Permit Application Status

B0500128


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0500128
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
ALTERATION COMMERCIAL
MISC ELECTRICAL, MECHANICAL, FRAMING
02/02/2005
02/02/2005
08/01/2005
08/08/2005
Locations
Contacts
CITY OF LEES SUMMIT, Address:207 SW MARKET ST  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 08/01/2005 10/29/2010
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
25 Electrical Permit Fee $15.00 $15.00 Paid 02/02/2005
25 Mechanical Permit Fees $21.50 $21.50 Paid 02/02/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Partial 02/03/2005
Correction
Partial Correction
02/03/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH TRNG105 E WALL; OK TO COVER WHEN READY SPACES/WALLS LISTEDBELOW:
All Rough Inspection - Commercial Partial 02/23/2005
Correction
Partial Correction
02/23/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH TRNG105 E WALL; M&W RESTROOMS; OK TO COVER WHEN READY SPACES/WALLS LISTEDBELOW:
Above Ceiling Inspection Failed 03/16/2005
Correction
Corrective Action Required
03/16/2005
ELECTRICAL JUNCTION BOX KNOCKOUT NOT PLUGGED CENTER OF CORRIDOR NOT SECURED TO STRUCTURE+
Correction
Corrective Action Required
03/16/2005
MC & AC ELECTRICAL CABLES WHEREVER POSSIBLE. NEC 300-11 & 334-10 [ALLOWABLE EXCEPTION: FIXTURE WHIPS NOT IN EXCESS OF 6` LONG] SECURE WITHIN 12" OF ENTRY TO BOX
Correction
Corrective Action Required
03/16/2005
ELECTRICAL JUNCTION BOX BOX NOT CLOSED SOUTH OF CORRIDOR EXPOSED CONDUCTORS
Correction
Corrective Action Required
03/16/2005
HVAC SUPPLY FLEX CONNECTORS CONNECTIONS TO FITTINGS NOT TAPED PER ADC/SMACNA
Correction
Partial Correction
03/16/2005
LOW VOLTAGE CABLES WHEREVER POSSIBLE. ADVISE TO RAISE/SUPPORT ABOVE OTHER SYSTEMS
Above Ceiling Inspection Partial 03/17/2005
Correction
Resolved
03/17/2005
ELECTRICAL JUNCTION BOX
Correction
Resolved
03/17/2005
MC & AC ELECTRICAL CABLES
Correction
Resolved
03/17/2005
ELECTRICAL JUNCTION BOX
Correction
Resolved
03/17/2005
HVAC SUPPLY FLEX CONNECTORS
Correction
Resolved
03/17/2005
LOW VOLTAGE CABLES
Correction
Partial Correction
03/17/2005
ABOVE-CEILING SYSTEMS TWO NEW RESTROOMS + ADJACENT CORRIDOR; SPACES INDICATED BELOW OK TO COVER WHEN READY
All Rough Inspection - Commercial Failed 03/22/2005
Correction
Corrective Action Required
03/22/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH APPROVED: TRNG105 E WALL; M&W RESTROOMS; NOT APPROVED: NEW STORAGE ROOM @ NORTH WALL 1) WATER PIPING INSULATION INCOMPLETE 2) COPPER PIPING NOT ISOLATED FROM STEEL STUDS & TRACKS SPACES/WALLS LISTEDBELOW:
Rough Framing Inspection - Commercial Request Complete 3/21/2005 3/22/2005 03/22/2005
All Rough Inspection - Commercial Partial 03/23/2005
Correction
Partial Correction
03/23/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH APPROVED: TRNG105 E WALL; M&W RESTROOMS; NEW STORAGE ROOM @ NORTH WALL; OK TO COVER WHEN READY SPACES/WALLS LISTEDBELOW:
Above Ceiling Inspection Not Ready 04/01/2005
Correction
Resolved
04/01/2005
ABOVE-CEILING SYSTEMS TWO NEW RESTROOMS + ADJACENT CORRIDOR
Correction
Corrective Action Required
04/01/2005
ABOVE-CEILING SYSTEMS @ WORK RM 106 + JAN CLO 113 OBSERVATIONS TO DATE: 1) REMOVE ABANDONED MATERIAL TO EXTENT FEASIBLE 2) CLOSE UNUSED OPENINGS IN ELECT J-BOXES; REMOVE UNUSED BUSHINGS 3) SECURE MC CABLE WITHIN 12" OF BOXES 4) SUPPORT L.V. CABLE ABOVE OTHER SYSTEMS WHEREVER POSSIBLE PRELIM INSPECTION DUE TO COMPLETE WORK IN PROGRESS
Above Ceiling Inspection Partial 04/05/2005
Correction
Partial Correction
04/05/2005
ABOVE-CEILING SYSTEMS @ WORK RM 106 + JAN CLO 113 OK TO COVER WHEN READY
All Rough Inspection - Commercial Partial 04/05/2005
Correction
Partial Correction
04/05/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH APPROVED: TRNG105 E WALL; M&W RESTROOMS; NEW STORAGE ROOM @ NORTH WALL; NEW EMS ROOM @ BASEMENT; OK TO COVER WHEN READY SPACES/WALLS LISTEDBELOW:
Above Ceiling Inspection Failed 05/06/2005
Correction
Resolved
05/06/2005
ABOVE-CEILING SYSTEMS @ WORK RM 106 + JAN CLO 113
Correction
Corrective Action Required
05/06/2005
ABOVE-CEILING SYSTEMS @ EMS BILLING ROOM 1) SEISMIC TIES ON LIGHT FIXTURES @ OPPOSITE DIAGONAL CORNERS 2) CLOSE ALL OPENINGS @ ELECT J-BOXES 3) CAP OR REMOVE DISCONTINUOUS CAST IRON PLUMBING DRAIN PIPE CORRECT & REQUEST REINSP OF FOLLOWING ISSUES:
Above Ceiling Inspection Passed 05/09/2005
Correction
Resolved
05/09/2005
ABOVE-CEILING SYSTEMS @ EMS BILLING ROOM OK TO COVER WHEN READY
All Rough Inspection - Commercial Passed 08/05/2005
Correction
Resolved
08/05/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH
Occupancy Inspection - Codes Commercial Passed 08/05/2005
Documents & Images

No documents are currently available for viewing.

Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home