Summary
B0500047
Building Permit - Commercial
Final Completion
MJB OF MISSOURI LLC
PARTIAL COMMERCIAL
FOUNDATION AND UNDERSLAB
01/14/2005
01/18/2005
07/17/2005
09/23/2005
Locations
Contacts
DAVIDSON DESIGN GROUP, Address:11301STRANG LINE ROAD  
LYTLE CONSTRUCTION, Address:1051 SE BROADWAY DR  
MJB OF MISSOURI LLC, Address:640 NE SHORELINE DR  
INDEPENDENCE SAFTEY STORAGE NORTH LLC, Address:1101 NW PAMELA BLVD UNIT C  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 07/13/2005 10/29/2010
Correction

CA - This is an "at risk permit". Construction shall be in accordance with plans submitted for permit approval. The applicant understands that issuance of this permit does not guaranty issuance of a full permit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $254.00 $254.00 Paid 01/18/2005
25 Plumbing Permit Fees $30.00 $30.00 Paid 01/18/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 02/24/2005
Correction
Partial Correction
02/24/2005
None APPROVED: LINE 1, E2.5 TO F
Footing Inspection - Commercial Partial 02/24/2005
Correction
Partial Correction
02/24/2005
None SHEET S2.1 LINE F FROM LINE 1 TO 4.5
Footing Inspection - Commercial Partial 02/25/2005
Correction
Partial Correction
02/25/2005
None APPROVED: LINE 1, E2.5 TO F APPROVED: SPREAD FOOTINGS D5, 35 - NORTH EXTERIOR COMPLETE - WEST EXTERIOR F TO C.7 - ALL OF WEST OFFICE AND PATIO
Footing Inspection - Commercial Partial 02/28/2005
Correction
Partial Correction
02/28/2005
None APPROVED: LINE 5.4, C.7 THRU C LINE 5, C THRU A.8
Footing Inspection - Commercial Partial 03/01/2005
Correction
Partial Correction
03/01/2005
None FOLLOWING APPROVED: LINE 5, A THRU A.8 LINE A, 5 THRU 4.2 LINE C, 5 THRU 2.3 5' SOUTH ON LINE 4.2 5' SOUTH ON LINE 1 SPREADS B,2.7 & B.5,2.7
Footing Inspection - Commercial Partial 03/02/2005
Correction
Partial Correction
03/02/2005
None APPROVED THE FOLLOWING: LINE 1, A.0-A.2 LINE A.2, 1-0.9 LINE 0.9, A2-C LINE C, 0.9-2.3 LINE 1, C-C.2 LINE 2.7 - COMPLETE
Footing Inspection - Commercial Partial 03/03/2005
Correction
Partial Correction
03/03/2005
None APPROVED AS FOLLOWS: LINE 4.2 ALL LINE X ALL LINE 1, X THRU X.8 SPREADS 2.7, Y & 2.7, Z
Footing Inspection - Commercial Passed 03/04/2005
Correction
Resolved
03/04/2005
None APPROVED: LINE 1, E2.5 TO F APPROVED: SPREAD FOOTINGS D5, 35 - NORTH EXTERIOR COMPLETE - WEST EXTERIOR F TO C.7 - ALL OF WEST OFFICE AND PATIO
Correction
Resolved
03/04/2005
SEE TEXT APPROVED AS FOLLOWS: LINE 1, C.2 THRU E2.5 LINE 1, X.8 THRU A ALL OF FRONT ENTRY FOOTING INSPECTIONS COMPLETE AND APPROVED
Correction
Resolved
03/04/2005
None APPROVED AS FOLLOWS: LINE 4.2 ALL LINE X ALL LINE 1, X THRU X.8 SPREADS 2.7, Y & 2.7, Z
Correction
Resolved
03/04/2005
None APPROVED THE FOLLOWING: LINE 1, A.0-A.2 LINE A.2, 1-0.9 LINE 0.9, A2-C LINE C, 0.9-2.3 LINE 1, C-C.2 LINE 2.7 - COMPLETE
Correction
Resolved
03/04/2005
None FOLLOWING APPROVED: LINE 5, A THRU A.8 LINE A, 5 THRU 4.2 LINE C, 5 THRU 2.3 5' SOUTH ON LINE 4.2 5' SOUTH ON LINE 1 SPREADS B,2.7 & B.5,2.7
Correction
Resolved
03/04/2005
None APPROVED: LINE 5.4, C.7 THRU C LINE 5, C THRU A.8
Underslab Electrical Inspection - Commercial Passed 03/18/2005
Correction
Resolved
03/18/2005
None
Footing Inspection - Commercial Passed 04/01/2005
Correction
Resolved
04/01/2005
None FOOTINGS FOR TRASH ENCLOSURE AND EQUIPMENT PAD APPROVED.
Sewer Service Inspection - Commercial Request Complete 4/14/2005 4/14/2005 04/14/2005
Sewer Service Inspection - Commercial Request Complete 4/20/2005 4/20/2005 04/20/2005
Water Service Inspection - Commercial Request Complete 4/25/2005 4/25/2005 04/25/2005
Erosion Control Inspection Residential Passed 06/06/2005
Correction
Resolved
06/06/2005
Erosion Control
Footing Inspection - Commercial Partial 06/06/2005
Correction
Partial Correction
06/06/2005
See Comment RETAINING WALL FOOTING - EAST SIDE PER PLANS FROM ENGINEER - PAD APPROX 9' X 14' 6" # 8 REBAR 12" OC, # 4 REBAR 12" 0C OKAY TO POUR AT OWN RISK SUBMIT STAMPED & SIGNED ENGINEER DRAWINGS FOR APPROVAL
Underslab Plumbing Inspection - Commercial Passed 09/22/2005
Footing Inspection - Commercial Passed 09/22/2005
Correction
Resolved
09/22/2005
See Comment RETAINING WALL FOOTING - EAST SIDE PER PLANS FROM ENGINEER - PAD APPROX 9' X 14' 6" # 8 REBAR 12" OC, # 4 REBAR 12" 0C OKAY TO POUR AT OWN RISK SUBMIT STAMPED & SIGNED ENGINEER DRAWINGS FOR APPROVAL
Final Inspection - Commercial Passed 09/22/2005
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home