Summary
B0401371
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
NEW SHELL BUILDING
BUILDING A FULL BUILDING SHELL
07/21/2004
10/19/2004
04/17/2005
12/12/2005
Locations
Contacts
JE DUNN CONSTRUCTION, Address:929 HOLMES  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 01/17/2005 10/29/2010
Correction

Codes Administration - 2003 IBC 1008.1.8.1 - Hardware. Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 shall not require tight grasping, tight pinching or twisting of the wrist to operate.
Correction

Codes Administration - 2003 IBC 1020.4 - Openings and penetrations. Exit passageway opening protectives shall be in accordance with the requirements of Section 715. Except as permitted in Section 402.4.6, openings in exit passageways other than unexposed exterior openings shall be limited to those necessary for exit access to the exit passageway from normally occupied spaces and for egress from the exit passageway. Where interior exit enclosures are extended to the exterior of a building by an exit passageway, the door assembly from the exit enclosure to the exit passageway shall be protected by a fire door conforming to the requirements in Section 715.3. Fire door assemblies in exit passageways shall comply with Section 715.3.4.
Correction

Codes Administration - 2003 IBC 1704.1.1 - Building permit requirements. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with Section 106.1 as a condition for permit issuance. This statement shall include a complete list of materials and work requiring special inspections by this section, the inspections to be performed and a list of the individuals, approved agencies or firms intended to be retained for conducting such inspections.
Correction

Codes Administration - 2003 IBC 1704.1.2 - Report Requirement. Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and to the registered design professional in responsible charge prior to the completion of that phase of the work. A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted at a point in time agreed upon by the permit applicant and the building official prior to the start of work.
Correction

Codes Administration - 2003 IBC 2406.1 - Human impact loads. Individual glazed areas, including glass mirrors, in hazardous locations as defined in Section 2406.3 shall comply with Sections 2406.1 through 2406.1.5.
Correction

Codes Administration - 2003 IBC 302.1.1.1 - Separation. Where Table 302.1.1 requires a fire-resistance-rated separation, the incidental use area shall be separated fron the remainder of the building with a fire barrier. Where Table 302.1.1 permits an automatic fire-extinguishing system without a fire barrier, the incidential use area shall be separated by construction capable of resisting the passage of smoke. The partitions shall extend fron the floor to the underside of the fire-resistance-rated floor/ceiling assembly or fire-resistance-rated roof/ceiling assembly or to the underside of the floor or roof deck above. Doors shall be self-closing or automatic-closing upon detection of smoke. Doors shall not have air transfer openings and shall not be undercut in excess of the clearance permitted in accordance with NFPA 80.
Correction

Codes Administration - 2003 IBC 602.1 - General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. The building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire-resistance rating not less than that specified in Table 602.
Correction

Codes Administration - 2003 IBC 706.10 - Ducts and air transfer openings. Penetrations by ducts and air transfer openings shall comply with Sections 712 and 716.
Correction

Codes Administration - The electrical systems shall be reviewed by a 3rd party. Comments from the 3rd party shall be submittted to the Codes Administration Department for review.
Correction

CA - All plans shall be designed to the requirements of the 2003 International Building Code, 2003 International Mechanical Code, 2003 International Plumbing Code, 2003 International Fuel Gas Code, 2003 International Fire Code, 2002 National Electric Code and the ANSI A117.1-1998 as amended and adopted by the City of Lee's Summit.
Correction

Codes Administration - The information in the location column of the Door Schedule is flipped for doors 113 A & B and doors 114A & B.
Correction

Codes Administration - The door schedule indicates that doors A046 and A048A are rated for 90 minutes.
Correction

Codes Administration - The Staff Corridor doors are shown to be 20 minute doors but the Code Plan shows them to be located in a two-hour fire barrier.
Correction

Codes Administration - A finish schedule has not been provided for the basement.
Correction

CA - The cost of the project has not been provided.
Correction

Fire Department- Plans reviewed for shell only.
Correction

Fire Department- A medical gas piping shall be installed in accordance with NFPA 99. All testing shall be documented and given to the fire department.
Correction

Fire Department- Where required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Exit sign placement shall be such that no point in an exit access corridor is more than 100 feet (30 480 mm) from the nearest visible exit sign.
Correction

St. Lukes - The City shall not issue any temporary or final Certificate of Occupancy for any structure in the Developerment until a Certificate of Substantial Completion for the Road Improvements has been issued by MoDOT.
Correction

St. Lukes - A Proprtionate Share of the Total Road Contribution shall be made to the City at or before the time a certificate of occupancy is issued by the City for a building constructed by, or by a building contractor on behalf of, the Developer on the Property, excluding the medical office buildings.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Tenant finish plans shall be submitted to the Codes Administration Department prior to any interior alteration or improvments. Permits shall be obtained prior to any performing any work which requires permits.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - Each layer of fire-resistive assemblies shall be inspected and approved prior to the application of additional layers or finishes. All firestopping of penetrations and required dampers shall be inspected and approved prior to concealing.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - Placement of required exit signage and emergency lighting is subject to onsite inspection.
Correction

CA - 2000 IBC 1704.1.2 - Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and the registered design professional in responsible charge prior to the completion of that phase of the work. A final report of inspections documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted periodically at a frequency agreed upon by the permit applicant and the building official prior to the start of work.
Correction

Fire Department; A 1-hour exterior room shall be a room or enclosure separated from the remainder of the building by not less than 1-hour-rated fire-resistance rated construction. Openings between the room or enclosure and interior spaces shall be self-closing smoke and draft-control assemblies having a fire protection rating of not less than 1 hour. Rooms shall have at least one exterior wall which is provided with at least two vents. Each vent shall not be less than 36 square inches (0.023 m 2 ) in area. One vent shall be within 6 inches (152 mm) of the floor and one shall be within 6 inches (152 mm) of the ceiling. Rooms shall be provided with at least one automatic sprinkler to provide container cooling in case of fire. IFC 3006.2.1
Correction

Fire Department; Dumpsters and containers with an individual capacity of 1.5 cubic yards (40.5 cubic feet) or more shall not be stored in buildings or placed within 5 feet of combustible walls, openings or combustible roof eave lines.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department: Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the code official is authorized to require a key box to be installed in an accessible location. The key box shall be of an approved type and shall contain keys to gain access as required by the code official.
Correction

Fire Department; The required fire-resistance rating of fire-resistance-rated construction (including walls, fire stops, shaft enclosures, partitions and floors) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings, and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance rated assemblies shall be protected by self-closing or automatic- closing doors of approved construction meeting the fire protection requirements for the assembly.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-7343.
Correction

905.1 General. Standpipe systems shall be provided in new buildings and structures in accordance with this section and as required by the Code Offical. Fire hose threads used in connection with standpipe systems shall comply with NFPA 1963 or as otherwise approved and shall be compatible with fire department hose threads. The location of fire department hose connections shall be approved. In build-ings used for high-piled combustible storage, fire protection shall be in accordance with Chapter 23.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

Fire Department- 907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. 3. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $42,689.00 $42,689.00 Paid 10/19/2004
24 BLDG Plan Check Fees $731.45 $731.45 Paid 10/19/2004
25 Electrical Permit Fee $1,831.04 $1,831.04 Paid 10/19/2004
25 Mechanical Permit Fees $274.00 $274.00 Paid 10/19/2004
25 Plumbing Permit Fees $153.00 $153.00 Paid 10/19/2004
89 Sewer Tap Fees $360.00 $360.00 Paid 10/19/2004
Road and Bridge Escrow $38,499.70 $38,499.70 Paid 02/01/2005
Road and Bridge Escrow ($38,499.70) ($38,499.70) $0.00 N/A
Road and Bridge Escrow $38,499.71 $38,499.71 Paid 02/01/2005
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Electrical Inspection - Commercial Partial 08/02/2004
Correction
Partial Correction
08/02/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: A; B; C; D; E; F; G; H; I; J; K; L; M; N; O; P; Q; R; 24; 27; 28; 32; 36; 37; 38; 39; 40; 41; 49; 50; 51; 52; 53; 54; 55; 56; 57; 58; 59; 60; 61; (62?) APPROVED: CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Rough Framing Inspection - Commercial Partial 09/01/2004
Correction
Partial Correction
09/01/2004
10" x 10" C.I.P. CONC. COLUMNS @ CONNECTOR TO BLDG B REFERENCED FROM NORTH: FIRST 4 PAIRS = 8; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Correction
Partial Correction
09/01/2004
C.I.P. CONCRETE C OLUMNS - 1ST LEVEL B/1; A/2; LIGHTNING PROTECTION NOT READY: A/1; C/1; D/2; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 09/02/2004
Correction
Partial Correction
09/02/2004
10" x 10" C.I.P. CONC. COLUMNS @ CONNECTOR TO BLDG B REFERENCED FROM NORTH: FIRST 5 PAIRS = 10 + S 2 @ W SIDE; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 09/07/2004
Correction
Partial Correction
09/07/2004
10" x 10" C.I.P. CONC. COLUMNS @ CONNECTOR TO BLDG B REFERENCED FROM NORTH: FIRST 5 PAIRS = 10 + S 2 @ W SIDE; ENSURE RE-BAR COVERAGE
Correction
Partial Correction
09/07/2004
C.I.P. CONCRETE C OLUMNS - 1ST LEVEL A/1; B/1; C/1; D/1; A/2; B/2; C/2; D/2; A/3; B/3; C/3; D/3; LIGHTNING PROTECTION NOT READY: A/4; D/4 ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 09/08/2004
Correction
Partial Correction
09/08/2004
C.I.P. CONCRETE C OLUMNS - 1ST LEVEL A/1; B/1; C/1; D/1; A/2; B/2; C/2; D/2; A/3; B/3; C/3; D/3; A/4; B/4; C/4; D/4; B/5; C/5; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 09/09/2004
Correction
Partial Correction
09/09/2004
C.I.P. CONCRETE C OLUMNS - 1ST LEVEL A/1; B/1; C/1; D/1; A/2; B/2; C/2; D/2; A/3; B/3; C/3; D/3; A/4; B/4; C/4; D/4; B/5; C/5; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Underground Electrical Inspection - Commercial Partial 09/09/2004
Correction
Partial Correction
09/09/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: A; B; C; D; E; F; G; H; I; J; K; L; M; N; O; P; Q; R; 24; 27; 28; 32; 36; 37; 38; 39; 40; 41; 49; 50; 51; 52; 53; 57; 58; 59; 60; 61; (62?) APPROVED: 54; 55; 56; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Rough Framing Inspection - Commercial Partial 09/14/2004
Correction
Partial Correction
09/14/2004
C.I.P. CONCRETE C OLUMNS - 1ST LEVEL A/1; B/1; C/1; D/1; A/2; B/2; C/2; D/2; A/3; B/3; C/3; D/3; A/4; B/4; C/4; D/4; B/5; C/5; A/5; D/5; A/6; B/6; C/6; D/6; A/7; B/7; C/7; D/7; A.1/8; B/8; C/8; D/8; A.8/9.5;B.8/9.5; C/9; D/9; D/10; A.8/10.5; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Underground Electrical Inspection - Commercial Partial 09/14/2004
Correction
Partial Correction
09/14/2004
SITE LIGHTING UNDERGROUND CONDUIT EAST OF BLDG E; ENSURE COVERAGE PER CODE OK TO COVER WHEN READY
Rough Framing Inspection - Commercial Partial 09/15/2004
Correction
Partial Correction
09/15/2004
C.I.P. CONCRETE C OLUMNS - 1ST LEVEL A/1; B/1; C/1; D/1; A/2; B/2; C/2; D/2; A/3; B/3; C/3; D/3; A/4; B/4; C/4; D/4; B/5; C/5; A/5; D/5; A/6; B/6; C/6; D/6; A/7; B/7; C/7; D/7; A.1/8; B/8; C/8; D/8; A.8/9.5;B.8/9.5; C/9; D/9; D/10; A.8/10.5; B.8/10.5; C'/10.5; A.1'/12; B'/12; C'/12; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Underground Electrical Inspection - Commercial Partial 09/15/2004
Correction
Partial Correction
09/15/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: A; B; C; D; E; F; G; H; I; J; K; L; M; N; O; P; Q; R; 24; 27; 28; 32; 36; 37; 38; 39; 40; 41; 49; 50; 51; 52; 53; 58; 59; 60; 61; (62?) APPROVED: 54; 55; 56; 57; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Rough Framing Inspection - Commercial Partial 09/16/2004
Correction
Partial Correction
09/16/2004
C.I.P. CONCRETE C OLUMNS - 1ST LEVEL B/2;C/2;D/2;A/3;B/3;C/3;D/3;A/4;B/4;C/4;D/4;B/5;C/5;A/5;D/5;A/6;B/6;C/6;D/6;A/7;B/7;C/7;D/7;A.1/8;B/8;C/8;D/8;A.8/9.5;B.8/9.5;C/9;D/9;D/10; A.8/10.5;B.8/10.5;C'/10.5;A.1'/12;B'/12;C'/12; A'/12.9; B'/12.9; C'/12.9; D'/12.9; D'/12; OK TO POUR WHEN READY A/1; B/1; C/1; D/1; A/2;
Rough Framing Inspection - Commercial Partial 09/16/2004
Correction
Partial Correction
09/16/2004
C.I.P. CONCRETE C OLUMNS - 1ST LEVEL B/2;C/2;D/2;A/3;B/3;C/3;D/3;A/4;B/4;C/4;D/4;B/5;C/5;A/5;D/5;A/6;B/6;C/6;D/6;A/7;B/7;C/7;D/7;A.1/8;B/8;C/8;D/8;A.8/9.5;B.8/9.5;C/9;D/9;D/10; A.8/10.5;B.8/10.5;C'/10.5;A.1'/12;B'/12;C'/12; A'/12.9; B'/12.9; C'/12.9; D'/12.9; D'/12; D'/11; D/7; OK TO POUR WHEN READY A/1; B/1; C/1; D/1; A/2;
Underground Electrical Inspection - Commercial Partial 09/16/2004
Correction
Partial Correction
09/16/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: A; B; C; D; E; G; I; J; K; L; M; N; O; P; Q; R; 24; 27; 28; 32; 36; 37; 38; 39; 40; 41; 49; 50; 51; 52; 53; 58; 59; 60; 61; (62?) APPROVED: 54; 55; 56; 57; F; H; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Rough Framing Inspection - Commercial Partial 09/17/2004
Correction
Resolved
09/17/2004
C.I.P. CONCRETE C OLUMNS - 1ST LEVEL A/3;B/3;C/3;D/3;A/4;B/4;C/4;D/4;B/5;C/5;A/5;D/5;A/6;B/6;C/6;D/6;A/7;B/7;C/7;D/7;A.1/8;B/8;C/8;D/8;A.8/9.5;B.8/9.5;C/9;D/9;D/10;A.8/10.5;B.8/10.5;C'/10.5;A.1'/12;B'/12;C'/12;A'/12.9;B'/12.9;C'/12.9;D'/12.9;D'/12;D'/11;D/7; A'/13.1;B'/13.1;C'/13.1;D'/13.1 OK TO POUR WHEN READY A/1 - D/1; A/2- D/2;
Rough Framing Inspection - Commercial Partial 09/20/2004
Correction
Resolved
09/20/2004
10" x 10" C.I.P. CONC. COLUMNS @ CONNECTOR TO BLDG B FIRST 5 PAIRS = 10 + S 2 @ W SIDE; FINAL 3 COLUMNS ENSURE RE-BAR COVERAGE REFERENCED FROM NORTH
Correction
Partial Correction
09/20/2004
C.I.P. CONCRETE C OLUMNS - 1ST LEVEL A/3;B/3;C/3;D/3;A/4;B/4;C/4;D/4;B/5;C/5;A/5;D/5;A/6;B/6;C/6;D/6;A/7;B/7;C/7;D/7;A.1/8;B/8;C/8;D/8;A.8/9.5;B.8/9.5;C/9;D/9;D/10;A.8/10.5;B.8/10.5;C'/10.5;A.1'/12;B'/12;C'/12;A'/12.9;B'/12.9;C'/12.9;D'/12.9;D'/12;D'/11;D/7; A'/13.1;B'/13.1;C'/13.1;D'/13.1 OK TO POUR WHEN READY A/1 - D/1; A/2- D/2;
Underground Electrical Inspection - Commercial Partial 09/23/2004
Correction
Partial Correction
09/23/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: A; B; C; D; E; G; I; J; K; L; M; N; O; P; Q; R; 24; 27; 28; 32; 36; 37; 38; 39; 40; 41; 49; 50; 51; 52; 53; 58; 59; 60; 61; (62?) APPROVED: 54; 55; 56; 57; F; H; A; B; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Correction
Partial Correction
09/23/2004
SITE LIGHTING UNDERGROUND CONDUIT EAST OF BLDG E; FRM A TO B TO D; ENSURE COVERAGE PER CODE OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 09/24/2004
Correction
Partial Correction
09/24/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: E; G; I; J; K; L; M; N; O; P; Q; R; 24; 27; 28; 32; 36; 37; 38; 39; 40; 41; 49; 50; 51; 52; 53; 58; 59; 60; 61; (62?) APPROVED: 54; 55; 56; 57; F; H; A; B; C; D; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Correction
Partial Correction
09/24/2004
SITE LIGHTING UNDERGROUND CONDUIT EAST OF BLDG E; FRM A TO B TO D TO C; ENSURE COVERAGE PER CODE OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 09/28/2004
Correction
Partial Correction
09/28/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: E; G; I; J; K; L; M; N; O; P; Q; R; 24; 27; 32; 36; 37; 38; 39; 40; 41; 49; 50; 51; 52; 53; 58; 59; 60; 61; APPROVED: 54; 55; 56; 57; F; H; A; B; C; D; 26; 28; 62; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Underground Electrical Inspection - Commercial Partial 09/29/2004
Correction
Partial Correction
09/29/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: G; I; J; K; L; M; N; O; P; Q; R; 24; 27; 32; 38; 39; 40; 41; 49; 50; 51; 52; 53; 58; 59; 60 APPROVED: 54; 55; 56; 57; F; H; A; B; C; D; 26; 28; 62; 61; 36; 37; E; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Correction
Partial Correction
09/29/2004
SITE LIGHTING UNDERGROUND CONDUIT EAST OF BLDG E; FRM A TO B TO D TO C; 36 TO 37; ENSURE COVERAGE PER CODE OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 10/05/2004
Correction
Partial Correction
10/05/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: G; I; J; L; M; N; O; P; Q; R; 24; 27; 32; 38; 39; 40; 41; 49; 50; 51; 52; 53; 58; 59; 60 APPROVED: 54; 55; 56; 57; F; H; A; B; C; D; 26; 28; 62; 61; 36; 37; E; K; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Correction
Partial Correction
10/05/2004
SITE LIGHTING UNDERGROUND CONDUIT EAST OF BLDG E; FRM A TO B TO D TO C; 36 TO 37; TO LP BASES #K, #O, #J, #L, #P, #M, ENSURE COVERAGE PER CODE OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 10/06/2004
Correction
Partial Correction
10/06/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: G; I; J; L; M; N; O; P; Q; R; 24; 27; 32; 38; 39; 40; 41; 49; 50; 51; 52; 53; 58; 59; 60 APPROVED: 54; 55; 56; 57; F; H; A; B; C; D; 26; 28; 62; 61; 36; 37; E; K; L; M EXCEPT GROUND; J; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
All Rough Inspection - Commercial Partial 10/15/2004
Correction
Partial Correction
10/15/2004
WALL FRAMING + IN-WALL SYSTEMS ROUGH 029; 030; 031; 032 AFTER COPPER PIPE ISOLATED; 033; 034; 040; OK TO COVER WHEN READY SPACES LISTED BELOW:
Underground Electrical Inspection - Commercial Partial 10/15/2004
Correction
Partial Correction
10/15/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: G; R; 24; 27; 32; 38; 39; 40; 41; 49; 50; 51; 52; 53; 58; 59; 60 APPROVED: 54; 55; 56; 57; F; H; A; B; C; D; 26; 28; 62; 61; 36; 37; E; K; L; M; Q; I; J; K; N; O; P; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Correction
Partial Correction
10/15/2004
SITE LIGHTING UNDERGROUND CONDUIT EAST OF BLDG E; FRM A TO B TO D TO C; 36 TO 37; TO LP BASES #K, #O, #J, #L, #P, #M; ALONG N SIDE OF BLDG "E" TO LP E; ENSURE COVERAGE PER CODE OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 10/19/2004
Correction
Partial Correction
10/19/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: G; R; 24; 27; 32; 38; 41; 49; 50; 51; 52; 53; 58; 59; 60 APPROVED: 54; 55; 56; 57; F; H; A; B; C; D; 26; 28; 62; 61; 36; 37; E; K; L; M; Q; I; J; K; N; O; P; 40; 39; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Correction
Partial Correction
10/19/2004
SITE LIGHTING UNDERGROUND CONDUIT EAST OF BLDG E; FRM A TO B TO D TO C; 36 TO 37; TO LP BASES #K, #O, #J, #L, #P, #M; ALONG N SIDE OF BLDG "E" TO LP E; #40 TO 39 TO 38; ENSURE COVERAGE PER CODE OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 10/20/2004
Correction
Partial Correction
10/20/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: G; R; 24; 27; 32; 38; 41; 52; 53; 58; 59; 60 APPROVED: 54; 55; 56; 57; F; H; A; B; C; D; 26; 28; 62; 61; 36; 37; E; K; L; M; Q; I; J; K; N; O; P; 40; 39; 49; 50; 51; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Correction
Partial Correction
10/20/2004
SITE LIGHTING UNDERGROUND CONDUIT EAST OF BLDG E; FRM A TO B TO D TO C; 36 TO 37; TO LP BASES #K, #O, #J, #L, #P, #M; ALONG N SIDE OF BLDG "E" TO LP E; #40 TO 39 TO 38 TO 37; #49 TO 50 TO 51 TO 52; #52 TO 53 TO 56; ENSURE COVERAGE PER CODE OK TO COVER WHEN READY
Underslab Plumbing Inspection - Commercial Partial 10/27/2004
Correction
Partial Correction
10/27/2004
UNDER-FLOOR DWV PIPING WEST OF (13) 8" WASTE FROM OUTSIDE S WALL TO 25' N OF (D'); PRESSURE TEST OK TO COVER: VISUAL INSPECTION OK
Correction
Partial Correction
10/27/2004
UNDER-FLOOR STORM PIPING WEST OF (13) 10" STORM FROM OUTSIDE S WALL TO 25' N OF (D'); PRESSURE TEST OK TO COVER: VISUAL INSPECTION OK
Underslab Plumbing Inspection - Commercial Partial 10/28/2004
Correction
Partial Correction
10/28/2004
UNDER-FLOOR DWV PIPING WEST OF (13) 8" WASTE FROM OUTSIDE S WALL N TO (B') + BRANCHES (14) TO (15) PRESSURE TEST OK TO COVER WHEN READY; VISUAL INSPECTION OK
Correction
Partial Correction
10/28/2004
UNDER-FLOOR STORM PIPING WEST OF (13) 10" STORM FROM OUTSIDE S WALL N TO (B') + BRANCHES (14) TO (15) PRESSURE TEST OK TO COVER VISUAL INSPECTION OK
All Rough Inspection - Commercial Partial 10/29/2004
Correction
Partial Correction
10/29/2004
WALL FRAMING + IN-WALL SYSTEMS ROUGH 029; 030; 031; 032; 033; 034; 040; 029; OK TO COVER WHEN READY SPACES LISTED BELOW:
Underground Electrical Inspection - Commercial Partial 11/03/2004
Correction
Partial Correction
11/03/2004
SITE LIGHTING UNDERGROUND CONDUIT EAST OF BLDG E; FRM A TO B TO D TO C; 36 TO 37; TO LP BASES #K, #O, #J, #L, #P, #M; ALONG N SIDE OF BLDG "E" TO LP E; #40 TO 39 TO 38 TO 37; #49 TO 50 TO 51 TO 52; #52 TO 53 TO 56; FROM #58 WEST TO D:(1); ENSURE COVERAGE PER CODE OK TO COVER WHEN READY
Rough Plumbing Inspection - Commercial Partial 11/04/2004
Correction
Partial Correction
11/04/2004
WASTE & VENT PIPING UNDER & AT MEZZANINE ONE LEAKING BAND TIGHTENED PRESSURE TEST & VISUAL FROM (7) TO (13)
Correction
Partial Correction
11/04/2004
WASTE & VENT PIPING ABOVE IT ROOM A032 VISUAL & PRESSURE TEST 1 LEAKING BAND TIGHTENED
All Rough Inspection - Commercial Partial 11/04/2004
Correction
Partial Correction
11/04/2004
WALL FRAMING + IN-WALL SYSTEMS ROUGH 029; 030; 031; 032; 033; 034; 040; 029; OK TO COVER WHEN READY SPACES LISTED BELOW:
Underground Electrical Inspection - Commercial Partial 11/05/2004
Correction
Partial Correction
11/05/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: G; R; 24; 27; 32; 38; 41; 52; 53 APPROVED: 54; 55; 56; 57; F; H; A; B; C; D; 26; 28; 62; 61; 36; 37; E; K; L; M; Q; I; J; K; N; O; P; 40; 39; 49; 50; 51; 58; 59; 60; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Correction
Partial Correction
11/05/2004
SITE LIGHTING UNDERGROUND CONDUIT EAST OF BLDG E; FRM A TO B TO D TO C; 36 TO 37; TO LP BASES #K, #O, #J, #L, #P, #M; ALONG N SIDE OF BLDG "E" TO LP E; #40 TO 39 TO 38 TO 37; #49 TO 50 TO 51 TO 52; #52 TO 53 TO 56; FROM #58 WEST TO 59 TO 60; ENSURE COVERAGE PER CODE OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 11/09/2004
Correction
Partial Correction
11/09/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: G; R; 24; 27; 32; 38; 41; 52; 53 APPROVED: 54; 55; 56; 57; F; H; A; B; C; D; 26; 28; 62; 61; 36; 37; E; K; L; M; Q; I; J; K; N; O; P; 40; 39; 49; 50; 51; 58; 59; 60; 23; 31; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Underground Electrical Inspection - Commercial Partial 11/10/2004
Correction
Partial Correction
11/10/2004
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: G; R; 24; 27; 32; 38; 41; 52; 53 APPROVED: 54; 55; 56; 57; F; H; A; B; C; D; 26; 28; 62; 61; 36; 37; E; K; L; M; Q; I; J; K; N; O; P; 40; 39; 49; 50; 51; 58; 59; 60; 23; 31; S; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Above Ceiling Inspection Partial 11/10/2004
Correction
Partial Correction
11/10/2004
ABOVE-CEILING SYSTEMS IT RM AO32 EXCEPT CONDUIT PENS @ S WALL; OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 01/20/2005
Correction
Partial Correction
01/20/2005
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: G; R; 24; 27; 32; 38; 52; 53 APPROVED: 54; 55; 56; 57; F; H; A; B; C; D; 26; 28; 62; 61; 36; 37; E; K; L; M; Q; I; J; K; N; O; P; 40; 39; 49; 50; 51; 58; 59; 60; 23; 31; S; 41 CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Correction
Partial Correction
01/20/2005
SITE LIGHTING UNDERGROUND CONDUIT EAST OF BLDG E; FRM A TO B TO D TO C; 36 TO 37; TO LP BASES #K, #O, #J, #L, #P, #M; ALONG N SIDE OF BLDG "E" TO LP E; #40 TO 39 TO 38 TO 37; #49 TO 50 TO 51 TO 52; #52 TO 53 TO 56; FROM #58 WEST TO 59 TO 60; 40 TO 41 ENSURE COVERAGE PER CODE OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 01/26/2005
Correction
Partial Correction
01/26/2005
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING NOT YET APPROVED: G; R; 24; 27; 38; 52; 53 APPROVED: 54; 55; 56; 57; F; H; A; B; C; D; 26; 28; 62; 61; 36; 37; E; K; L; M; Q; I; J; K; N; O; P; 40; 39; 49; 50; 51; 58; 59; 60; 23; 31; S; 41; 32; CONT'D FROM BLDG A SUBSTRUCTURE PERMIT
Electrical Service Inspection Passed 01/31/2005
Correction
Resolved
01/31/2005
AQUILA-DESIGNATED SERVICE "B" TO ENERGY CENTER RELEASE SERVICE
All Rough Inspection - Commercial Failed 04/18/2005
Correction
Corrective Action Required
04/18/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH 029; 030; 031; 032; 033; 034; 040; 029; PENTHOUSE #1 & #2 NOT APPROVED TO COVER > STUDS NOT FULLY SCREWED TO TRACKS SPACES LISTED BELOW:
All Rough Inspection - Commercial Partial 04/21/2005
Correction
Partial Correction
04/21/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH 029; 030; 031; 032; 033; 034; 040; 029; PENTHOUSES #1 & #2; OK TO COVER WHEN READY SPACES LISTED BELOW:
Rough Plumbing Inspection - Commercial Partial 04/25/2005
Correction
Partial Correction
04/25/2005
ROOF DRAIN PIPING @ SECOND FLOOR STACK @ B'.5/17.7; STACK @ B'.5/17.6; STACK @ C.6/9; STACK @ B'.7/15.6 OK EXCEPT LEAKS TO BE CORRECTED AT 6" RISER FOR FUTURE TO ROOF; VISUAL + WATER PRESS TEST SYSTEMS LISTED BELOW:
Water Service Inspection - Commercial Request Complete 4/25/2005 4/25/2005 04/25/2005
Rough Plumbing Inspection - Commercial Partial 04/27/2005
Correction
Resolved
04/27/2005
WASTE & VENT PIPING UNDER & AT MEZZANINE
Correction
Resolved
04/27/2005
WASTE & VENT PIPING ABOVE IT ROOM A032
Correction
Partial Correction
04/27/2005
ROOF DRAIN PIPING @ SECOND FLOOR STACK @ B'.5/17.7; STACK @ B'.5/17.6; STACK @ C.6/9; STACK @ B'.7/15.6; ALL REMAINING SYSTEMS THIS LEVEL VISUAL + WATER PRESS TEST SYSTEMS LISTED BELOW:
Sewer Service Inspection - Commercial Request Complete 4/26/2005 4/27/2005 04/27/2005
Rough Plumbing Inspection - Commercial Partial 04/28/2005
Correction
Partial Correction
04/28/2005
WASTE & VENT PIPING @ 2ND FLOOR A.4/1.05; A.4/2.05; A.4/3.05; C.6/5.05; C.6/6.05; VISUAL + H2O PRESS TEST SYSTEMS WITH MAIN VTR AT:
Rough Plumbing Inspection - Commercial Partial 04/29/2005
Correction
Partial Correction
04/29/2005
None PENETRATIONS THROUGH SECOND FLOOR CEILING THAT WERE INSPAECTED AND APPROVED = STACK @ A.5/4; STACK @ A.5/5; STACK @ C.7/7.1; SINK @ B.9/5.9; SINK @ B.1/6.9; SINK @ B.1/5.9 BLDG "A" SOUTH SIDE WASTE AND VENT 2ND FLOOR
Rough Plumbing Inspection - Commercial Partial 05/02/2005
Correction
Partial Correction
05/02/2005
None AREAS APPROVED - (A.5)/7.1, (A.5)/7.4, (AA.8)/12.5, (C.8)/8.1 W & V THIRD FLOOR BLDG "A"
Rough Plumbing Inspection - Commercial Partial 05/03/2005
Correction
Partial Correction
05/03/2005
None STORM SEWER APPROVED AT FIRST FLOOR LOCATIONS - B.5/17.7, B.5/17.8, B.7/15.5, B.8/15.2, B.3/14.5, B.5/13.5 STORM SEWER - 1ST FLOOR NORTH AREA BLDG "A"
Correction
Partial Correction
05/03/2005
None STACKS APROVED AT LOCATIONS - C.7/8.9, C.5/10.1 2ND FLOOR -WASTE & VENT MIDDLE OF BLDG "A"
Rated Assembly Inspection Partial 05/26/2005
Correction
Partial Correction
05/26/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 2ND FLOOR ALONG (A) & (D) FROM (1) TO (6.5); PER E&K 12/7/04 SUBMITTAL OK TO COVER WHEN READY
Rough Plumbing Inspection - Commercial Partial 05/27/2005
Correction
Partial Correction
05/27/2005
WASTE & VENT 1ST FLOOR WASTE & VENT LINES APPROVED FROM COLUMN LINE 15-19. THREE WATER PRESSURE TESTS FOR ALL LINES WITHIN THIS AREA. ALL APPROVED. COLUMN LINE 19-15
Above Ceiling Inspection Partial 05/27/2005
Correction
Partial Correction
05/27/2005
RM A038 INSPECTED WEST OF COLUMN LINE ONLY. -REMOVE TEMP LIGHTING -SEAL THROUGH PENETRATION IN FIRE RATED WALLS @ 5 INCH SPRINKLER LINE. -SEAL JUNCTION BOX AT NW CORNER OF ROOM WEST OF COLUMN LINE ONLY
Above Ceiling Inspection Partial 06/01/2005
Correction
Resolved
06/01/2005
ABOVE-CEILING SYSTEMS
Correction
Partial Correction
06/01/2005
RM A038 -SEAL THROUGH PENETRATION IN FIRE RATED WALLS @ 5 INCH SPRINKLER LINE. -SEAL JUNCTION BOX AT NW CORNER OF ROOM -CHECK EAST WALL FOR FIRE-BLOCKING OF PENETRATIONS
Above Ceiling Inspection Passed 06/06/2005
Correction
Resolved
06/06/2005
RM A038 COMPLETE FIRE-BLOCKING AT EAST WALL
Rated Assembly Inspection Partial 06/14/2005
Correction
Partial Correction
06/14/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 2ND FLOOR (INCLUDING FRAMING) ALONG (A) & (D) FROM (1) TO (6.5); ALONG (D) FROM (6.5) TO (12.5); ALONG (D) FROM (12.5) TO (14.5); PER E&K 12/7/04 SUBMITTAL OK TO COVER WHEN READY
Miscellaneous Inspection Failed 06/16/2005
Correction
Resolved
06/16/2005
WASTE LINES WASTE PENETRATIONS APPROVED AT THE FOLLOWING LOCATIONS - C.9@1.1, C.9@1.6, C.9@2.1, C.9@2.8, C.9@3.1, B.7@2.5, B.6@2.4 BLDG A SOUTH SIDE
Correction
Resolved
06/16/2005
IN-WALL 2A059, 060, 061, 092, 093, 030 - APPROVED TO COVER BLDG A C.5@7.5
Correction
Resolved
06/16/2005
EXTERIOR FIRE SEPERATION D:14.5 - D:16.5 = FIRE RATED TAPE AND CHUALKING APROVED BLDG A WEST WALL
Correction
Partial Correction
06/16/2005
ROUGH FRAMING SOUTH SIDE WALL OF ELEVATOR SHAFT OK FOR 1ST LAYER OF ROCK BLDG A ELEVATOR AREA - NORTH END
Rated Assembly Inspection Partial 06/20/2005
Correction
Partial Correction
06/20/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 2ND FLOOR (INCLUDING FRAMING) ALONG (A) & (D) FROM (1) TO (6.5); ALONG (D) FROM (6.5) TO (12.5); ALONG (D) FROM (12.5) TO (14.5); ALONG (D) FROM (17) TO (18); PER E&K 12/7/04 SUBMITTAL OK TO COVER WHEN READY
Rated Assembly Inspection Partial 06/21/2005
Correction
Partial Correction
06/21/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 2ND FLOOR (INCLUDING FRAMING) ALONG (A) & (D) FROM (1) TO (6.5); ALONG (A) FROM (13.5) TO (14.5); ALONG (D) FROM (6.5) TO (18); PER E&K 12/7/04 SUBMITTAL OK TO COVER WHEN READY
Rated Assembly Inspection Partial 06/22/2005
Correction
Partial Correction
06/22/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 2ND FLOOR (INCLUDING FRAMING) ALONG (A) & (D) FROM (1) TO (6.5); ALONG (A) FROM (13.5) TO (15) + (16) TO (16.5); ALONG (D) FROM (6.5) TO (18); PER E&K 12/7/04 SUBMITTAL OK TO COVER WHEN READY
Rated Assembly Inspection Partial 06/28/2005
Correction
Partial Correction
06/28/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 2ND FLOOR (INCLUDING FRAMING) ALONG (A) & (D) FROM (1) TO (6.5); ALONG (A) FROM (13.5) TO (15) + (16) TO (16.5); ALONG (D) FROM (6.5) TO (18); ALONG (A) FROM (7) TO (8), FROM (12) TO (16.5), FROM (17.5) TO (19); ALONG (D) FROM (14) TO (18); PER E&K 12/7/04 SUBMITTAL OK TO COVER WHEN READY
All Rough Inspection - Commercial Partial 06/30/2005
Correction
Partial Correction
06/30/2005
SPANDREL GLASS INSULATION @ EXTERIOR WALLS ON (D) FROM (1) TO (12.5); OK TO COVER WHEN READY WALL LENGTHS LISTED BELOW
Rated Assembly Inspection Partial 07/01/2005
Correction
Partial Correction
07/01/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 2ND FLOOR (INCLUDING FRAMING) ALONG (A) & (D) FRM (1) TO (6.5); ALONG (A) FRM (13.5) TO (15) + (16) TO (16.5); ALONG (D) FRM (6.5) TO (18); ALONG (A) FRM (7) TO (8), FRM (12) TO (16.5), FRM (17.5) TO (19); ALONG (D) FRM (14) TO (18); ALONG (D) FROM (18.5) TO (19) PER E&K 12/7/04 SUBMITTAL OK TO COVER WHEN READY
All Rough Inspection - Commercial Partial 07/01/2005
Correction
Partial Correction
07/01/2005
SPANDREL GLASS INSULATION @ EXTERIOR WALLS ON (D) FROM (1) TO (12.5); ON (D) FROM (12.5) TO (18) + (18.5) TO (19); OK TO COVER WHEN READY WALL LENGTHS LISTED BELOW
Underground Electrical Inspection - Commercial Failed 08/09/2005
Correction
Corrective Action Required
08/09/2005
LIGHTNING PROTECTION GROUND RING WEST SIDE: COMPLETE CONNECTIONS TO LEADS FROM BUILDING AND TO GROUND RODS; EAST SIDE: PROVIDE ASSURANCE ANY CONDUCTOR <24" DEEP IS TO BE PROTECTED PROVIDE DESIGN DRAWINGS + SEE NOTES BELOW:
Rated Assembly Inspection Failed 08/09/2005
Correction
Corrective Action Required
08/09/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 2ND FLOOR ALONG (A) & (D) FRM (1) TO (6.5); ALONG (A) FRM (13.5) TO (15) + (16) TO (16.5); ALONG (D) FRM (6.5) TO (18); ALONG (A) FRM (7) TO (8), FRM (12) TO (16.5), FRM (17.5) TO (19); ALONG (D) FRM (14) TO (18); ALONG (D) FROM (18.5) TO (19); AT ROOM 2A054 PER E&K 12/7/04 SUBMITTAL OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 08/10/2005
Correction
Partial Correction
08/10/2005
LIGHTNING PROTECTION GROUND RING WEST SIDE / NORTH END: FROM (D'/14) TO (D'/19) TO LINK CONNECTION TO SURG CTR OK TO COVER WHEN READY EXCEPT FOR FOUR LOCATIONS WHERE CONNECTIONS TO BE COMPLETED; EAST SIDE: FROM NE CORNER COLUMN OF MAIN ENT CANOPY NORTH TO RING @ SURGICENTER OK TO COVER WHEN READY PER APPROVED DRAWING
Rated Assembly Inspection Partial 08/10/2005
Correction
Partial Correction
08/10/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 2ND FLOOR ALONG (A) & (D) FRM (1) TO (6.5); ALONG (A) FRM (13.5) TO (15) + (16) TO (16.5); ALONG (D) FRM (6.5) TO (18); ALONG (A) FRM (7) TO (8), FRM (12) TO (16.5), FRM (17.5) TO (19); ALONG (D) FRM (14) TO (18); ALONG (D) FROM (18.5) TO (19); AT ROOM 2A054 PER E&K 12/7/04 SUBMITTAL OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Request Complete 8/10/2005 8/10/2005 08/10/2005
Underground Electrical Inspection - Commercial Partial 08/11/2005
Correction
Partial Correction
08/11/2005
LIGHTNING PROTECTION GROUND RING WEST SIDE / NORTH END: FROM CONNECTION TO RING AT SURGICENTER TO (D'/19) TO (D'/14) EAST SIDE: FROM RING @ SURGICENTER TO (A'/19) TO (A/1) OK TO COVER WHEN READY PER APP'D DRWG MO-32-04
Underground Electrical Inspection - Commercial Partial 08/16/2005
Correction
Partial Correction
08/16/2005
LIGHTNING PROTECTION GROUND RING WEST SIDE / NORTH END: FROM CONNECTION TO RING AT SURGICENTER TO (D'/19) TO (D'/14) EAST SIDE: FROM RING @ SURGICENTER TO (A'/19) TO (A/1); (A/1) SOUTH TO WITHIN 18" OF EMERG CTR WALL OK TO COVER WHEN READY PER APP'D DRWG MO-32-04
Underground Electrical Inspection - Commercial Partial 08/18/2005
Correction
Resolved
08/18/2005
BURIED PVC CONDUIT OUTSIDE MAIN ENTRANCE TO BE COVERED BY CONCRETE OR ASPHALT
Above Ceiling Inspection Not Ready 08/19/2005
Correction
Corrective Action Required
08/19/2005
ABOVE-CEILING SYSTEMS RM 033: APPARENT PENETRATIONS OF 2HR WALL; MOST CEILING TILE IN PLACE; PROVIDE VISIBILITY OR ACCESS FOR REINSPECTION SPACES LISTED BELOW:
Correction
Resolved
08/19/2005
RM A038
Occupancy Inspection - Codes Commercial Not Ready 08/19/2005
Correction
Corrective Action Required
08/19/2005
OCCUPANCY APPROVAL STATUS RM 032 LOCKED; NO KNOWN OCCUPANCY AUTHORIZATION SPACES LISTED BELOW:
Above Ceiling Inspection Partial 08/23/2005
Correction
Partial Correction
08/23/2005
ABOVE-CEILING SYSTEMS RM 033; NOT APPROVED: CORR 034 - ENSURE WALLS TIGHT TO DECK AND SEALED AT PENETRATIONS OK TO COVER WHEN READY SPACES LISTED BELOW:
Occupancy Inspection - Codes Commercial Failed 08/23/2005
Correction
Corrective Action Required
08/23/2005
OCCUPANCY APPROVAL STATUS I.S. RM 032 AFTER TEMPORARY ELECT DISCONNECTS ARE REMOVED AND CORRIDOR A034 IS APPROVED; BIO MED 033 AFTER ELECT FACE PLATES ARE IN PLACE AND CORRIDOR A034 IS APPROVED; OK TO OCCUPY SPACES LISTED BELOW:
Above Ceiling Inspection Partial 08/24/2005
Correction
Partial Correction
08/24/2005
ABOVE-CEILING SYSTEMS OK TO COVER WHEN READY
Occupancy Inspection - Codes Commercial Failed 08/24/2005
Correction
Corrective Action Required
08/24/2005
OCCUPANCY APPROVAL STATUS I.S. RM 032 AFTER CORRIDOR A034 IS APPROVED; BIO MED 033 AFTER CORRIDOR A034 IS APPROVED; OK TO OCCUPY SPACES LISTED BELOW:
Underground Electrical Inspection - Commercial Partial 08/29/2005
Correction
Resolved
08/29/2005
LIGHTNING PROTECTION GROUND RING WEST SIDE / NORTH END: FROM CONNECTION TO RING AT SURGICENTER TO (D'/19) TO (D'/14) EAST SIDE: FROM RING @ SURGICENTER TO (A'/19) TO (A/1); (A/1) SOUTH TO EMERG CTR WALL OK TO COVER WHEN READY PER APP'D DRWG MO-32-04
Rated Assembly Inspection Partial 08/29/2005
Correction
Partial Correction
08/29/2005
RATED CEILING IN CORRIDOR A034 FRAMING + LINER BOARD (FIRE-SEALING YET TO BE COMPLETED); OK TO COVER WHEN READY COMPONENTS LIATED BELOW:
Rated Assembly Inspection Partial 08/30/2005
Correction
Resolved
08/30/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 2ND FLOOR
Correction
Partial Correction
08/30/2005
RATED CEILING IN CORRIDOR A034 FRAMING + LINER BOARD; 1ST LAYER 5/8" GWB FROM WEST END TO ABOVE DOOR #032; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Rated Assembly Inspection Partial 08/31/2005
Correction
Partial Correction
08/31/2005
RATED CEILING IN CORRIDOR A034 FRAMING + LINER BOARD; 1ST LAYER 5/8" GWB FROM WEST END TO ABOVE DOOR #032; 2ND LAYER 5/8" GWB FROM WEST END TO NEAR DOOR #032; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Rated Assembly Inspection Passed 09/05/2005
Correction
Resolved
09/05/2005
RATED CEILING IN CORRIDOR A034 FRAMING + LINER BOARD; 1ST LAYER 5/8" GWB FROM WEST END TO ABOVE DOOR #032; 2ND LAYER 5/8" GWB FROM WEST END TO NEAR DOOR #032; 1ST + 2ND LAYER GWB COMPLETE OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Above Ceiling Inspection Partial 09/12/2005
Correction
Corrective Action Required
09/12/2005
ABOVE-CEILING SYSTEMS NOT APPROVED: CORR 1A034 OK TO COVER WHEN READY
Rated Assembly Inspection Failed 09/12/2005
Correction
Partial Correction
09/12/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 2ND FLOOR NOT APPROVED: (D) FROM (18) TO (18.5)
Above Ceiling Inspection Partial 09/13/2005
Correction
Partial Correction
09/13/2005
ABOVE-CEILING SYSTEMS CORR 1A034; OK TO COVER WHEN READY SPACES LISTED BELOW:
Rated Assembly Inspection Partial 09/13/2005
Correction
Partial Correction
09/13/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 2ND FLOOR (D) FROM (18) TO (18.5); OK TO COVER WHEN READY
Rated Assembly Inspection Partial 09/14/2005
Correction
Partial Correction
09/14/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 1ST FLOOR (D/18) TO (D/18.5) INSULATION + FRAMING ABOVE WINDOW HEADS; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Occupancy Inspection - Codes Commercial Partial 09/14/2005
Correction
Partial Correction
09/14/2005
OCCUPANCY APPROVAL STATUS I.S. RM 032; CORRIDOR A034; BIO MED 033; OK TO OCCUPY SPACES LISTED BELOW:
Above Ceiling Inspection Partial 09/15/2005
Correction
Partial Correction
09/15/2005
ABOVE-CEILING SYSTEMS A021-026; 029; 031; 033; 034; NOT APPROVED: 043; 046; 047 OK TO COVER WHEN READY SPACES LISTED BELOW:
Above Ceiling Inspection Partial 09/16/2005
Correction
Partial Correction
09/16/2005
ABOVE-CEILING SYSTEMS A021-026; 029; 031; 033; 034; 043; 047 NOT APPROVED: 046 OK TO COVER WHEN READY SPACES LISTED BELOW:
Above Ceiling Inspection Partial 09/19/2005
Correction
Partial Correction
09/19/2005
ABOVE-CEILING SYSTEMS A021-026; 029; 031; 033; 034; 043; 046; 047 NOT APPROVED: 045 OK TO COVER WHEN READY SPACES LISTED BELOW:
All Rough Inspection - Commercial Partial 10/24/2005
Correction
Partial Correction
10/24/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH 029; 030; 031; 032; 033; 034; 040; 029; PENTHOUSES #1 & #2; 102 E WALL; 113 W/N WALL; 114 W/N WALL; OK TO COVER WHEN READY SPACES LISTED BELOW:
Rated Assembly Inspection Partial 10/24/2005
Correction
Partial Correction
10/24/2005
RATED WALL OR CEILING ASSEMBLIES -- 1ST FLOOR 114 W/N WALL (EXCLUDING SOUTH 8' & EAST 6') ONE LAYER 5/8" TYPE X GWB; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
All Rough Inspection - Commercial Partial 11/04/2005
Correction
Partial Correction
11/04/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH 029; 030; 031; 032; 033; 034; 040; 029; PENTHOUSES #1 & #2; 102 E WALL; 113 W/N WALL; 114 W/N WALL AFTER SECURING ONE ELECT BOX @ 6' AFF; ; OK TO COVER WHEN READY SPACES LISTED BELOW:
Rated Assembly Inspection Partial 11/07/2005
Correction
Partial Correction
11/07/2005
RATED WALL OR CEILING ASSEMBLIES -- 1ST FLOOR 113 E/S WALL 1ST LAYER 5/8" TYPE X GWB; 114 W/N WALL 2ND LAYER 5/8" TYPE X GWB; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Rated Assembly Inspection Partial 11/08/2005
Correction
Resolved
11/08/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 2ND FLOOR
Correction
Resolved
11/08/2005
RATED CEILING IN CORRIDOR A034
Correction
Resolved
11/08/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 1ST FLOOR
Correction
Partial Correction
11/08/2005
RATED WALL OR CEILING ASSEMBLIES -- 1ST FLOOR 101 W WALL E FACE 2 LAYERS 5/8" TYPE X GWB; 113 E/S WALL 1ST LAYER 5/8" TYPE X GWB; 114 W/N WALL 2ND LAYER 5/8" TYPE X GWB; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
All Rough Inspection - Commercial Partial 11/15/2005
Correction
Partial Correction
11/15/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH 029; 030; 031; 032; 033; 034; 040; 029; PENTHOUSES #1 & #2; 102 E WALL; 113 W/N WALL; 114 W/N WALL AFTER SECURING ONE ELECT BOX @ 6' AFF; ; OK TO COVER WHEN READY SPACES LISTED BELOW:
Rated Assembly Inspection Partial 11/18/2005
Correction
Partial Correction
11/18/2005
RATED WALL OR CEILING ASSEMBLIES -- 1ST FLOOR 101 W WALL E FACE 2 LAYERS 5/8" TYPE X GWB; 113 E/S WALL 1ST LAYER 5/8" TYPE X GWB; 114 W/N WALL 2ND LAYER 5/8" TYPE X GWB; 102 E WALL 1ST LAYER 5/8" TYPE X GWB; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
Rated Assembly Inspection Partial 11/21/2005
Correction
Partial Correction
11/21/2005
RATED WALL OR CEILING ASSEMBLIES -- 1ST FLOOR 101 W WALL E FACE 2 LAYERS 5/8" TYPE X GWB; 113 E/S WALL 1ST LAYER 5/8" TYPE X GWB; 114 W/N WALL 2ND LAYER 5/8" TYPE X GWB; 102 E 2ND LAYER 5/8" TYPE X GWB; OK TO COVER WHEN READY COMPONENTS LISTED BELOW:
All Rough Inspection - Commercial Partial 11/21/2005
Correction
Partial Correction
11/21/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH 029; 030; 031; 032; 033; 034; 040; 029; PENTHOUSES #1 & #2; 102 E WALL; 113 W/N WALL; 114 W/N WALL AFTER SECURING ONE ELECT BOX @ 6' AFF; 101 W WALL COLUMN BOX-OUTS + FASCIA; OK TO COVER WHEN READY SPACES LISTED BELOW:
Above Ceiling Inspection Partial 12/02/2005
Correction
Partial Correction
12/02/2005
ABOVE-CEILING SYSTEMS A021-026; 029; 031; 033; 034; 043; 046; 047; 113; NOT APPROVED: 045 OK TO COVER WHEN READY SPACES LISTED BELOW:
Miscellaneous Inspection Passed 12/10/2005
Correction
Resolved
12/10/2005
WASTE LINES
Correction
Resolved
12/10/2005
IN-WALL
Correction
Resolved
12/10/2005
EXTERIOR FIRE SEPERATION
Correction
Resolved
12/10/2005
ROUGH FRAMING
Underground Electrical Inspection - Commercial Passed 12/10/2005
Correction
Resolved
12/10/2005
SITE LIGHT POLE BASES, CONDUIT & POLE GROUNDING
Correction
Resolved
12/10/2005
SITE LIGHTING UNDERGROUND CONDUIT
Correction
Resolved
12/10/2005
LIGHTNING PROTECTION GROUND RING
Correction
Resolved
12/10/2005
BURIED PVC CONDUIT OUTSIDE MAIN ENTRANCE
Rated Assembly Inspection Passed 12/10/2005
Correction
Resolved
12/10/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 2ND FLOOR
Correction
Resolved
12/10/2005
RATED CEILING IN CORRIDOR A034
Correction
Resolved
12/10/2005
SPANDREL INSULATION + FLOOR-TO-FLOOR SAFING @ 1ST FLOOR
Correction
Resolved
12/10/2005
RATED WALL OR CEILING ASSEMBLIES -- 1ST FLOOR
Above Ceiling Inspection Passed 12/10/2005
Correction
Resolved
12/10/2005
ABOVE-CEILING SYSTEMS
Correction
Resolved
12/10/2005
RM A038
All Rough Inspection - Commercial Passed 12/10/2005
Correction
Resolved
12/10/2005
WALL FRAMING + IN-WALL SYSTEMS ROUGH
Correction
Resolved
12/10/2005
SPANDREL GLASS INSULATION @ EXTERIOR WALLS
Occupancy Inspection - Codes Commercial Passed 12/10/2005
Correction
Resolved
12/10/2005
OCCUPANCY APPROVAL STATUS I.S. RM 032; CORRIDOR A034; BIO MED 033 APPROVAL OF ALL OTHER HABITABLE AND CIRCULATION SPACES SHOWN ON DRAWINGS FOR THIS PERMIT ARE COVERED BY FINAL INSPECTION UNDER FINISH PERMIT B0500162 OK TO OCCUPY SPACES LISTED BELOW:
Final Inspection - Commercial Passed 12/10/2005
Correction
Resolved
12/10/2005
CLOSE PERMIT
Rough Plumbing Inspection - Commercial Passed 12/10/2005
Correction
Resolved
12/10/2005
WASTE & VENT PIPING UNDER & AT MEZZANINE
Correction
Resolved
12/10/2005
WASTE & VENT PIPING ABOVE IT ROOM A032
Correction
Resolved
12/10/2005
ROOF DRAIN PIPING @ SECOND FLOOR
Correction
Resolved
12/10/2005
WASTE & VENT PIPING @ 2ND FLOOR
Correction
Resolved
12/10/2005
None
Correction
Resolved
12/10/2005
None
Correction
Resolved
12/10/2005
None
Correction
Resolved
12/10/2005
None
Correction
Resolved
12/10/2005
WASTE & VENT 1ST FLOOR
Rough Framing Inspection - Commercial Passed 12/10/2005
Correction
Resolved
12/10/2005
10" x 10" C.I.P. CONC. COLUMNS @ CONNECTOR TO BLDG B
Correction
Resolved
12/10/2005
C.I.P. CONCRETE C OLUMNS - 1ST LEVEL
Underslab Plumbing Inspection - Commercial Passed 12/10/2005
Correction
Resolved
12/10/2005
UNDER-FLOOR DWV PIPING WEST OF (13)
Correction
Resolved
12/10/2005
UNDER-FLOOR STORM PIPING WEST OF (13)
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home