Permit Application Status

B0500603


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0500603
Building Permit - Commercial
Final Completion
LE GRAND APARTMENTS LLC
ALTERATION COMMERCIAL
EXTERIOR IMPROVEMENTS
04/15/2005
04/25/2005
10/22/2005
05/10/2007
Locations
Contacts
MOR-FORD CONSTRUCTION, Address:3412 NE DUNCAN RD  
LE GRAND APARTMENTS LLC, Address:25706 E SHADYBROOK LN  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 10/17/2005 10/29/2010
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department; Required means of egress components shall be maintained during construction and demolition.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $128.00 $128.00 Paid 04/25/2005
24 BLDG Plan Check Fees $12.50 $12.50 Paid 04/25/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Passed 05/10/2005
Correction
Resolved
05/10/2005
None APPROVED 3 PIERS ON FACE OF BUILDING
Miscellaneous Inspection Failed 05/18/2005
Correction
Corrective Action Required
05/18/2005
None CALLED FOR STRUCTURAL STUD INSPECTION - NO ONE ON SITE OR ANY PRINTS TO BE FOUND TO DO INSPECTION
Miscellaneous Inspection Failed 05/23/2005
Correction
Corrective Action Required
05/23/2005
None CALLED FOR STRUCTURAL STUD INSPECTION - NO ONE ON SITE OR ANY PRINTS TO BE FOUND TO DO INSPECTION MET W/ ENGINEER - REQUESTING THAT PRINTS OR SOLUTION BE FAXED TO THE OFFICE
All Rough Inspection - Commercial Failed 06/09/2005
Correction
Corrective Action Required
06/09/2005
None NO PLANS AT DOOR
All Rough Inspection - Commercial Passed 06/13/2005
Correction
Resolved
06/13/2005
None NO PLANS AT DOOR
Correction
Resolved
06/13/2005
None WIND BRACING IS INSTALLED PER ENGINEERS RECOMMANDATIONS OK TO COVER
Miscellaneous Inspection Passed 06/13/2005
Correction
Resolved
06/13/2005
None CALLED FOR STRUCTURAL STUD INSPECTION - NO ONE ON SITE OR ANY PRINTS TO BE FOUND TO DO INSPECTION MET W/ ENGINEER - REQUESTING THAT PRINTS OR SOLUTION BE FAXED TO THE OFFICE
Final Inspection - Commercial Passed 04/27/2007
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home