Summary
B0500002
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
ALTERATION COMMERCIAL
INTERIOR ELECTRICAL RENOVATION
01/03/2005
06/15/2005
12/12/2005
01/09/2007
Locations
Contacts
CIMMARON ELECTRIC INC, Address:1831 SW MARKET ST  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 07/17/2005 10/29/2010
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Plan Check Fees $4.75 $4.75 Paid 06/15/2005
25 Electrical Permit Fee $120.00 $120.00 Paid 06/15/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Above Ceiling Inspection Failed 06/16/2005
Correction
Corrective Action Required
06/16/2005
2ND FLOOR BATH PROVIDE LISTING ON CAN LIGHT OVER SHOWER (SUITABLE FOR WET LOCATIONS). SECURE J-BOX FOR CAN OVER SHOWER. SHOWER CAN LIGHT
Correction
Resolved
06/16/2005
EMS STORAGE ROOM & CLOSET OKAY TO COVER.
Above Ceiling Inspection Partial 06/17/2005
Correction
Resolved
06/17/2005
2ND FLOOR BATH SHOWER CAN LIGHT
Correction
Partial Correction
06/17/2005
EMS STORAGE ROOM & CLOSET OKAY TO COVER.
Rough Electrical Inspection - Commercial Partial 09/28/2005
Correction
Partial Correction
09/28/2005
EXERCISE ROOM CUT-IN RECEPTACLES INSTALLED AT WALLS
Above Ceiling Inspection Partial 09/28/2005
Correction
Partial Correction
09/28/2005
EXERCISE ROOM NO ISSUES FOUND
Correction
Resolved
09/28/2005
2ND FLOOR BATH SHOWER CAN LIGHT
Correction
Resolved
09/28/2005
EMS STORAGE ROOM & CLOSET OKAY TO COVER
Rough Electrical Inspection - Commercial Partial 10/20/2005
Correction
Partial Correction
10/20/2005
CONDUIT & BOXES IN WALLS @ BUNK ROOMS INSTALLED BY LSPW MAINT
Rough Electrical Inspection - Commercial Partial 10/26/2005
Correction
Partial Correction
10/26/2005
COMPLETION OF MC CABLE & BOXES @ BUNK ROOMS PERFORMED BY CIMMERON
Correction
Resolved
10/26/2005
CONDUIT & BOXES IN WALLS @ BUNK ROOMS INSTALLED BY LSPW MAINT
Above Ceiling Inspection Passed 11/04/2005
Correction
Resolved
11/04/2005
EMS STORAGE ROOM & CLOSET
Correction
Resolved
11/04/2005
2ND FLOOR BATH
Correction
Resolved
11/04/2005
EXERCISE ROOM
Correction
Resolved
11/04/2005
BUNK AREA
Rough Electrical Inspection - Commercial Passed 11/04/2005
Correction
Resolved
11/04/2005
EXERCISE ROOM CUT-IN RECEPTACLES INSTALLED AT WALLS
Correction
Resolved
11/04/2005
COMPLETION OF MC CABLE & BOXES @ BUNK ROOMS PERFORMED BY CIMMERON
Final Electrical Inspection - Commercial Passed 01/08/2007
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home