Summary
B0500136
Building Permit - Commercial
Certificate of Occupancy
JOHN KNOX VILLAGE
ALTERATION COMMERCIAL
BUILDING B INTERIOR RENOVATION
02/04/2005
03/29/2005
09/25/2005
11/15/2006
Locations
Contacts
GASTINGER WALKER HARDEN ARCHITECTS, Address:817 WYANDOTTE  
THE WEITZ COMPANY, Address:9900 W 109TH ST  
SHAFER KLINE & WARREN, Address:2940 MAIN ST  
JOHN KNOX VILLAGE, Address:400 NW MURRAY RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 09/13/2005 10/29/2010
Correction

Codes Administration - 2003 IBC 1110.1 - Signs. Required accessible elements shall be identified by the International Symbol of Accessiblity a the following locations: 1. Accessible parking spaces required by Section 1106.1 except where the total number of parking spaces provided is four or less. 2. Accessible passenger loading zones. 3. Accessbile areas of refuge required by Section 1007.6. 4. Accessible rooms where multiple single-user toilet or bathing rooms are clustered in a single location. 5. Accessible entrances where not all entrances are accessible. 6. Accessible check-out aisles where not all aisles are accessible. The sign, where provided, shall be above the check-out aisle in the same location as the checkout aisle number or type of check-out identification. 7. Unisex toilet and bathing rooms. 8. Accessible dressing, fitting and locker rooms where not all such rooms are accessible.
Correction

Codes Administration - 2003 IBC 3002.3 - Emergency signs. An approved pictorial sign of a standardized design shall be posted adjacent to each elevator call station on all floors instructing occupants to use the exit stairways and not to use the elevators in case of fire. The sign shall read: IN FIRE EMERGENCY, DO NOT USE ELEVATOR. USE EXIT STAIRS. The emergency sign shall not be required for elevators that are part of an accessible means of egress complying with Section 1007.4.
Correction

Codes Administration - 2003 IBC 708.3 - Fire-resistance rating. The fire-resistance rating of the walls shall be at least 1 hour.
Correction

Codes Administration - The notes on Sheet A3 overlap and are difficult to read.
Correction

Codes Administration - Doors 21-1 and 310-1 are not shown as rated on the door schedule.
Correction

Codes Administration - The exit signs at the intersection of the corridors on the second and third floors indicate arrows pointing to both the north and the south. There is no exit to the south.
Correction

Codes Administration - 2003 IBC 907.2.10.1.2 - Groups R-2, R-3, R-4 and I-1. Single- or multiple-station smoke alarms shall be installed and maintained in Groups R-2, R-3, R-4 and I-1, regardless of occupant load at all of the following locations: 1. On the ceiling or wall outside of each separate sleeping area in the immediate vacinity of bedrooms. 2. In each room used for sleeping purposes. 3. In each story within a dwelling unit, including basements but not including crawl spaces and uninhabitable attics. In dwelling units with split levels and without an intervening door between the adjacent levels, a smoke alarm installed on the upper level shall suffice for the adjacent lower level provided that the lower level is less than one full story below the upper level.
Correction

Codes Administration - 2003 IBC 1019.1 - Enclosures required. Interior exit stairways and interior exit ramps shall be enclosed with fire barriers. Exit enclosures shall have a fire-resistance rating of not less than 2 hours where connecting four stories or more and not less than 1 hour where connecting less than four stories. The number of stories connected by the shaft enclosure shall include any basements but not any mezzanines. An exit enclosure shall not be used for any purposes other than means of egress. Enclosures shall be constructed as fire barriers in accordance with Section 706.
Correction

Codes Administration - 2003 IBC 707.14.1 - Elevator and dumbwaiter shafts. Elevator hoistway and dumbwaiter enclosures shall be constructed in accordance with Section 707.4 and Chapter 30.
Correction

Codes Administration - 2003 IBC 3002.1.1 - Opening protectives. Openings in hoistway enclosures shall be protected as required in Chapter 7.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department; Required means of egress components shall be maintained during construction and demolition.
Correction

Fire Department; The required fire-resistance rating of fire-resistance-rated construction (including walls, fire stops, shaft enclosures, partitions and floors) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings, and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance rated assemblies shall be protected by self-closing or automatic- closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-7343.
Correction

905.1 General. Standpipe systems shall be provided in new buildings and structures in accordance with this section and as required by the Code Offical. Fire hose threads used in connection with standpipe systems shall comply with NFPA 1963 or as otherwise approved and shall be compatible with fire department hose threads. The location of fire department hose connections shall be approved. In build-ings used for high-piled combustible storage, fire protection shall be in accordance with Chapter 23.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

Codes Administration - The cost of this portion of the project has not been provided.
Correction

Fire Department: Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the code official is authorized to require a key box to be installed in an accessible location. The key box shall be of an approved type and shall contain keys to gain access as required by the code official.
Correction

Fire Department- IFC 905.3.1 Building height. Class I standpipe systems shall be installed throughout buildings where the floor level of the highest story is located more than two stories above the lowest level of the fire department vehicle access, or where the floor level of the lowest story is located more than two stories below the highest level of fire department vehicle access.
Correction

Fire Department- 703.2.1 Signs. Where required by the code official, a sign shall be permanently displayed on or near each fire door in letters not less than 1 inch (25 mm) high to read as follows: 1. For doors designed to be kept normally open: FIRE DOOR-DO NOT BLOCK. 2. For doors designed to be kept normally closed: FIRE DOOR-KEEP CLOSED.
Correction

Fire Department- Fire protection for the elevator and elevator(mechanical room) equipment room shall be provided per the Missouri Elevator Safety Act and Rules.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $6,002.00 $6,002.00 Paid 03/29/2005
24 BLDG Plan Check Fees $120.00 $120.00 Paid 03/29/2005
25 Electrical Permit Fee $1,895.60 $1,895.60 Paid 03/29/2005
25 Mechanical Permit Fees $573.00 $573.00 Paid 03/29/2005
25 Plumbing Permit Fees $733.00 $733.00 Paid 03/29/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 05/09/2005
Correction
Partial Correction
05/09/2005
BUILDING DRAIN LINE @ CORRIDORS 1001 & 1003 OK TO COVER WHEN READY
Underground Plumbing Inspection - Commercial Request Complete 5/6/2005 5/9/2005 05/09/2005
Underslab Plumbing Inspection - Commercial Partial 05/31/2005
Correction
Resolved
05/31/2005
BUILDING DRAIN LINE @ CORRIDORS 1001 & 1003
Correction
Partial Correction
05/31/2005
WASTE & VENT PIPING UNDER 1ST FLOOR SLAB OK TO COVER WHEN READY
Rough Plumbing Inspection - Commercial Partial 07/18/2005
Correction
Partial Correction
07/18/2005
COPPER WATER PIPING 3RD FLOOR EAST 1/2; VISUAL INSPECTION OK TO INSULATE WHEN READY
All Rough Inspection - Commercial Failed 07/25/2005
Correction
Corrective Action Required
07/25/2005
SYSTEMS ROUGH IN-WALL AND ABOVE-CEILING -- INCLUDING FRAMING 3RD FLOOR WEST 1/2: SCREW ALL STUD FLANGES AT CONNECTIONS TO STUDS & HEADERS AREAS LISTED BELOW
Rated Assembly Inspection Failed 07/25/2005
Correction
Corrective Action Required
07/25/2005
RATED WALLS & CEILINGS -- 1ST FLOOR
Correction
Corrective Action Required
07/25/2005
RATED WALLS & CEILINGS -- 2ND FLOOR
Correction
Corrective Action Required
07/25/2005
RATED WALLS & CEILINGS -- 3RD FLOOR VERIFY COMPLIANCE PER DRAWINGS & CODES AT PARTY WALLS AND CORRIDOR WALLS AREAS LISTED BELOW
Rough Plumbing Inspection - Commercial Partial 07/25/2005
Correction
Partial Correction
07/25/2005
COPPER WATER PIPING 3RD FLOOR WEST 1/2; 3RD FLOOR EAST 1/2 SOUTH SIDE; VISUAL INSPECTION OK TO INSULATE WHEN READY
Rough Plumbing Inspection - Commercial Partial 07/28/2005
Correction
Partial Correction
07/28/2005
COPPER WATER PIPING 3RD FLOOR WEST 1/2; 3RD FLOOR EAST 1/2 SOUTH SIDE; 3RD FLOOR EAST 1/2 NORTH SIDE; VISUAL INSPECTION OK TO INSULATE WHEN READY
All Rough Inspection - Commercial Partial 08/02/2005
Correction
Partial Correction
08/02/2005
SYSTEMS ROUGH IN-WALL AND ABOVE-CEILING -- INCLUDING FRAMING 3RD FLOOR WEST 1/2; 3RD FLOOR EAST 1/2 CORRIDOR WALLS CORRIDOR FACE; OK TO COVER WHEN READY AREAS LISTED BELOW
Rated Assembly Inspection Partial 08/09/2005
Correction
Partial Correction
08/09/2005
RATED WALLS & CEILINGS -- 3RD FLOOR 2HR VESTIBULES @ E & W ENDS OF CORRIDOR; ENTIRE CORRIDOR CEILING; OK TO COVER WHEN READY AREAS LISTED BELOW
All Rough Inspection - Commercial Partial 08/10/2005
Correction
Partial Correction
08/10/2005
SYSTEMS ROUGH IN-WALL AND ABOVE-CEILING -- INCLUDING FRAMING 3RD FLOOR WEST 1/2; 3RD FLOOR EAST 1/2 CORRIDOR WALLS CORRIDOR FACE; 3RD FLOOR EAST 1/2 CEILINGS OK TO COVER; WALLS NOT APPROVED -- COMPLETE FIRE-SEALING OF OPENINGS IN TOP TRACK OK TO COVER WHEN READY AREAS LISTED BELOW
All Rough Inspection - Commercial Partial 08/11/2005
Correction
Partial Correction
08/11/2005
SYSTEMS ROUGH IN-WALL AND ABOVE-CEILING -- INCLUDING FRAMING 3RD FLOOR WEST 1/2; 3RD FLOOR EAST 1/2 CORRIDOR WALLS CORRIDOR FACE; 3RD FLOOR EAST 1/2 CEILINGS & WALLS OK TO COVER WHEN READY -- FIRE-SEALING OF OPENINGS IN TOP TRACK SUBSTANTIALLY COMPLETE OK TO COVER WHEN READY AREAS LISTED BELOW
Rated Assembly Inspection Partial 08/11/2005
Correction
Corrective Action Required
08/11/2005
RATED WALLS & CEILINGS -- 1ST FLOOR YET TO BE INSPECTED
Correction
Partial Correction
08/11/2005
RATED WALLS & CEILINGS -- 2ND FLOOR 2HR VESTIBULES @ E & W ENDS OF CENTRAL CORRIDOR FRAMING + 1 LAYER GWB OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Rough Plumbing Inspection - Commercial Partial 08/12/2005
Correction
Partial Correction
08/12/2005
COPPER WATER PIPING 3RD FLOOR WEST 1/2; 3RD FLOOR EAST 1/2 SOUTH SIDE; 3RD FLOOR EAST 1/2 NORTH SIDE; 2ND FLOOR WEST 1/2; VISUAL INSPECTION OK TO INSULATE WHEN READY
Rated Assembly Inspection Partial 08/15/2005
Correction
Partial Correction
08/15/2005
RATED WALLS & CEILINGS -- 3RD FLOOR 2HR VESTIBULES @ E & W ENDS OF CORRIDOR; ENTIRE CORRIDOR CEILING; WEST WING CORRIDOR WALLS + PARTY WALLS GWB; OK TO COVER WHEN READY AREAS LISTED BELOW
All Rough Inspection - Commercial Partial 08/19/2005
Correction
Partial Correction
08/19/2005
SYSTEMS ROUGH IN-WALL AND ABOVE-CEILING -- INCLUDING FRAMING 3RD FLOOR WEST 1/2; 3RD FLOOR EAST 1/2 CORRIDOR WALLS CORRIDOR FACE; 3RD FLOOR EAST 1/2 CEILINGS & WALLS; 2ND FLOOR WEST 1/2 CEILINGS & WALLS; OK TO COVER WHEN READY AREAS LISTED BELOW
Rated Assembly Inspection Not Ready 08/24/2005
Correction
Partial Correction
08/24/2005
RATED WALLS & CEILINGS -- 3RD FLOOR 2HR VESTIBULES @ E & W ENDS OF CORRIDOR; ENTIRE CORRIDOR CEILING; WEST WING CORRIDOR WALLS + PARTY WALLS GWB; EAST WING CORRIDOR WALLS TAPE & MUD IN PROGRESS PRIOR TO APPROVAL OK TO COVER WHEN READY AREAS LISTED BELOW
Rated Assembly Inspection Partial 08/25/2005
Correction
Partial Correction
08/25/2005
RATED WALLS & CEILINGS -- 3RD FLOOR 2HR VESTIBULES @ E & W ENDS OF CORRIDOR; ENTIRE CORRIDOR CEILING; WEST WING CORRIDOR WALLS + PARTY WALLS GWB; EAST WING CORRIDOR WALLS + PARTY WALLS GWB; OK TO COVER WHEN READY AREAS LISTED BELOW
Rough Plumbing Inspection - Commercial Partial 08/26/2005
Correction
Partial Correction
08/26/2005
COPPER WATER PIPING 3RD FLOOR WEST 1/2; 3RD FLOOR EAST 1/2 SOUTH SIDE; 3RD FLOOR EAST 1/2 NORTH SIDE; 2ND FLOOR WEST 1/2; 2ND FLOOR EAST 1/2; 3RD FLOOR CORRIDOR E&W WINGS ABOVE CEILING; VISUAL INSPECTION OK TO INSULATE WHEN READY
Rated Assembly Inspection Partial 08/26/2005
Correction
Partial Correction
08/26/2005
RATED WALLS & CEILINGS -- 2ND FLOOR 2HR VESTIBULES @ E & W ENDS OF CENTRAL CORRIDOR FRAMING + 1 LAYER GWB; W WING CENTRAL CORRIDOR GWB; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
All Rough Inspection - Commercial Partial 08/31/2005
Correction
Corrective Action Required
08/31/2005
FRAMING; IN-WALL + ABOVE-CEILING SYSTEMS ROUGH -- 1ST FLOOR OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Correction
Partial Correction
08/31/2005
FRAMING; IN-WALL + ABOVE-CEILING SYSTEMS ROUGH -- 2ND FLOOR WEST WING CEILINGS & WALLS; EAST WING CORRIDOR + SOUTH SIDE CEILINGS & WALLS; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Correction
Partial Correction
08/31/2005
SYSTEMS ROUGH IN-WALL AND ABOVE-CEILING -- INCLUDING FRAMING FOLLOWING COMPONENTS: 3RD FLOOR WEST 1/2; 3RD FLOOR EAST 1/2 CORRIDOR WALLS CORRIDOR FACE; 3RD FLOOR EAST 1/2 CEILINGS & WALLS; CENTRAL STAIRWELL; 3RD FLOOR LEVEL OK TO COVER WHEN READY
Rated Assembly Inspection Partial 08/31/2005
Correction
Partial Correction
08/31/2005
RATED WALLS & CEILINGS -- 2ND FLOOR 2HR VESTIBULES @ E & W ENDS OF CENTRAL CORRIDOR FRAMING + 1 LAYER GWB; W WING CENTRAL CORRIDOR GWB; W WING ROOM COMMON WALLS GWB; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
All Rough Inspection - Commercial Partial 09/06/2005
Correction
Partial Correction
09/06/2005
SYSTEMS ROUGH IN-WALL AND ABOVE-CEILING -- INCLUDING FRAMING FOLLOWING COMPONENTS: 3RD FLOOR WEST 1/2; 3RD FLOOR EAST 1/2 CORRIDOR WALLS CORRIDOR FACE; 3RD FLOOR EAST 1/2 CEILINGS & WALLS; CENTRAL STAIRWELL; 3RD FLOOR LEVEL OK TO COVER WHEN READY
Correction
Partial Correction
09/06/2005
FRAMING; IN-WALL + ABOVE-CEILING SYSTEMS ROUGH -- 2ND FLOOR WEST WING CEILINGS & WALLS; EAST WING CORRIDOR + SOUTH SIDE CEILINGS & WALLS; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Correction
Resolved
09/06/2005
Framing 207, 209,211
Correction
Resolved
09/06/2005
Electrical 207, 209, 211
Correction
Corrective Action Required
09/06/2005
Plumbing PLANS CALL FOR 4" SANITARY PVC. 3" INSTALLED. PROVIDE CHANGE FROM ENGINEER 207, 209, 211
Correction
Corrective Action Required
09/06/2005
None 1st LAYER - SCREW PATTERN Corridor 3002
Rated Assembly Inspection Partial 09/06/2005
Correction
Partial Correction
09/06/2005
None 1st LAYER - SCREW PATTERN Corridor 3002
Rated Assembly Inspection Partial 09/09/2005
Correction
Corrective Action Required
09/09/2005
RATED WALLS & CEILINGS -- 3RD FLOOR 2HR VESTIBULES @ E & W ENDS OF CORRIDOR; ENTIRE CORRIDOR CEILING; WEST WING CORRIDOR WALLS + PARTY WALLS GWB; EAST WING CORRIDOR WALLS + PARTY WALLS GWB; OK TO COVER WHEN READY AREAS LISTED BELOW
Correction
Partial Correction
09/09/2005
RATED WALLS & CEILINGS -- 2ND FLOOR 2HR VESTIBULES @ E & W ENDS OF CENTRAL CORRIDOR FRAMING + 1 LAYER GWB; W WING CENTRAL CORRIDOR GWB; W WING ROOM COMMON WALLS GWB; EAST WING ROOM COMMON WALLS GWB; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Above Ceiling Inspection Failed 09/09/2005
Correction
Corrective Action Required
09/09/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS ROUGH -- 3RD FLOOR NOT APPROVED: WEST WING; SECTIONS LISTED BELOW
Above Ceiling Inspection Partial 09/13/2005
Correction
Partial Correction
09/13/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS ROUGH -- 3RD FLOOR EAST + WEST WING; OK TO COVER WHEN READY SECTIONS LISTED BELOW
Correction
Corrective Action Required
09/13/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS - 2ND FLR NOT YET INSPECTED
Correction
Corrective Action Required
09/13/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS - 1ST FLR NOT YET INSPECTED
Rated Assembly Inspection Partial 09/13/2005
Correction
Partial Correction
09/13/2005
RATED WALLS & CEILINGS -- 2ND FLOOR 2HR VESTIBULES @ E & W ENDS OF CENTRAL CORRIDOR FRAMING + 1 LAYER GWB; W WING CENTRAL CORRIDOR GWB; W WING ROOM COMMON WALLS GWB; EAST WING ROOM COMMON & CORRIDOR WALLS GWB (EXCL 212 + MECH RM); OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
All Rough Inspection - Commercial Partial 09/13/2005
Correction
Partial Correction
09/13/2005
FRAMING; IN-WALL + ABOVE-CEILING SYSTEMS ROUGH -- 2ND FLOOR WEST WING CEILINGS & WALLS; EAST WING CORRIDOR + SOUTH SIDE CEILINGS & WALLS; CENTRAL STAIR WALLS ONLY; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Rough Plumbing Inspection - Commercial Partial 09/14/2005
Correction
Partial Correction
09/14/2005
COPPER WATER PIPING 3RD FLR W 1/2; 3RD FLR E 1/2 S SIDE; 3RD FLR E 1/2 N SIDE; 2ND FLR W 1/2; 2ND FLR E 1/2; 3RD FLR CORR E&W WINGS ABOVE HARD LID; 3RD FLOOR CORRIDOR E&W WINGS RECIRC PIPING; VISUAL INSPECTION OK TO INSULATE WHEN READY
Rough Plumbing Inspection - Commercial Partial 09/16/2005
Correction
Partial Correction
09/16/2005
COPPER WATER PIPING 3RD FLR W 1/2; 3RD FLR E 1/2 S SIDE; 3RD FLR E 1/2 N SIDE; 2ND FLR W 1/2; 2ND FLR E 1/2; 3RD FLR CORR E&W WINGS ABOVE HARD LID; 3RD FLOOR CORRIDOR E&W WINGS RECIRC PIPING; 1ST FLR WEST WING; VISUAL INSPECTION OK TO INSULATE WHEN READY
Above Ceiling Inspection Partial 09/16/2005
Correction
Partial Correction
09/16/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS ROUGH -- 3RD FLOOR ROOMS @ EAST + WEST WING; CORRIDOR @ EAST + WEST WING; OK TO COVER WHEN READY SECTIONS LISTED BELOW
All Rough Inspection - Commercial Partial 09/21/2005
Correction
Partial Correction
09/21/2005
FRAMING; IN-WALL + ABOVE-CEILING SYSTEMS ROUGH -- 1ST FLOOR W WING CORR + N SIDE ROOMS; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Above Ceiling Inspection Partial 09/22/2005
Correction
Partial Correction
09/22/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS - 2ND FLR ROOMS @ WEST WING; OK TO COVER WHEN READY SECTIONS LISTED BELOW
Above Ceiling Inspection Partial 09/27/2005
Correction
Partial Correction
09/27/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS - 2ND FLR ROOMS @ WEST WING; ROOMS @ EAST WING EXCEPT 212; OK TO COVER WHEN READY SECTIONS LISTED BELOW
All Rough Inspection - Commercial Partial 09/27/2005
Correction
Partial Correction
09/27/2005
FRAMING; IN-WALL + ABOVE-CEILING SYSTEMS ROUGH -- 1ST FLOOR W WING CORR + N SIDE ROOMS; W WING S SIDE ROOMS; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Rough Framing Inspection - Commercial Request Complete 9/26/2005 9/27/2005 09/27/2005
All Rough Inspection - Commercial Partial 09/28/2005
Correction
Partial Correction
09/28/2005
SYSTEMS ROUGH IN-WALL AND ABOVE-CEILING -- INCLUDING FRAMING FOLLOWING COMPONENTS: 3RD FLOOR WEST 1/2; 3RD FLOOR EAST 1/2 CORRIDOR WALLS CORRIDOR FACE; CORRIDOR 3002; 3RD FLOOR EAST 1/2 CEILINGS & WALLS; CENTRAL STAIRWELL; 3RD FLOOR LEVEL OK TO COVER WHEN READY
Correction
Partial Correction
09/28/2005
FRAMING; IN-WALL + ABOVE-CEILING SYSTEMS ROUGH -- 2ND FLOOR WEST WING CEILINGS & WALLS; EAST WING CORRIDOR + SOUTH SIDE CEILINGS & WALLS; 207; 209; 211; CENTRAL STAIR WALLS ONLY; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Rough Plumbing Inspection - Commercial Partial 09/28/2005
Correction
Partial Correction
09/28/2005
COPPER WATER PIPING 3RD FLR ROOMS; 2ND FLR ROOMS; 3RD FLR CORR RECIRC PIPING; 1ST FLR WEST WING ROOMS; 2ND FLOOR CORRIDOR RECIRC PIPING; 1ST FLR E WING S SIDE EXCEPT 110; VISUAL INSPECTION OK TO INSULATE WHEN READY
Rough Plumbing Inspection - Commercial Partial 10/04/2005
Correction
Partial Correction
10/04/2005
COPPER WATER PIPING 3RD FLR ROOMS; 2ND FLR ROOMS; 3RD FLR CORR RECIRC PIPING; 1ST FLR WEST WING ROOMS; 2ND FLOOR CORRIDOR RECIRC PIPING; 1ST FLR E WING S SIDE EXCEPT 110; 1ST FLR E WING N SIDE + 110; VISUAL INSPECTION OK TO INSULATE WHEN READY
Above Ceiling Inspection Partial 10/05/2005
Correction
Partial Correction
10/05/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS - 2ND FLR ROOMS @ WEST WING; ROOMS @ EAST WING EXCEPT 212; CENTRAL CORRIDOR; OK TO COVER WHEN READY SECTIONS LISTED BELOW
Underslab Plumbing Inspection - Commercial Passed 10/10/2005
Correction
Resolved
10/10/2005
WASTE & VENT PIPING UNDER 1ST FLOOR SLAB OK TO COVER WHEN READY
Correction
Resolved
10/10/2005
FLOOR DRAIN ADDED @ STORAGE 1003E + FCO IN CORRIDOR
All Rough Inspection - Commercial Partial 10/10/2005
Correction
Partial Correction
10/10/2005
FRAMING; IN-WALL + ABOVE-CEILING SYSTEMS ROUGH -- 1ST FLOOR W WING CORR + N SIDE ROOMS; W WING S SIDE ROOMS; E WING CORR + N SIDE ROOMS; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Above Ceiling Inspection Partial 10/10/2005
Correction
Partial Correction
10/10/2005
ABOVE ACT CEILING AREAS IN BATHROOMS 3RD FLR W WING; OK TO COVER WHEN READY SPACES LISTED BELOW:
Correction
Partial Correction
10/10/2005
WALK-IN CLOSETS TO RECEIVE ACT CEILING IN LIEU OF GWB PARTIAL TILE ONLY AS NECESSARY TO INSTALL LIGHT FIXTURES @ WALK-IN CLOSETS @ 302; 306; 308 DUE TO INTERFERENCES OK TO COVER WHEN READY
Gas Piping Inspection - Commercial Passed 10/12/2005
Correction
Resolved
10/12/2005
GAS PIPING TO NEW PRIMERA WATER HEATER @ 1ST FLR MECH RM PRESSURE TESTED @ 15 PSI
All Rough Inspection - Commercial Partial 10/12/2005
Correction
Partial Correction
10/12/2005
SYSTEMS ROUGH IN-WALL AND ABOVE-CEILING -- INCLUDING FRAMING FOLLOWING COMPONENTS: 3RD FLOOR WEST 1/2; 3RD FLOOR EAST 1/2 CORRIDOR WALLS CORRIDOR FACE; CORRIDOR 3002; 3RD FLOOR EAST 1/2 CEILINGS & WALLS; CENTRAL STAIRWELL; WEST STAIRWELL; 3RD FLOOR LEVEL OK TO COVER WHEN READY
Correction
Partial Correction
10/12/2005
FRAMING; IN-WALL + ABOVE-CEILING SYSTEMS ROUGH -- 1ST FLOOR W WING CORR + N SIDE ROOMS; W WING S SIDE ROOMS; E WING CORR + N SIDE ROOMS; E WING S SIDE ROOMS CEILINGS + BATHROOMS; CORR WALL @ 1001D OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Correction
Resolved
10/12/2005
Plumbing 207, 209, 211
Correction
Resolved
10/12/2005
None
Above Ceiling Inspection Partial 10/12/2005
Correction
Partial Correction
10/12/2005
ABOVE ACT TILE SYSTEM @ CORRIDORS / COMMON SPACES 3RD FLR W WING CORRIDOR; OK TO COVER WHEN READY SPACES LISTED BELOW:
Rated Assembly Inspection Partial 10/12/2005
Correction
Partial Correction
10/12/2005
RATED WALLS & CEILINGS -- 1ST FLOOR W WING ROOMS; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Correction
Partial Correction
10/12/2005
None
Correction
Partial Correction
10/12/2005
RATED SHAFTS / CHASES WATER HEATER VENT STACK SHAFT 2 SIDES @ MECH RM 2ND & 3RD FLOOR; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
All Rough Inspection - Commercial Partial 10/13/2005
Correction
Partial Correction
10/13/2005
FRAMING; IN-WALL + ABOVE-CEILING SYSTEMS ROUGH -- 1ST FLOOR W WING CORR + N SIDE ROOMS; W WING S SIDE ROOMS; E WING CORR + N SIDE ROOMS; CORR WALL @ 1001D; E WING S SIDE ROOMS; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Above Ceiling Inspection Partial 10/17/2005
Correction
Partial Correction
10/17/2005
ABOVE ACT TILE SYSTEM @ CORRIDORS / COMMON SPACES 3RD FLR W WING CORRIDOR; 3RD FLR E WING CORRIDOR; OK TO COVER WHEN READY SPACES LISTED BELOW:
All Rough Inspection - Commercial Partial 10/17/2005
Correction
Partial Correction
10/17/2005
SYSTEMS ROUGH IN-WALL AND ABOVE-CEILING -- INCLUDING FRAMING FOLLOWING COMPONENTS: 3RD FLOOR WEST 1/2; 3RD FLOOR EAST 1/2 CORRIDOR WALLS CORRIDOR FACE; CORRIDOR 3002; 3RD FLOOR EAST 1/2 CEILINGS & WALLS; CENTRAL STAIRWELL; WEST STAIRWELL; 312 3RD FLOOR LEVEL OK TO COVER WHEN READY
Correction
Partial Correction
10/17/2005
FRAMING; IN-WALL + ABOVE-CEILING SYSTEMS ROUGH -- 2ND FLOOR WEST WING CEILINGS & WALLS; EAST WING CORRIDOR + SOUTH SIDE CEILINGS & WALLS; 207; 209; 211; CENTRAL STAIR WALLS ONLY; 212 OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Rated Assembly Inspection Partial 10/17/2005
Correction
Partial Correction
10/17/2005
RATED WALLS & CEILINGS -- 1ST FLOOR W WING ROOMS; E WING N SIDE RES ROOMS; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Rough Plumbing Inspection - Commercial Partial 10/17/2005
Correction
Partial Correction
10/17/2005
COPPER WATER PIPING 3RD FLR ROOMS; 2ND FLR ROOMS; 3RD FLR CORR RECIRC PIPING; 1ST FLR WEST WING ROOMS; 2ND FLOOR CORRIDOR RECIRC PIPING; 1ST FLR E WING S SIDE EXCEPT 110; 1ST FLR E WING N SIDE + 110; COND PIPING @ 110 VISUAL INSPECTION OK TO INSULATE WHEN READY
Rated Assembly Inspection Partial 10/20/2005
Correction
Partial Correction
10/20/2005
RATED WALLS & CEILINGS -- 3RD FLOOR 2HR VESTIBULES @ E & W ENDS OF CORRIDOR; ENTIRE CORRIDOR CEILING; WEST WING CORRIDOR WALLS + PARTY WALLS GWB; EAST WING CORRIDOR WALLS + PARTY WALLS GWB; 312; OK TO COVER WHEN READY AREAS LISTED BELOW
Correction
Partial Correction
10/20/2005
RATED WALLS & CEILINGS -- 1ST FLOOR W WING ROOMS; E WING N SIDE RES ROOMS; CORRIDOR W WING WALLS + CEILING, E WING CEILING; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Above Ceiling Inspection Partial 10/24/2005
Correction
Partial Correction
10/24/2005
ABOVE ACT CEILING AREAS IN BATHROOMS 3RD FLR W WING; 2FLR E & W WINGS N SIDE; OK TO COVER WHEN READY SPACES LISTED BELOW:
Rated Assembly Inspection Partial 10/24/2005
Correction
Partial Correction
10/24/2005
RATED WALLS & CEILINGS -- 2ND FLOOR 2HR VESTIBULES @ E & W ENDS OF CENTRAL CORRIDOR FRAMING + 1 LAYER GWB; W WING CENTRAL CORRIDOR GWB; W WING ROOM COMMON WALLS GWB; EAST WING ROOM COMMON & CORRIDOR WALLS GWB (EXCL MECH RM); OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Correction
Partial Correction
10/24/2005
RATED WALLS & CEILINGS -- 1ST FLOOR W WING ROOMS; E WING N SIDE RES ROOMS; CORRIDOR W WING WALLS + CEILING, E WING CEILING; E WING CORRIDOR + S SIDE ROOMS; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Correction
Partial Correction
10/24/2005
RATED SHAFTS / CHASES WATER HEATER VENT STACK SHAFT 2 SIDES @ MECH RM 2ND & 3RD FLOOR; 212 + ADJACENT MECH/ELECT RM 2 LAYERS 5/8" GWB; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Rough Plumbing Inspection - Commercial Partial 10/26/2005
Correction
Partial Correction
10/26/2005
COPPER WATER PIPING 3RD FLR ROOMS; 2ND FLR ROOMS; 3RD FLR CORR RECIRC PIPING; 1ST FLR WEST WING ROOMS; 2ND FLOOR CORRIDOR RECIRC PIPING; 1ST FLR E WING S SIDE EXCEPT 110; 1ST FLR E WING N SIDE + 110; COND PIPING @ 110; RECIRC PIPING ABOVE KIT CEILING @ 212 & 312; VISUAL INSPECTION OK TO INSULATE WHEN READY
Above Ceiling Inspection Partial 10/26/2005
Correction
Partial Correction
10/26/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS - 1ST FLR ROOMS @ WEST WING; OK TO COVER WHEN READY SPACES LISTED BELOW:
Correction
Partial Correction
10/26/2005
ABOVE ACT CEILING AREAS IN BATHROOMS SPACES FOLLOWING: 3RD FLR W WING; 2FLR E & W WINGS N SIDE EXCEPT 212; 2FLR E & W WINGS S SIDE; OK TO COVER WHEN READY INCL ACT CEILING CLOSETS
Correction
Resolved
10/26/2005
WALK-IN CLOSETS TO RECEIVE ACT CEILING IN LIEU OF GWB
Above Ceiling Inspection Partial 10/27/2005
Correction
Resolved
10/27/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS ROUGH -- 3RD FLOOR ROOMS @ EAST + WEST WING; CORRIDOR @ EAST + WEST WING; RM 312 OK TO COVER WHEN READY SECTIONS LISTED BELOW
Correction
Resolved
10/27/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS - 2ND FLR ROOMS @ WEST WING; RM 212; ROOMS @ EAST WING; CENTRAL CORRIDOR OK TO COVER WHEN READY SECTIONS LISTED BELOW
Rated Assembly Inspection Partial 10/27/2005
Correction
Partial Correction
10/27/2005
STAIRWELL RATED WALLS ONE LAYER 5/8" TYPE X GWB: EAST STAIR WELL; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Above Ceiling Inspection Partial 11/01/2005
Correction
Partial Correction
11/01/2005
ABOVE ACT TILE SYSTEM @ CORRIDORS / COMMON SPACES 3RD FLR W WING CORRIDOR; 3RD FLR E WING CORRIDOR; 2ND FLR ENTIRE CORRIDOR; OK TO COVER WHEN READY SPACES LISTED BELOW:
Rated Assembly Inspection Partial 11/01/2005
Correction
Resolved
11/01/2005
STAIRWELL RATED WALLS ONE LAYER 5/8" TYPE X GWB: EAST STAIR WELL; CENTER STAIR WELL; WEST STAIR WELL OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Above Ceiling Inspection Partial 11/07/2005
Correction
Partial Correction
11/07/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS - 1ST FLR ROOMS @ WEST WING; RESIDENSE ROOMS @ EAST WING; OK TO COVER WHEN READY SPACES LISTED BELOW:
Above Ceiling Inspection Partial 11/09/2005
Correction
Partial Correction
11/09/2005
WATER PIPE INSPECTION WATER PIPE WITNESSED UNDER 140psi - NO LEAKS. APPROVED TO INSULATE PIPE. 1ST FLOOR CORRIDOR
Rough Plumbing Inspection - Commercial Partial 11/10/2005
Correction
Partial Correction
11/10/2005
TEXT OK TO INSULATE CHILLED/HOT WATER RISER BUILDING B
Above Ceiling Inspection Partial 11/14/2005
Correction
Partial Correction
11/14/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS - 1ST FLR ROOMS @ WEST WING; RES ROOMS @ EAST WING; WEST WING CORRIDOR; OK TO COVER WHEN READY SPACES LISTED BELOW:
Gas Piping Inspection - Commercial Passed 11/22/2005
Correction
Resolved
11/22/2005
GAS FEEDER LINE CONNECTION OUTSIDE SOUTH WALL HELD STEADY AT 14.5 PSI FOR >60 MIN. TEST PRESSURE LEVEL FOR INTERIOR PIPING
Gas Service Inspection - Commercial Passed 11/28/2005
Correction
Resolved
11/28/2005
BENCH TEST OF WELDED SPOOL FOR CONNECTION OUTSIDE S WALL OF BLDG AT >= 60 PSI FOR >=30 MIN TEST PRESSURE LEVEL HELD STEADY
Above Ceiling Inspection Not Ready 11/29/2005
Correction
Partial Correction
11/29/2005
ABOVE ACT CEILING AREAS IN BATHROOMS SPACES FOLLOWING: 3RD FLR W WING; 2FLR E & W WINGS N SIDE EXCEPT 212; 2FLR E & W WINGS S SIDE; 1ST FLOOR NOT READY FOR INSPECTION OK TO COVER WHEN READY INCL ACT CEILING CLOSETS
Above Ceiling Inspection Partial 11/30/2005
Correction
Partial Correction
11/30/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS - 1ST FLR ROOMS @ WEST WING; RES ROOMS @ EAST WING; WEST WING CORRIDOR; CENTRAL CORRIDOR 1002; OK TO COVER WHEN READY SPACES LISTED BELOW:
Above Ceiling Inspection Partial 12/07/2005
Correction
Resolved
12/07/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS ROUGH -- 3RD FLOOR
Correction
Resolved
12/07/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS - 2ND FLR
Correction
Resolved
12/07/2005
GWB DROP CEILING FRAMING + ABOVE-CEILING SYSTEMS - 1ST FLR
Correction
Resolved
12/07/2005
ABOVE ACT CEILING AREAS IN BATHROOMS SPACES FOLLOWING: 3RD FLR W WING; 2FLR E & W WINGS N SIDE EXCEPT 212; 2FLR E & W WINGS S SIDE; ENTIRE 1ST FLOOR OK TO COVER WHEN READY INCL ACT CEILING CLOSETS
Correction
Resolved
12/07/2005
WALK-IN CLOSETS TO RECEIVE ACT CEILING IN LIEU OF GWB
Correction
Resolved
12/07/2005
WATER PIPE INSPECTION 1ST FLOOR CORRIDOR
Above Ceiling Inspection Failed 12/09/2005
Correction
Corrective Action Required
12/09/2005
ABOVE ACT TILE SYSTEM @ CORRIDORS / COMMON SPACES 3RD FLR W WING CORRIDOR; 3RD FLR E WING CORRIDOR; 2ND FLR ENTIRE CORRIDOR; NOT APPROVED: 1ST FLR ENTIRE CORRIDOR OK TO COVER WHEN READY SPACES LISTED BELOW:
Above Ceiling Inspection Failed 12/21/2005
Correction
Corrective Action Required
12/21/2005
ABOVE ACT TILE SYSTEM @ CORRIDORS / COMMON SPACES 3RD FLR W WING CORRIDOR; 3RD FLR E WING CORRIDOR; 2ND FLR ENTIRE CORRIDOR; NOT APPROVED: 1ST FLR ENTIRE CORRIDOR OK TO COVER WHEN READY SPACES LISTED BELOW:
Above Ceiling Inspection Passed 12/22/2005
Correction
Resolved
12/22/2005
ABOVE ACT TILE SYSTEM @ CORRIDORS / COMMON SPACES 3RD FLR W WING CORRIDOR; 3RD FLR E WING CORRIDOR; 2ND FLR CORRIDOR; 1ST FLR CORRIDOR OK TO COVER WHEN READY SPACES LISTED BELOW:
Rough Plumbing Inspection - Commercial Passed 01/04/2006
Correction
Resolved
01/04/2006
COPPER WATER PIPING 3RD FLR RMS; 2ND FLR RMS; 3RD FLR CORR RECIRC PIPING; 1ST FLR W WING ROOMS; 2ND FLR CORR RECIRC PIPING; 1ST FLR E WING S SIDE EXCEPT 110; 1ST FLR E WING N SIDE + 110; COND PIPING @ 110; RECIRC PIPE ABV KIT CLG @ 212 & 312; WATER PIPING TO SPRINKLER RM FS VISUAL INSPECTION OK TO INSULATE WHEN READY
Correction
Resolved
01/04/2006
TEXT CHILLED/HOT WATER RISER OK TO INSULATE
Underslab Plumbing Inspection - Commercial Passed 01/04/2006
Correction
Resolved
01/04/2006
FLOOR DRAIN @ NEW SPRINKLER F.P. ROOM OK TO COVER WHEN READY
Occupancy Inspection - Codes Commercial Not Ready 02/24/2006
Correction
Partial Correction
02/24/2006
Receive Public Works Approval PER PW COFC 1/27/06
Rated Assembly Inspection Passed 03/21/2006
Correction
Resolved
03/21/2006
RATED WALLS & CEILINGS -- 3RD FLOOR
Correction
Resolved
03/21/2006
RATED WALLS & CEILINGS -- 2ND FLOOR
Correction
Resolved
03/21/2006
RATED WALLS & CEILINGS -- 1ST FLOOR
Correction
Resolved
03/21/2006
None
Correction
Resolved
03/21/2006
RATED SHAFTS / CHASES
Correction
Resolved
03/21/2006
STAIRWELL RATED WALLS
All Rough Inspection - Commercial Passed 03/21/2006
Correction
Resolved
03/21/2006
SYSTEMS ROUGH IN-WALL AND ABOVE-CEILING -- INCLUDING FRAMING
Correction
Resolved
03/21/2006
FRAMING; IN-WALL + ABOVE-CEILING SYSTEMS ROUGH -- 2ND FLOOR
Correction
Resolved
03/21/2006
FRAMING; IN-WALL + ABOVE-CEILING SYSTEMS ROUGH -- 1ST FLOOR
Correction
Resolved
03/21/2006
Framing
Correction
Resolved
03/21/2006
Electrical
Correction
Resolved
03/21/2006
Plumbing
Correction
Resolved
03/21/2006
None
Occupancy Inspection - Codes Commercial Not Ready 03/21/2006
Correction
Resolved
03/21/2006
Receive Public Works Approval PER PW COFC 1/27/06
Correction
Corrective Action Required
03/21/2006
Receive Fire Department approval
Correction
Corrective Action Required
03/21/2006
LABELING OF ELECTRICAL CIRCUIT BREAKERS CORRIDORS + UNITS INCOMPLETE
Correction
Corrective Action Required
03/21/2006
HEIGHT OF EXISTING GUARDS @ STAIRWELLS NOT 42" PER IBC
Occupancy Inspection - Codes Commercial Not Ready 03/22/2006
Occupancy Inspection - Codes Commercial Not Ready 03/23/2006
Correction
Corrective Action Required
03/23/2006
LABELING OF ELECTRICAL CIRCUIT BREAKERS CORRIDORS, ELECT ROOMS, UNITS AND EQUIPMENT INCOMPLETE
Correction
Corrective Action Required
03/23/2006
INSTALLATION OF CORRIDOR WALL SCONCE LUMINAIRES NOT COMPLETED
Correction
Corrective Action Required
03/23/2006
INSTALLATION OF ELECTRICAL RECEPTACLES IRC E3901.10; E3902.6 <> NEC 380-10; 410-56(f) CHECK ALL NOT TIGHT TO BOX VARIOUS LOCATIONS
Correction
Corrective Action Required
03/23/2006
MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR OVENS, FURNACES, COOKTOPS, DISHWASHERS REQUIRED FOR INSPECTION
Correction
Corrective Action Required
03/23/2006
ELECT RECEPT @ 308 KITCHEN LEFT OF COOKTOP NOT GFCI PROTECTED
Correction
Corrective Action Required
03/23/2006
BUTT HINGES @ FIRE-RATED DOORS SOME MISSING SCREWS
Correction
Corrective Action Required
03/23/2006
PENETRATION OF FIRE-RATED CORRIDOR WALLS SOME NOT SEALED CONDENSATE LINES, ETC
Correction
Corrective Action Required
03/23/2006
FIRE INTEGRITY OF ELECTRICAL ROOMS CHECK / SEAL PER DRAWINGS
Occupancy Inspection - Codes Commercial Not Ready 03/24/2006
Correction
Corrective Action Required
03/24/2006
IDENTIFICATION OF ELECTRICAL PANELS/EQUIPMENT LABEL ALL AT CORRIDORS, ELECTRICAL RMS
Correction
Corrective Action Required
03/24/2006
LABELING OF ELECTRICAL CIRCUIT BREAKERS CORRIDORS, ELECT ROOMS, UNITS INCOMPLETE
Occupancy Inspection - Codes Commercial Not Ready 03/27/2006
Occupancy Inspection - Codes Commercial Not Ready 03/29/2006
Occupancy Inspection - Codes Commercial Not Ready 03/30/2006
Correction
Corrective Action Required
03/30/2006
HEIGHT OF EXISTING GUARDS @ STAIRWELLS ON ORDER; AWAITING DELIVERY & INSTALLATION. GUARDS @ FLOOR LEVELS HAVE BEEN MODIFIED TO COMPLY. TEMP OCCUPANCY BY 4/15/06 OK IF MATERIAL IS RECEIVED & INSTALLATION IN PROGRESS. NOT 42" PER IBC MATERIAL FOR MODIFICATION
Correction
Corrective Action Required
03/30/2006
HANDRAILS @ 2ND FLOOR CORRIDOR SOME BEING MODIFIED TO BE RE-INSTALLED
Correction
Corrective Action Required
03/30/2006
COMPLIANCE WITH JOHN KNOX 353 REDEVELOPMENT AGREEMENT BEFORE ISSUING TCO OR COFO CONFIRM W/ M. WEISENBORN OR MARK DUNNING
Occupancy Inspection - Codes Commercial Failed 04/03/2006
Correction
Corrective Action Required
04/03/2006
Receive Fire Department approval OK FOR TCO PER JOE DIRR
Correction
Resolved
04/03/2006
LABELING OF ELECTRICAL CIRCUIT BREAKERS
Correction
Corrective Action Required
04/03/2006
HEIGHT OF EXISTING GUARDS @ STAIRWELLS ON ORDER; AWAITING DELIVERY & INSTALLATION. GUARDS @ FLOOR LEVELS HAVE BEEN MODIFIED TO COMPLY. TEMP OCCUPANCY BY 4/15/06 OK IF MATERIAL IS RECEIVED & INSTALLATION IN PROGRESS. NOT 42" PER IBC MATERIAL FOR MODIFICATION
Correction
Resolved
04/03/2006
INSTALLATION OF CORRIDOR WALL SCONCE LUMINAIRES
Correction
Resolved
04/03/2006
INSTALLATION OF ELECTRICAL RECEPTACLES
Correction
Corrective Action Required
04/03/2006
MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR OVENS, FURNACES, COOKTOPS, DISHWASHERS REQUIRED FOR INSPECTION
Correction
Resolved
04/03/2006
ELECT RECEPT @ 308 KITCHEN LEFT OF COOKTOP
Correction
Resolved
04/03/2006
BUTT HINGES @ FIRE-RATED DOORS
Correction
Resolved
04/03/2006
PENETRATION OF FIRE-RATED CORRIDOR WALLS
Correction
Resolved
04/03/2006
IDENTIFICATION OF ELECTRICAL PANELS/EQUIPMENT
Correction
Corrective Action Required
04/03/2006
DOOR LABELS PROVIDE APPROVED NUMBERING/LETTERING IDENTIFICATION ON ALL RESIDENCES, AND ALL REQUIRED ACCESSIBLE ELEMENTS. THROUGHOUT
Correction
Corrective Action Required
04/03/2006
ELECTRICAL FINISH SECURE MC CABLE TO STRUCTURE WITHIN 12" OF JUNCTION BOXES. ALL FLOORS FURNACE ROOM IN ALL UNITS
Correction
Corrective Action Required
04/03/2006
EGRESS WINDOWS BEDROOM EGRESS WINDOWS ABOVE MAXIMUM 44" REQUIREMENT 1ST FLOOR THROUGHOUT
Correction
Corrective Action Required
04/03/2006
FIRE SEPARATION 1- COMPLETE FIRE CAULKING OF ALL WALL/CEILING PENETRATIONS. 2- SECURE ALL MC CABLE WITHIN 12" OF JUNCTION BOXES. 1ST FLOOT MECHANICAL ROOM
Correction
Corrective Action Required
04/03/2006
STORAGE/MECHANICAL ROOMS 1- FIRE CAULK ALL PENETRATIONS TO CORRIDOR. 2- SECURE MC CABLE WITHIN 12" OF JUNCTION BOXES 3- COMPLETE INSTALLATION OF FCU CONTROL BOX COVERS. ALL FLOORS CORRIDOR
Correction
Corrective Action Required
04/03/2006
COVER OPEN RECEPTACLE 1ST FLOOR 102
Correction
Corrective Action Required
04/03/2006
ACCESSIBLE ROOMS PROVIDE ADDITIONAL INFORMATION AS PERTAINS TO ACCESSIBLE REQUIREMENTS IN BATHROOMS AND KITCHENS. (NO GRAB BARS AT SHOWER/TOILET. KNEE SPACE AT KITCHEN SINK QUESTIONABLE) 104, 204, 304
Correction
Corrective Action Required
04/03/2006
GFCI CIRCUIT NEAR SINK NON-FUNCTIONAL 106 - KITCHEN
Correction
Corrective Action Required
04/03/2006
NOT READY NOTE: PROVIDE ANTI-TIP DEVICE AT STOVES 212, 312
Correction
Corrective Action Required
04/03/2006
CORRIDOR ELECTRICAL ROOM 1- INSTALL FIRE DOOR 2- COVER BLANK CIRCUIT IN PANEL 2ND FLOOR CORRIDOR
Correction
Corrective Action Required
04/03/2006
ACCESSIBILITY PROVIDE ADDITIONAL INFORMATION AS PERTAINS TO ACCESSIBLE REQUIREMENTS IN KITCHEN. PLANS DO NOT SHOW WHETHER REQUIRED OR NOT. 205 - KITCHEN
Correction
Corrective Action Required
04/03/2006
FIRE SEPARATION GLASS DOORS INTO EGRESS CORRIDOR ARE NOT FIRE RATED. PLANS DO NOT CALL FOR FIRE RATING. PROVIDE VERIFICATION FROM ARCHITECT. PENDING APPROVAL FROM PLANS EXAMINER AS WELL. 205 - LOUNGE
Correction
Corrective Action Required
04/03/2006
GFCI CIRCUIT BY STOVE NON-FUNCTIONAL 202 - KITCHEN
Correction
Corrective Action Required
04/03/2006
Panel Circuit Identification (IRC) BEDROOM CIRCUITS NOT TO BE IDENTIFIED BY NUMBERS. PROVIDE DIRECTIONAL INFORMATION. I.E. NORTH, SOUTH 302, 304, 306, 308
Correction
Corrective Action Required
04/03/2006
FIRE SEPARATION REPAIR BREECH IN FIRE PARTITION TO CORRIDOR. 310 - MECH. ROOM
Correction
Corrective Action Required
04/03/2006
None DO NOT OCCUPY
Occupancy Inspection - Codes Commercial Failed 04/06/2006
Correction
Partial Correction
04/06/2006
Receive Fire Department approval OK FOR TCO PER JOE DIRR
Correction
Resolved
04/06/2006
MANUFACTURER'S INSTALLATION INSTRUCTIONS
Correction
Corrective Action Required
04/06/2006
DOOR LABELS PROVIDE APPROVED NUMBERING/LETTERING IDENTIFICATION ON ALL RESIDENCES, AND ALL REQUIRED ACCESSIBLE ELEMENTS. INCLUDE PHONE ROOM THROUGHOUT
Correction
Corrective Action Required
04/06/2006
ELECTRICAL FINISH SECURE MC CABLE TO STRUCTURE WITHIN 12" OF JUNCTION BOXES. MC TO BE SECURED TO STRUCTURE. SOME UNITS HAVE MC RAN DIAGONAL IN OPEN SPACE UNSOPPORTED. ALL FLOORS FURNACE ROOM IN ALL UNITS
Correction
Resolved
04/06/2006
EGRESS WINDOWS
Correction
Corrective Action Required
04/06/2006
FIRE SEPARATION 1- COMPLETE FIRE CAULKING OF ALL WALL/CEILING PENETRATIONS. 2- SECURE ALL MC CABLE WITHIN 12" OF JUNCTION BOXES. 1ST FLOOT MECHANICAL ROOM
Correction
Corrective Action Required
04/06/2006
COVER OPEN RECEPTACLE 1ST FLOOR 102
Correction
Resolved
04/06/2006
GFCI CIRCUIT NEAR SINK NON-FUNCTIONAL
Correction
Corrective Action Required
04/06/2006
NOT READY NOTE: PROVIDE ANTI-TIP DEVICE AT STOVES 207, 312
Correction
Corrective Action Required
04/06/2006
CORRIDOR ELECTRICAL ROOM 1- INSTALL FIRE DOOR 2ND FLOOR CORRIDOR
Correction
Resolved
04/06/2006
GFCI CIRCUIT BY STOVE NON-FUNCTIONAL
Occupancy Inspection - Codes Commercial Failed 04/07/2006
Correction
Resolved
04/07/2006
COVER OPEN RECEPTACLE
Correction
Corrective Action Required
04/07/2006
NOT READY NOTE: PROVIDE ANTI-TIP DEVICE AT STOVES 312
Correction
Resolved
04/07/2006
CORRIDOR ELECTRICAL ROOM
Correction
Resolved
04/07/2006
Panel Circuit Identification (IRC)
Correction
Resolved
04/07/2006
FIRE SEPARATION
Correction
Partial Correction
04/07/2006
None TEMPORARY OCCUPANCY GRANTED TO ALL ROOMS/AREAS EXCEPT AS LISTED: 104, 204, 304, 312, 2ND FLOOR LOUNGE/LIBRARY/KITCHEN 30 DAY TCO
Correction
Resolved
04/07/2006
FIRE INTEGRITY OF ELECTRICAL ROOMS
Correction
Resolved
04/07/2006
HANDRAILS @ 2ND FLOOR CORRIDOR
Correction
Resolved
04/07/2006
DOOR LABELS
Correction
Resolved
04/07/2006
ELECTRICAL FINISH
Correction
Resolved
04/07/2006
FIRE SEPARATION
Correction
Resolved
04/07/2006
STORAGE/MECHANICAL ROOMS
Occupancy Inspection - Codes Commercial Failed 04/17/2006
Correction
Resolved
04/17/2006
Receive Planning & Development Approval PER HECTOR SOTO 4/6/06 NO ISSUES
Occupancy Inspection - Codes Commercial Failed 05/05/2006
Correction
Resolved
05/05/2006
Receive Fire Department approval PER J DIR 5/5/06
Correction
Resolved
05/05/2006
HEIGHT OF EXISTING GUARDS @ STAIRWELLS
Correction
Resolved
05/05/2006
ACCESSIBLE ROOMS
Correction
Resolved
05/05/2006
NOT READY
Correction
Corrective Action Required
05/05/2006
ACCESSIBILITY PROVIDE ADDITIONAL INFORMATION AS PERTAINS TO ACCESSIBLE REQUIREMENTS IN KITCHEN. PLANS DO NOT SHOW WHETHER REQUIRED OR NOT. 205 - KITCHEN
Correction
Corrective Action Required
05/05/2006
FIRE SEPARATION GLASS DOORS INTO EGRESS CORRIDOR ARE NOT FIRE RATED. PLANS DO NOT CALL FOR FIRE RATING. PROVIDE VERIFICATION FROM ARCHITECT. PENDING APPROVAL FROM PLANS EXAMINER AS WELL. 205 - LOUNGE
Correction
Resolved
05/05/2006
None
Correction
Corrective Action Required
05/05/2006
EGRESS PATH OUTSIDE NW DOOR PROVIDE TEMPORARY RAMP PENDING UPCOMING PROJECT
Occupancy Inspection - Codes Commercial Failed 05/11/2006
Correction
Partial Correction
05/11/2006
COMPLIANCE WITH JOHN KNOX 353 REDEVELOPMENT AGREEMENT PROCESSING IN PROGRESS LS ADMINISTRATION
Correction
Resolved
05/11/2006
EGRESS PATH OUTSIDE NW DOOR
Final Mechanical Inspection Passed 05/16/2006
Occupancy Inspection - Codes Commercial Passed 05/16/2006
Correction
Resolved
05/16/2006
COMPLIANCE WITH JOHN KNOX 353 REDEVELOPMENT AGREEMENT JKV TO RECEIVE RESPONSE PROCESSING IN PROGRESS LS ADMINISTRATION
Correction
Resolved
05/16/2006
ACCESSIBILITY 205 - KITCHEN OK PER T DEISTER 4/10/06
Correction
Resolved
05/16/2006
FIRE SEPARATION 205 - LOUNGE OK PER T DEISTER 4/10/06
Occupancy Inspection - Codes Commercial Passed 11/13/2006
Correction
Resolved
11/13/2006
COMPLIANCE WITH JOHN KNOX 353 REDEVELOPMENT AGREEMENT PER M DUNNING 11/13/06
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home