Summary
B0500072
Building Permit - Commercial
Certificate of Occupancy
GRONBERG DIANA R & GUY W TRUSTEE
CHANGE OF TENANT
TENANT FINISH
01/21/2005
01/21/2005
07/20/2005
03/23/2005
Locations
Contacts
GUY GRONBERG ARCHITECTS, PC, Address:PO BOX 2024  
GUY GRONBERG ARCHITECTS, PC, Address:PO BOX 2024  
GRONBERG DIANA R & GUY W TRUSTEE, Address:1516 NE HARDAGE CIR  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 07/20/2005 10/29/2010
Correction

Codes Administration - This permit was issued over the counter and a full plan review was not performed. Any violations found during the construction process shall be corrected. Corrections to design issues shall be approved by the Plans Examiner prior to actually making the correction.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department; Extension cords and flexible cords shall not be a substitute for permanent wiring. Extension cords and flexible cords shall not be affixed to structures, extended through walls, ceilings or floors, or under doors or floor cove-ings, nor shall such cords be subject to environmental damage or physical impact.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

Fire Department; IFC 1003.3.1.8 Egress doors shall be readily openable from the egress side without the use of akey or special knowledge or effort. Exit doors shall not be locked, chained, barred, latched or otherwise rendered unusable. All locking devises shall be of an approved type. IFC 1003.3.1.8
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $17.00 $17.00 Paid 01/21/2005
24 BLDG Plan Check Fees $3.25 $3.25 Paid 01/21/2005
25 Electrical Permit Fee $32.90 $32.90 Paid 01/21/2005
25 Mechanical Permit Fees $15.00 $15.00 Paid 01/21/2005
25 Electrical Permit Fee $15.00 $15.00 Paid 01/27/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Passed 01/27/2005
Correction
Resolved
01/27/2005
ELECTRICAL SERVICE REPLACEMENT 100 AMP RELEASE SERVICE
All Rough Inspection - Commercial Passed 01/27/2005
Correction
Resolved
01/27/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH OK TO COVER WHEN READY
All Rough Inspection - Commercial Passed 01/31/2005
Correction
Resolved
01/31/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH INTERIOR PARTIAL-HEIGHT WALL APPROVED 1/31/05 OK TO COVER WHEN READY
Occupancy Inspection - Codes Commercial Failed 03/21/2005
Correction
Partial Correction
03/21/2005
OCCUPANCY APPROVAL STATUS SEE TEMPORARY OCCUPANCY
Correction
Corrective Action Required
03/21/2005
PENETRATION OF EAST EXTERIOR WALL SEAL ANNULAR SPACE CONDENSATE DRAIN NOT SEALED
Correction
Resolved
03/21/2005
STREET ADDRESS FD INFORMED CHANGED TO 113 APPROVED BY P&D
Correction
Corrective Action Required
03/21/2005
PERMANENT LABELING OF ELECTRICAL SERVICE METER NOT COMPLETED
Occupancy Inspection - Codes Commercial Passed 03/23/2005
Correction
Resolved
03/23/2005
OCCUPANCY APPROVAL STATUS
Correction
Resolved
03/23/2005
PENETRATION OF EAST EXTERIOR WALL CONDENSATE DRAIN
Correction
Resolved
03/23/2005
PERMANENT LABELING OF ELECTRICAL SERVICE METER
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home