Permit Application Status

B0400661


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
B0400661
Building Permit - Commercial
Certificate of Occupancy
PREMIERLIFE REAL ESTATE HOLDING
NEW COMMERCIAL
FULL BUILDING PERMIT
04/20/2004
07/27/2004
01/23/2005
05/25/2005
Locations
Contacts
THE WEITZ COMPANY, Address:9900 W 109TH ST STE 230  
GASTINGER WALKER HARDEN ARCHITECTS, Address:817 WYANDOTTE  
PREMIERLIFE REAL ESTATE HOLDING, Address:400 NW MURRAY RD  
ETHAN D COLEMAN TRUST DTD MARCH 4 2020, Address:10491 FILED CT  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 10/17/2004 10/29/2010
Correction

CA - The disposal of demolition waste is regulated by the Department of Natural Resources under Chapter 260 RSMO. Such waste, in types and quantities established by the department, shall be taken to a demolition landfill or a sanitary landfill for disposal.
Correction

CA - Erosion control devices shall be installed and maintained throughout the construction process in accordance with the City of Lee's Summit Design and Construction Manual. Failure to install or maintain erosion control devices may result in inspections not being performed, stop work orders being issued or court charges/action may be taken.
Correction

CA - No merchandise, stock, interior furnishings or supplies shall be placed in this facility without approval from the City of Lee's Summit.
Correction

CA - Each structure shall have the address of that structure visibly posted on the jobsite throughtout the construction process.
Correction

CA - A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Correction

CA - The occupancy and or final inspection shall be scheduled with the Codes Administration Department and requires a minimum of two (2) working days notice. Codes Administration will contact the appropriate city departments and will notify the applicant of the date and time the inspection will be performed.
Correction

CA - 2000 IBC 1109.1 - Required accessible elements shall be identified by the International Symbol of Accessiblity at the locations listed in Section 1109.1. 1. Not applicable as the zoning ordinance is more restrictive. 2. Accessible passenger loading zones. 3. Accessible areas of refuge required by Section 1103.2.13.5. 4. Accessible rooms where multi single-user toilet or bathing rooms are clustered at a single location. 5. Accessible entrances where not all entrances are accessible. 6. Accessible check-out aisles where not all aisles are accessible. The sign, where provided, shall be above the check-out aisle in the same location as the check-out aisle number or type of check-out identification. 7. Unisex toilet and bathing rooms. 8. Accessible dressing, fitting, and locker rooms where not all such rooms are accessible.
Correction

CA - 2000 IBC 2406.1 - Human impact loads. Individual glazed areas, including glass mirrors, in hazardous locations as devined in Section 2406.2 shall pass the test requirements of CPSC 16 CFR 1201, listed in Chapter 35. Glazing shall comply with the CSPC 16 CFR, Part 1201 criteria for Category I or Category II as indicated in Table 2406.1.
Correction

Fire Department: Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the code official is authorized to require a key box to be installed in an accessible location. The key box shall be of an approved type and shall contain keys to gain access as required by the code official.
Correction

Fire Department. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. The plans and specifications shall bear a State of Missouri licensed engineers seal. This includes fire sprinkler systems, grease hood and duct suppression systems as well as other fire suppression system.
Correction

Fire Department: Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service main and all other fire protection systems and appurteances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the code official. The code official shall be notified before any required acceptance testing. NOTE: Acceptance testing shall be scheduled at least 48 hours in advance by calling (816) 969-7343.
Correction

Fire Department; Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Documents shall bear a State of Missouri architect/engineers seal..Construction documents shall include, but not be limited to, all of the following: 1. A floor plan. 2. Locations of alarm-initiating and notification appli- ances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing informa- tion for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Correction

CA - 2000 IMC 403.3 - Ventilation systems shall be designed to have the capacity to supply the minimum outdoor airflow rate determined in accordance with Table 403.3 based on the occupancy of the space and the occupant load or other perameter as stated therein. The occupant load utilized for design of the ventilation system shall not be less then the number determined from the estimated maximum occupant load rate indicated in Table 403.3. Ventilation rates for occupancies not represented in Table 403.3 shall be determined by an approved engineering analysis. The ventilation system shall be designed to supply the required rate of ventilation air continuously during the period the building is occupied, except as otherwise stated in other provisions of the code.
Correction

CA - LSCO Chapter7, Section 117 - Materials, equipment, and devices approved by the building official shall be constructed and installed in accordance with such approval.
Correction

CA - LSCO 7-134 - Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. Permits for exterior work, i.e., walls, fences, decks, patios, patio covers and similar type work requiring permits, as well as permits for residential room additions and remodels shall be limited to 180 days duration. Permits for other new construction shall be limited to one-year duration. The building official official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each.
Correction

CA - LSCO 7-162 - It shall be the duty of the holder of the permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by this code. Inspection requests shall be made in advance and in accordance with the most current written policies of the Codes Administration Department.
Correction

CA - LSCO7-168 - The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid.
Correction

P & D - Sign permits must be obtained for all signs prior to installation. All signs shall comply with the sign requirements outlined in the UDO, Article 13.
Correction

CA - ANSI A117.1-1998 404.2.7 - Door Hardware. Handles, pulls, latches, locks, and other operable parts on accessible doors shall have a shape that is easy to grasp with one hand and does not require tight grasping, pinching, or twisting of the wrist to operate. Such hardware shall be 34 inches minimum and 48 inches maximum above the floor or ground. Where sliding doors are in the fully open position, operating hardware shall be exposed and usable from both sides.
Correction

CA - Manufactures information on the Structural Insulated panels was not included with the permit application.
Correction

CA - The Final Development Plan must be approved prior to issuing full building permits.
Correction

CA - 2000 IBC 1003.2.10 - Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visable to the occupants. Exit sign placement shall be such that no point in an exit access corridor is more than 100 feet from the nearest visible exit sign.
Correction

CA - 2000 IBC 1003.3.1.2 - Door swing. Doors shall swing in the direction of egress travel where serving an occupant load of 50 or more persons or a high-hazard occupancy.
Correction

CA - 2000 IBC 1003.2.11.2 - Illumination emergency power. The power supply for means of egress illumination shall normally be provided by the premise's electrical supply. In the event of power supply failure, an emergency system shall automatically illuminate all of the follow areas: 1. Exit access corridors, passageways, and aisles in rooms and spaces which require two or more means of egress. 2. Exit access corridors and exit stairways located in buildings required to have two or more exits. 3. Interior exit discharge elements, as permitted in Section 1006.1, in buildings required to have two or more exits. 4. The portion of the exterior exit discharge immediately adjacent to exit discharge doorways in buildings required to have two or more exits.
Correction

Fire Department; New and existing buildings shall have approved address numbers, building numbers, placed in a position to be plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background.
Correction

Fire Department; Portable fire extinguishers shall be installed in occupancies and locations as set forth in the IFC Sec. 906 and as required by the Code Offical. Fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Correction

Fire Department- 907.12 Duct smoke detectors. Duct smoke detectors shall be connected to the building’s fire alarm control panel when a fire alarm system is provided. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. 3. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble.
Correction

CA - 1999 NEC 250-104(b) - Metal gas piping. Each aboveground portion of a gas piping system upstream from the equipment shutoff valve shall be electrically continuous and bonded to the grounding electrode system.
Correction

A note should be provided indicating a Reduce Pressure Zone (RPZ) principal backflow prevention device will be placed inside the building on the domestic water service line prior to any point of use.
Correction

A double check detector check valve assembly is required on the fire service line.
Correction

All backflow prevention assemblies must be tested and reports filed with the Lee's Summit Water Utilities Backflow Division (816-969-7636) within 30 days from the date installed.
Correction

Backflow prevention assembly must be located in an accessible location, min. 12" from floor, min. 6" from wall, max. 48" from floor.
Correction

CA - 1999 NEC 250-104(a) - Metal water piping. The interior metal water piping system shall be bonded as required in (1), (2), (3), or (4) of this section. The bonding jumper shall be installed in accordance with Section 250-64(a), (b), and (e). The points of attachment of the bonding jumper(s) shall be accessible.
Fees
Paid Fees Amount Paid Owing Date Paid
24 BLDG Permit Fees $2,552.00 $2,552.00 Paid 07/27/2004
24 BLDG Plan Check Fees $62.50 $62.50 Paid 07/27/2004
25 Electrical Permit Fee $374.86 $374.86 Paid 07/27/2004
25 Mechanical Permit Fees $54.50 $54.50 Paid 07/27/2004
25 Plumbing Permit Fees $80.00 $80.00 Paid 07/27/2004
84 Water Meters $625.00 $625.00 Paid 07/27/2004
85 Water Taps $13,670.00 $13,670.00 Paid 07/27/2004
89 Sewer Tap Fees $420.00 $420.00 Paid 07/27/2004
24 BLDG Permit Fees ($2,552.00) ($2,552.00) $0.00 N/A
24 BLDG Plan Check Fees ($62.50) ($62.50) $0.00 N/A
25 Electrical Permit Fee ($374.86) ($374.86) $0.00 N/A
25 Mechanical Permit Fees ($54.50) ($54.50) $0.00 N/A
25 Plumbing Permit Fees ($80.00) ($80.00) $0.00 N/A
84 Water Meters ($625.00) ($625.00) $0.00 N/A
85 Water Taps ($13,670.00) ($13,670.00) $0.00 N/A
89 Sewer Tap Fees ($420.00) ($420.00) $0.00 N/A
24 BLDG Permit Fees $2,551.50 $2,551.50 Paid 07/27/2004
24 BLDG Plan Check Fees $62.50 $62.50 Paid 07/27/2004
25 Electrical Permit Fee $374.86 $374.86 Paid 07/27/2004
25 Mechanical Permit Fees $54.50 $54.50 Paid 07/27/2004
25 Plumbing Permit Fees $80.00 $80.00 Paid 07/27/2004
84 Water Meters $625.00 $625.00 Paid 07/27/2004
85 Water Taps $13,670.00 $13,670.00 Paid 07/27/2004
89 Sewer Tap Fees $420.00 $420.00 Paid 07/27/2004
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Partial 07/28/2004
Correction
Partial Correction
07/28/2004
TEMPORARY ELECTRICAL SERVICE INSTALLATION RELEASE TEMPORARY SERVICE
Water Service Inspection Failed 07/28/2004
Correction
Partial Correction
07/28/2004
INITIAL PARTIAL WATER SERVICE INSTALL PERMIT DRAWINGS NOT ON SITE. WORKMANSHIP & MATERIAL OK. COVER AT RISK. TAP COMPLETED METER INSTALLED
Water Service Inspection - Commercial Request Complete 7/28/2004 7/28/2004 07/28/2004
Foundation Inspection - Commercial Partial 08/02/2004
Correction
Partial Correction
08/02/2004
FOUNDATION WALL OK TO POUR WHEN READY: N WALL + N 40` OF E & W WALLS; CLEAN BOTTOM B4 POUR ENSURE RE-BAR COVERAGE
Underground Plumbing Inspection - Commercial Partial 09/03/2004
Correction
Partial Correction
09/03/2004
None UNDERSLAB PLUMBING APPROVED FOR STORM DRAIN FROM RISER TO ABOUT 5' OUT FROM FOUNDATION.
Sewer Service Inspection Passed 09/03/2004
Correction
Resolved
09/03/2004
None SEWER APPROVED
Underground Plumbing Inspection - Commercial Request Complete 9/2/2004 9/3/2004 09/03/2004
Underslab Electrical Inspection - Commercial Passed 09/09/2004
Correction
Resolved
09/09/2004
UNDER-FLOOR ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP OK TO COVER WHEN READY
Driveway Inspection Passed 10/19/2004
All Rough Inspection - Commercial Partial 10/20/2004
Correction
Partial Correction
10/20/2004
PRESSURE TEST OF DWV TOP ROUGH & ROOF DRAIN STACK NO LEAKS OBSERVED
Driveway Inspection Passed 10/26/2004
All Rough Inspection - Commercial Failed 12/02/2004
Correction
Corrective Action Required
12/02/2004
WALL FRAMING + IN-WALL SYSTEMS ROUGH BOTTOM TRACKS. COMPLETE ENCLOSING BUILDING BEFORE HANGING GWB. PROTECT PVC PIPE WHERE < 1-1/2" FROM FACE OF
Correction
Resolved
12/02/2004
PRESSURE TEST OF DWV TOP ROUGH & ROOF DRAIN STACK
Electrical Service Inspection Passed 12/21/2004
Correction
Resolved
12/21/2004
TEMPORARY ELECTRICAL SERVICE INSTALLATION
Correction
Resolved
12/21/2004
ELECTRICAL SERVICE INSTALLATION 400 AMP RELEASE SERVICE
All Rough Inspection - Commercial Passed 12/21/2004
Correction
Resolved
12/21/2004
WALL FRAMING + IN-WALL SYSTEMS ROUGH
Gas Service Inspection - Commercial Passed 12/29/2004
Gas Piping Inspection - Commercial Passed 12/29/2004
Sidewalk Inspection Passed 01/27/2005
Above Ceiling Inspection Failed 02/11/2005
Correction
Corrective Action Required
02/11/2005
CABLE & JUNCTION BOXES 1- SUPPORT CONDUIT WHIPS OUT OF J-BOXES 12" FROM BOX. 2- PROVIDE VERIFICATION THAT ALL LOW VOLTAGE WIRING IS PLENUM RATED.
Above Ceiling Inspection Passed 02/14/2005
Correction
Resolved
02/14/2005
CABLE & JUNCTION BOXES
Underground Plumbing Inspection - Commercial Passed 02/18/2005
Correction
Resolved
02/18/2005
None
Foundation Inspection - Commercial Passed 02/18/2005
Correction
Resolved
02/18/2005
FOUNDATION WALL
Water Service Inspection Passed 02/18/2005
Correction
Resolved
02/18/2005
INITIAL PARTIAL WATER SERVICE INSTALL
Occupancy Inspection - Codes Commercial Failed 02/18/2005
Correction
Corrective Action Required
02/18/2005
OCCUPANCY APPROVAL STATUS IBC 110.1: UNTIL APPROVED DO NOT OCCUPY OR PLACE PERSONAL PROPERTY
Correction
Corrective Action Required
02/18/2005
ROOFTOP INSPECTION PROVIDE LADDER FOR ACCESS
Correction
Corrective Action Required
02/18/2005
SAN SEWER CLEANOUT RISER NOT SET TO GRADE
Correction
Corrective Action Required
02/18/2005
EXTERIOR CAULKING/SEALANTS/GROUTING INCOMPLETE
Correction
Corrective Action Required
02/18/2005
H/C RESTROOM SIGNS NOT MOUNTED
Correction
Corrective Action Required
02/18/2005
PREMISES ADDRESS NOT DISPLAYED
Correction
Corrective Action Required
02/18/2005
ELECT RECEPT RIGHT OF SINK IN ROOM 114 NOT GFCI PROTECTED
Correction
Corrective Action Required
02/18/2005
RECEPTACLE LEFT OF SINK @ ROOM 115 NOT GFCI PROTECTED NOT SINGLE RECEPT
Correction
Corrective Action Required
02/18/2005
GWB CUTOUT AROUND ELECT RECEPT SE ENTRANCE ROOM GAP > 1/8"
Correction
Corrective Action Required
02/18/2005
Receive Water Utilities Approval
Correction
Corrective Action Required
02/18/2005
Receive Public Works Approval
Correction
Corrective Action Required
02/18/2005
Receive Planning & Development Approval
Correction
Corrective Action Required
02/18/2005
Receive Fire Department approval
Occupancy Inspection - Codes Commercial Failed 03/07/2005
Correction
Corrective Action Required
03/07/2005
Receive Planning & Development Approval @ 969-7381 COORDINATE W/ JENNIFER THOMPSON
Correction
Corrective Action Required
03/07/2005
Receive Public Works Approval COORDINATE W/ SHAWN GRAFF
Correction
Corrective Action Required
03/07/2005
Receive Water Utilities Approval FOR DOMESTIC WATER SERVICE LINE CONFIRM BACKFLOW TEST RESULTS SUBMITTED TO LSWU
Correction
Resolved
03/07/2005
GWB CUTOUT AROUND ELECT RECEPT
Correction
Resolved
03/07/2005
RECEPTACLE LEFT OF SINK @ ROOM 115
Correction
Resolved
03/07/2005
ELECT RECEPT RIGHT OF SINK IN ROOM 114
Correction
Resolved
03/07/2005
PREMISES ADDRESS
Correction
Resolved
03/07/2005
H/C RESTROOM SIGNS
Correction
Resolved
03/07/2005
EXTERIOR CAULKING/SEALANTS/GROUTING
Correction
Resolved
03/07/2005
SAN SEWER CLEANOUT RISER
Correction
Resolved
03/07/2005
ROOFTOP INSPECTION
Correction
Partial Correction
03/07/2005
OCCUPANCY APPROVAL STATUS IBC 110.1: NO PUBLIC UNTIL APPROVED OK TO STAFF & STOCK THROUGH 3/17/05
Correction
Corrective Action Required
03/07/2005
Receive Fire Department approval COORDINATE W/ NEIL ULLERY AT PHONE# PROVIDED
Occupancy Inspection - Codes Commercial Failed 03/10/2005
Correction
Resolved
03/10/2005
Receive Fire Department approval
Correction
Partial Correction
03/10/2005
OCCUPANCY APPROVAL STATUS SEE TEMPORARY OCCUPANCY
Occupancy Inspection - Codes Commercial Failed 05/09/2005
Correction
Resolved
05/09/2005
Receive Planning & Development Approval PER JENNIFER THOMPSON 5/9/05
Correction
Resolved
05/09/2005
Receive Water Utilities Approval NO ISSUES PRESENTED
Occupancy Inspection - Codes Commercial Failed 05/09/2005
Occupancy Inspection - Codes Commercial Passed 05/24/2005
Correction
Resolved
05/24/2005
Receive Public Works Approval PER SHAWN GRAFF 5/24/05
Correction
Resolved
05/24/2005
OCCUPANCY APPROVAL STATUS
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home