Permit Application Status

B0400766


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0400766
Building Permit - Commercial
Certificate of Occupancy
REORGANIZED SCHOOL DIST NO 7
NEW COMMERCIAL
RELOCATE RELOCATABLE CLASSROOM
04/30/2004
05/13/2004
11/09/2004
08/03/2004
Locations
Contacts
LEE'S SUMMIT R-7 SCHOOL DISTRICT, Address:702 SE STATE ROUTE 291  
REORGANIZED SCHOOL DIST NO 7, Address:301 NE TUDOR RD, Phone:(816) 986-1000  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 10/27/2004 10/29/2010
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

Fire Department: Fire protection systems shall be maintained in accordance with the original installation standards for that system. Required fire protection systems shall be extended, altered, or augmented as necessary to maintain and continue pro-tection whenever the building is altered, remodeled or added to.
Correction

Fire Department; Extension cords and flexible cords shall not be a substitute for permanent wiring. Extension cords and flexible cords shall not be affixed to structures, extended through walls, ceilings or floors, or under doors or floor cove-ings, nor shall such cords be subject to environmental damage or physical impact.
Correction

Fire Department; An approved lock shall be installed on gates or similar barriers when required by the code official.
Correction

Fire Department; Exit signs shall be internally or externally illuminated. The face of an exit sign illuminated from an external source shall have an intensity of not less than 5 foot-candles (54 lux). Internally illuminated signs shall provide equivalent luminance and be listed for the purpose. IFC 1003.2.10.4 Exit sign illumination shall also be in accordance with the IBC.
Correction

Fire Department; IFC 1003.3.1.8 Egress doors shall be readily openable from the egress side without the use of akey or special knowledge or effort. Exit doors shall not be locked, chained, barred, latched or otherwise rendered unusable. All locking devises shall be of an approved type. IFC 1003.3.1.8
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

Fire Department- Provide smoke detection and manual pull stations in each of the units and connect to the existing building alarm system as indicated on the plans.
Correction

CA - ANSI A117.1-1998 405.9.2 - Curb or Barrier. A curb or barrier shall be provided that prevents the passage of a 4-inch diameter sphere below a height of 4 inches.
Correction

CA - ANSI A117.1-1998 405.8 - Handrails. Ramps with a rise greater than 6 inches shall have handrails complying with Section 505. Handrails shall not reduce the required clearances of a ramp run or landing.
Correction

CA - ANSI A117.1 405.2 - Slope. Ramp runs shall have a running slope not steeper than 1:12.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $62.00 $62.00 Paid 05/13/2004
24 BLDG Plan Check Fees $7.00 $7.00 Paid 05/13/2004
25 Electrical Permit Fee $35.00 $35.00 Paid 05/13/2004
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Passed 05/24/2004
Correction
Resolved
05/24/2004
None 45 PIERS 18 INCHS IN DIAMETER DRILLED TO SHALE
Underground Electrical Inspection - Commercial Partial 06/09/2004
Correction
Partial Correction
06/09/2004
None UNDER GROUND CANTEX 2 INCH CONDUIT FROM DISCONECT TO NORTH RELOCATABLE CLASSROOM. APPROVED
Underground Electrical Inspection - Commercial Request Complete 6/9/2004 6/9/2004 06/09/2004
Miscellaneous Inspection Passed 07/22/2004
Tie-Down Inspection Passed 07/22/2004
Correction
Resolved
07/22/2004
None 10 TIE DOWNS APPROVED
Electrical Service Inspection Passed 07/26/2004
Correction
Resolved
07/26/2004
TYPE YOUR OWN TEXT 200 AMP SERVICE - APPROVED - RELEASE
Occupancy Inspection - Codes Commercial Passed 08/02/2004
Correction
Resolved
08/02/2004
None OCCUPANCY APPROVED FIRE DEPT. APP.
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: