Permit Application Status

B0500040


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0500040
Building Permit - Commercial
Final Completion
EVANS JOHN S &
ALTERATION COMMERCIAL
WHITE BOX FINISH
01/12/2005
02/23/2005
08/22/2005
02/11/2008
Locations
Contacts
KESSINGER HUNTER AND COMPANY LC, Address:2600 GRAND #700  
EVANS JOHN S &, Address:208 SW ASPEN  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 08/13/2005 10/29/2010
Correction

Fire Department; I Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. Exit doors shall not be locked, chained, barred, latched or otherwise rendered unusable. All locking devises shall be of an approved type. IFC 1003.3.1.8
Correction

Codes Administration - The project cost has not been provided.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department; The required fire-resistance rating of fire-resistance-rated construction (including walls, fire stops, shaft enclosures, partitions and floors) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings, and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance rated assemblies shall be protected by self-closing or automatic- closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

Codes Administration - 2003 IPC 403.2 - Separate facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $83.00 $83.00 Paid 02/23/2005
24 BLDG Plan Check Fees $8.75 $8.75 Paid 02/23/2005
25 Electrical Permit Fee $30.00 $30.00 Paid 02/23/2005
25 Plumbing Permit Fees $15.00 $15.00 Paid 02/23/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Failed 04/05/2005
Correction
Partial Correction
04/05/2005
None WALL ROUGH ONLY ON 797, BATHROOM ONLY. APPROVED
Above Ceiling Inspection Failed 04/28/2005
Correction
Corrective Action Required
04/28/2005
See Comment 1. IS CEILING RATED? 2. OPEN J-BOXES 3. HVAC DUCTS NOT INSTALLED
All Rough Inspection - Commercial Failed 04/28/2005
Correction
Partial Correction
04/28/2005
None WALL ROUGH ONLY ON 797, BATHROOM ONLY. APPROVED
Correction
Corrective Action Required
04/28/2005
Doors TWO (2) AT FRONT & TWO (2) AT REAR HAVE BEEN CLOSED IN
Correction
Corrective Action Required
04/28/2005
Water Heater NEW HEATER INSTALLED ABOVE SOUTH RESTROOM - NOT ON PLANS
Correction
Corrective Action Required
04/28/2005
Girder and Header Spans SHEET AI - WALL SECTION 4 AT FOUR (4) LOCATIONS NEW DOORWAYS TO BE INSTALLED. COVERED BY SHEETROCK - UNABLE TO INSPECT FRAMING
Correction
Corrective Action Required
04/28/2005
See Comment SHEET A1 - GENERAL NOTES - #2 - HVAC & DUCT WORK REMOVED/REPLACED
All Rough Inspection - Commercial Not Ready 05/02/2005
Correction
Corrective Action Required
05/02/2005
No Access Provided
All Rough Inspection - Commercial Failed 05/04/2005
Correction
Resolved
05/04/2005
None WALL ROUGH ONLY ON 797, BATHROOM ONLY. APPROVED
Correction
Resolved
05/04/2005
Doors TWO (2) AT FRONT & TWO (2) AT REAR HAVE BEEN CLOSED IN
Correction
Resolved
05/04/2005
Water Heater NEW HEATER INSTALLED ABOVE SOUTH RESTROOM - NOT ON PLANS
Correction
Resolved
05/04/2005
Girder and Header Spans SHEET AI - WALL SECTION 4 AT FOUR (4) LOCATIONS NEW DOORWAYS TO BE INSTALLED. COVERED BY SHEETROCK - UNABLE TO INSPECT FRAMING see letter from Garwood Construction dated 28 April 2005
Correction
Resolved
05/04/2005
See Comment SHEET A1 - GENERAL NOTES - #2 - HVAC & DUCT WORK REMOVED/REPLACED
Correction
Resolved
05/04/2005
No Access Provided
Correction
Corrective Action Required
05/04/2005
Bathroom ventilation (IRC) TWO (2) NOT INSTALLED ONE (1) NOT WORKING Bathrooms
Above Ceiling Inspection Passed 05/04/2005
Correction
Resolved
05/04/2005
See Comment 1. IS CEILING RATED? 2. OPEN J-BOXES 3. HVAC DUCTS NOT INSTALLED OKAY TO HANG TILE
Final Inspection - Commercial Passed 02/08/2008
Correction
Resolved
02/08/2008
None CLOSE BUILDING PERMIT- SEE TENANT FINISH PERMIT
All Rough Inspection - Commercial Passed 02/08/2008
Correction
Resolved
02/08/2008
Bathroom ventilation (IRC)
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home