTORS PROVIDE PROPER INSTALLATION OF THESE FITTINGS. NO CUTTING OF THESE FITTINGS PLEASE
Electrical Service Inspection Passed 04/10/2006
Correction
Resolved
04/10/2006
INSULATING FITTINGS FOR #4 OR LARGER UNGROUNDED CONDUCTORS
Correction
Resolved
04/10/2006
JUMPER TO GRADE BEAM GROUND CLAMP G.E.C. TO RE-BAR BEFORE CONCRETE POUR
Correction
Resolved
04/10/2006
TEMPORARY ELECTRICAL SERVICE INSTALLATION 100 AMP RELEASE SERVICE
Gas Service Inspection - Commercial Not Ready 04/17/2006
Correction
Corrective Action Required
04/17/2006
TEST PRESSURE LEVEL PRESSURIZE SYSTEM TO HOLD STEADY AT OR ABOVE MINIMUM BELOW REQUIRED MINIMUM 10 PSI or 6" Hg REQUIRED
Gas Piping Inspection - Commercial Failed 04/17/2006
Correction
Corrective Action Required
04/17/2006
GAS PIPING ROUGH STRAP TO BLOCKS; ENSURE SLIP SHEETS ADHERED TO BLOCKS; SEAL PIPE PENETRATIONS OF ROOF INCOMPLETE SUPPORT/SECURING @ ROOF
Gas Service Inspection - Commercial Passed 04/19/2006
Correction
Resolved
04/19/2006
TEST PRESSURE LEVEL RELEASE GAS SERVICE HELD STEADY AT >= 20 PSI FOR >=60 MIN
Hood/Duct Inspection Partial 04/21/2006
Correction
Partial Correction
04/21/2006
GREASE DUCT FABRICATION ONE OFFSET APPROVED
Driveway Inspection Partial 04/21/2006
Above Ceiling Inspection Partial 04/24/2006
Correction
Resolved
04/24/2006
ABOVE-CEILING ELECTRICAL ONLY
Correction
Partial Correction
04/24/2006
CEILING FRAMING + ABOVE-CEILING SYSTEMS ALL EXCEPT CORRIDOR AT NORTH BETWEEN COOLERS/FREEZERS OK TO COVER WHEN READY AREAS LISTED BELOW:
Occupancy Inspection - Codes Commercial Not Ready 04/24/2006
Correction
Corrective Action Required
04/24/2006
OCCUPANCY APPROVAL STATUS NO PUBLIC, INCLUDING JOB APPLICANTS, UNTIL APPROVED OK FOR STAFF & SERVICE FOR SET-UP FOR BUSINESS
Hood/Duct Inspection Partial 04/24/2006
Correction
Resolved
04/24/2006
GREASE DUCT FABRICATION
Correction
Partial Correction
04/24/2006
GREASE DUCT INSTALLATION VISUAL + LIGHT TEST OK OK TO APPLY DUCT WRAP
Correction
Corrective Action Required
04/24/2006
COMMERCIAL KITCHEN HOOD PERFORMANCE TESTS IMC 507.16 REPORT VELOCITY TEST + DEMONSTRATE SMOKE CAPTURE
Occupancy Inspection - Codes Commercial Not Ready 04/26/2006
Correction
Corrective Action Required
04/26/2006
Receive Water Utilities Approval
Correction
Corrective Action Required
04/26/2006
Receive Public Works Approval
Correction
Corrective Action Required
04/26/2006
READINESS FOR INSPECTION CALL FOR INSPECTION AFTER PREPARATION IS COMPLETE WORK REQUESTED FOR INSP NOT COMPLETED
Correction
Corrective Action Required
04/26/2006
Receive Fire Department approval
Correction
Corrective Action Required
04/26/2006
Receive Planning & Development Approval
Underground Electrical Inspection - Commercial Passed 04/26/2006
Correction
Resolved
04/26/2006
SECONDARY SERVICE CONDUIT FROM XFRMR TO BLDG
All Rough Inspection - Commercial Passed 04/26/2006
Correction
Resolved
04/26/2006
Wiring Installation and Support (IRC)
Correction
Resolved
04/26/2006
None
Correction
Resolved
04/26/2006
Bearing (Joist/Beam Girder) (IRC)
Correction
Resolved
04/26/2006
Foundation Anchor Bolts (IRC)
Correction
Resolved
04/26/2006
Prevent Physical Damage (IRC)
Correction
Resolved
04/26/2006
Water/DWV Preotection Against Physical Damage (IRC)
Correction
Resolved
04/26/2006
Fireblocking (IRC)
Above Ceiling Inspection Failed 04/26/2006
Correction
Partial Correction
04/26/2006
CEILING FRAMING + ABOVE-CEILING SYSTEMS ALL EXCEPT CORRIDOR AT NORTH BETWEEN COOLER & RESTROOMS OK TO COVER WHEN READY AREAS LISTED BELOW:
Footing Inspection - Commercial Passed 04/26/2006
Correction
Resolved
04/26/2006
PERIMETER GRADE BEAM
Piers/Caissons Inspection - Commercial Passed 04/26/2006
Correction
Resolved
04/26/2006
CANOPY PIER POUR PREP
Gas Piping Inspection - Commercial Passed 04/26/2006
Correction
Resolved
04/26/2006
GAS PIPING ROUGH
Hood/Duct Inspection Failed 04/26/2006
Correction
Resolved
04/26/2006
GREASE DUCT INSTALLATION
Water Service Inspection - Commercial Request Complete 4/26/2006 4/26/2006 04/26/2006
Water Service Inspection - Commercial Request Complete 4/26/2006 4/26/2006 04/26/2006
Occupancy Inspection - Codes Commercial Partial 04/27/2006
Correction
Partial Correction
04/27/2006
OCCUPANCY APPROVAL STATUS NO PUBLIC OTHER THAN JOB APPLICANTS, UNTIL APPROVED OK TO STOCK & STAFF
Correction
Corrective Action Required
04/27/2006
Receive Planning & Development Approval CONTACT MIKE GORECKI PHONE 969-7645
Correction
Partial Correction
04/27/2006
Receive Water Utilities Approval COORDINATE W/ BEN HASKAMP PHONE 969-7636
Correction
Corrective Action Required
04/27/2006
Receive Public Works Approval COORDINATE W/ RAY SCHICK REQUEST TO INFORM J BORNS
Correction
Resolved
04/27/2006
READINESS FOR INSPECTION
Correction
Corrective Action Required
04/27/2006
GUTTER BETWEEN ENTRANCE CANOPY & BUILDING NOT INSTALLED
Correction
Corrective Action Required
04/27/2006
SEALING OF ROOF PENETRATIONS TO BE COMPLETED
Correction
Corrective Action Required
04/27/2006
SUPPORT OF GAS PIPE @ ROOF ALSO, CHECK SLIP SHEETS UNDER ALL BLOCKS TO ENSURE ALL SECURELY ADHERED BLOCK NEAR LADDER NOT BEARING ON ROOF
Correction
Corrective Action Required
04/27/2006
FINAL CLEANING OF ROOF WHEN ALL WORK COMPLETED ENSURE NO LOOSE METAL
Correction
Corrective Action Required
04/27/2006
LABELING OF ELECTRICAL CIRCUIT BREAKERS PERMANENT PANEL SCHEDULES PLACE IN PANELS WHEN DONE
Correction
Partial Correction
04/27/2006
Receive Fire Department approval COORDINATE W/ CPT DIR
Correction
Corrective Action Required
04/27/2006
PERMANENT LABELING OF ELECTRICAL SERVICE METER/DISCONNECT
Correction
Corrective Action Required
04/27/2006
ELECTRICAL RECEPTACLES @ RTU'S NOT HOT FOR TEST
Correction
Corrective Action Required
04/27/2006
PERMANENT ROOF @ DRIVE-THROUGH NOT INSTALLED
Hood/Duct Inspection Partial 04/27/2006
Correction
Partial Correction
04/27/2006
COMMERCIAL KITCHEN HOOD PERFORMANCE TESTS IMC 507.16 SMOKE CAPTURE TEST OK REPORT VELOCITY TEST
Sidewalk Inspection Passed 04/27/2006
Occupancy Inspection - Codes Commercial Partial 04/28/2006
Correction
Partial Correction
04/28/2006
Receive Planning & Development Approval OK FOR TCO 4/28/06 CONTACT MIKE GORECKI PHONE 969-7645
Occupancy Inspection - Codes Commercial Failed 05/01/2006
Correction
Resolved
05/01/2006
PERMANENT ROOF @ DRIVE-THROUGH
Correction
Resolved
05/01/2006
ELECTRICAL RECEPTACLES @ RTU'S
Occupancy Inspection - Codes Commercial Failed 05/02/2006
Correction
Partial Correction
05/02/2006
OCCUPANCY APPROVAL STATUS SEE TEMPORARY OCCUPANCY
Correction
Corrective Action Required
05/02/2006
Receive Planning & Development Approval PHONE 969-7645 OK FOR TCO 4/28/06 LIST PROVIDED CONTACT MIKE GORECKI
Correction
Partial Correction
05/02/2006
Receive Water Utilities Approval AND RICH THOMAS -- PHONE 969-1911 COORDINATE W/ BEN HASKAMP PHONE 969-7636
Correction
Corrective Action Required
05/02/2006
Receive Public Works Approval REQUEST PW TO INFORM J BORNS WHEN ALL APPROVED. COORDINATE W/ RAY SCHICK REGARDING LIST PROVIDED
Correction
Resolved
05/02/2006
GUTTER BETWEEN ENTRANCE CANOPY & BUILDING
Correction
Corrective Action Required
05/02/2006
SUPPORT OF GAS PIPE @ ROOF ALSO, CHECK SLIP SHEETS UNDER ALL BLOCKS TO ENSURE ALL SECURELY ADHERED CHECK ALL BLOCKS FOR BEARING ON ROOF
Correction
Corrective Action Required
05/02/2006
FINAL CLEANING OF ROOF WHEN ALL WORK COMPLETED ENSURE NO LOOSE METAL
Correction
Corrective Action Required
05/02/2006
LABELING OF ELECTRICAL CIRCUIT BREAKERS ONE PLUG MISSING AT UNOCCUPIED POSITION; SHOW ALL POSITIONS ON ALL SCHEDULES SO FUTURE ADDITIONS CAN BE WRITTEN-IN; LABEL ALL POSITIONS ON DEAD FRONT; RE-CHECK/CORRECT ACCURACY OF CB LABELING. PERMANENT PANEL SCHEDULES INCOMPLETE / INCORRECT
Correction
Resolved
05/02/2006
PERMANENT LABELING OF ELECTRICAL SERVICE METER/DISCONNECT
Occupancy Inspection - Codes Commercial Failed 05/11/2006
Correction
Resolved
05/11/2006
Receive Fire Department approval PER J DIR 5/10/06
Occupancy Inspection - Codes Commercial Failed 05/22/2006
Correction
Partial Correction
05/22/2006
Receive Water Utilities Approval COORDINATE W/ BEN HASKAMP PHONE 969-7636
Correction
Resolved
05/22/2006
WATER METERS RAISED TO SUIT REVISED ELEVATION OF SIDEWALK OK RICH THOMAS OF LSWU OK TO COVER WHEN READY
Water Service Inspection - Commercial Request Complete 5/22/2006 5/22/2006 05/22/2006
Occupancy Inspection - Codes Commercial Failed 05/26/2006
Correction
Resolved
05/26/2006
SEALING OF ROOF PENETRATIONS
Correction
Resolved
05/26/2006
SUPPORT OF GAS PIPE @ ROOF
Correction
Resolved
05/26/2006
LABELING OF ELECTRICAL CIRCUIT BREAKERS
Occupancy Inspection - Codes Commercial Failed 06/01/2006
Correction
Corrective Action Required
06/01/2006
OCCUPANCY APPROVAL STATUS TEMPORARY OCCUPANCY AUTHORIZATION EXPIRED
Correction
Resolved
06/01/2006
Receive Water Utilities Approval PER BEN HASKAMP 5/31/06
Correction
Resolved
06/01/2006
FINAL CLEANING OF ROOF
Occupancy Inspection - Codes Commercial Passed 06/01/2006
Correction
Resolved
06/01/2006
OCCUPANCY APPROVAL STATUS
Correction
Resolved
06/01/2006
Receive Planning & Development Approval PER MIKE GORECKI 6/1/06
Correction
Resolved
06/01/2006
Receive Public Works Approval PER RAY SCHICK 6/1/06
Above Ceiling Inspection Passed 06/05/2006
Correction
Resolved
06/05/2006
CEILING FRAMING + ABOVE-CEILING SYSTEMS
Driveway Inspection Passed 06/05/2006
Hood/Duct Inspection Passed 06/05/2006
Correction
Resolved
06/05/2006
COMMERCIAL KITCHEN HOOD PERFORMANCE TESTS
Driveway Inspection Passed 06/05/2006
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.