Permit Application Status

B0402132


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0402132
Building Permit - Commercial
Certificate of Occupancy
CCK LLC
PARTIAL COMMERCIAL
CHANGE OF TENANT
11/09/2004
11/09/2004
05/08/2005
03/14/2005
Locations
Contacts
CK ENTERPRISES, Address:1204 SW JEFFERSON ST  
CCK LLC, Address:1204 SW JEFFERSON ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 05/08/2005 10/29/2010
Correction

CA - This is an "at risk permit". Construction shall be in accordance with plans submitted for permit approval. The applicant understands that issuance of this permit does not guaranty issuance of a full permit.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $38.00 $38.00 Paid 11/09/2004
24 BLDG Plan Check Fees $5.00 $5.00 Paid 11/09/2004
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Framing Inspection - Commercial Passed 11/22/2004
Correction
Resolved
11/22/2004
None INSTALLED PER APPROVED PLANS OK TO SHEETROCK
Rough Framing Inspection - Commercial Request Complete 11/18/2004 11/22/2004 11/22/2004
Footing Inspection - Commercial Passed 11/30/2004
Correction
Resolved
11/30/2004
None STEEL PLACED AS PLANS REQUIRE
All Rough Inspection - Commercial Partial 11/30/2004
Correction
Partial Correction
11/30/2004
None SCREW PATTERN APPROVED - WAITING ON FIREBLOCKING AROUND UTILITIES FOR FIRE RATING
All Rough Inspection - Commercial Partial 12/03/2004
Correction
Partial Correction
12/03/2004
None SCREW PATTERN APPROVED - FIREBLOCKING AROUND UTILITIES APPROVED - WAITING FOR FIRE RATED DOORS FOR FULL ASSEMBLY CHECK AT FINAL OK TO COVER CEILING AREA IN OFFICE AREA
Foundation Inspection - Commercial Passed 12/07/2004
Correction
Resolved
12/07/2004
None WALL AROUND HOLDING TANKS INSTALLED PER PLAN
All Rough Inspection - Commercial Passed 03/14/2005
Correction
Resolved
03/14/2005
None SCREW PATTERN APPROVED - FIREBLOCKING AROUND UTILITIES APPROVED - WAITING FOR FIRE RATED DOORS FOR FULL ASSEMBLY CHECK AT FINAL OK TO COVER CEILING AREA IN OFFICE AREA
Final Building Inspection - Commercial Passed 03/14/2005
Correction
Resolved
03/14/2005
None FIRE DOORS APPROVED AT TIME OF OCCUPANCY INSPECTION
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home