Permit Application Status

B0400741


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0400741
Building Permit - Commercial
Final Completion
SAINT LUKES EAST HOSPITAL
NEW OTHER
TUNNEL EXTENSION
04/29/2004
05/11/2004
11/07/2004
10/06/2004
Locations
Contacts
ACI BOLAND, Address:11229 NALL SUITE 140  
J E DUNN CONSTRUCTION, Address:929 HOLMES  
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 10/26/2004 10/29/2010
Correction

CA - This is an "at risk permit". Construction shall be in accordance with plans submitted for permit approval. The applicant understands that issuance of this permit does not guaranty issuance of a full permit.
Correction

St. Lukes - The City shall not issue any temporary or final Certificate of Occupancy for any structure in the Developerment until a Certificate of Substantial Completion for the Road Improvements has been issued by MoDOT.
Correction

St. Lukes - A Proprtionate Share of the Total Road Contribution shall be made to the City at or before the time a certificate of occupancy is issued by the City for a building constructed by, or by a building contractor on behalf of, the Developer on the Property, excluding the medical office buildings.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - 2000 IBC 1704.1.2 - Special inspectors shall keep records of inspections. The special inspector shall furnish inspection reports to the building official, and to the registered design professional in responsible charge. Reports shall indicate that work inspected was done in conformance to approved construction documents. Discrepancies shall be brought to the immediate attention of the contractor for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official and the registered design professional in responsible charge prior to the completion of that phase of the work. A final report of inspections documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted periodically at a frequency agreed upon by the permit applicant and the building official prior to the start of work.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $5,555.00 $5,555.00 Paid 05/11/2004
24 BLDG Plan Check Fees $112.55 $112.55 Paid 05/11/2004
25 Plumbing Permit Fees $30.00 $30.00 Paid 05/11/2004
24 BLDG Permit Fees $2,610.00 $2,610.00 Paid 07/07/2004
24 BLDG Plan Check Fees $43.50 $43.50 Paid 07/07/2004
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 05/03/2004
Correction
Partial Correction
05/03/2004
C.I. DWV PIPING UNDER BASE SLAB @ ASC TO F.6/3.5; FCO, FD, VENT @ N END; S TO ASC F.7/2; FRM F.6/5
Underslab Plumbing Inspection - Commercial Partial 05/04/2004
Correction
Partial Correction
05/04/2004
C.I. DWV PIPING UNDER BASE SLAB @ ASC TO F.6/3.5; FRM F.6/3.5 N TO MH, FCO & FD @ 1.7 [VISUAL NOW OK ALL N OF 5.5]; FCO, FD, VENT @ N END; S TO ASC F.7/2; FRM F.6/5
Footing Inspection - Commercial Partial 05/07/2004
Correction
Partial Correction
05/07/2004
BASE SLAB @ TUNNEL NORTH LEG 0 + 40' TO 0 + 80'; OK TO POUR WHEN READY FROM N END
Footing Inspection - Commercial Partial 05/11/2004
Correction
Partial Correction
05/11/2004
BASE SLAB @ TUNNEL NORTH LEG 0 + 40' TO 0 + 80'; 0 + 0' TO 0 + 40'; 0 + 80' TO 0 + 120'; OK TO POUR WHEN READY FROM N END
Rough Framing Inspection - Commercial Partial 05/12/2004
Correction
Partial Correction
05/12/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC W WALL FROM N END 0 TO 0+ 40`; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Underslab Plumbing Inspection - Commercial Partial 05/12/2004
Correction
Partial Correction
05/12/2004
C.I. DWV PIPING UNDER BASE SLAB @ ASC TO F.6/3.5; FRM F.6/3.5 N TO MH, FCO & FD @ 1.7; E LEG OF TUNNEL FRM (F.2) TO 92.5` SE OF (B); [VISUAL OK] FCO, FD, VENT @ N END; S TO ASC F.7/2; FRM F.6/5
Rough Framing Inspection - Commercial Partial 05/17/2004
Correction
Partial Correction
05/17/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC W WALL FROM N END 0 TO 0+ 40`; W WALL 0+ 40` TO 0+ 80`; E WALL FROM N END 0 TO 0+ 40`; ENSURE WATER STOP IS CLEAN & PROPERLY PLACED PRIOR TO POUR. ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Footing Inspection - Commercial Partial 05/17/2004
Correction
Partial Correction
05/17/2004
BASE SLAB @ TUNNEL NORTH LEG 0 + 40' TO 0 + 80'; 0 + 0' TO 0 + 40'; 0 + 80' TO 0 + 120'; 0 + 120' TO 0 + 148`; OK TO POUR WHEN READY FROM N END
Rough Framing Inspection - Commercial Partial 05/21/2004
Correction
Partial Correction
05/21/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC W WALL FRM N END 0 TO 0+ 40`; W WALL 0+ 40` TO 0+ 80`; E WALL FRM N END 0 TO 0+ 40`; E WALL FROM 0+ 40` TO 0+ 80`; ENSURE WATER STOP IS CLEAN & PROPERLY PLACED PRIOR TO POUR. ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 05/24/2004
Correction
Partial Correction
05/24/2004
PLACEMENT OF WATER STOP PRIOR TO POUR ENSURE WATERSTOP IS CLEAN & PROPERLY PLACED
Correction
Partial Correction
05/24/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC W WALL N END 0 TO 0+ 40`; W WALL 0+ 40` TO 0+ 80`; E WALL N END 0 TO 0+ 40`; E WALL FRM 0+ 40` TO 0+ 80`; N END WALL + 4` RETURNS EA SIDE; E WALL FROM 0+ 80` TO 0+ 120`; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 05/25/2004
Correction
Partial Correction
05/25/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC W WALL N END 0 TO 0+ 40`; W WALL 0+ 40` TO 0+ 80`; E WALL N END 0 TO 0+ 40`; E WALL 0+ 40` TO 0+ 80`; N END WALL + 4` RETURNS EA SIDE; E WALL FRM 0+ 80` TO 0+ 120`; W WALL FROM 0+ 80` TO 0+ 120`; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Footing Inspection - Commercial Partial 05/27/2004
Correction
Partial Correction
05/27/2004
BASE SLAB @ TUNNEL NORTH LEG 0 + 40' TO 0 + 80'; 0 + 0' TO 0 + 40'; 0 + 80' TO 0 + 120'; 0 + 120' TO 0 + 148`; 0 + 174' TO 0 + 214`; OK TO POUR WHEN READY FROM N END
Rough Framing Inspection - Commercial Partial 05/27/2004
Correction
Partial Correction
05/27/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC W WALL N END 0 TO 0+ 40`; W WALL 0+ 40` TO 0+ 80`; E WALL N END 0 TO 0+ 40`; E WALL 0+ 40` TO 0+ 80`; N END WALL + 4` RETURNS EA SIDE; E WALL 0+ 80` TO 0+ 120`; W WALL FRM 0+ 80` TO 0+ 120`; E WALL 0+ 120` TO 0+ 148`; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 05/28/2004
Correction
Partial Correction
05/28/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC W WALL N END 0 TO 0+ 40`; W WALL 0+ 40` TO 0+ 80`; E WALL N END 0 TO 0+ 40`; E WALL 0+ 40` TO 0+ 80`; N END WALL + 4` RETURNS EA SIDE; E WALL 0+ 80` TO 0+ 120`; W WALL FRM 0+ 80` TO 0+ 120`; E WALL 0+ 120` TO 0+ 148`; W WALL 0+ 120` TO 0+ 148`; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Footing Inspection - Commercial Partial 05/28/2004
Correction
Partial Correction
05/28/2004
BASE SLAB @ TUNNEL NORTH LEG 0 + 40' TO 0 + 80'; 0 + 0' TO 0 + 40'; 0 + 80' TO 0 + 120'; 0 + 120' TO 0 + 148`; 0 + 174' TO 0 + 214`; "T" AREA 0 + 228' TO 0 + 264` + E16` & W4`; OK TO POUR WHEN READY FROM N END
Footing Inspection - Commercial Partial 06/02/2004
Correction
Partial Correction
06/02/2004
BASE SLAB @ TUNNEL NORTH LEG 0 + 40' TO 0 + 80'; 0 + 0' TO 0 + 40'; 0 + 80' TO 0 + 120'; 0 + 120' TO 0 + 148`; 0 + 174' TO 0 + 214`; "T" AREA 0 + 228' TO 0 + 264` + E16` & W4`; 0 + 148' TO 0 + 174`; 0 + 214' TO 0 + 228`; OK TO POUR WHEN READY FROM N END
Rough Framing Inspection - Commercial Partial 06/02/2004
Correction
Resolved
06/02/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC W WALL N END 0 TO 0+ 40`; W WALL 0+ 40` TO 0+ 80`; E WALL N END 0 TO 0+ 40`; E WALL 0+ 40` TO 0+ 80`; N END WALL + 4` RETURNS EA SIDE; E WALL 0+ 80` TO 0+ 120`; W WALL 0+ 80` TO 0+ 120`; E WALL 0+ 120` TO 0+ 148`; W WALL 0+ 120` TO 0+ 148`; CONT`D
Correction
Partial Correction
06/02/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC E WALL 0+ 174` TO 0+ 214` WHEN OPENING PENETRATION REINFORCEMENT IS COMPLETE; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 06/03/2004
Correction
Partial Correction
06/03/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC E WALL 0+ 174` TO 0+ 214`; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 06/04/2004
Correction
Partial Correction
06/04/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC E WALL 0+ 174` TO 0+ 214`; E WALL 0+ 148` TO 0+ 174`; W WALL 0+ 174` TO 0+ 214`; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Footing Inspection - Commercial Partial 06/07/2004
Correction
Partial Correction
06/07/2004
BASE SLAB @ TUNNEL EAST LEG E56 TO E96; E96 TO E136; OK TO POUR WHEN READY FROM E FACE OF N LEG
Correction
Partial Correction
06/07/2004
BASE SLAB @ TUNNEL NORTH LEG 0 + 40' TO 0 + 80'; 0 + 0' TO 0 + 40'; 0 + 80' TO 0 + 120'; 0 + 120' TO 0 + 148`; 0 + 174' TO 0 + 214`; "T" AREA 0 + 228' TO 0 + 264` + E16` & W4`; 0 + 148' TO 0 + 174`; 0 + 214' TO 0 + 228`; FROM N END
Rough Framing Inspection - Commercial Partial 06/07/2004
Correction
Partial Correction
06/07/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC E WALL 0+ 174` TO 0+ 214`; E WALL 0+ 148` TO 0+ 174`; W WALL 0+ 174` TO 0+ 214`; W WALL 0 + 120` TO 0+ 148`; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Footing Inspection - Commercial Partial 06/08/2004
Correction
Partial Correction
06/08/2004
BASE SLAB @ TUNNEL EAST LEG E56 TO E96; E96 TO E136; E176 TO ~E212; E136 TO E176; OK TO POUR WHEN READY FROM E FACE OF N LEG
Rough Framing Inspection - Commercial Partial 06/11/2004
Correction
Partial Correction
06/11/2004
C.I.P. CONC WALL E LEG OF TUNNEL @ ASC N WALL TO E16`; FROM E WALL OF N LEG OK TO POUR WHEN READY
Correction
Partial Correction
06/11/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC E WALL 0+ 174` TO 0+ 214`; E WALL 0+ 148` TO 0+ 174`; W WALL 0+ 174` TO 0+ 214`; W WALL 0 + 120` TO 0+ 148`; S END 36` OF E WALL; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Correction
Resolved
06/11/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC E WALL N END 0 TO 0+ 40`; E WALL 0+ 40` TO 0+ 80`; N END WALL + 4` RETURNS EA SIDE; E WALL 0+ 80` TO 0+ 120`; W WALL 0+ 80` TO 0+ 120`; E WALL 0+ 120` TO 0+ 148`; W WALL 0+ 120` TO 0+ 148`; CONT`D W WALL N END 0 TO 0+ 40`; W WALL 0+ 40` TO 0+ 80`;
Rough Framing Inspection - Commercial Partial 06/14/2004
Correction
Partial Correction
06/14/2004
C.I.P. CONC WALL E LEG OF TUNNEL @ ASC N WALL TO E16`; S WALL E56 TO E96; N WALL E56 TO E96 OK WHEN VERTICAL WATERSTOP @ E END IS REPAIRED OR REPLACED; FROM E WALL OF N LEG OK TO POUR WHEN READY
Correction
Partial Correction
06/14/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC E WALL 0+ 174` TO 0+ 214`; E WALL 0+ 148` TO 0+ 174`; W WALL 0+ 174` TO 0+ 214`; W WALL 0 + 120` TO 0+ 148`; S END 36` OF E WALL; ENSURE RE-BAR COVERAGE
Rough Framing Inspection - Commercial Partial 06/16/2004
Correction
Partial Correction
06/16/2004
C.I.P. CONC WALL E LEG OF TUNNEL @ ASC N WALL TO E16`; S WALL E56 TO E96; N WALL E56 TO E96; N WALL E96 TO E136 AFTER CURLED WATERSTOP @ E96 IS CORRECTED; FROM E WALL OF N LEG OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 06/17/2004
Correction
Partial Correction
06/17/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC E WALL 0+ 174` TO 0+ 214`; E WALL 0+ 148` TO 0+ 174`; W WALL 0+ 174` TO 0+ 214`; W WALL 0 + 120` TO 0+ 148`; S END 36` OF E WALL; S END OF W WALL - THEN WEST ~3`; ENSURE RE-BAR COVERAGE
Correction
Partial Correction
06/17/2004
C.I.P. CONC WALL E LEG OF TUNNEL @ ASC N WALL TO E16`; S WALL E56 TO E96; N WALL E56 TO E96; N WALL E96 TO E136; S WALL E96 TO E136; FROM E WALL OF N LEG OK TO POUR WHEN READY
Footing Inspection - Commercial Failed 06/22/2004
Correction
Corrective Action Required
06/22/2004
BASE SLAB @ TUNNEL NORTH LEG 0 + 40' TO 0 + 80'; 0 + 0' TO 0 + 40'; 0 + 80' TO 0 + 120'; 0 + 120' TO 0 + 148`; 0 + 174' TO 0 + 214`; "T" AREA 0 + 228' TO 0 + 264` + E16` & W4`; 0 + 148' TO 0 + 174`; 0 + 214' TO 0 + 228`; FROM N END
Correction
Partial Correction
06/22/2004
BASE SLAB @ TUNNEL EAST LEG E56 TO E96; E96 TO E136; E176 TO ~E212; E136 TO E176; E15 TO E56 NOT READY - E &W ENDS MEMBRANE NOT CLEAN FOR DAMAGE INSPECTION & INSUFFICIENT REBAR COVERAGE OK TO POUR WHEN READY FROM E FACE OF N LEG
Suspended Slab Inspection Partial 06/22/2004
Correction
Partial Correction
06/22/2004
TOP SLAB - NORTH LEG OF TUNNEL 0 - S40; OK TO POUR WHEN READY REFERENCED FROM NORTH END
Footing Inspection - Commercial Partial 06/23/2004
Correction
Resolved
06/23/2004
BASE SLAB @ TUNNEL NORTH LEG 0 + 40' TO 0 + 80'; 0 + 0' TO 0 + 40'; 0 + 80' TO 0 + 120'; 0 + 120' TO 0 + 148`; 0 + 174' TO 0 + 214`; "T" AREA 0 + 228' TO 0 + 264` + E16` & W4`; 0 + 148' TO 0 + 174`; 0 + 214' TO 0 + 228`; FROM N END
Correction
Partial Correction
06/23/2004
BASE SLAB @ TUNNEL EAST LEG E56 TO E96; E96 TO E136; E176 TO ~E212; E136 TO E176; E15 TO E56; OK TO POUR WHEN READY FROM E FACE OF N LEG
Suspended Slab Inspection Partial 06/23/2004
Correction
Partial Correction
06/23/2004
TOP SLAB - NORTH LEG OF TUNNEL 0 - S40; 40 - S80; OK TO POUR WHEN READY REFERENCED FROM NORTH END
Rough Framing Inspection - Commercial Partial 06/24/2004
Correction
Partial Correction
06/24/2004
C.I.P. CONC WALL E LEG OF TUNNEL @ ASC N WALL TO E16`; S WALL E56 TO E96; N WALL E56 TO E96; N WALL E96 TO E136; S WALL E96 TO E136; N WALL E15 TO E56; FROM E WALL OF N LEG OK TO POUR WHEN READY
Footing Inspection - Commercial Partial 06/24/2004
Correction
Corrective Action Required
06/24/2004
BASE SLAB @ TUNNEL EAST LEG E56 TO E96; E96 TO E136; E176 TO ~E212; E136 TO E176; E15 TO E56; E136 TO E176 HORIZ KEYWAY WATERSTOP CURLED OUT OF PREVIOUS POUR @ E136 + BASE MEMBRANE JOINTS NOT SEALED; OK TO POUR WHEN READY FROM E FACE OF N LEG
Suspended Slab Inspection Partial 06/24/2004
Correction
Partial Correction
06/24/2004
TOP SLAB - NORTH LEG OF TUNNEL 0 - S40; S40 - S80; S80 - S120; OK TO POUR WHEN READY REFERENCED FROM NORTH END
Footing Inspection - Commercial Partial 06/25/2004
Correction
Partial Correction
06/25/2004
BASE SLAB @ TUNNEL EAST LEG E56 TO E96; E96 TO E136; E176 TO ~E212; E136 TO E176; E15 TO E56; E136 TO E176; OK TO POUR WHEN READY FROM E FACE OF N LEG
Rough Framing Inspection - Commercial Partial 06/25/2004
Correction
Partial Correction
06/25/2004
C.I.P. CONC WALL E LEG OF TUNNEL @ ASC N WALL TO E16`; S WALL E56 TO E96; N WALL E56 TO E96; N WALL E96 TO E136; S WALL E96 TO E136; N WALL E15 TO E56; N WALL E136 TO E176; FROM E WALL OF N LEG OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 06/28/2004
Correction
Resolved
06/28/2004
C.I.P. CONC WALL - N LEG OF TUNNEL @ ASC E WALL 0+ 174` TO 0+ 214`; E WALL 0+ 148` TO 0+ 174`; W WALL 0+ 174` TO 0+ 214`; W WALL 0 + 120` TO 0+ 148`; S END 36` OF E WALL; S END OF W WALL - THEN WEST ~3`;
Correction
Partial Correction
06/28/2004
C.I.P. CONC WALL E LEG OF TUNNEL @ ASC N WALL TO E16`; S WALL E56 TO E96; N WALL E56 TO E96; N WALL E96 TO E136; S WALL E96 TO E136; N WALL E15 TO E56; N WALL E136 TO E176; N WALL E176 TO E216; FROM E WALL OF N LEG OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 06/29/2004
Correction
Partial Correction
06/29/2004
C.I.P. CONC WALL E LEG OF TUNNEL @ ASC N WALL TO E16`; S WALL E56 TO E96; N WALL E56 TO E96; N WALL E96 TO E136; S WALL E96 TO E136; N WALL E15 TO E56; N WALL E136 TO E176; N WALL E176 TO E216; S WALL E136 TO E176; S WALL E15 TO E56; FROM E WALL OF N LEG OK TO POUR WHEN READY
Piers/Caissons Inspection - Commercial Passed 06/29/2004
Correction
Resolved
06/29/2004
TUNNEL BASE PIERS (A`) & (A.4`) FROM (13) TO (19.4) INSPECTION & TESTING BY SEA & TERRACON
Underslab Plumbing Inspection - Commercial Partial 06/29/2004
Correction
Partial Correction
06/29/2004
C.I. DWV PIPING UNDER BASE SLAB @ ASC TO F.6/3.5; FRM F.6/3.5 N TO MH, FCO & FD @ 1.7; E LEG OF TUNNEL FRM (F.2) TO 92.5` SE OF (B); [VISUAL OK]; W LEG OF TUNNEL FROM (14) TO S.P. @ (16.6); FCO, FD, VENT @ N END; S TO ASC F.7/2; FRM F.6/5
Underslab Plumbing Inspection - Commercial Passed 06/30/2004
Correction
Resolved
06/30/2004
C.I. DWV PIPING UNDER BASE SLAB @ ASC FCO, FD, VENT @ N END; S TO ASC F.7/2; FRM F.6/5; TO F.6/3.5; FRM F.6/3.5 N TO MH, FCO & FD @ 1.7; E LEG OF TUNNEL FRM (F.2) TO 92.5` SE OF (B); W LEG OF TUNNEL FROM (14) TO S.P. @ (16.6); FROM (16.6) TO NE END NEAR BLDG E(H) [VISUAL OK] & BLDG "A" SEE BELOW
Rough Framing Inspection - Commercial Not Ready 06/30/2004
Correction
Corrective Action Required
06/30/2004
C.I.P. CONC WALL E LEG OF TUNNEL @ ASC N WALL TO E16`; S WALL E56 TO E96; N WALL E56 TO E96; N WALL E96 TO E136; S WALL E96 TO E136; N WALL E15 TO E56; N WALL E136 TO E176; N WALL E176 TO E216; S WALL E136 TO E176; S WALL E15 TO E56; S WALL E176 TO E216 NOT READY FROM E WALL OF N LEG
Footing Inspection - Commercial Partial 07/01/2004
Correction
Resolved
07/01/2004
BASE SLAB @ TUNNEL EAST LEG E56 TO E96; E96 TO E136; E176 TO ~E212; E136 TO E176; E15 TO E56; E136 TO E176; FROM E FACE OF N LEG
Correction
Partial Correction
07/01/2004
BASE SLAB @ TUNNEL WEST LEG W173 TO W213; OK TO POUR WHEN READY FROM W FACE OF NORTH LEG
Rough Framing Inspection - Commercial Partial 07/01/2004
Correction
Partial Correction
07/01/2004
C.I.P. CONC WALL E LEG OF TUNNEL @ ASC N WALL TO E16`; S WALL E56 TO E96; N WALL E56 TO E96; N WALL E96 TO E136; S WALL E96 TO E136; N WALL E15 TO E56; N WALL E136 TO E176; N WALL E176 TO E216; S WALL E136 TO E176; S WALL E15 TO E56; S WALL E176 TO E216; OK TO POUR WHEN READY FROM E WALL OF N LEG
Rough Framing Inspection - Commercial Partial 07/02/2004
Correction
Partial Correction
07/02/2004
C.I.P. CONC WALL E LEG OF TUNNEL @ ASC N WALL TO E16`; S WALL E56 TO E96; N WALL E56 TO E96; N WALL E96 TO E136; S WALL E96 TO E136; N WALL E15 TO E56; N WALL E136 TO E176; N WALL E176 TO E216; S WALL E136 TO E176; S WALL E15 TO E56; S WALL E176 TO E216; S WALL @ S END OF N LEG + E TO E15; OK TO POUR WHEN READY FROM E WALL OF N LEG
Correction
Partial Correction
07/02/2004
C.I.P. CONC WALL - W LEG OF TUNNEL EXT TO W 4`; FROM W FACE OF N LEG OK TO POUR WHEN READY
Suspended Slab Inspection Partial 07/06/2004
Correction
Partial Correction
07/06/2004
TOP SLAB - NORTH LEG OF TUNNEL 0 - S40; S40 - S80; S80 - S120; 0 + 120' TO 0 + 148`; OK TO POUR WHEN READY REFERENCED FROM NORTH END
Rough Framing Inspection - Commercial Partial 07/08/2004
Correction
Partial Correction
07/08/2004
C.I.P. CONC WALL - W LEG OF TUNNEL EXT BOTH WALLS TO W 4` OF N LEG; W WALL W253 - W213; W WALL W173 - W133; FROM W FACE OF N LEG OK TO POUR WHEN READY
Suspended Slab Inspection Partial 07/08/2004
Correction
Partial Correction
07/08/2004
TOP SLAB - NORTH LEG OF TUNNEL 0 - S40; S40 - S80; S80 - S120; 0 + 120' TO 0 + 148`; 0 + 148' TO 0 + 188`; OK TO POUR WHEN READY REFERENCED FROM NORTH END
Rough Framing Inspection - Commercial Partial 07/09/2004
Correction
Partial Correction
07/10/2004
C.I.P. CONC WALL - W LEG OF TUNNEL EXT BOTH WALLS TO W 4` OF N LEG; W WALL W253 - W213; W WALL W173 - W133; W WALL W173 - W213; E WALL W253 - W213; OK TO POUR WHEN READY FROM W FACE OF N LEG
Footing Inspection - Commercial Partial 07/09/2004
Correction
Partial Correction
07/10/2004
BASE SLAB @ TUNNEL WEST LEG W173 TO W213; W93 TO W133; W4 TO W39; W39 TO W93; OK TO POUR WHEN READY FROM W FACE OF NORTH LEG
Suspended Slab Inspection Partial 07/10/2004
Correction
Partial Correction
07/10/2004
TOP SLAB - NORTH LEG OF TUNNEL 0 - S40; S40 - S80; S80 - S120; 0 + 120' TO 0 + 148`; 0 + 148' TO 0 + 188`; S TO E:(4.8); OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 07/12/2004
Correction
Resolved
07/12/2004
C.I.P. CONC WALL E LEG OF TUNNEL @ ASC N WALL TO E16`; S WALL E56 TO E96; N WALL E56 TO E96; N WALL E96 TO E136; S WALL E96 TO E136; N WALL E15 TO E56; N WALL E136 TO E176; N WALL E176 TO E216; S WALL E136 TO E176; S WALL E15 TO E56; S WALL E176 TO E216; S WALL @ S END OF N LEG + E TO E15; FROM E WALL OF N LEG
Correction
Partial Correction
07/12/2004
C.I.P. CONC WALL - W LEG OF TUNNEL EXT BOTH WALLS TO W 4` OF N LEG; W WALL W253 - W213; W WALL W173 - W133; W WALL W173 - W213; E WALL W253 - W213; E WALL W173 - W213; OK TO POUR WHEN READY FROM W FACE OF N LEG
Rough Framing Inspection - Commercial Partial 07/13/2004
Correction
Partial Correction
07/13/2004
C.I.P. CONC WALL - W LEG OF TUNNEL EXT BOTH WALLS TO W 4` OF N LEG; W WALL W253 - W213; W WALL W173 - W133; W WALL W173 - W213; E WALL W253 - W213; E WALL W173 - W213; W WALL W4 - W39; OK TO POUR WHEN READY FROM W FACE OF N LEG
Rough Framing Inspection - Commercial Partial 07/14/2004
Correction
Partial Correction
07/14/2004
C.I.P. CONC WALL - W LEG OF TUNNEL EXT BOTH WALLS TO W 4` OF N LEG; W WALL W253 - W213; W WALL W173 - W133; W WALL W173 - W213; E WALL W253 - W213; E WALL W173 - W213; W WALL W4 - W39; W WALL W39 - W65; W WALL W95 - W140; OK TO POUR WHEN READY FROM W FACE OF N LEG
Rough Framing Inspection - Commercial Partial 07/15/2004
Correction
Partial Correction
07/15/2004
C.I.P. CONC WALL - W LEG OF TUNNEL EXT BOTH WALLS TO W 4` OF N LEG; W WALL W253 - W213; W WALL W173 - W133; W WALL W173 - W213; E WALL W253 - W213; E WALL W173 - W213; W WALL W4 - W39; W WALL W39 - W65; W WALL W95 - W140; W WALL W65 - W95 TO COMPLETE W WALL; OK TO POUR WHEN READY FROM W FACE OF N LEG
Rough Framing Inspection - Commercial Partial 07/16/2004
Correction
Partial Correction
07/16/2004
C.I.P. CONC WALL - W LEG OF TUNNEL EXT BOTH WALLS TO W 4` OF N LEG; W WALL COMPLETE TO W 253; E WALL W253 - W213; E WALL W173 - W213; E WALL W100 - W132; OK TO POUR WHEN READY FROM W FACE OF N LEG
Rough Framing Inspection - Commercial Partial 07/19/2004
Correction
Partial Correction
07/19/2004
C.I.P. CONC WALL - W LEG OF TUNNEL EXT BOTH WALLS TO W 4` OF N LEG; W WALL COMPLETE TO W 253; E WALL W253 - W213; E WALL W173 - W213; E WALL W100 - W132; E WALL W132 - W93; OK TO POUR WHEN READY FROM W FACE OF N LEG
Suspended Slab Inspection Partial 07/19/2004
Correction
Partial Correction
07/19/2004
TOP SLAB - NORTH LEG OF TUNNEL 0 - S40; S40 - S80; S80 - S120; 0 + 120' TO 0 + 148`; 0 + 148' TO 0 + 188`; S TO E:(4.8); 0 + 188' TO 0 + 228`; REFERENCED FROM NORTH END OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 07/20/2004
Correction
Partial Correction
07/20/2004
C.I.P. CONC WALL - W LEG OF TUNNEL EXT BOTH WALLS TO W 4` OF N LEG; W WALL COMPLETE TO W 253; E WALL W253 - W213; E WALL W173 - W213; E WALL W100 - W132; E WALL W132 - W93; E WALL W4 - W43; OK TO POUR WHEN READY FROM W FACE OF N LEG
Suspended Slab Inspection Partial 07/20/2004
Correction
Resolved
07/20/2004
TOP SLAB - NORTH LEG OF TUNNEL S80 - S120; 0 + 120' TO 0 + 148`; 0 + 148' TO 0 + 188`; S TO E:(4.8); 0 + 188' TO 0 + 228`; REFERENCED FROM NORTH END 0 - S40; S40 - S80;
Correction
Partial Correction
07/20/2004
TOP SLAB - EAST LEG OF TUNNEL E16 - E56; REFERENCED FROM EAST FACE OF NORTH LEG
Rough Framing Inspection - Commercial Partial 07/22/2004
Correction
Resolved
07/22/2004
C.I.P. CONC WALL - W LEG OF TUNNEL EXT BOTH WALLS TO W 4` OF N LEG; W WALL COMPLETE TO W 253; E WALL W253 - W213; E WALL W173 - W213; E WALL W100 - W132; E WALL W132 - W93; E WALL W4 - W43; E WALL W43 - W65 TO COMPLETE E WALL OK TO POUR WHEN READY FROM W FACE OF N LEG
Suspended Slab Inspection Partial 07/22/2004
Correction
Partial Correction
07/22/2004
TOP SLAB - EAST LEG OF TUNNEL E16 - E56; E56 E96; REFERENCED FROM EAST FACE OF NORTH LEG
Suspended Slab Inspection Partial 07/26/2004
Correction
Partial Correction
07/26/2004
TOP SLAB - EAST LEG OF TUNNEL E16 - E56; E56 - E96; E96 - E136; REFERENCED FROM EAST FACE OF NORTH LEG
Suspended Slab Inspection Partial 07/27/2004
Correction
Partial Correction
07/27/2004
TOP SLAB - EAST LEG OF TUNNEL E16 - E56; E56 - E96; E96 - E136; E136 - E176; REFERENCED FROM EAST FACE OF NORTH LEG
Suspended Slab Inspection Partial 07/28/2004
Correction
Partial Correction
07/28/2004
TOP SLAB - W LEG OF TUNNEL OK TO POUR WHEN READY: W124 - 164; W204 - 244; REFERENCED FROM WEST FACE OF NORTH LEG
Suspended Slab Inspection Partial 07/29/2004
Correction
Partial Correction
07/29/2004
TOP SLAB - W LEG OF TUNNEL OK TO POUR WHEN READY: W124 - 164; W204 - 244; W164 - 204; REFERENCED FROM WEST FACE OF NORTH LEG
Suspended Slab Inspection Partial 08/03/2004
Correction
Partial Correction
08/03/2004
TOP SLAB - W LEG OF TUNNEL OK TO POUR WHEN READY: W124 - 164; W204 - 244; W164 - 204; W 80 - 124; W20 - 54; REFERENCED FROM WEST FACE OF NORTH LEG
Underslab Plumbing Inspection - Commercial Partial 08/04/2004
Correction
Resolved
08/04/2004
C.I. DWV PIPING UNDER BASE SLAB @ ASC & BLDG "A"
Correction
Partial Correction
08/04/2004
C.I. DWV PIPING & PLMBG STRUCTURES UNDER BASE SLAB @ FINAL SECTION OF TUNNEL FRM N/NW124 @ SUMP PIT - 240 VISUAL OK; LIMITS REFERENCED FROM ORIGINAL "0" @ NE CORNER
Suspended Slab Inspection Partial 08/04/2004
Correction
Partial Correction
08/04/2004
TOP SLAB - W LEG OF TUNNEL OK TO POUR WHEN READY: W124 - 164; W204 - 244; W164 - 204; W 80 - 124; W20 - 54; W54 - 80; REFERENCED FROM WEST FACE OF NORTH LEG
Suspended Slab Inspection Partial 08/05/2004
Correction
Resolved
08/05/2004
TOP SLAB - W LEG OF TUNNEL OK TO POUR WHEN READY: W124 - 164; W204 - 244; W164 - 204; W 80 - 124; W20 - 54; W54 - 80; SLAB "T" SECTION @ INTERSECTION OF N, W, & E LEGS OF TUNNEL EXT TO COMPLETE N & W LEGS REFERENCED FROM WEST FACE OF NORTH LEG
Footing Inspection - Commercial Partial 08/06/2004
Correction
Partial Correction
08/06/2004
BASE SLAB @ FINAL(NE) SECTION OF TUNNEL OK TO POUR WHEN READY: 200 - 240; LIMITS REFERENCED FROM ORIGINAL ZERO @ N.E. CRNR
Footing Inspection - Commercial Partial 08/09/2004
Correction
Partial Correction
08/09/2004
BASE SLAB @ FINAL(NE) SECTION OF TUNNEL OK TO POUR WHEN READY: 200 - 240; 240 - 280; LIMITS REFERENCED FROM ORIGINAL ZERO @ N.E. CRNR
Footing Inspection - Commercial Partial 08/10/2004
Correction
Partial Correction
08/10/2004
BASE SLAB @ FINAL(NE) SECTION OF TUNNEL OK TO POUR WHEN READY: 200 - 240; 240 - 280; 160 - 200; LIMITS REFERENCED FROM ORIGINAL ZERO @ N.E. CRNR
Rough Framing Inspection - Commercial Partial 08/11/2004
Correction
Partial Correction
08/11/2004
C.I.P. CONCRETE WALLS - FINAL(NE) SECTION OF TUNNEL REF FROM INITIAL TUNNEL "0": S WALL 200 - 240; N WALL 240 - 280; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 08/12/2004
Correction
Partial Correction
08/12/2004
C.I.P. CONCRETE WALLS - FINAL(NE) SECTION OF TUNNEL REF FROM INITIAL TUNNEL "0": S WALL 200 - 240; N WALL 240 - 280; S WALL 240 - 280; N WALL 200 - 240; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Footing Inspection - Commercial Partial 08/13/2004
Correction
Resolved
08/13/2004
BASE SLAB @ TUNNEL WEST LEG W173 TO W213; W93 TO W133; W4 TO W39; W39 TO W93;
Correction
Partial Correction
08/13/2004
BASE SLAB @ FINAL(NE) SECTION OF TUNNEL OK TO POUR WHEN READY: 200 - 240; 240 - 280; 160 - 200; 100 - 160; LIMITS REFERENCED FROM ORIGINAL ZERO @ N.E. CRNR
Rough Framing Inspection - Commercial Partial 08/13/2004
Correction
Partial Correction
08/13/2004
C.I.P. CONCRETE WALLS - FINAL(NE) SECTION OF TUNNEL REF FROM INITIAL TUNNEL "0": S WALL 200 - 240; N WALL 240 - 280; S WALL 240 - 280; N WALL 200 - 240; N WALL 160 - 200; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Footing Inspection - Commercial Partial 08/16/2004
Correction
Partial Correction
08/16/2004
BASE SLAB @ FINAL(NE) SECTION OF TUNNEL OK TO POUR WHEN READY: 200 - 240; 240 - 280; 160 - 200; 120 - 160; 120 - 80; LIMITS REFERENCED FROM ORIGINAL ZERO @ N.E. CRNR
Rough Framing Inspection - Commercial Partial 08/18/2004
Correction
Partial Correction
08/18/2004
C.I.P. CONCRETE WALLS - FINAL(NE) SECTION OF TUNNEL REF FROM INITIAL TUNNEL "0": S WALL 200 - 240; N WALL 240 - 280; S WALL 240 - 280; N WALL 200 - 240; N WALL 160 - 200; N WALL 160 - 120; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 08/19/2004
Correction
Partial Correction
08/19/2004
C.I.P. CONCRETE WALLS - FINAL(NE) SECTION OF TUNNEL REF FROM INITIAL TUNNEL "0": S WALL 200 - 240; N WALL 240 - 280; S WALL 240 - 280; N WALL 200 - 240; N WALL 160 - 200; N WALL 160 - 120; S WALL 160 - 120; COMPLETE WATERSTOP PREP @ N WALL 120 - 80; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Rough Framing Inspection - Commercial Partial 08/20/2004
Correction
Partial Correction
08/20/2004
C.I.P. CONCRETE WALLS - FINAL(NE) SECTION OF TUNNEL REF FROM INITIAL TUNNEL "0": S WALL 200 - 240; N WALL 240 - 280; S WALL 240 - 280; N WALL 200 - 240; N WALL 160 - 200; N WALL 160 - 120; S WALL 160 - 120; N WALL 120 - 80; S WALL 120 - 80; ENSURE RE-BAR COVERAGE OK TO POUR WHEN READY
Suspended Slab Inspection Partial 08/30/2004
Correction
Resolved
08/30/2004
TOP SLAB - NORTH LEG OF TUNNEL
Correction
Partial Correction
08/30/2004
TOP SLAB - EAST LEG OF TUNNEL E16 - E56; E56 - E96; E96 - E136; E136 - E176; E176 - E216; REFERENCED FROM EAST FACE OF NORTH LEG
Correction
Resolved
08/30/2004
TOP SLAB - W LEG OF TUNNEL
Suspended Slab Inspection Partial 08/31/2004
Correction
Partial Correction
08/31/2004
TOP SLAB - EAST LEG OF TUNNEL E16 - E56; E56 - E96; E96 - E136; E136 - E176; E176 - E216; E216 - E256; REFERENCED FROM EAST FACE OF NORTH LEG
Suspended Slab Inspection Partial 09/01/2004
Correction
Partial Correction
09/01/2004
TOP SLAB - EAST LEG OF TUNNEL E16 - E56; E56 - E96; E96 - E136; E136 - E176; E176 - E216; E216 - E256; E256 - E296; REFERENCED FROM EAST FACE OF NORTH LEG
Rough Framing Inspection - Commercial Partial 09/03/2004
Correction
Resolved
09/03/2004
None SHEET S7.0 EAST - WEST LINE OF NORTH TUNNEL WALL.
Footing Inspection - Commercial Partial 09/08/2004
Correction
Partial Correction
09/08/2004
BASE SLAB @ FINAL(NE) SECTION OF TUNNEL OK TO POUR WHEN READY: 200 - 240; 240 - 280; 160 - 200; 120 - 160; 120 - 80; 80 - 40; LIMITS REFERENCED FROM ORIGINAL ZERO @ N.E. CRNR
Footing Inspection - Commercial Passed 09/09/2004
Correction
Resolved
09/09/2004
BASE SLAB @ FINAL(NE) SECTION OF TUNNEL OK TO POUR WHEN READY: 200 - 240; 240 - 280; 160 - 200; 120 - 160; 120 - 80; 80 - 40; 40 - 0 LIMITS REFERENCED FROM ORIGINAL ZERO @ N.E. CRNR
Footing Inspection - Commercial Passed 09/14/2004
Correction
Resolved
09/14/2004
BASE SLAB @ TUNNEL WEST LEG W173 TO W213; W93 TO W133; W4 TO W39; W39 TO W93; TIE-IN TO BLDG A
Rough Framing Inspection - Commercial Passed 09/14/2004
Correction
Resolved
09/14/2004
PLACEMENT OF WATER STOP
Correction
Resolved
09/14/2004
C.I.P. CONCRETE WALLS - FINAL(NE) SECTION OF TUNNEL REF FROM INITIAL TUNNEL "0": S WALL 200 - 240; N WALL 240 - 280; S WALL 240 - 280; N WALL 200 - 240; N WALL 160 - 200; N WALL 160 - 120; S WALL 160 - 120; N WALL 120 - 80; S WALL 120 - 80; FINAL CONNECTION OF WALLS TO ORIGINAL "0"
Correction
Resolved
09/14/2004
None
Suspended Slab Inspection Partial 09/17/2004
Correction
Partial Correction
09/17/2004
TOP SLAB - EAST LEG OF TUNNEL E16 - E56; E56 - E96; E96 - E136; E136 - E176; E176 - E216; E216 - E256; E256 - E296; E296 - 346; REFERENCED FROM EAST FACE OF NORTH LEG
Suspended Slab Inspection Partial 09/20/2004
Correction
Partial Correction
09/20/2004
TOP SLAB - EAST LEG OF TUNNEL 0 TO NW35'; REFERENCED FROM ORIGINAL TUNNEL CONSTRUCTION "0"
Suspended Slab Inspection Partial 09/21/2004
Correction
Partial Correction
09/21/2004
TOP SLAB - EAST LEG OF TUNNEL OK TO POUR WHEN READY: 0 TO NW35'; 35' TO NW75'; REFERENCED FROM ORIGINAL TUNNEL CONSTRUCTION "0"
Suspended Slab Inspection Passed 09/22/2004
Correction
Resolved
09/22/2004
TOP SLAB - EAST LEG OF TUNNEL OK TO POUR WHEN READY: 0 TO NW35'; 35' TO NW75'; 75' TO NW95'; REFERENCED FROM ORIGINAL TUNNEL CONSTRUCTION "0"
Correction
Resolved
09/22/2004
TOP SLAB - W LEG OF TUNNEL FINAL SECTION @ TIE-IN TO BLDG PHASE ALT "A"
Suspended Slab Inspection Partial 09/23/2004
Correction
Partial Correction
09/23/2004
TOP SLAB - EAST LEG OF TUNNEL OK TO POUR WHEN READY: 0 TO NW35'; 35' TO NW75'; 75' TO NW95'; 115' TO NW155'; REFERENCED FROM ORIGINAL TUNNEL CONSTRUCTION "0"
Suspended Slab Inspection Partial 09/30/2004
Correction
Partial Correction
09/30/2004
REMOVABLE TOP SLAB PANELS OK TO POUR WHEN READY NUMBERED FROM EAST #2 & #4 OF 4
Suspended Slab Inspection Passed 10/04/2004
Correction
Resolved
10/04/2004
TOP SLAB - EAST LEG OF TUNNEL
Correction
Resolved
10/04/2004
TOP SLAB - W LEG OF TUNNEL
Correction
Resolved
10/04/2004
REMOVABLE TOP SLAB PANELS #2; #4; #1; #3 OF 4 NUMBERED FROM EAST OK TO POUR WHEN READY
Final Inspection - Commercial Passed 10/05/2004
Correction
Resolved
10/05/2004
CLOSE PERMIT
Underslab Plumbing Inspection - Commercial Passed 10/05/2004
Correction
Resolved
10/05/2004
C.I. DWV PIPING UNDER BASE SLAB @ ASC
Correction
Resolved
10/05/2004
C.I. DWV PIPING & PLMBG STRUCTURES UNDER BASE SLAB @ FINAL SECTION OF TUNNEL
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home