Summary
B0400760
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
PARTIAL COMMERCIAL
BLDG E, FOUND/UNDERSLAB/STURCTURAL
04/30/2004
05/11/2004
11/07/2004
12/27/2004
Locations
Contacts
ACI BOLAND, Address:11229 NALL SUITE 140  
JE DUNN CONSTRUCTION CO., Address:929 HOLMES  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 10/27/2004 10/29/2010
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - This is an "at risk permit". Construction shall be in accordance with plans submitted for permit approval. The applicant understands that issuance of this permit does not guaranty issuance of a full permit.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - 2000 IBC 1704.1.2 - Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and the registered design professional in responsible charge prior to the completion of that phase of the work. A final report of inspections documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted periodically at a frequency agreed upon by the permit applicant and the building official prior to the start of work.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $467.00 $467.00 Paid 05/11/2004
24 BLDG Plan Check Fees $27.75 $27.75 Paid 05/11/2004
24 BLDG Permit Fees $1,281.00 $1,281.00 Paid 07/07/2004
24 BLDG Plan Check Fees $21.35 $21.35 Paid 07/07/2004
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 05/06/2004
Correction
Partial Correction
05/06/2004
ISOLATED COLUMN FOOTINGS OK TO POUR WHEN READY F/1; F/2; F/3; F/4; F/5;
Footing Inspection - Commercial Partial 05/11/2004
Correction
Partial Correction
05/11/2004
ISOLATED COLUMN FOOTINGS G/2.7; G/3; G/4; G/5; OK TO POUR WHEN READY F/1; F/2; F/3; F/4; F/5;
Footing Inspection - Commercial Partial 05/17/2004
Correction
Partial Correction
05/17/2004
ISOLATED COLUMN FOOTINGS G/2.7; G/3; G/4; G/5; F/6; F/7; G/6; G/7; OK TO POUR WHEN READY F/1; F/2; F/3; F/4; F/5;
Footing Inspection - Commercial Partial 05/24/2004
Correction
Partial Correction
05/24/2004
ISOLATED COLUMN FOOTING F/7.6 POUR AT RISK UNTIL FOUND ON PERMIT DRAWINGS NOT FOUND ON PERMIT DRWGS WORKMANSHIP OK
Correction
Partial Correction
05/24/2004
ISOLATED COLUMN FOOTINGS G/2.7; G/3; G/4; G/5; F/6; F/7; G/6; G/7; E/6; D.9/7; OK TO POUR WHEN READY F/1; F/2; F/3; F/4; F/5;
Foundation Inspection - Commercial Partial 06/01/2004
Correction
Partial Correction
06/01/2004
C.I.P. CONCRETE COLUMNS @ TUNNEL LEVEL F/1; F/2; F/3; F/4; F/5; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Footing Inspection - Commercial Partial 06/03/2004
Correction
Resolved
06/03/2004
ISOLATED COLUMN FOOTING F/7.6
Correction
Partial Correction
06/03/2004
ISOLATED COLUMN FOOTINGS G/2.7; G/3; G/4; G/5; F/6; F/7; G/6; G/7; E/6; D.9/7; B/6; C/6; D/6; D.9/8; E.3/8; D.6/7; OK TO POUR WHEN READY F/1; F/2; F/3; F/4; F/5;
Footing Inspection - Commercial Partial 06/04/2004
Correction
Partial Correction
06/04/2004
ISOLATED COLUMN FOOTINGS G/2.7; G/3; G/4; G/5; F/6; F/7; G/6; G/7; E/6; D.9/7; B/6; C/6; D/6; D.9/8; E.3/8; D.6/7; H/6; H/7; OK TO POUR WHEN READY F/1; F/2; F/3; F/4; F/5;
Foundation Inspection - Commercial Partial 06/29/2004
Correction
Partial Correction
06/29/2004
C.I.P. CONCRETE COLUMNS @ TUNNEL LEVEL F/1; F/2; F/3; F/4; F/5; F/7.6; E.3/8; D.9/8; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Footing Inspection - Commercial Partial 07/13/2004
Correction
Partial Correction
07/13/2004
ISOLATED COLUMN FOOTINGS G/2.7; G/3; G/4; G/5; F/6; F/7; G/6; G/7; E/6; D.9/7; B/6; C/6; D/6; D.9/8; E.3/8; D.6/7; H/6; H/7; C.6/4; D/4; D/5; E/4; E/5; D/3; E/3; OK TO POUR WHEN READY F/1; F/2; F/3; F/4; F/5;
Footing Inspection - Commercial Partial 07/14/2004
Correction
Partial Correction
07/14/2004
ISOLATED COLUMN FOOTINGS G/2.7; G/3; G/4; G/5; F/6; F/7; G/6; G/7; E/6; D.9/7; B/6; C/6; D/6; D.9/8; E.3/8; D.6/7; H/6; H/7; C.6/4; D/4; D/5; E/4; E/5; D/3; E/3; D/2; E/2; C/2; C/3; C/5; B.6/4; OK TO POUR WHEN READY F/1; F/2; F/3; F/4; F/5;
Footing Inspection - Commercial Partial 07/20/2004
Correction
Partial Correction
07/20/2004
GRADE BEAM + INTEGRAL COLUMN FOOTINGS G/3 TO F/3 TO F/1 TO E.8/1; G/2.7 TO H/2.7 TO H/3.2; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Underslab Plumbing Inspection - Commercial Partial 07/21/2004
Correction
Partial Correction
07/21/2004
UNDER-SLAB DWV PIPING 2.8/D.3 TO 2.8/E.4 TO 5/E.4; [INCL BRANCHES] OK TO COVER WHEN READY VISUAL & PRESSURE TESTED
Footing Inspection - Commercial Partial 07/22/2004
Correction
Partial Correction
07/22/2004
ISOLATED COLUMN FOOTINGS G/2.7; G/3; G/4; G/5; F/6; F/7; G/6; G/7; E/6; D.9/7; B/6; C/6; D/6; D.9/8; E.3/8; D.6/7; H/6; H/7; C.6/4; D/4; D/5; E/4; E/5; D/3; E/3; D/2; E/2; C/2; C/3; C/5; B.6/4; B/4; OK TO POUR WHEN READY F/1; F/2; F/3; F/4; F/5;
Correction
Partial Correction
07/22/2004
GRADE BEAM + INTEGRAL COLUMN FOOTINGS G/3 TO F/3 TO F/1 TO E.8/1; G/2.7 TO H/2.7 TO H/3.2; F/1 TO B.5/1; B.5/1 TO B/1 TO B/2.8; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Underslab Plumbing Inspection - Commercial Partial 07/22/2004
Correction
Partial Correction
07/22/2004
UNDER-SLAB DWV PIPING 2.8/D.3 TO 2.8/E.4 TO 5/E.4; VISUAL ONLY: 3.6 - 4.8 x E - F; [INCL BRANCHES] OK TO COVER WHEN READY VISUAL & PRESSURE TESTED
Underslab Plumbing Inspection - Commercial Partial 07/23/2004
Correction
Partial Correction
07/23/2004
UNDER-SLAB DWV PIPING W OF (D.8) SUBSTANTIALLY COMPLETED; OK TO COVER WHEN READY VISUAL & PRESSURE TESTED
Footing Inspection - Commercial Partial 07/23/2004
Correction
Partial Correction
07/23/2004
GRADE BEAM + INTEGRAL COLUMN FOOTINGS G/3 TO F/3 TO F/1 TO E.8/1; G/2.7 TO H/2.7 TO H/3.2; F/1 TO B.5/1; B.5/1 TO B/1 TO B/2.8; B/2.8 TO B/3 TO A/3 TO A/3.2; H/3.3 TO H/6; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Underslab Plumbing Inspection - Commercial Failed 07/26/2004
Correction
Corrective Action Required
07/26/2004
UNDER-SLAB DWV PIPING ALL W OF (D.7); W OF (C.3) x N OF (3) TWO DEFECTIVE FITTINGS TO BE REPLACED
Underslab Plumbing Inspection - Commercial Partial 07/27/2004
Correction
Partial Correction
07/27/2004
UNDER-SLAB DWV PIPING ALL W OF (D.7); W OF (C.3) x N OF (3); SUBSTANTIALLY COMPLETED. PRESSURE TESTING PROGRESSIVE OK TO COVER WHEN READY VISUAL OK
Correction
Partial Correction
07/27/2004
U.G. STORM DRAIN PIPING MAIN LINES ALONG (B/2) & (2.7) + BRANCHES - 1 LEAKING COMBO FITTING VISUAL OK
Underslab Plumbing Inspection - Commercial Partial 07/28/2004
Correction
Resolved
07/28/2004
U.G. STORM DRAIN PIPING VISUAL & PRESSURE TEST OK
Footing Inspection - Commercial Partial 07/28/2004
Correction
Partial Correction
07/28/2004
GRADE BEAM + INTEGRAL COLUMN FOOTINGS G/3 TO F/3 TO F/1 TO E.8/1; G/2.7 TO H/2.7 TO H/3.2; F/1 TO B.5/1; B.5/1 TO B/1 TO B/2.8; B/2.8 TO B/3 TO A/3 TO A/3.2; H/3.3 TO H/6; A/3.2 TO A/5 TO B/5 TO B/6 INCL BOTTOM OF COL B/6; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Underslab Plumbing Inspection - Commercial Partial 07/29/2004
Correction
Partial Correction
07/29/2004
UNDER-SLAB DWV PIPING ALL W OF (D.7); W OF (C.3) x N OF (3); E OF (C.3) x N OF (3); TRUNKS N-S ALONG (3.6) & (4.5) E OF (H) + BRANCHES COMPLETED. PRESSURE TESTING PROGRESSIVE OK TO COVER WHEN READY VISUAL OK
Correction
Partial Correction
07/29/2004
UNDER-SLAB WATER PIPING BLDG ENTRY OF DOMESTIC & FIRE WATER SERVICE LINES; VISUAL OK
Footing Inspection - Commercial Partial 07/29/2004
Correction
Resolved
07/29/2004
ELEVATOR PIT SLAB OK TO POUR WHEN READY
Foundation Inspection - Commercial Passed 07/30/2004
Correction
Resolved
07/30/2004
C.I.P. CONCRETE COLUMNS @ TUNNEL LEVEL F/1; F/2; F/3; F/4; F/5; F/7.6; E.3/8; D.9/8
Correction
Resolved
07/30/2004
ELEVATOR PIT WALLS PREP IN PROGRESS OK TO POUR WHEN READY
Underslab Plumbing Inspection - Commercial Partial 07/30/2004
Correction
Partial Correction
07/30/2004
UNDER-SLAB DWV PIPING ALL W OF (D.7); ALL N OF (5) PRESSURE TESTING PROGRESSIVE OK TO COVER WHEN READY VISUAL OK
Correction
Resolved
07/30/2004
U.G. STORM DRAIN PIPING
Correction
Partial Correction
07/30/2004
UNDER-SLAB WATER PIPING DOMESTIC & FIRE WATER SERVICE LINES; VISUAL OK BLDG ENTRY OF
Underslab Plumbing Inspection - Commercial Passed 08/02/2004
Correction
Resolved
08/02/2004
UNDER-SLAB DWV PIPING PRESSURE TESTING IN PROGRESS. OK TO COVER WHEN READY. ESSENTIALLY COMPLETED VISUAL OK
Correction
Resolved
08/02/2004
UNDER-SLAB WATER PIPING DOMESTIC & FIRE WATER SERVICE LINES. TO BE PRESSURE TESTED BEFORE ACTIVATION. VISUAL OK BLDG ENTRY OF
Footing Inspection - Commercial Partial 08/06/2004
Correction
Partial Correction
08/06/2004
GRADE BEAM + INTEGRAL COLUMN FOOTINGS G/3 TO F/3 TO F/1 TO E.8/1; G/2.7 TO H/2.7 TO H/3.2; F/1 TO B.5/1; B.5/1 TO B/1 TO B/2.8; B/2.8 TO B/3 TO A/3 TO A/3.2; H/3.3 TO H/6; A/3.2 TO A/5 TO B/5 TO B/6 INCL BOTTOM OF COL B/6; GRADE BEAM @ S ENTRANCE; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Footing Inspection - Commercial Passed 09/17/2004
Correction
Resolved
09/17/2004
ISOLATED COLUMN FOOTINGS G/2.7; G/3; G/4; G/5; F/6; F/7; G/6; G/7; E/6; D.9/7; B/6; C/6; D/6; D.9/8; E.3/8; D.6/7; H/6; H/7; C.6/4; D/4; D/5; E/4; E/5; D/3; E/3; D/2; E/2; C/2; C/3; C/5; B.6/4; B/4; TWO CANOPY COL FTGS PER (13) @ SHEET S9.3 OK TO POUR WHEN READY F/1; F/2; F/3; F/4; F/5;
Correction
Resolved
09/17/2004
GRADE BEAM + INTEGRAL COLUMN FOOTINGS
Correction
Resolved
09/17/2004
ELEVATOR PIT SLAB
Underground Electrical Inspection - Commercial Partial 11/05/2004
Correction
Partial Correction
11/05/2004
LIGHTNING PROTECTION GROUND RING OUTSIDE N WALL + OUTSIDE E WALL S TO NEAR A/3; CONDUCTORS & GROUND RODS OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 11/15/2004
Correction
Partial Correction
11/15/2004
LIGHTNING PROTECTION GROUND RING O/S N WALL + O/S E WALL S TO NEAR (A/3); OUTSIDE E WALL FROM (A/3) S TO (A/5); (G/2.7) TO (H/2.7) TO (H/6); CONDUCTORS & GROUND RODS OK TO COVER WHEN READY
Water Service Inspection Passed 11/17/2004
Correction
Resolved
11/17/2004
FIRE PROTECTION SERVICE LINE VISUAL & PRESSURE TEST OK FROM BUILDING ENTRY TO SHUT-OFF @ STN 0+59.75
Correction
Resolved
11/17/2004
DOMESTIC WATER SERVICE PIPING VISUAL & PRESSURE TEST OK FROM BUILDING ENTRY TO METER PIT
Footing Inspection - Commercial Passed 11/17/2004
Correction
Resolved
11/17/2004
GRADE BEAM @ TRASH ENCLOSURE NOT ON PERMIT DRAWINGS OK PER CONSTR DRAWINGS
Electrical Service Inspection Passed 11/23/2004
Underground Electrical Inspection - Commercial Partial 11/23/2004
Correction
Partial Correction
11/23/2004
LIGHTNING PROTECTION GROUND RING O/S N WALL + O/S E WALL S TO NEAR (A/3); OUTSIDE E WALL FROM (A/3) S TO (A/5); (G/2.7) TO (H/2.7) TO (H/6); NW CORNER ACROSS TOP OF TUNNEL; CONDUCTORS & GROUND RODS OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 12/01/2004
Correction
Partial Correction
12/01/2004
LIGHTNING PROTECTION GROUND RING O/S N WALL + O/S E WALL S TO NEAR (A/3); OUTSIDE E WALL FROM (A/3) S TO (A/5); (G/2.7) TO (H/2.7) TO (H/6); NW CORNER ACROSS TOP OF TUNNEL; CONNECTIONS @ 4 LOCATIONS @ SE & S ENTRANCES CONDUCTORS & GROUND RODS OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Partial 12/14/2004
Correction
Partial Correction
12/14/2004
LIGHTNING PROTECTION GROUND RING O/S N WALL + O/S E WALL S TO NEAR (A/3); OUTSIDE E WALL FROM (A/3) S TO (A/5); (G/2.7) TO (H/2.7) TO (H/6); NW CORNER ACROSS TOP OF TUNNEL; CONNECTIONS @ 4 LOCATIONS @ SE & S ENTRANCES; FROM S ENTRANCE TO E ENTRANCE; CONDUCTORS & GROUND RODS OK TO COVER WHEN READY
Underground Electrical Inspection - Commercial Passed 12/22/2004
Correction
Resolved
12/22/2004
LIGHTNING PROTECTION GROUND RING O/S N WALL + O/S E WALL S TO NEAR (A/3); OUTSIDE E WALL FROM (A/3) S TO (A/5); (G/2.7) TO (H/2.7) TO (H/6); NW CORNER ACROSS TOP OF TUNNEL; CONNECTIONS @ 4 LOCATIONS @ SE & S ENTRANCES; FROM S ENTRANCE TO E ENTRANCE; COMPLETE @ SE & S ENTRANCES CONDUCTORS & GROUND RODS OK TO COVER WHEN READY
Final Inspection - Commercial Passed 12/22/2004
Correction
Resolved
12/22/2004
CLOSE PERMIT
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home