Summary
B0402163
Building Permit - Commercial
Final Completion
MJB OF MISSOURI LLC
NEW COMMERCIAL
NEW BUILDING
11/12/2004
02/09/2005
08/08/2005
10/31/2005
Locations
Contacts
LYTLE CONSTRUCTION, Address:1051 SE BROADWAY DR  
DAVIDSON DESIGN GROUP, Address:11301STRANG LINE ROAD  
MJB OF MISSOURI LLC, Address:640 NE SHORELINE DR  
INDEPENDENCE SAFTEY STORAGE NORTH LLC, Address:1101 NW PAMELA BLVD UNIT C  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 05/11/2005 10/29/2010
Correction

Codes Administration - 2003 IBC 1209.2 - Attic spaces. An opening not less than 20 inches by 30 inches shall be provided to any attic area having a clear height of over 30 inches. A 30-inch minimum clear headroom in the attic space shall be provided at or above the access opening.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

Fire Department; The required fire-resistance rating of fire-resistance-rated construction (including walls, fire stops, shaft enclosures, partitions and floors) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings, and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance rated assemblies shall be protected by self-closing or automatic- closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Codes Administration - 2003 IBC 1009.11 - Handrails. Stairways shall have handrails on each side. Handrails shall be adequate in strength and attachment in accordance with Section 1607.7. Handrails for ramps, where required by Section 1010.8, shall comply with this section.
Correction

Codes Administration - 2003 IBC 1110.1 - Signs. Required accessible elements shall be identified by the International Symbol of Accessiblity a the following locations: 1. Accessible parking spaces required by Section 1106.1 except where the total number of parking spaces provided is four or less. 2. Accessible passenger loading zones. 3. Accessbile areas of refuge required by Section 1007.6. 4. Accessible rooms where multiple single-user toilet or bathing rooms are clustered in a single location. 5. Accessible entrances where not all entrances are accessible. 6. Accessible check-out aisles where not all aisles are accessible. The sign, where provided, shall be above the check-out aisle in the same location as the checkout aisle number or type of check-out identification. 7. Unisex toilet and bathing rooms. 8. Accessible dressing, fitting and locker rooms where not all such rooms are accessible.
Correction

Codes Administration - 2003 IBC 1704.1.1 - Building permit requirements. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with Section 106.1 as a condition for permit issuance. This statement shall include a complete list of materials and work requiring special inspections by this section, the inspections to be performed and a list of the individuals, approved agencies or firms intended to be retained for conducting such inspections.
Correction

Codes Administration - 2003 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work.
Correction

Codes Administration - 2003 IBC 2406.1 - Human impact loads. Individual glazed areas, including glass mirrors, in hazardous locations as defined in Section 2406.3 shall comply with Sections 2406.1 through 2406.1.5.
Correction

Codes Administration - The projected cost of the building was not provided at the time of permit application.
Correction

Codes Administration - The size of the water service line and meter are not the same on the civil and mep plans.
Correction

Codes Administration - The plans indicate that the warehouse and boiler room are separated from the rest of the buiding by one-hour fire resistive construction. The information required for the separation is not complete.
Correction

Codes Administration - The minor plat combining the two lots into one lot must be approved and recorded prior to issuance of a full building permit.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

All backflow prevention assemblies must be tested and reports filed with the Lee's Summit Water Utilities Backflow Division (816-969-7636) within 30 days from the date installed.
Correction

Codes Administration - Item 2 on C1.1 indicates a 4 foot sidewalk and item 1 on Sheet A1.1 indicates a 6 foot sidewalk.
Correction

Codes Administration - Copies of the engineered truss package were not provided at the time of permit application.
Correction

Codes Administration - 2003 IPC 608.16.5 - Connections to lawn irrigation systems. The potable water supply to lawn irrigation systems shall be protected against backflow by an atmospheric-type vacuum breaker, a pressure-type vacuum breaker or a reduced pressure principle bacflow preventer. A valve shall not be installed downstream from an atmospheric vacuum breaker. Where chemicals are introduced into the system, the potable water supply shall be protected against backflow by a reduced principle backflow preventer.
Correction

Codes Administration - 2003 IBC 1014.1 - Exit or exit access doorways required. Two exits or exit access doorways from any space shall be provided where one of the following conditions exists: 1. The occupant load of the space exceeds the value in Table 1014.1. 2. The common path of egress travel exceeds the limitations of Section 1013.3. 3. Where required by Sections 1014.3, 1014.4 and 1014.5.
Correction

Fire Department- The addition as built would require a second exit. Depending on how the tenant finish is designed will guide the need for a second means of egress.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

Fire Department: Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the code official is authorized to require a key box to be installed in an accessible location. The key box shall be of an approved type and shall contain keys to gain access as required by the code official.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-7343.
Correction

Fire Department; All valves controlling the water supply for automatic sprinkler systems and water-flow switches on all sprinkler systems shall be electrically supervised when the number of sprinkler heads are 20 (twenty) or greater.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Fire Department- 907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. 3. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

Codes Administration - 2003 IMC 304.9 - Clearance from grade. Equipment and appliances in stalled at grade level shall be supported on a level concrete slab or other approved material extending above adjoining grade or shall be suspended a minimum of 6 inches above adjoining grade.
Correction

Codes Administration - 2003 IPC 312.1 - Required tests. The permit holder shall make the applicable tests prescribed in Sections 312.2 through 312.9 to determine compliance with the provisions of this code. The permit holder shall give reasonable advance notice to the code official when the plumbing work is ready for tests. The equipment, material, power and laber necessary for the inspection and test shall be furnished by the permit holder and the permit holder shall be responsible for determining that the work will withstand the test pressure prescribed in the following tests. All plumbing systems piping shall be tested with either wator or, for piping systems other than plastic, by air. After the plumbing fixtures have been set and their traps filled with water, the entire drainage system shall be submitted to final tests. The code official shall require the removal of any cleanouts if necessary to ascertain whether the pressure has reached all parts of the system. Note: Testing of the plumbing system is not required to be witnessed by the Codes Administration Staff with the exception of gas piping.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $3,923.00 $3,923.00 Paid 02/09/2005
24 BLDG Plan Check Fees $85.35 $85.35 Paid 02/09/2005
25 Electrical Permit Fee $519.54 $519.54 Paid 02/09/2005
25 Mechanical Permit Fees $214.00 $214.00 Paid 02/09/2005
25 Plumbing Permit Fees $94.00 $94.00 Paid 02/09/2005
84 Water Meters $600.00 $600.00 Paid 02/09/2005
85 Water Taps $6,835.00 $6,835.00 Paid 02/09/2005
89 Sewer Tap Fees $420.00 $420.00 Paid 02/09/2005
Right of Way Permit $35.00 $35.00 Paid 02/09/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 03/11/2005
Correction
Partial Correction
03/11/2005
SEE TEXT APPROVED AS FOLLOWS: DWV PIPING - LOWER MAIN TRUNK & BUILDING EXIT. DWV PIPING - UPPER EAST TRUNK TO COL. LINE B.5
Underslab Plumbing Inspection - Commercial Partial 03/14/2005
Correction
Partial Correction
03/14/2005
SEE TEXT APPROVED AS FOLLOWS: ALL SOUTH OF LINE C
Underslab Plumbing Inspection - Commercial Passed 03/16/2005
Correction
Resolved
03/16/2005
SEE TEXT APPROVED AS FOLLOWS: ALL SOUTH OF LINE C
Correction
Resolved
03/16/2005
None REMAINDER OF BELOW SLAB APPROVED
Correction
Resolved
03/16/2005
SEE TEXT APPROVED AS FOLLOWS: DWV PIPING - LOWER MAIN TRUNK & BUILDING EXIT. DWV PIPING - UPPER EAST TRUNK TO COL. LINE B.5
Electrical Service Inspection Partial 03/18/2005
Correction
Partial Correction
03/18/2005
Grounding Electrode Installation (IRC) GROUND TO WATER INSPECTED. LOCATED AT UNDERSLAB WATER PIPE ON EAST SIDE OF BUILDING. STUBS UP ON WEST SIDE FOR CONNECTION TO SERVICE
Sewer Service Inspection Partial 04/14/2005
Correction
Partial Correction
04/14/2005
None APPROVED TO 65' FROM BUILDING. NOTE: FINISHED GRADE CLEANOUT WILL BE REQUIRED.
Sewer Service Inspection Passed 04/20/2005
Correction
Resolved
04/20/2005
None
Water Service Inspection Passed 04/25/2005
Above Ceiling Inspection Partial 05/18/2005
Correction
Corrective Action Required
05/18/2005
ROOF VENTILATION. ROOF VENTILATORS NOT YET INSTALLED. TO BE VERIFIED AT FUTURE INSPECTION. OK TO INSTALL GYP LID. ABOVE GYP LID
Correction
Corrective Action Required
05/18/2005
DRAFT STOPS PATCH HOLES IN DRAFT STOPPING ABOVE GYP LID
Correction
Corrective Action Required
05/18/2005
ATTIC ACCESS PROVIDE ATTIC ACCESS TO ALL PORTIONS OF CEILING. I.E. BETWEEN DRAFT STOPS. ABOVE GYP LID
Underground Electrical Inspection - Commercial Partial 06/17/2005
Correction
Partial Correction
06/17/2005
TEXT APPROVED PRIMARY & SECONDARY CONDUITS SERVING XFORMER. INSTALLED PER AQUILLA'S SHOP DRAWINGS. PROVIDE AMENDED ENGINEER'S DRAWINGS DEPICTING ACTUAL INSTALLATION.
Rough Framing Inspection - Commercial Partial 06/17/2005
Correction
Partial Correction
06/17/2005
TEXT APPROVED ALL WALLS NORTH OF COLUMN LINE 'C' FOR COVER.
Underground Electrical Inspection - Commercial Request Complete 6/16/2005 6/17/2005 06/17/2005
Underground Electrical Inspection - Commercial Partial 06/23/2005
Correction
Partial Correction
06/23/2005
None APPROVED TO COVER TRENCHES SERVING ALL LIGHT POLES.
Underground Electrical Inspection - Commercial Request Complete 6/22/2005 6/23/2005 06/23/2005
Rough Framing Inspection - Commercial Partial 06/29/2005
Correction
Partial Correction
06/29/2005
TEXT APPROVED ALL WALLS NORTH OF COLUMN LINE 'C' FOR COVER. APPROVED ALL WALLS SOUTH OF COLUMN LINE 'C' & NORTH OF "FUTURE" AREA FOR COVER.
Erosion Control Inspection Residential Failed 06/29/2005
Correction
Corrective Action Required
06/29/2005
Erosion Control PROTECT STORM INLETS WITH 3" ROCK MAINTAIN SILT FENCE SOUTH OF PROPERTY. ADDITIONAL INTERMEDIATE SILT FENCE REQUIRED BETWEEN EXISTING SILT FENCE SERVICE ROAD.
Gas Piping Inspection - Commercial Failed 07/07/2005
Correction
Corrective Action Required
07/07/2005
PIPING IN CONCEALED SPACES MUST BE WELDED.
Gas Service Inspection - Commercial Failed 07/07/2005
Correction
Corrective Action Required
07/07/2005
Gas Test Pressure (IRC) PLANS CALL FOR 1 HOUR, 100 PSI TEST. NOTE: GAUGES CANNOT HAVE RANGE OF MORE THAN 5 TIMES TEST PRESSURE. ALSO - COMPLETE MECHANICAL ROOM NG PIPING PRIOR TO PRESSURE TEST. (PIPE WILL NOT BE REQUIRED TO BE CONNECTED TO EQUIPMENT FOR PRESSURE TEST)
Miscellaneous Inspection Failed 07/07/2005
Correction
Corrective Action Required
07/07/2005
Premises Identification (IRC) PROPERTY MUST BE IDENTIFIABLE FROM STREET.
Erosion Control Inspection Residential Failed 07/07/2005
Correction
Resolved
07/07/2005
Tracking Mud, Debris
Correction
Corrective Action Required
07/07/2005
Erosion Control 2ND NOTICE - NO FURTHER INSPECTIONS UNTIL COMPLIANT. PROTECT STORM INLETS WITH 3" ROCK MAINTAIN SILT FENCE SOUTH OF PROPERTY. ADDITIONAL INTERMEDIATE SILT FENCE REQUIRED BETWEEN EXISTING SILT FENCE SERVICE ROAD.
Gas Service Inspection - Commercial Partial 07/12/2005
Correction
Partial Correction
07/12/2005
Gas Test Pressure (IRC) PRESSURE TEST APPROVED FOR PIPING BETWEEN METER SITE AND JUST INSIDE MECH. ROOM. ADDITIONAL TEST TO BE PERFORMED ON MECH. ROOM PIPING. (PIPE WILL NOT BE REQUIRED TO BE CONNECTED TO EQUIPMENT FOR PRESSURE TEST)
Gas Piping Inspection - Commercial Partial 07/12/2005
Correction
Partial Correction
07/12/2005
None NG PIPING APPROVED FROM METER SITE TO JUST INSIDE MECH. ROOM. ADDITIONAL INSPECTION WILL BE REQUIRED AFTER MECH. ROOM PIPING IS COMPLETED.
Correction
Resolved
07/12/2005
PIPING IN CONCEALED SPACES MUST BE WELDED.
Electrical Service Inspection Failed 07/12/2005
Correction
Corrective Action Required
07/12/2005
Grounding Electrode Installation (IRC) 1- PROVIDE FULL SIZED GROUND TO NEUTRAL JUMPER. 2- DISSIMILAR SIZED WIRES ARE NOT TO SHARE COMMON LUG.
Electrical Service Inspection Passed 07/13/2005
Correction
Resolved
07/13/2005
Grounding Electrode Installation (IRC)
Correction
Resolved
07/13/2005
None SERVICE RELEASED FOR 600A SERVICE ONLY. 400A PANEL FOR FUTURE LOAD WILL REQUIRE ADDITIONAL PERMIT.
Underground Electrical Inspection - Commercial Partial 07/27/2005
Correction
Corrective Action Required
07/27/2005
POLE BASES - NOT READY
Underground Electrical Inspection - Commercial Passed 07/28/2005
Correction
Resolved
07/28/2005
TEXT APPROVED PRIMARY & SECONDARY CONDUITS SERVING XFORMER. INSTALLED PER AQUILLA'S SHOP DRAWINGS. PROVIDE AMENDED ENGINEER'S DRAWINGS DEPICTING ACTUAL INSTALLATION.
Correction
Resolved
07/28/2005
LIGHT POLE BASES APPROVED
Correction
Resolved
07/28/2005
POLE BASES - NOT READY
Correction
Resolved
07/28/2005
None APPROVED TO COVER TRENCHES SERVING ALL LIGHT POLES.
Underground Electrical Inspection - Commercial Request Complete 7/27/2005 7/28/2005 07/28/2005
Sidewalk Inspection Passed 08/08/2005
Gas Piping Inspection - Commercial Passed 08/29/2005
Correction
Resolved
08/29/2005
None
Gas Service Inspection - Commercial Passed 08/29/2005
Correction
Resolved
08/29/2005
Gas Test Pressure (IRC)
Above Ceiling Inspection Partial 09/07/2005
Correction
Resolved
09/07/2005
ATTIC ACCESS ABOVE GYP LID
Correction
Resolved
09/07/2005
DRAFT STOPS ABOVE GYP LID
Correction
Resolved
09/07/2005
ROOF VENTILATION. ABOVE GYP LID
Correction
Partial Correction
09/07/2005
PLENUM RATING OF CABLES (2) TYPES OF CABLES UNABLE TO VERIFY PLENUM RATING: GRAY SPEAKER WIRE & RED FIRE CABLE. PROVIDE VERIFICATION OF PLENUM RATINGS.
Correction
Resolved
09/07/2005
None APPROVED TO INSTALL ALL CEILING TILES. APPROVAL CONTINGENT UPON COMPLETING ALL TASKS LISTED. COVER CEILING AT YOUR OWN RISK.
Correction
Resolved
09/07/2005
INSULATION SOME DUCTS AND WATER PIPES LACK INSULATION. ENGINEER HAS COVERED ON PUNCH LIST TO COMPLETE. APPROVAL CONTINGENT UPON COMPLETION OF INSULATION
Occupancy Inspection - Codes Commercial Failed 09/22/2005
Correction
Corrective Action Required
09/22/2005
Receive Planning & Development Approval APPROVAL TO GRANT TCO PER TOM SCANNELL IN LETTER DATED 9/21/05. SOME ISSUES YET UNRESOLVED UNDER SEPARATE COVER
Correction
Corrective Action Required
09/22/2005
Receive Public Works Approval UNDER SEPARATE COVER
Correction
Resolved
09/22/2005
Receive Water Utilities Approval NO ISSUES PRESENTED
Correction
Corrective Action Required
09/22/2005
ELECTRICAL LABELING 1- LABEL ALL PANELS, DISCONNECT SWITCHES & EQUIPMENT SERVED 2- PANEL CIRCUIT BREAKER LABELS TO BE IN INK.
Correction
Corrective Action Required
09/22/2005
OVERCURRENT PROTECTION BREAKER SERVING CU-2 IS OVERSIZED. SHALL BE BETWEEN 40 & 50A
Correction
Corrective Action Required
09/22/2005
TEXT DO NOT OCCUPY APPROVED TO STORE FURNITURE AND EQUIPMENT
Correction
Resolved
09/22/2005
Receive Fire Department approval APPROVED PER JIM EDEN
Correction
Corrective Action Required
09/22/2005
FROM ABOVE-CEILING PROVIDE VERIFICATION OF PLENUM RATING ON CABLES: GRAY SPEAKER WIRE & RED FIRE CABLE
Correction
Corrective Action Required
09/22/2005
Grading (IRC) TRIM PVC FLUSH WITH GRADE ON NW LOT
Correction
Corrective Action Required
09/22/2005
EXTERIOR GFCI'S NON-FUNCTIONAL
Correction
Corrective Action Required
09/22/2005
INTERIOR LIGHTING SYSTEMS NOT FUNCTIONAL
Correction
Corrective Action Required
09/22/2005
COMPLETE PIPE INSULATION MECH. ROOM & WAREHOUSE AREAS
Correction
Corrective Action Required
09/22/2005
PROVIDE POWER TO WAREHOUSE OVERHEAD HEATERS
Above Ceiling Inspection Passed 09/22/2005
Correction
Resolved
09/22/2005
PLENUM RATING OF CABLES (2) TYPES OF CABLES UNABLE TO VERIFY PLENUM RATING: GRAY SPEAKER WIRE & RED FIRE CABLE. PROVIDE VERIFICATION OF PLENUM RATINGS. ITEM MOVED TO OCCUPANCY INSPECTION
Rough Framing Inspection - Commercial Passed 09/22/2005
Correction
Resolved
09/22/2005
TEXT APPROVED ALL WALLS NORTH OF COLUMN LINE 'C' FOR COVER. APPROVED ALL WALLS SOUTH OF COLUMN LINE 'C' & NORTH OF "FUTURE" AREA FOR COVER.
Erosion Control Inspection Residential Passed 09/22/2005
Correction
Resolved
09/22/2005
Erosion Control
Correction
Resolved
09/22/2005
Tracking Mud, Debris
Occupancy Inspection - Codes Commercial Failed 10/12/2005
Correction
Corrective Action Required
10/12/2005
FROM ABOVE-CEILING PROVIDE VERIFICATION OF PLENUM RATING ON CABLES: GRAY SPEAKER WIRE & RED FIRE CABLE
Correction
Resolved
10/12/2005
Grading (IRC)
Correction
Resolved
10/12/2005
EXTERIOR GFCI'S NON-FUNCTIONAL
Correction
Resolved
10/12/2005
INTERIOR LIGHTING SYSTEMS NOT FUNCTIONAL
Correction
Resolved
10/12/2005
COMPLETE PIPE INSULATION
Correction
Resolved
10/12/2005
PROVIDE POWER TO WAREHOUSE OVERHEAD HEATERS
Correction
Resolved
10/12/2005
ELECTRICAL LABELING
Correction
Resolved
10/12/2005
OVERCURRENT PROTECTION
Correction
Corrective Action Required
10/12/2005
TEXT DO NOT OCCUPY APPROVED TO STORE FURNITURE AND EQUIPMENT NO TCO SHALL BE GRANTED PRIOR TO PAYMENT OF LICENSE/EXCISE TAX.
Occupancy Inspection - Codes Commercial Failed 10/14/2005
Correction
Resolved
10/14/2005
Receive Planning & Development Approval UNDER SEPARATE COVER
Correction
Resolved
10/14/2005
FROM ABOVE-CEILING
Miscellaneous Inspection Passed 10/28/2005
Correction
Resolved
10/28/2005
Premises Identification (IRC)
Occupancy Inspection - Codes Commercial Passed 10/28/2005
Correction
Resolved
10/28/2005
Receive Public Works Approval
Correction
Resolved
10/28/2005
TEXT
Final Inspection - Commercial Passed 10/28/2005
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home